CN218617925U - Curtain wall construction flow design special protection section of thick bamboo that conveniently carries - Google Patents

Curtain wall construction flow design special protection section of thick bamboo that conveniently carries Download PDF

Info

Publication number
CN218617925U
CN218617925U CN202223138424.3U CN202223138424U CN218617925U CN 218617925 U CN218617925 U CN 218617925U CN 202223138424 U CN202223138424 U CN 202223138424U CN 218617925 U CN218617925 U CN 218617925U
Authority
CN
China
Prior art keywords
barrel
connecting rod
design drawing
curtain wall
wall construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223138424.3U
Other languages
Chinese (zh)
Inventor
胡拥军
王俊伟
胡鑫
周莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shengfeng Construction Engineering Co ltd
Original Assignee
Shanghai Heyan Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Heyan Decoration Engineering Co ltd filed Critical Shanghai Heyan Decoration Engineering Co ltd
Priority to CN202223138424.3U priority Critical patent/CN218617925U/en
Application granted granted Critical
Publication of CN218617925U publication Critical patent/CN218617925U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model discloses a curtain construction flow design special use protection section of thick bamboo that conveniently carries relates to a protection section of thick bamboo technical field. The device comprises a barrel body, wherein a barrel cover and a strap rope are rotatably arranged at one end of the barrel body and are arranged on the outer surface of the barrel body. This curtain construction flow design special protection section of thick bamboo that conveniently carries sets up the movable plate through the inside at the barrel, and the movable plate can reciprocate along the inside connecting rod that sets up of barrel to can adjust the inside inner chamber length that is used for curtain construction flow drawing of barrel, so that adapt to the demand of placing of different length dimension design drawings, make the design drawing by spacing in movable plate and cover between the top, avoid the design drawing to rock the drawing limit page damage condition that causes everywhere in the barrel and appear.

Description

Curtain construction process design drawing special protection section of thick bamboo that conveniently carries
Technical Field
The utility model relates to a protection section of thick bamboo technical field specifically is a special protection section of thick bamboo of curtain construction flow design picture that conveniently carries.
Background
Curtain before carrying out the construction installation, need be under construction according to on the construction flow design drawing, and the designer can use a protection section of thick bamboo to place the design drawing when taking the design drawing to the curtain job site from the office to ensure that the design drawing can not be damaged carrying the in-process.
The size of current curtain construction flow design drawing exists the difference, for example size drawings such as A3, A4, and the inside length size that is used for the drawing to place of a protection section of thick bamboo is fixed, therefore the state that the design drawing placed and is lain in a protection section of thick bamboo also has the difference, causes the scattered damage of design drawing easily.
The main reason that above-mentioned problem appears lies in that the designer bears it through the braces rope that protective barrel surface set up and carries, carrying the in-process, designer's state such as walking about can cause the health to rock, and then make the protective barrel who contacts with designer's health rock, if the design drawing of this moment small-size is located the inside of this great protective barrel relatively, the design drawing rocks in protective barrel's inside easily, make the strake of design drawing constantly collide with protective barrel's inside wall, cause the damage of design drawing corner, thereby influence the later stage and to the impression of this curtain construction flow design drawing, to the above-mentioned condition, we provide a special protective barrel of curtain construction flow design drawing who conveniently carries.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model discloses a curtain construction flow design drawing special protection section of thick bamboo that conveniently carries to there is the difference in the size of a dimension of solving the current curtain construction flow design drawing that provides among the above-mentioned background art, and the inside length size that is used for the drawing to place of a protection section of thick bamboo is fixed, and consequently there is the difference in the state that the design drawing was placed and is located in a protection section of thick bamboo, causes the scattered damaged problem of design drawing easily.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a curtain construction flow design special protection section of thick bamboo that conveniently carries, includes:
the device comprises a barrel body, wherein a barrel cover is rotatably arranged at one end of the barrel body;
the strap rope is arranged on the outer surface of the barrel;
the adjusting mechanism is arranged inside the barrel and used for adjusting the length of a placing space for a curtain wall construction process design drawing inside the barrel;
the adjusting mechanism comprises a connecting rod and a moving plate, the connecting rod is rotatably arranged in the barrel, the moving plate is arranged on the outer surface of the connecting rod, and the moving plate is slidably arranged in the barrel.
Preferably, the outer surface of the connecting rod is provided with a thread groove, and the moving plate is in threaded sleeve joint with the outer surface of the connecting rod provided with the thread groove.
Preferably, the inner bottom of the barrel is fixedly provided with a limiting ring, and one end of the connecting rod rotates in a limiting mode at the limiting ring.
Preferably, the one end of connecting rod extends to the barrel and keeps away from the one end outside of cover, the one end that the connecting rod is located the barrel outside is provided with the stopper.
Preferably, a bolt is sleeved at one end of the connecting rod extending to the outside of the cylinder in a threaded manner and is used for fixing the connecting rod.
Preferably, the inner side wall of the cylinder body is provided with a sliding groove for limiting sliding of the moving plate.
Preferably, the outer surface of the moving plate is provided with a bump, and the bump slides in the sliding groove in a limiting manner.
The utility model discloses a curtain construction flow design special use protection section of thick bamboo that conveniently carries, its beneficial effect who possesses as follows:
1. this curtain construction flow design special protection section of thick bamboo that conveniently carries sets up the movable plate through the inside at the barrel, and the movable plate can reciprocate along the inside connecting rod that sets up of barrel to can adjust the inside inner chamber length that is used for curtain construction flow drawing of barrel, so that adapt to the demand of placing of different length dimension design drawings, make the design drawing by spacing in movable plate and cover between the top, avoid the design drawing to rock the drawing limit page damage condition that causes everywhere in the barrel and appear.
2. This curtain construction flow design special protection section of thick bamboo that conveniently carries sets up the bolt through the one end at the connecting rod of seting up the thread groove for the bolt can fasten the connecting rod, and then makes the movable plate that sets up at the connecting rod surface can stably set up in the inside of barrel behind the adjusting position, thereby convenient inner chamber length to the barrel inside adjusts, in order to satisfy the demand of placing of not unidimensional design drawing.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is an exploded view of the structure of the cover and the barrel of the present invention;
FIG. 3 is a sectional view of the inner structure of the barrel of the present invention;
FIG. 4 is a schematic view of the bolt structure of the present invention;
fig. 5 is an enlarged view of the structure a in fig. 3 according to the present invention.
In the figure: 1. a barrel; 101. a cylinder cover; 102. a harness cord; 2. an adjustment mechanism; 201. a connecting rod; 202. a thread groove; 203. a limiting ring; 204. moving the plate; 205. a bolt; 206. a limiting block; 3. a chute; 301. and (4) a bump.
Detailed Description
The embodiment of the utility model discloses curtain construction flow design special use protection section of thick bamboo that conveniently carries, as shown in fig. 1-5, include: the curtain wall construction design drawing storage barrel comprises a barrel body 1, wherein a barrel cover 101 and a strap rope 102 are rotatably arranged at one end of the barrel body 1 and are arranged on the outer surface of the barrel body 1, the barrel body 1 can be used for placing curtain wall construction process design drawings, and the strap rope 102 is arranged on the outer surface of the barrel body 1, so that designers can conveniently carry the barrel body 1 and the design drawings placed inside the barrel body to a construction site of a curtain wall to prevent the design drawings from being lost.
According to the attached drawings 2-3, in the device, an adjusting mechanism 2 is arranged inside a barrel 1 and used for adjusting the length of a space for placing a curtain wall construction process design drawing inside the barrel 1, the adjusting mechanism 2 comprises a connecting rod 201 and a moving plate 204, the connecting rod 201 is rotatably arranged inside the barrel 1, the moving plate 204 is arranged on the outer surface of the connecting rod 201, a thread groove 202 is formed in the outer surface of the connecting rod 201, the moving plate 204 is in threaded sleeve connection with the outer surface of the connecting rod 201 provided with the thread groove 202, a rubber cushion is arranged on the upper surface of the moving plate 204 and can reduce abrasion when the design drawing is in contact with the moving plate, the moving plate 204 is slidably arranged inside the barrel 1, the moving plate 204 can move up and down along the outer surface of the connecting rod 201 provided with the thread groove 202 by rotating the connecting rod 201, the length of an inner cavity of the barrel 1 is adjusted, the adjusted length of the inner cavity is equal to the length of the design drawing, and then the barrel cover 101 can be connected with the barrel 1 in a threaded mode, two ends of the design drawing are limited between the moving plate 204 and the top of the barrel cover, and random shaking of the barrel 1 is reduced.
According to the attached drawings 3-4, a limiting ring 203 is fixedly arranged at the inner bottom of a barrel 1 in the device, one end of a connecting rod 201 rotates at the limiting ring 203 in a limiting mode, one end of the connecting rod 201 extends to the outside of one end, far away from a barrel cover 101, of the barrel 1, a limiting block 206 is arranged at one end, located outside the barrel 1, of the connecting rod 201, a bolt 205 is sleeved at one end, extending to the outside of the barrel 1, of the connecting rod 201 in a threaded mode, the connecting rod 201 can be fixed through the bolt 205, the connecting rod 201 can be fastened, and then an adjusted moving plate 204 is stably arranged inside the barrel 1.
According to the drawings 3 and 5, the inner side wall of the cylinder 1 of the device is provided with the sliding groove 3 for limiting sliding of the moving plate 204, the outer surface of the moving plate 204 is provided with the bump 301, the bump 301 is limited to slide in the sliding groove 3, and the moving track of the moving plate 204 can be limited through the limiting action of the sliding groove 3 and the bump 301.
The working principle is as follows:
when the moving plate 204 is in the initial state, the lower surface of the moving plate 204 abuts against the upper surface of the limiting ring 203 arranged at the bottom in the cylinder 1, and at this time, the length for placing the design drawing in the cylinder 1 is in the maximum state.
This curtain construction flow design special protection section of thick bamboo that conveniently carries can carry out the rolling with curtain construction flow design earlier when using, then places the design after the rolling in the inside of barrel 1, and the surface of the connecting rod 201 of the inside setting of barrel 1 is cup jointed at the center of the design of rolling for the one end of design at this moment contacts with movable plate 204 upper surface mounting's rubber pad, and the design is accomodate in the inside of barrel 1.
Further, when the length of the design drawing is smaller than the length of the inner cavity of the barrel body 1, the connecting rod 201 arranged at the inner cavity of the barrel body 1 can be rotated at the moment, and the connecting rod 201 cannot move randomly at the barrel body 1 under the limit of the limit ring 203 in the process, so that the moving plate 204 and the design drawing placed on the upper surface of the moving plate 204 move upwards along the outer surface of the connecting rod 201 provided with the thread groove 202, the length of the inner cavity of the barrel body 1 is adjusted, and one end of the design drawing, which is far away from the moving plate 204, is flush with the surface of one end, which is close to the barrel cover 101, of the barrel body 1.
Further, when one end of the design drawing, which is far away from the moving plate 204, is flush with the surface of one end, which is close to the barrel cover 101, of the barrel body 1, the barrel cover 1 can be connected with the barrel body 1 in a threaded manner, so that the two ends of the design drawing are limited between the upper surface of the moving plate 204 and the inner top of the barrel cover 101, and random shaking of the design drawing in the barrel body 1 is reduced.
Finally, the designer can carry the barrel 1 and the design drawing placed inside the barrel 1 through the strap rope 102 arranged on the outer surface of the barrel 1, so that the designer can conveniently carry the curtain wall construction flow design drawing to the construction site of the curtain wall, and the loss of the design drawing can be prevented.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a curtain construction flow design special protection section of thick bamboo that conveniently carries, includes:
the device comprises a cylinder body (1), wherein a cylinder cover (101) is rotatably arranged at one end of the cylinder body (1);
the strap rope (102) is arranged on the outer surface of the barrel body (1);
the curtain wall construction design drawing adjusting device is characterized in that an adjusting mechanism (2) is arranged inside the barrel body (1) and used for adjusting the length of a placing space for a curtain wall construction process design drawing inside the barrel body (1);
the adjusting mechanism (2) comprises a connecting rod (201) and a moving plate (204), the connecting rod (201) is rotatably arranged in the cylinder body (1), the moving plate (204) is arranged on the outer surface of the connecting rod (201), and the moving plate (204) is slidably arranged in the cylinder body (1).
2. The portable protective cylinder special for the curtain wall construction process design drawing according to claim 1, is characterized in that: the outer surface of the connecting rod (201) is provided with a thread groove (202), and the moving plate (204) is sleeved on the outer surface of the connecting rod (201) provided with the thread groove (202) in a threaded manner.
3. The portable protective cylinder special for the curtain wall construction process design drawing according to claim 2, is characterized in that: the inner bottom of the barrel body (1) is fixedly provided with a limiting ring (203), and one end of the connecting rod (201) rotates in a limiting mode at the limiting ring (203).
4. The portable protective cylinder special for the curtain wall construction process design drawing according to claim 3, is characterized in that: the one end of connecting rod (201) extends to barrel (1) and keeps away from the one end outside of cover (101), connecting rod (201) are located the outside one end of barrel (1) and are provided with stopper (206).
5. The portable protective cylinder special for the curtain wall construction process design drawing according to claim 4, is characterized in that: bolt (205) have been cup jointed to the outside one end screw thread that connecting rod (201) extended to barrel (1) for the fixed of connecting rod (201).
6. The convenient-to-carry special protective cylinder for curtain wall construction process design drawings as claimed in claim 5, is characterized in that: the inner side wall of the cylinder body (1) is provided with a sliding groove (3) for limiting sliding of the moving plate (204).
7. The portable protective cylinder special for the curtain wall construction process design drawing according to claim 6, is characterized in that: the outer surface of the moving plate (204) is provided with a bump (301), and the bump (301) slides in the sliding groove (3) in a limiting manner.
CN202223138424.3U 2022-11-25 2022-11-25 Curtain wall construction flow design special protection section of thick bamboo that conveniently carries Active CN218617925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223138424.3U CN218617925U (en) 2022-11-25 2022-11-25 Curtain wall construction flow design special protection section of thick bamboo that conveniently carries

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223138424.3U CN218617925U (en) 2022-11-25 2022-11-25 Curtain wall construction flow design special protection section of thick bamboo that conveniently carries

Publications (1)

Publication Number Publication Date
CN218617925U true CN218617925U (en) 2023-03-14

Family

ID=85449872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223138424.3U Active CN218617925U (en) 2022-11-25 2022-11-25 Curtain wall construction flow design special protection section of thick bamboo that conveniently carries

Country Status (1)

Country Link
CN (1) CN218617925U (en)

Similar Documents

Publication Publication Date Title
CN208652049U (en) A kind of computer host box adjustable installing seat
CN207777776U (en) A kind of petroleum pipeline supporting rack
CN205021556U (en) L shape settee maintenance device convenient to adjust
CN107701893B (en) Computer camera device convenient to adjust
CN110266867A (en) A kind of anti-skidding fixed self-shooting bar
CN218617925U (en) Curtain wall construction flow design special protection section of thick bamboo that conveniently carries
CN104279404A (en) Portable laptop support
CN208236451U (en) A kind of mine down-hole operation safety protection bracket
CN108418286A (en) Vertical wireless charging device
CN210219129U (en) VR panorama outdoor shooting support
CN209747123U (en) Slot type solid state hard drives
CN204005145U (en) A kind of arm vest of multi-functional double mechanical arms
CN108670737A (en) A kind of Portable medical crutch
CN207166577U (en) Multifunctional mobile phone case
CN209015098U (en) Health-care mouse pad
CN212966756U (en) Visual transmission teaching model supporting device
CN108412355A (en) Hinge
CN213213544U (en) Mobile phone support convenient to assemble
CN106340918A (en) Power bank with support
CN206112423U (en) Tripod
CN208062868U (en) Vertical wireless charging device
CN204190816U (en) Extending formula phone pallet
CN208137723U (en) hinge
CN204005146U (en) A kind of arm vest of multifunctional single mechanical arm
CN211529047U (en) Anti-falling tablet computer protective sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20230815

Address after: Room 502, Building 8, Haitang Garden, No. 88, Dongcheng Section, Dongsheng Road, Dongcheng District, Dongguan City, Guangdong Province, 523000

Patentee after: Ding Dujing

Address before: 200333 Room 509, Floor 5, No. 89, Yunling East Road, Putuo District, Shanghai

Patentee before: Shanghai Heyan Decoration Engineering Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20231017

Address after: 523000 No. 1514-1515, Wanda Plaza office building, Dongcheng Street, Dongguan City, Guangdong Province

Patentee after: GUANGDONG SHENGFENG CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: Room 502, Building 8, Haitang Garden, No. 88, Dongcheng Section, Dongsheng Road, Dongcheng District, Dongguan City, Guangdong Province, 523000

Patentee before: Ding Dujing

TR01 Transfer of patent right