CN218623004U - Construction of woman's wall recess is pressed top and is whitewashed device - Google Patents

Construction of woman's wall recess is pressed top and is whitewashed device Download PDF

Info

Publication number
CN218623004U
CN218623004U CN202222104904.1U CN202222104904U CN218623004U CN 218623004 U CN218623004 U CN 218623004U CN 202222104904 U CN202222104904 U CN 202222104904U CN 218623004 U CN218623004 U CN 218623004U
Authority
CN
China
Prior art keywords
rod
positive
rotatably connected
short
handle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222104904.1U
Other languages
Chinese (zh)
Inventor
欧自珍
宋增明
高帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
Building Installation Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
Building Installation Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, Building Installation Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN202222104904.1U priority Critical patent/CN218623004U/en
Application granted granted Critical
Publication of CN218623004U publication Critical patent/CN218623004U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of whitewash the device, especially, be a device is whitewashed to basement recess construction coping, including handle and cylinder brush, the front end of handle is fixed with first cross, on the first cross, the lower extreme rotates and is connected with first positive quarter butt, the front end of first positive quarter butt rotates and is connected with first positive stock, the middle part of first positive stock rotates and is connected with second cross axle, the front end of first positive stock rotates and is connected with second positive stock, the middle part of second positive stock rotates and is connected with third cross axle, the front end of second positive stock rotates and is connected with second positive quarter butt, the front end of second positive quarter butt rotates and is connected with fourth cross axle, present whitewash device function singleness has been solved, can not adjust suitable length, satisfy the use of different operating personnel and different positions of whitewashing, and whitewash the device all adopt to carry by operating personnel to whitewash the material bucket and brush the mode of dipping in once, lead to the higher problem of intensity of labour.

Description

Construction of parapet wall recess is pressed and is pressed a whitewashed device
Technical Field
The utility model belongs to the technical field of whitewash the device, concretely relates to female wall groove construction bears down on one whitewashes device.
Background
Parapet is called pressing eaves wall again, is roofing and outer wall and links up a mode of handling, as a railing on the roof or a measure that the house appearance was handled, can prevent that personnel from dropping. The parapet is usually a wall which is newly built on the roof after the building is built, so that a connecting seam is easy to exist between the parapet and the roof, and when water is accumulated on rainy days or the roof, the accumulated water is easy to permeate into the connecting seam and permeate to the outer surface of the building body of the building through the connecting seam. At the moment, a waterproof coiled material needs to be laid, the waterproof coiled material needs to be fixed by a fixing pressing strip and sealing paste, and then the parapet wall is pressed and painted on the waterproof coiled material, the existing painting device is single in function, cannot be adjusted to be proper in length, and meets the requirements of different operators and different painting positions, and the painting device is painted in a way that the operator carries a painting bucket and brushes once, so that the labor intensity is high; in view of the problems that the prior painting device is exposed to during the use process, the painting device needs to be improved and optimized in structure.
SUMMERY OF THE UTILITY MODEL
For solving the above-mentioned problem that exists among the prior art, the utility model provides a female wall groove construction bears down on one whitewashes device has the length of nimble adjusting roller brush and fixed characteristics.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a woman's wall recess construction is pressed and is whitewashed device, includes handle and cylinder brush, the front end of handle is fixed with first cross axle, the upper and lower end of first cross axle is rotated and is connected with first positive quarter butt, the front end rotation of first positive quarter butt is connected with first positive stock, the middle part rotation of first positive stock is connected with second positive stock, the front end rotation of first positive stock is connected with second positive stock, the middle part rotation of second positive stock is connected with third positive stock, the front end rotation of second positive stock is connected with second positive quarter butt, the front end rotation of second positive stock is connected with fourth positive stock, the both ends of first cross axle are rotated and are connected with first vice quarter butt, the front end rotation of first vice quarter butt is connected with first vice butt, and the middle part and the second positive stock rotate and are connected, the front end rotation of first vice butt is connected with second vice butt, the front end rotation of first vice butt is connected with the second vice butt outer wall of second vice butt is connected with the outer wall of second vice butt support, the front end rotation of second vice butt is connected with the outer wall of second positive stock, the outer wall of second vice butt is connected with the outer wall of the first vice quarter butt is connected with the front end rotation of the outer wall of the front end is connected with the outer wall of the short stub.
As the utility model discloses a woman's wall recess construction bears down on one and whitewashes preferred technical scheme of device, the threaded hole is seted up to the upper end inside of first universal joint, the inside threaded connection of screw hole has the knob bolt.
As the utility model discloses a female wall groove construction coping whitewashes preferred technical scheme of device, the upper end of connecting piece is fixed with the interface, the front end of interface is fixed with the conveyer pipe, the front end of conveyer pipe is equipped with four align to grid distribution's shower nozzle.
As the utility model discloses a women's wall recess construction bears down on one and whitewashes preferred technical scheme of device, the front end inner wall middle part of handle is fixed with the grab handle.
As the utility model discloses a female wall groove construction is pressed and is pressed a whitewashed preferred technical scheme of device, the outer wall fixed mounting of grab handle has the rubber sleeve.
Compared with the prior art, the beneficial effects of the utility model are that: drive first positive quarter butt through rotating the handle and rotate, first positive quarter butt passes through first positive stock cooperation second cross axle and drives second positive stock, second positive stock passes through the positive quarter butt of third cross axle cooperation second and drives forty word axle, the forty word axle passes through connecting piece cooperation support and drives the cylinder brush, and then adjust the length distance between cylinder brush and the handle, make simultaneously at first pair quarter butt, first pair stock, make under the cooperation of the vice quarter butt of second pair stock and the vice quarter butt of second make and keep the horizontal motion throughout flexible in-process, and play reinforced (rfd) effect
Through with hose connection interface, the wall plastering machine is connected to the other end, will brush the material and spray on the cylinder brush from the shower nozzle through the conveyer pipe from the interface, avoid frequently dipping in the material.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the present invention during elongation;
FIG. 2 is a schematic view of the shortened structure of the present invention;
FIG. 3 is a schematic view of the structure of the roller brush of the present invention;
FIG. 4 is a schematic view of a three-dimensional assembly structure of the handle of the present invention;
fig. 5 is a schematic view of a three-dimensional assembly structure of a handle in a second embodiment of the present invention;
in the figure: 1. a handle; 2. a first cross-shaft; 3. a first short bar; 4. a first long and regular rod; 5. a second cross-shaped shaft; 6. a second long and straight rod; 7. a third cross-axis; 8. a second short bar; 9. a forty-th shaft; 10. a first secondary short bar; 11. a first auxiliary long rod; 12. a second auxiliary long rod; 13. a second pair of short bars; 14. a connecting member; 15. a support; 16. a roller brush; 17. an interface; 18. a delivery pipe; 19. a spray head; 20. a handle; 21. a handle; 22. a threaded hole; 23. a knob bolt; 24. a screw; 25. a knob sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Example one
Referring to fig. 1-4, the present invention provides the following technical solutions: a coping whitewashing device for the construction of a recess of a woman wall comprises a handle 1 and a roller brush 16, wherein a first cross shaft 2 is fixed at the front end of the handle 1, the upper end and the lower end of the first cross shaft 2 are rotatably connected with a first positive short rod 3, the front end of the first positive short rod 3 is rotatably connected with a first positive long rod 4, the middle part of the first positive long rod 4 is rotatably connected with a second crossed shaft 5, the front end of the first positive long rod 4 is rotatably connected with a second positive long rod 6, the middle part of the second positive long rod 6 is rotatably connected with a third crossed shaft 7, the front end of the second positive long rod 6 is rotatably connected with a second positive short rod 8, the front end of the second positive short rod 8 is rotatably connected with a fourth crossed shaft 9, the two ends of the first cross shaft 2 are rotatably connected with a first pair of short rods 10, the front end of the first pair of short rods 10 is rotatably connected with a first pair of long rods 11, and the middle part of the first pair of long rods 11 is rotatably connected with the second crossed shaft 5, the front end of the first auxiliary long rod 11 is rotatably connected with a second auxiliary long rod 12, the middle part of the second auxiliary long rod 12 is rotatably connected with a third cross shaft 7, the front end of the second auxiliary long rod 12 is rotatably connected with a second auxiliary short rod 13, the front end of the second auxiliary short rod 13 is rotatably connected with a fourth cross shaft 9, the front end of the fourth cross shaft 9 is fixedly provided with a connecting piece 14, the outer walls of the two ends of the connecting piece 14 are fixedly provided with a support 15, a roller brush 16 is rotatably connected between the support 15 at the two ends, the outer wall of the rear end of the first short positive rod 3 is fixedly provided with a handle 21, in the embodiment, the handle 21 is rotated to drive the first short positive rod 3 to rotate, the first short positive rod 3 is matched with the second cross shaft 5 through the first short rod 4 to drive the second long positive rod 6, the second long rod 6 is matched with the second short rod 8 through the third cross shaft 7 to drive the fourth cross shaft 9, the fourth cross shaft 9 is matched with the support 15 through the connecting piece 14 to drive the roller brush 16, and then adjust the length distance between cylinder brush 16 and the handle 1, make simultaneously under the cooperation of first pair quarter butt 10, first pair quarter butt 11, the vice butt 12 of second and the vice butt 13 make and keep horizontal motion throughout flexible in-process, and play reinforced effect.
Specifically, a threaded hole 22 is formed in the upper end of the first cross shaft 2, a knob bolt 23 is connected to the threaded hole 22 through a thread, and in this embodiment, the knob bolt 23 is unscrewed by rotation, so that the rotatable handle 21 drives the first short bar 3 to rotate for telescopic adjustment; by screwing the knob bolt 23, the first short bar 3 is fixed by pressing the handle 21, and the telescopic length is fixed.
Specifically, the upper end of connecting piece 14 is fixed with interface 17, and interface 17's front end is fixed with conveyer pipe 18, and conveyer pipe 18's front end is equipped with four align to grid's shower nozzle 19, and the accessible is with hose connection interface 17 in this embodiment, and the wall plastering machine is connected to the other end, will brush the material from interface 17 through conveyer pipe 18 from shower nozzle 19 spray on roller brush 16, avoid frequently dipping in the material.
Specifically, the middle part of the inner wall of the front end of the handle 1 is fixed with the handle 20, and in the embodiment, the painting device can be operated by holding the handle 20 or the handle 1, so that the use adaptation requirements under different conditions can be met.
Specifically, the outer wall fixed mounting of grab handle 20 has the rubber sleeve, improves the comfort level when operating personnel uses in this embodiment.
Example two
Referring to fig. 5, the present invention provides the following technical solutions: a female wall groove construction coping whitewashing device comprises a handle 1 and a roller brush 16, wherein a first cross shaft 2 is fixed at the front end of the handle 1, the upper end and the lower end of the first cross shaft 2 are rotatably connected with a first short rod 3, the front end of the first short rod 3 is rotatably connected with a first long rod 4, the middle part of the first long rod 4 is rotatably connected with a second cross shaft 5, the front end of the first long rod 4 is rotatably connected with a second long rod 6, the middle part of the second long rod 6 is rotatably connected with a third cross shaft 7, the front end of the second long rod 6 is rotatably connected with a second short rod 8, the front end of the second short rod 8 is rotatably connected with a fourth cross shaft 9, the two ends of the first cross shaft 2 are rotatably connected with first short rods 10, the front end of the first short rods 10 is rotatably connected with a first short rod 11, and the middle part of the first short rod 11 is rotatably connected with the second cross shaft 5, the front end of the first auxiliary long rod 11 is connected with a second auxiliary long rod 12 in a rotating way, the middle part of the second auxiliary long rod 12 is connected with a third cross shaft 7 in a rotating way, the front end of the second auxiliary long rod 12 is connected with a second auxiliary short rod 13 in a rotating way, the front end of the second auxiliary short rod 13 is connected with a fourth cross shaft 9 in a rotating way, the front end of the fourth cross shaft 9 is fixed with a connecting piece 14, the outer walls at the two ends of the connecting piece 14 are fixed with brackets 15, a roller brush 16 is connected between the brackets 15 at the two ends in a rotating way, the outer wall at the rear end of the first positive short rod 3 is fixed with a handle 21, in the embodiment, the first positive short rod 3 is driven to rotate by rotating the handle 21, the first positive short rod 3 is matched with the second cross shaft 5 through the first positive long rod 4 to drive the second positive long rod 6, the second positive long rod 6 is matched with the second positive short rod 8 through the third cross shaft 7 to drive the fourth cross shaft 9, the fourth cross shaft 9 is matched with the brackets 15 through the connecting piece 14 to drive the roller brush 16, and then adjust the length distance between cylinder brush 16 and the handle 1, make simultaneously under the cooperation of first pair quarter butt 10, first pair quarter butt 11, the vice butt 12 of second and the vice butt 13 make and keep horizontal motion throughout flexible in-process, and play reinforced effect.
Specifically, a screw 24 is fixed at the upper end of the first cross shaft 2, a knob sleeve 25 is connected to the outer wall of the screw 24 in a threaded manner, and in this embodiment, the knob sleeve 25 is unscrewed by rotation, so that the rotatable handle 21 drives the first short and positive rod 3 to rotate to perform telescopic adjustment; by screwing the knob sleeve 25, the first short bar 3 is fixed by the pressing handle 21, and the telescopic length is fixed.
Specifically, the upper end of connecting piece 14 is fixed with interface 17, and interface 17's front end is fixed with conveyer pipe 18, and the front end of conveyer pipe 18 is equipped with four align to grid's shower nozzle 19, and the accessible is with hose connection interface 17 in this embodiment, and the wall plastering machine is connected to the other end, will brush the material from interface 17 through conveyer pipe 18 from shower nozzle 19 spray on roller brush 16, avoid frequently dipping in the material.
Specifically, the middle part of the inner wall of the front end of the handle 1 is fixed with the handle 20, and in the embodiment, the painting device can be operated by holding the handle 20 or the handle 1, so that the use adaptation requirements under different conditions can be met.
Specifically, the outer wall fixed mounting of grab handle 20 has the rubber sleeve, improves the comfort level when operating personnel uses in this embodiment.
The utility model discloses a theory of operation and use flow: firstly, a knob sleeve 25 is unscrewed in a rotating mode, a handle 21 is rotated to drive a first positive short rod 3 to rotate, the first positive short rod 3 is matched with a second crossed shaft 5 through a first positive long rod 4 to drive a second positive long rod 6, the second positive long rod 6 is matched with a second positive short rod 8 through a third crossed shaft 7 to drive a forty-shaped shaft 9, the forty-shaped shaft 9 is matched with a support 15 through a connecting piece 14 to drive a roller brush 16, the length distance between the roller brush 16 and a handle 1 is further adjusted, meanwhile, the first auxiliary short rod 10, the first auxiliary long rod 11, the second auxiliary long rod 12 and the second auxiliary short rod 13 are matched to enable the first auxiliary short rod 3 to always keep horizontal movement in the telescopic process and play a reinforcing role, and then the knob sleeve 25 is screwed in a rotating mode, the handle 21 is squeezed to fix the first positive short rod 3, and further the telescopic length is fixed; when the device is used, the hose is connected with the connector 17, the other end of the hose is connected with a wall plastering machine, and brushing materials are sprayed on the roller brush 16 from the connector 17 through the conveying pipe 18 and the spray head 19, so that frequent dipping is avoided.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (5)

1. The utility model provides a device is whitewashed to construction coping of parapet wall recess, includes handle (1) and roller brush (16), its characterized in that: the front end of the handle (1) is fixed with a first cross shaft (2), the upper and lower ends of the first cross shaft (2) are rotatably connected with a first short front rod (3), the front end of the first short front rod (3) is rotatably connected with a first long front rod (4), the middle of the first long front rod (4) is rotatably connected with a second short front rod (5), the front end of the first long front rod (4) is rotatably connected with a second long front rod (6), the middle of the second long front rod (6) is rotatably connected with a third cross shaft (7), the front end of the second long front rod (6) is rotatably connected with a second short front rod (8), the front end of the second short front rod (8) is rotatably connected with a fourth cross shaft (9), the two ends of the first cross shaft (2) are rotatably connected with a second short sub rod (10), the front end of the first short sub rod (10) is rotatably connected with a second short sub rod (11), the middle of the first short sub rod (11) is rotatably connected with the second short sub rod (12), the front end of the second short sub rod (7) is rotatably connected with a second short sub rod (13), the front end of the fourth shaft (9) is fixed with a connecting piece (14), the outer walls of two ends of the connecting piece (14) are fixed with brackets (15), roller brushes (16) are rotatably connected between the brackets (15) at two ends, and the outer wall of the rear end of the first short bar (3) is fixed with a handle (21).
2. The coping and plastering device for the construction of the groove of the parapet wall as claimed in claim 1, wherein: a threaded hole (22) is formed in the upper end of the first cross shaft (2), and a knob bolt (23) is connected to the inner portion of the threaded hole (22) in a threaded mode.
3. The coping and plastering device for the construction of the groove of the parapet wall as claimed in claim 1, wherein: the upper end of connecting piece (14) is fixed with interface (17), the front end of interface (17) is fixed with conveyer pipe (18), the front end of conveyer pipe (18) is equipped with four shower nozzles (19) that the align to grid distributes.
4. The coping and plastering device for the construction of the groove of the parapet wall as claimed in claim 1, wherein: a grab handle (20) is fixed in the middle of the inner wall of the front end of the handle (1).
5. The coping and plastering device for the construction of the groove of the parapet wall as claimed in claim 4, wherein: the outer wall of the grab handle (20) is fixedly provided with a rubber sleeve.
CN202222104904.1U 2022-08-05 2022-08-05 Construction of woman's wall recess is pressed top and is whitewashed device Active CN218623004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222104904.1U CN218623004U (en) 2022-08-05 2022-08-05 Construction of woman's wall recess is pressed top and is whitewashed device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222104904.1U CN218623004U (en) 2022-08-05 2022-08-05 Construction of woman's wall recess is pressed top and is whitewashed device

Publications (1)

Publication Number Publication Date
CN218623004U true CN218623004U (en) 2023-03-14

Family

ID=85459392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222104904.1U Active CN218623004U (en) 2022-08-05 2022-08-05 Construction of woman's wall recess is pressed top and is whitewashed device

Country Status (1)

Country Link
CN (1) CN218623004U (en)

Similar Documents

Publication Publication Date Title
CN206245685U (en) A kind of new wall painting machine
CN108756171B (en) Whitewash device for construction
CN211488311U (en) Gardens are with trees root brush application device
CN110863637A (en) Wall whitewashes device for interior decoration
CN218623004U (en) Construction of woman's wall recess is pressed top and is whitewashed device
CN213143775U (en) Whitewash device for architectural decoration
CN111622470A (en) Building wall whitewashes device
CN214183787U (en) Mechanical spraying device for interface agent
CN213898012U (en) Indoor painting device for housing construction
CN212583144U (en) Wall whitewashes device for municipal works
CN213038796U (en) Interior wall whitewashes device for building engineering construction
CN208858119U (en) Roller brush assembly for building
CN219100617U (en) Wall watering humidification device for building engineering
CN218454547U (en) Painting device for decoration
CN218492999U (en) Interior wall whitewashes device
CN211899485U (en) Whitewash wall device for construction
CN219298676U (en) Multifunctional roller brush
CN218562913U (en) A device is applied paint with a brush to waterproof paint for building waterproof engineering
CN215107016U (en) Outer window waterproof material's that building engineering construction was used equipment of applying paint with a brush
CN220014351U (en) Interior wall plastering machine for constructional engineering
CN214885231U (en) Wall whitewashing device for building engineering construction
CN211172949U (en) Spraying device for interior decoration
CN219861121U (en) Concrete curing means
CN219100634U (en) Wall plastering machine
CN215564198U (en) Building wall coating tool

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant