CN218622233U - Emergent work or material rest of pile foundation - Google Patents

Emergent work or material rest of pile foundation Download PDF

Info

Publication number
CN218622233U
CN218622233U CN202222300610.6U CN202222300610U CN218622233U CN 218622233 U CN218622233 U CN 218622233U CN 202222300610 U CN202222300610 U CN 202222300610U CN 218622233 U CN218622233 U CN 218622233U
Authority
CN
China
Prior art keywords
hopper
movable hopper
supporting
pile foundation
movable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222300610.6U
Other languages
Chinese (zh)
Inventor
李守宝
徐国兴
赵映冠
鞠云昌
杨西
李经润
孟令旺
马文俊
李晨光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN202222300610.6U priority Critical patent/CN218622233U/en
Application granted granted Critical
Publication of CN218622233U publication Critical patent/CN218622233U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses an emergent work or material rest of pile foundation relates to bored concrete pile on water and pours technical field, include: the movable hopper is used for transferring concrete in a tank car, a hoisting piece is fixedly arranged at the top of the movable hopper and is used for being connected with a hoisting device to transfer the movable hopper, and a control device is arranged at a discharge port at the bottom of the movable hopper and is used for opening or closing the discharge port of the movable hopper; the supporting main frame is used for supporting the movable hopper, and the movable hopper can be separated from the supporting main frame; the chute is used for being arranged below the discharge port and guiding concrete transferred by the movable hopper into a pouring hopper of the pouring pile, has a simple structure, can avoid the pouring interruption of a pile foundation, improves the pile forming quality and saves the cost.

Description

Emergent work or material rest of pile foundation
Technical Field
The utility model relates to a bored concrete pile on water pours technical field, especially relates to an emergent work or material rest of pile foundation.
Background
In the pile filling process of the above-water platform, the platform is not smaller than the land, the field is narrower, when abnormal conditions occur, for example, the material discharging of a tank car is blocked, the tank car fails to move away in time, the filling pile which is filling is made due to the fact that concrete on the tank car cannot be conveyed, the concrete filling of the pile is stopped, the concrete in the filling pile and the pipe is solidified or the pipe needs to be pulled out of the concrete due to long-time stopping, fatal harm can be caused to the pile forming quality of the above-water pile foundation, and a large amount of cost is needed to treat in the later period. There is a need for a device that avoids interrupting the concrete placement.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an emergent work or material rest of pile foundation to solve the problem that above-mentioned prior art exists, simple structure, can avoid the pile foundation to pour the interrupt, improve and become stake quality, practice thrift the cost.
In order to achieve the above object, the utility model provides a following scheme:
the utility model provides an emergent work or material rest of pile foundation, include: the movable hopper is used for transferring concrete in a tank car, a hoisting piece is fixedly arranged at the top of the movable hopper and used for being connected with a hoisting device to transfer the movable hopper, and a control device is arranged at a discharge port at the bottom of the movable hopper and used for opening or closing the discharge port of the movable hopper; the supporting main frame is used for supporting the movable hopper, and the movable hopper can be separated from the supporting main frame; the chute be used for set up in the below of discharge gate and can with the concrete that the activity hopper transported is leading-in to the bored concrete hopper of bored concrete pile in.
Preferably, the movable hopper comprises a plurality of hopper supports, and each hopper support is used for being fixed in the middle of the hopper and supporting the hopper.
Preferably, the top of the movable hopper is provided with a connecting part, and the connecting part can enable the movable hopper to be clamped on the top of the supporting main frame.
Preferably, the connecting parts are four ribs arranged circumferentially, and the movable hopper can be clamped on the top of the supporting main frame by the ribs.
Preferably, the movable hopper comprises a rectangular body part and a trapezoidal table part, the trapezoidal table part is arranged below the rectangular body part, one end of the trapezoidal table part with a large cross section area is integrally connected with the rectangular body part, and the discharge port is arranged at one end of the trapezoidal table part with a small cross section area.
Preferably, the supporting main frame is provided with four supporting columns, four top supporting rods and four middle connecting rods, the four top supporting rods are vertically fixed end to form a rectangle, the supporting columns perpendicular to the top supporting rods are arranged at the joints of the top supporting rods, and one middle connecting rod is arranged between every two adjacent supporting columns.
Preferably, controlling means includes handle, barrier plate and articulated elements, the discharge gate of activity hopper is provided with the horizontal slot, the articulated elements set up in discharge gate department, the one end of barrier plate is passed through the articulated elements with the activity hopper is articulated, and the other end is fixed and is provided with the handle, the drive the handle can drive the barrier plate stretches into the horizontal slot is right the discharge gate stops, changes the barrier plate stretches into the size of the area in the horizontal slot can change what of the discharge gate unit interval ejection of compact.
Preferably, the number of the hopper supports is four, and the four hopper supports are uniformly arranged at four corners of the bottom of the rectangular body.
Preferably, the chute is hinged to the middle connecting rod, one end of the chute extends out of the supporting main frame, the other end of the chute is hinged to the connecting rod, one end, far away from the chute, of the connecting rod is provided with a hook, a connecting ring is fixedly arranged at the bottom of the movable hopper, and the hook is used for being hung in the connecting ring so as to fix the chute below the discharge end of the movable hopper.
Preferably, the support main frame further comprises a ladder stand, and the ladder stand is arranged along one side of the support upright post in a full-length mode.
The utility model discloses for prior art gain following technological effect:
the utility model provides an emergent work or material rest of pile foundation, when the tank car can't transport the bored concrete pile with the concrete, through will supporting the body frame and place on the bored concrete pile next door, use hoist device to hoist movable hopper to other the carrying on of tank car concrete and load, the movable hopper that will fill with the concrete is hoisted to the support body frame on, through the chute with the concrete transportation to the bored concrete hopper of bored concrete pile in, thereby simple structure, can avoid the pile foundation to pour the interrupt and improve the pile-forming quality, practice thrift the cost.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the emergency material rack for pile foundation provided by the present invention;
fig. 2 is a schematic structural view of a support column in the emergency material frame for pile foundation provided by the present invention;
fig. 3 is a schematic structural view of a movable hopper in the emergency material rack for pile foundation provided by the present invention;
fig. 4 is a bottom view of a movable hopper in the pile foundation emergency material frame provided by the present invention;
in the figure: 1. a movable hopper; 2. supporting the main frame; 3. a chute; 4. a discharge end; 5. hoisting a piece; 6. supporting the upright post; 7. a middle connecting rod; 8. a top support rod 9 and a ladder stand; 10. a horizontal groove; 11. an articulation member; 12. a handle; 13. a blocking plate; 14. a hopper support.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
The utility model aims at providing an emergent work or material rest of pile foundation to solve the problem that above-mentioned prior art exists, simple structure, can avoid the pile foundation to pour the interrupt, improve and become stake quality, practice thrift the cost.
In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention is described in detail with reference to the accompanying drawings and the detailed description.
The utility model provides an emergent work or material rest of pile foundation, as shown in fig. 1 ~ 4, include: the movable hopper 1 is used for transferring concrete in a tank car, a hoisting piece 5 is fixedly arranged at the top of the movable hopper 1, the hoisting piece 5 is used for being connected with a hoisting device to transfer the movable hopper 1, and a control device is arranged at a discharge port at the bottom of the movable hopper 1 and used for opening or closing the discharge port of the movable hopper 1; the supporting main frame 2 is used for supporting the movable hopper 1, and the movable hopper 1 can be separated from the supporting main frame 2; chute 3 is arranged in setting up the below of discharge gate and can leading-in the bored concrete hopper to the bored concrete pile with the concrete that movable hopper 1 transported, when the tank car can't transport the bored concrete pile with the concrete, place aside the bored concrete pile through supporting the body frame 2, use hoist device with 1 handling of movable hopper to the tank car other carry out the concrete and load, the movable hopper 1 handling to the support body frame 2 that will fill with the concrete, through chute 3 with the concrete transportation to the bored concrete hopper of bored concrete pile in, moreover, the steam generator is simple in structure, thereby can avoid the stake foundation to pour the interrupt and improve and become the stake quality, and the cost is saved.
In a preferred embodiment, the mobile hopper 1 comprises a plurality of hopper holders 14, each hopper holder 14 being adapted to be secured to a middle portion of the hopper and to support the hopper.
In a preferred embodiment, the top of the moving hopper 1 has a connecting portion that enables the moving hopper 1 to be snapped on the top of the supporting main frame 2.
In a preferred embodiment, the connecting portions are four circumferentially arranged ribs, each rib can clamp the moveable hopper 1 to the top of the supporting main frame 2, and the connecting portions are arranged in such a way that the four ribs can more stably clamp the moveable hopper 1 to the top of the supporting main frame 2.
In a preferred embodiment, the moveable hopper 1 comprises a rectangular body part and a trapezoidal part, the trapezoidal part is arranged below the rectangular body part, one end with a large cross section area of the trapezoidal part is integrally connected with the rectangular body part, the discharge port is arranged at one end with a small cross section area of the trapezoidal part, the rectangle is arranged at the top of the moveable hopper 1 to contain more concrete, the trapezoidal part is arranged at the lower part, and the inclined plane can facilitate the outflow of the concrete.
In a preferred embodiment, the supporting main frame 2 has four supporting columns 6, four top supporting rods 8 and four middle connecting rods 7, the four top supporting rods 8 are vertically fixed end to form a rectangle, a supporting column 6 perpendicular to the top supporting rod 8 is arranged at the joint of each top supporting rod 8, and a middle connecting rod 7 is arranged between two adjacent supporting columns 6.
In a preferred embodiment, the control device comprises a handle 12, a blocking plate 13 and an articulated element 11, a discharge port of the movable hopper 1 is provided with a horizontal groove 10, the articulated element 11 is arranged at the discharge port, one end of the blocking plate 13 is articulated with the movable hopper 1 through the articulated element 11, the other end of the blocking plate is fixedly provided with the handle 12, the driving handle 12 can drive the blocking plate 13 to stretch into the horizontal groove 10 and block the discharge port, the size of the area of the blocking plate 13 stretching into the horizontal groove 10 can be changed to change the discharge rate of the discharge port in unit time, the structure is simple, and the blocking plate 13 can control the outflow rate of the discharge port.
In a preferred embodiment, the number of the hopper holders 14 is four, four hopper holders 14 are uniformly provided at four corners of the bottom of the rectangular body, and four hopper holders 14 are uniformly provided at four corners of the bottom of the rectangular body, so that the movable hopper 1 can be kept stable when the movable hopper 1 is loaded with concrete at a tanker.
In a preferred embodiment, the chute 3 is hinged to the middle connecting rod 7, one end of the chute 3 extends out of the supporting main frame 2, the other end of the chute 3 is hinged to the connecting rod, one end, away from the chute 3, of the connecting rod is provided with a hook, the bottom of the movable hopper 1 is fixedly provided with a connecting ring, the hook is used for being hung in the connecting ring so as to fix the chute 3 below the discharge end 4 of the movable hopper 1, and the movable hopper 1 is simple in structure and convenient to detachably connect with the movable hopper 1.
In a preferred embodiment, the support frame 2 further comprises a ladder 9, the ladder 9 being arranged along the side of one of the support uprights 6, the ladder 9 facilitating the handling of the mobile hopper 11 by an operator.
The utility model discloses a concrete example is applied to explain the principle and the implementation mode of the utility model, and the explanation of the above example is only used to help understand the method and the core idea of the utility model; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the concrete implementation and the application scope. In summary, the content of the present specification should not be construed as a limitation of the present invention.

Claims (10)

1. The utility model provides an emergent work or material rest of pile foundation which characterized in that: the method comprises the following steps:
the movable hopper is used for transferring concrete in a tank car, a hoisting piece is fixedly arranged at the top of the movable hopper and is used for being connected with a hoisting device to transfer the movable hopper, and a control device is arranged at a discharge port at the bottom of the movable hopper and is used for opening or closing a discharge port of the movable hopper;
the supporting main frame is used for supporting the movable hopper, and the movable hopper can be separated from the supporting main frame; and
the chute, the chute be used for set up in the below of discharge gate and can with the concrete that the movable hopper transported is leading-in to the bored concrete hopper of bored concrete pile in.
2. The pile foundation emergency stack of claim 1, wherein: the movable hopper comprises a plurality of hopper brackets, and each hopper bracket is used for being fixed in the middle of the hopper and supporting the hopper.
3. The emergency pile foundation rack according to claim 2, wherein: the top of movable hopper has connecting portion, connecting portion can make movable hopper joint in the top of supporting the body frame.
4. The pile foundation emergency stack of claim 3, wherein: the connecting parts are four convex edges which are circumferentially arranged, and the convex edges can clamp the movable hopper on the top of the supporting main frame.
5. The emergency pile foundation rack according to claim 4, wherein: the movable hopper comprises a rectangular body part and a trapezoidal table part, the trapezoidal table part is arranged below the rectangular body part, one end of the trapezoidal table part, which is large in cross sectional area, is integrally connected with the rectangular body part, and the discharge port is arranged at one end of the trapezoidal table part, which is small in cross sectional area.
6. The emergency pile foundation rack according to claim 5, wherein: the supporting main frame is provided with four supporting stand columns, four top supporting rods and four middle connecting rods, the four top supporting rods are vertically fixed into a rectangle end to end, the joint of each top supporting rod is provided with one supporting stand column perpendicular to the top supporting rods, and one middle connecting rod is arranged between every two adjacent supporting stand columns.
7. The pile foundation emergency stack of claim 6, wherein: controlling means includes handle, barrier plate and articulated elements, the discharge gate of activity hopper is provided with the horizontal groove, the articulated elements set up in discharge gate department, the one end of barrier plate is passed through the articulated elements with the activity hopper is articulated, and the other end is fixed to be provided with the handle, the drive the handle can drive the barrier plate stretches into the horizontal groove is right the discharge gate blocks, changes the barrier plate stretches into the size of the area in the horizontal groove can change discharge gate unit interval is what of the ejection of compact.
8. The emergency pile foundation rack according to claim 7, wherein: the number of the hopper supports is four, and the four hopper supports are uniformly arranged at four corners of the bottom of the rectangular body part.
9. The emergency pile foundation rack according to claim 8, wherein: the chute is hinged to the middle connecting rod, one end of the chute extends out of the supporting main frame, the other end of the chute is hinged to the connecting rod, a hook is arranged at one end, away from the chute, of the connecting rod, a connecting ring is fixedly arranged at the bottom of the movable hopper, and the hook is used for being hung in the connecting ring so as to fix the chute below the discharge end of the movable hopper.
10. The emergency stack of pile foundations of claim 9, wherein: the support main frame further comprises a ladder stand, and the ladder stand is arranged along one side of the support upright post in a through-length mode.
CN202222300610.6U 2022-08-31 2022-08-31 Emergent work or material rest of pile foundation Active CN218622233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222300610.6U CN218622233U (en) 2022-08-31 2022-08-31 Emergent work or material rest of pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222300610.6U CN218622233U (en) 2022-08-31 2022-08-31 Emergent work or material rest of pile foundation

Publications (1)

Publication Number Publication Date
CN218622233U true CN218622233U (en) 2023-03-14

Family

ID=85464715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222300610.6U Active CN218622233U (en) 2022-08-31 2022-08-31 Emergent work or material rest of pile foundation

Country Status (1)

Country Link
CN (1) CN218622233U (en)

Similar Documents

Publication Publication Date Title
KR102635982B1 (en) Method for erecting segmented steel girders on short slideway girders at the top of piers
CN203473523U (en) Glass storage and transfer support
KR20160127802A (en) A container for framework elements
CN108483221B (en) Marine modular unit cabin overhead hoist
CN218622233U (en) Emergent work or material rest of pile foundation
CN207142717U (en) Small-sized hanging device
US4467845A (en) Method and means for filling of bulk material in flexible containers
US4441685A (en) Column form
CN108343252A (en) Dismantled and assembled adjustable multipurpose wall moulding bed
CN208039865U (en) A kind of dismantled and assembled adjustable multipurpose wall moulding bed
CN215168139U (en) Concrete overhead hoist
CN204999328U (en) Chemical industry bucket blowing frame
US3778491A (en) Method of erecting monolithic concrete and reinforced concrete constructions
CN208716681U (en) The transporting device of bulk material for building
CN215624167U (en) Over-and-under type hopper system
CN211033783U (en) Large stone gantry crane unloading supporting device
CN214827728U (en) Transport transmission device is used in production of quick solidification anticreep shelling cast aluminium tectorial membrane sand
CN205998681U (en) One brood lac barrel of batch turning cushioning and supporting device
CN215562610U (en) Movable rapid automatic feeding device for small-sized slurry spraying machine
CN214615476U (en) Movable concrete placement hopper
CN215825574U (en) Concrete transportation distributing equipment
CN212101034U (en) Transfer case promotes emptys device
CN116717081B (en) BDF ribbed steel mesh hollow member hollow floor construction device
CN214939347U (en) Construction equipment that prefabricated bent cap die block board demolishd fast
CN218950470U (en) Ton bag turner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant