CN218618473U - Clamp for carrying and installing stone - Google Patents

Clamp for carrying and installing stone Download PDF

Info

Publication number
CN218618473U
CN218618473U CN202220253669.1U CN202220253669U CN218618473U CN 218618473 U CN218618473 U CN 218618473U CN 202220253669 U CN202220253669 U CN 202220253669U CN 218618473 U CN218618473 U CN 218618473U
Authority
CN
China
Prior art keywords
stone material
dowel steel
vertical
shaped groove
limiting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220253669.1U
Other languages
Chinese (zh)
Inventor
李彪
王立涛
周小翠
匡企峰
孔军
胡向远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd
Original Assignee
Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd filed Critical Construction Decoration Corp of China Construction Seventh Engineering Division Corp Ltd
Priority to CN202220253669.1U priority Critical patent/CN218618473U/en
Application granted granted Critical
Publication of CN218618473U publication Critical patent/CN218618473U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides an anchor clamps of transport and installation stone material, relate to stone material anchor clamps technical field, including first dowel steel and second dowel steel, the intermediate position of first dowel steel and second dowel steel is alternately and articulated to be connected, the bottom fixedly connected with of first dowel steel type splint fall L, it includes horizontal board and vertical board group to fall L type splint, vertical board group includes two at least vertical boards, two at least vertical boards are close to the one side of stone material and deviate from the interval diverse between one side of stone material, horizontal board and vertical board can dismantle the connection, the structure of second dowel steel is the same with first dowel steel, and the type of falling L splint of first dowel steel and second dowel steel set up relatively, form to press from both sides the clamp of establishing the stone material and establish the space, select the vertical board of different thickness according to the erection interval between the stone material, after the stone material installation targets in place, directly upwards take out this anchor clamps can, need not to readjust the position of stone material, make the stone material can once only install and target in place.

Description

Clamp for carrying and installing stone
Technical Field
The utility model belongs to the technical field of the stone material anchor clamps, specifically provide an anchor clamps of transport and installation stone material.
Background
Massive materials such as stone materials are often used in landscape and decoration construction, and the mode that generally adopts bare-handed installation carries and installs the stone material in the work progress, can not once target in place when installing like this, and the hand must be set aside earlier at least, and the adjustment construction mounted position again leads to stone material transport and installation inconvenient, and the efficiency of construction is lower.
Accordingly, there is a need in the art for a jig for handling and installing stone materials that addresses the above-mentioned problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides an anchor clamps of transport and installation stone material to the bare-handed transport stone material that mentions in the solution background art can not once install the problem that targets in place.
The technical scheme of the utility model is realized like this: the utility model provides an anchor clamps of transport and installation stone material, includes first dowel steel and second dowel steel, first dowel steel with the intermediate position of second dowel steel is alternately and articulated to be connected, the bottom fixedly connected with of first dowel steel type splint fall L, fall L type splint include horizontal board and vertical board group, vertical board group includes two at least vertical boards, two at least vertical boards are close to one side of stone material and deviate from the interval diverse between one side of stone material, horizontal board with the connection can be dismantled to vertical board, the structure of second dowel steel with first dowel steel is the same, just first dowel steel with the fall L type splint of second dowel steel set up relatively, and the formation presss from both sides the clamp of establishing the stone material and establishes the space.
The technical effect of the scheme is as follows: through can dismantling horizontal board and vertical board to be connected, can select the vertical board of different thickness according to the erection space between the stone material, after the stone material installation targets in place, directly upwards take out this anchor clamps can, need not the position of readjustment stone material for the stone material can once only be installed and target in place, improves the installation accuracy and the installation effectiveness of stone material.
In the preferable technical scheme of the stone material carrying and installing clamp, the bottom of the transverse plate is provided with a C-shaped groove, the top of the vertical plate is connected with a T-shaped sliding block matched with the C-shaped groove, and the vertical plate is detachably connected with the transverse plate through the matching of the T-shaped sliding block and the C-shaped groove.
The technical effect of the scheme is as follows: the C-shaped groove limits the vertical movement of the T-shaped sliding block, the stability of the vertical plate when the stone is clamped is guaranteed, and meanwhile, the T-shaped sliding block can slide out from the C-shaped groove in the horizontal direction, so that the vertical plate is convenient to replace.
In the preferable technical scheme of the stone material carrying and installing clamp, a limiting structure for limiting the T-shaped sliding block to slide along the C-shaped groove is arranged between the vertical plate and the transverse plate.
The technical effect of the scheme is as follows: avoid pressing from both sides the in-process of establishing the transport stone material, vertical board is deviate from horizontal inboard, guarantees the reliability of this anchor clamps.
In the preferred technical scheme of above-mentioned anchor clamps of transport and installation stone material, limit structure includes the gag lever post, a side of horizontal board has been seted up and has been linked to the spacing groove in C shape groove, the gag lever post run through in the spacing inslot, the circumference of gag lever post is provided with the backstop ring, the spacing groove is kept away from the position in C shape groove is provided with the backstop piece, the backstop ring with be provided with the spring between the backstop piece, when the spring is in natural state, the one end of gag lever post is located C shape inslot, the other end expose in external environment, the one end in C shape groove is the enclosed construction, the gag lever post is located the part in C shape inslot with form between the enclosed construction and hold the spacing space of T shape slider.
The technical effect of the scheme is as follows: one end that is located external environment through the pulling gag lever post, the one end that makes the gag lever post be located C inslot slides to the spacing inslot, provide the space of dodging for the installation of T shape slider, after T shape slider installation is accomplished, loosen the gag lever post, under the effect of spring force, the gag lever post resets, the one end that the gag lever post is located the spacing inslot forms the restriction to the slip of T shape slider along the C inslot, avoid T shape slider from C inslot roll-off, guarantee the reliability of vertical board and transverse plate connection.
In the preferable technical scheme of the stone material carrying and installing clamp, the part of the limiting rod, which is positioned in the C-shaped groove, deviates from one side of the limiting space, and a wedge surface is arranged on one side of the limiting space.
The technical effect of the scheme is as follows: through setting up the tapered wedge face, when the T shape slider was installed, directly extrude the gag lever post through the tapered wedge face and slide along the spacing groove, need not the artificial gag lever post of pulling, easy to assemble.
In the preferable technical scheme of the stone material carrying and installing clamp, the top ends of the first dowel bar and the second dowel bar are respectively and fixedly connected with an annular handle.
The technical effect of the scheme is as follows: the stone material can be conveniently carried and installed through the annular handle.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without inventive exercise.
FIG. 1 is a front view of a stone handling and installing jig according to the present invention;
FIG. 2 is an enlarged view of a portion A of FIG. 1;
fig. 3 is a right side view of the stone material handling and mounting jig of the present invention.
List of reference numbers: 1. a first transfer lever; 2. a second dowel bar; 3. a transverse plate; 31. a C-shaped groove; 32. a limiting groove; 33. a stop block; 4. a vertical plate; 41. a T-shaped slider; 5. a limiting rod; 51. a stop ring; 6. a spring; 7. a ring-shaped handle.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
It should be noted that in the description of the present invention, the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicating the directions or positional relationships are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
The utility model relates to a concrete embodiment of anchor clamps of transport and installation stone material: as shown in figures 1 and 3, the clamp for carrying and installing the stone comprises a first dowel bar 1 and a second dowel bar 2, through holes are formed in the middle positions of the first dowel bar 1 and the second dowel bar 2 respectively, the middle positions of the first dowel bar 1 and the second dowel bar 2 are arranged in a crossed mode, a rotating shaft bolt is inserted into the through holes, and the two ends of the rotating shaft bolt are connected with nuts to connect the first dowel bar 1 and the second dowel bar 2 in a hinged mode. The bottom fixedly connected with of first dowel bar 1 type splint of falling L, the type splint of falling L include horizontal board 3 and vertical board group, vertical board group includes three vertical board 4, three vertical board 4 is close to one side of stone material and deviates from the interval diverse between one side of stone material, thickness diverse between three vertical board 4 promptly, horizontal board 3 and vertical board 4 can dismantle the connection, the structure of second dowel bar 2 is the same with first dowel bar 1, and the type splint of falling L of first dowel bar 1 and second dowel bar 2 set up relatively, the space is established in the clamp that the stone material was established in the formation clamp. The top of first dowel bar 1 and second dowel bar 2 is fixedly connected with annular handle 7 respectively, carries and installs the stone material through annular handle 7 is carried and is drawn first dowel bar 1 and second dowel bar 2.
Through can dismantling horizontal board 3 and vertical board 4 and connect, can select the vertical board 4 of different thickness according to the erection space between the stone material, after the stone material installation targets in place, directly upwards take out this anchor clamps can, need not the position of readjustment stone material for the stone material can once only be installed and target in place, improves the installation accuracy and the installation effectiveness of stone material.
As shown in fig. 2, a C-shaped groove 31 is formed at the bottom of the transverse plate 3, a T-shaped slider 41 adapted to the C-shaped groove 31 is connected to the top of the vertical plate 4, the vertical plate 4 is detachably connected to the transverse plate 3 by the T-shaped slider 41 matching with the C-shaped groove 31, and the vertical plate 4 and the T-shaped slider 41 at the top thereof are integrally formed. The vertical activity of C-shaped groove 31 to T shape slider 41 forms the restriction, guarantees to press from both sides the steadiness of establishing vertical board 4 when the stone material, and simultaneously, T shape slider 41 can follow the horizontal direction and slide out in C-shaped groove 31, makes things convenient for vertical board 4's change.
In order to avoid clamping and carrying the stone, the vertical plate 4 is separated from the transverse plate 3, and a limiting structure for limiting the T-shaped sliding block 41 to slide along the C-shaped groove 31 is arranged between the vertical plate 4 and the transverse plate 3. The limiting structure comprises a limiting rod 5, a limiting groove 32 communicated to a C-shaped groove 31 is formed in the right side face of the transverse plate 3, the limiting rod 5 penetrates through the limiting groove 32, a stop ring 51 extends in the circumferential direction of the limiting rod 5, a stop block 33 is arranged at the position, close to the right side, of the limiting groove 32, a spring 6 is arranged between the stop ring 51 and the stop block 33, the spring 6 is in a natural state, the left end of the limiting rod 5 is located in the C-shaped groove 31, the right end of the limiting rod 5 is exposed in the external environment, and the length of the part, located in the C-shaped groove 31, of the limiting rod 5 is smaller than the distance between the stop ring 51 and the stop block 33. The rear end of the C-shaped groove 31 is of a closed structure, a limiting space for accommodating the T-shaped sliding block 41 is formed between the part, located in the C-shaped groove 31, of the limiting rod 5 and the closed structure, and an inclined wedge surface is arranged on one side, away from the limiting space, of the part, located in the C-shaped groove 31, of the limiting rod 5, and the inclined wedge surface is arranged from right to left and inclines backwards from front to back.
When the vertical plate 4 is installed, the T-shaped sliding block 41 at the top of the vertical plate 4 is pushed along the C-shaped groove 31, the T-shaped sliding block 41 extrudes the limiting rod 5 through the wedge surface to slide towards the limiting groove 32, an avoiding space is provided for installation of the T-shaped sliding block 41, when the T-shaped sliding block 41 is separated from the limiting rod 5, the limiting rod 5 resets under the action of the elastic force of the spring 6, one end of the limiting rod 5, which is positioned in the limiting groove 32, forms limitation on the sliding of the T-shaped sliding block 41 along the C-shaped groove 31, and the T-shaped sliding block 41 is prevented from sliding out of the C-shaped groove 31; when vertical plate 4 is dismantled to needs, the one end that pulling gag lever post 5 is located external environment makes gag lever post 5 be located the one end of C shape inslot 31 and slides to spacing inslot 32, for T shape slider 41's roll-off provides dodge the space, along C shape groove 31 roll-off T shape slider 41 can.
The utility model discloses a concrete use of anchor clamps of transport and installation stone material as follows: selecting a vertical plate 4 with proper thickness according to the installation distance between the stones, and connecting the vertical plate 4 with the transverse plate 3 to form an inverted L-shaped clamping plate; place the stone material in the clamp that first dowel steel 1 and second dowel steel 2's the type of falling L splint formed establishes the space, upwards carry through annular handle 7 and pull first dowel steel 1 and second dowel steel 2, make vertical board 4 hug closely with the stone material both sides, upwards mention the stone material, carry to mounted position after, hug closely one side of installed stone material with one side of vertical board 4, vertically upwards take out this anchor clamps, realize the transport and the installation of stone material promptly.
In the above embodiments, the vertical plate group includes three vertical plates, and in other embodiments, the vertical plate group includes four vertical plates.
In the above-mentioned embodiment, the C-shaped groove has been seted up to the bottom of horizontal board, the top of vertical board be connected with the T shape slider of C shape groove adaptation, the vertical board can be dismantled with horizontal board through the cooperation in T shape slider and C shape groove and be connected, in other embodiments, the bottom downwardly extending of horizontal board has the T shape connecting strip, the C shape spout has been seted up at the top of vertical board, the vertical board can be dismantled with horizontal board through the cooperation of C shape spout with the T shape connecting strip and be connected.
In the above embodiments, the stop ring extends circumferentially of the stop rod, the stop block is disposed at a position on the right side of the limit groove, and the spring is disposed between the stop ring and the stop block.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides an anchor clamps of transport and installation stone material, its characterized in that, includes first dowel steel and second dowel steel, first dowel steel with the intermediate position of second dowel steel is alternately and articulated to be connected, the bottom fixedly connected with type splint of falling L of first dowel steel, type splint of falling L include horizontal board and vertical board group, vertical board group includes two at least vertical boards, two at least vertical boards are close to one side of stone material and deviate from the interval diverse between one side of stone material, horizontal board with the connection can be dismantled to vertical board, the structure of second dowel steel with first dowel steel is the same, just first dowel steel with the type splint of falling L of second dowel steel set up relatively, and the formation presss from both sides the clamp of establishing the stone material and establishes the space.
2. The clamp for carrying and installing the stone as claimed in claim 1, wherein the bottom of the transverse plate is provided with a C-shaped groove, the top of the vertical plate is connected with a T-shaped slider adapted to the C-shaped groove, and the vertical plate is detachably connected to the transverse plate through the matching of the T-shaped slider and the C-shaped groove.
3. The stone handling and installing jig of claim 2, wherein a limiting structure is provided between the vertical plate and the horizontal plate to limit the T-shaped sliding block to slide along the C-shaped groove.
4. The stone material handling and installing clamp of claim 3, wherein the limiting structure comprises a limiting rod, a limiting groove communicated to the C-shaped groove is formed in one side surface of the transverse plate, the limiting rod penetrates through the limiting groove, a stop ring is arranged on the limiting rod in the circumferential direction, a stop block is arranged on the position, away from the C-shaped groove, of the limiting groove, a spring is arranged between the stop ring and the stop block, when the spring is in a natural state, one end of the limiting rod is located in the C-shaped groove, the other end of the limiting rod is exposed in an external environment, one end of the C-shaped groove is of a closed structure, and a limiting space for accommodating the T-shaped sliding block is formed between the part, located in the C-shaped groove, of the limiting rod and the closed structure.
5. A stone handling and setting jig as claimed in claim 4, wherein the portion of the restraining bar within the C-shaped channel on the side facing away from the restraining space is provided with a cammed surface.
6. A stone handling and setting jig as claimed in any one of claims 1 to 5, wherein the first and second transfer bars have respective loop handles fixedly attached to the top ends thereof.
CN202220253669.1U 2022-02-08 2022-02-08 Clamp for carrying and installing stone Active CN218618473U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220253669.1U CN218618473U (en) 2022-02-08 2022-02-08 Clamp for carrying and installing stone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220253669.1U CN218618473U (en) 2022-02-08 2022-02-08 Clamp for carrying and installing stone

Publications (1)

Publication Number Publication Date
CN218618473U true CN218618473U (en) 2023-03-14

Family

ID=85420567

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220253669.1U Active CN218618473U (en) 2022-02-08 2022-02-08 Clamp for carrying and installing stone

Country Status (1)

Country Link
CN (1) CN218618473U (en)

Similar Documents

Publication Publication Date Title
CN109853950A (en) A kind of building trade form clamp
CN218618473U (en) Clamp for carrying and installing stone
CN107975244B (en) Masonry mortar filling pointing one-time forming equipment
CN108049630A (en) A kind of civil engineering work formwork connection device
CN212211136U (en) Building surveillance camera head
CN210890713U (en) Movable adjusting device of anti-seismic support
CN213846153U (en) A triangular support for fixing stainless steel crane span structure
CN211631124U (en) Forestry engineering seedling cultivation righting device
CN211967223U (en) Locating pin telescopic machanism on sheet metal anchor clamps
CN207526071U (en) A kind of modified claying knife
CN210987390U (en) Afforestation nursery stock is prevent wind and is used strutting arrangement
CN208051405U (en) Tubular workpiece fixed fixture
CN217053737U (en) Support type arc steel construction all around
CN216616755U (en) Connecting frame for construction
CN210032096U (en) Combined steel member
CN214091015U (en) Aluminum alloy template latch mechanism
CN210054028U (en) Clamping groove round steel pipe connecting and fixing device
CN217581245U (en) Template fixing device for building engineering
CN218609203U (en) Flat-opening stirring machine
CN216732380U (en) Steel bar positioning structure of reinforced concrete prefabricated part for architectural design
CN216340835U (en) Scaffold board fixing device of attached lifting scaffold
CN219864004U (en) Connecting clamping piece of scaffold
CN218221112U (en) Multistage distillation tower convenient to dismouting
CN212298284U (en) Engineering management monitoring device
CN216873810U (en) Soil stacking device of on-film transplanter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant