CN218585521U - Electric power surveys location and uses mark stake - Google Patents

Electric power surveys location and uses mark stake Download PDF

Info

Publication number
CN218585521U
CN218585521U CN202221036957.8U CN202221036957U CN218585521U CN 218585521 U CN218585521 U CN 218585521U CN 202221036957 U CN202221036957 U CN 202221036957U CN 218585521 U CN218585521 U CN 218585521U
Authority
CN
China
Prior art keywords
inserted bar
pile body
electric power
pile
control mechanism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221036957.8U
Other languages
Chinese (zh)
Inventor
王涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yueyang Electric Power Survey & Design Institute Co ltd
Original Assignee
Yueyang Electric Power Survey & Design Institute Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yueyang Electric Power Survey & Design Institute Co ltd filed Critical Yueyang Electric Power Survey & Design Institute Co ltd
Priority to CN202221036957.8U priority Critical patent/CN218585521U/en
Application granted granted Critical
Publication of CN218585521U publication Critical patent/CN218585521U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a marker pile for electric power survey positioning, which belongs to the technical field of electric power survey and comprises a pile body, wherein the bottom end of the pile body is fixedly connected with an inserted bar, the bottom end of the inserted bar is detachably connected with a plug, the outer surface of the inserted bar is movably hinged with a plurality of stabilizing plates through a hinge shaft, a control mechanism is arranged between the plurality of stabilizing plates and the pile body, and the control mechanism is used for controlling the plurality of stabilizing plates to rotate; the utility model discloses in, squeeze into the inserted bar to the soil layer through the plug in, the pile body spills and marks the location subaerial, and the inserted bar makes a plurality of firm boards and ground contact through control mechanism after getting into the soil layer to make pile body and inserted bar keep good stability, prevent that the mark stake from taking place the slope, influence the location that electric power surveyed time measuring.

Description

Electric power surveys location and uses mark stake
Technical Field
The utility model relates to an electric power surveys technical field, more specifically says, relates to an electric power surveys location with mark stake.
Background
Currently, when planning a power line in the power industry, a corresponding fixed-point site survey needs to be performed. Because the fixed point in the line has more positions and longer distance, the position of the fixed point in the line needs to be marked by adopting corresponding marking piles, so that the line can be evaluated, improved and finally determined more conveniently.
Most of the existing marking piles for electric power exploration positioning are used for driving piles into soil layers, most of the piles are cylindrical and poor in stability, and the piles are prone to toppling after being driven into the soil layers, so that positioning during electric power exploration is affected.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the prior art, the utility model aims to provide an electric power surveys marker pile for location aims at solving the above-mentioned problem that exists among the prior art.
In order to solve the problem, the utility model adopts the following technical scheme:
the utility model provides an electric power surveys mark stake for location, includes the pile body, the bottom fixedly connected with inserted bar of pile body, the bottom of inserted bar can be dismantled and is connected with the plug, the surface of inserted bar articulates through the hinge activity has a plurality of firm boards, and is a plurality of set up control mechanism between firm board and the pile body, control mechanism is used for controlling a plurality of firm board rotations.
As a preferred scheme of the utility model, control mechanism includes screw rod, commentaries on classics piece, nut, a plurality of spout, a plurality of slider and a plurality of connecting rod, the screw rod rotates the diapire of connecting in the pile body, change a fixed connection in the top of screw rod, and change the piece and run through to the upper end of pile body, nut threaded connection is in the surface of screw rod, and is a plurality of the spout is all dug on the pile body, and is a plurality of the equal fixed connection of slider is in the surface of nut, and a plurality of slider difference sliding connection is in a plurality of spouts, and is a plurality of the connecting rod articulates through the hinge activity respectively between a plurality of sliders and a plurality of firm board.
As an optimized scheme of the utility model, it is a plurality of equal fixedly connected with a set of firm strip on the firm board, and every group is firm strip is two.
As a preferred scheme of the utility model, threaded hole is seted up to the bottom of inserted bar, fixedly connected with threaded rod on the plug, and threaded rod threaded connection is in threaded hole.
As a preferred scheme of the utility model, the outer fixed surface of inserted bar is connected with a plurality of cuttings, and is a plurality of the cuttings centers on the center pin evenly distributed of inserted bar.
As an optimized scheme of the utility model, the top of commentaries on classics piece can be dismantled and be connected with the locator, the locator is located the upside of pile body.
Compared with the prior art, the utility model has the advantages of:
the utility model discloses in, when the mark stake is using, squeeze into the inserted bar to the soil layer through the plug, the plug makes the inserted bar can be smooth and easy to get into the soil layer, after the inserted bar got into the soil layer, a plurality of firm boards were located subaerial, made a plurality of firm boards rotate through control mechanism and expand, a plurality of firm boards contact with ground after expanding, thereby improve the stability of whole mark stake, when the mark stake needs to be taken out, extract inserted bar and plug from the soil layer through the pile body, then made a plurality of firm boards fold in the outside of pile body through control mechanism, thereby make things convenient for the removal of mark stake; the utility model discloses in, squeeze into the inserted bar to the soil layer through the plug in, the pile body spills and marks the location subaerial, and the inserted bar makes a plurality of firm boards and ground contact through control mechanism after getting into the soil layer to make pile body and inserted bar keep good stability, prevent that the mark stake from taking place the slope, influence the location that electric power surveyed time measuring.
Drawings
Fig. 1 is a perspective view of the present invention;
FIG. 2 is an exploded view of the present invention;
fig. 3 is a cross-sectional view of the present invention;
fig. 4 is a perspective view of the middle insert rod of the present invention.
The numbering in the figures illustrates:
1. a pile body; 2. inserting a rod; 3. a plug; 4. a stabilizing plate; 5. a screw; 6. rotating the block; 7. a nut; 8. a chute; 9. a slider; 10. a connecting rod; 11. stabilizing the strips; 12. a threaded hole; 13. a threaded rod; 14. cutting; 15. a locator.
Detailed Description
The technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiment of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all embodiments, and all other embodiments obtained by those skilled in the art without making creative efforts based on the embodiments of the present invention belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top/bottom", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings, and are only for convenience of description of the present invention and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted", "provided", "sleeved/connected", "connected", and the like are to be understood in a broad sense, such as "connected", which may be fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood as a specific case by those skilled in the art.
Example (b):
referring to fig. 1-4, the marking pile for electric power survey positioning comprises a pile body 1, an inserting rod 2 is fixedly connected to the bottom end of the pile body 1, a plug 3 is detachably connected to the bottom end of the inserting rod 2, a plurality of stabilizing plates 4 are movably hinged to the outer surface of the inserting rod 2 through a hinge shaft, and a control mechanism is arranged between the plurality of stabilizing plates 4 and the pile body 1 and used for controlling the plurality of stabilizing plates 4 to rotate.
In this embodiment, the marker pile is when using, squeeze into the inserted bar 2 to the soil layer through plug 3, plug 3 makes the entering soil layer that inserted bar 2 can be smooth and easy, after inserted bar 2 got into the soil layer, a plurality of firm boards 4 were located subaerially, make a plurality of firm boards 4 rotate through control mechanism and expand, a plurality of firm boards 4 expand back and ground contact, thereby improve the stability of whole marker pile, when the marker pile need take out, extract inserted bar 2 and plug 3 from the soil layer through pile body 1, then make a plurality of firm boards 4 fold the outside at pile body 1 through control mechanism, thereby make things convenient for the removal of marker pile.
Concretely, control mechanism includes screw rod 5, change piece 6, nut 7, a plurality of spout 8, a plurality of slider 9 and a plurality of connecting rod 10, screw rod 5 rotates to be connected in the diapire of pile body 1, change 6 fixed connection in screw rod 5's top of piece, and change 6 upper ends that run through to pile body 1 of piece, nut 7 threaded connection is in screw rod 5's surface, a plurality of spout 8 are all dug on pile body 1, the equal fixed connection in nut 7's surface of a plurality of slider 9, and a plurality of slider 9 difference sliding connection is in a plurality of spout 8, a plurality of connecting rod 10 articulate respectively through the hinge activity between a plurality of slider 9 and a plurality of steadying board 4.
In this embodiment, make pile body 1 squeeze into the soil layer with inserted bar 2 through commentaries on classics piece 6, inserted bar 2 gets into the soil layer after, rotate screw rod 5 through commentaries on classics piece 6 and make nut 7 lapse in pile body 1, nut 7 drives a plurality of sliders 9 lapse in a plurality of spouts 8, a plurality of sliders 9 make a plurality of steadying plates 4 expand through a plurality of connecting rods 10, a plurality of steadying plates 4 rotate on inserted bar 2 and contact with ground, thereby make pile body 1 and inserted bar 2 remain stable, when inserted bar 2 takes out from the soil layer, through reverse rotation commentaries on classics piece 6, commentaries on classics piece 6 makes nut 7 rebound, thereby make a plurality of steadying plates 4 fold to the outside of pile body 1, a plurality of steadying plates 4 after folding make things convenient for the removal of whole mark stake.
Specifically, a group of stabilizing strips 11 is fixedly connected to each of the plurality of stabilizing plates 4, and two stabilizing strips 11 are provided in each group.
In this embodiment, after the plurality of stabilizing plates 4 contact the ground, each group of two stabilizing strips 11 is pressed into the ground, so that the plurality of stabilizing plates 4 further keep stable, and the stability of the pile body 1 and the inserting rod 2 is improved.
Specifically, the bottom end of the inserted link 2 is provided with a threaded hole 12, the plug 3 is fixedly connected with a threaded rod 13, and the threaded rod 13 is in threaded connection with the threaded hole 12.
In this embodiment, the plug 3 can be detached and installed at the bottom end of the insertion rod 2 through the threaded hole 12 and the threaded rod 13, and is convenient to replace.
Specifically, a plurality of inserting bars 14 are fixedly connected to the outer surface of the inserting bar 2, and the plurality of inserting bars 14 are uniformly distributed around the central axis of the inserting bar 2.
In this embodiment, a plurality of cutting 14 can follow the inserted bar 2 and enter into the soil horizon together, and a plurality of cutting 14 prevent that the inserted bar 2 from taking place to rotate after getting into the soil horizon and influencing stability.
Specifically, the top end of the rotating block 6 is detachably connected with a positioner 15, and the positioner 15 is positioned on the upper side of the pile body 1.
In this embodiment, inserted bar 2 is after getting into the soil layer, through installing locator 15 on turning block 6, locator 15 can the transmission signal, makes things convenient for electric power surveying personnel to seek the mark stake, and locator 15 is the common general knowledge of technical staff in this scheme, does not do too much in this scheme and gives unnecessary the repeated description.
The working principle is as follows: the mark stake is when using, squeeze into the soil layer through commentaries on classics piece 6 messenger pile body 1 with inserted bar 2, plug 3 makes the entering soil layer that inserted bar 2 can be smooth and easy, behind the inserted bar 2 entering soil layer, a plurality of firm board 4 are located subaerial, rotate screw rod 5 through commentaries on classics piece 6 and make nut 7 lapse in pile body 1, nut 7 drives a plurality of sliders 9 lapse in a plurality of spouts 8, a plurality of sliders 9 make a plurality of firm board 4 expand through a plurality of connecting rods 10, a plurality of firm board 4 rotate on inserted bar 2 and ground contact, make pile body 1 and inserted bar 2 remain stable, thereby improve the stability of whole mark stake, when the mark stake needs to be taken out, through reverse rotation commentaries on classics piece 6, commentaries on classics piece 6 makes nut 7 rebound, thereby make a plurality of firm board 4 fold to the outside of pile body 1, a plurality of firm board 4 after folding make things convenient for the removal of whole mark stake.
The above description is only the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art can substitute or change the technical solution and the improvement concept of the present invention within the technical scope disclosed in the present invention.

Claims (6)

1. The utility model provides a electric power surveys location and uses mark stake, includes pile body (1), its characterized in that: the bottom fixedly connected with inserted bar (2) of pile body (1), the bottom of inserted bar (2) can be dismantled and be connected with plug (3), the surface of inserted bar (2) has a plurality of firm boards (4) through hinge activity hinge joint, and is a plurality of set up control mechanism between firm board (4) and pile body (1), control mechanism is used for controlling a plurality of firm boards (4) and rotates.
2. The marking pile for electric power survey positioning according to claim 1, characterized in that: control mechanism includes screw rod (5), commentaries on classics piece (6), nut (7), a plurality of spout (8), a plurality of slider (9) and a plurality of connecting rod (10), screw rod (5) rotate to be connected in the diapire of pile body (1), change piece (6) fixed connection in the top of screw rod (5), and change piece (6) and run through to the upper end of pile body (1), nut (7) threaded connection is in the surface of screw rod (5), and is a plurality of spout (8) are all dug on pile body (1), and are a plurality of slider (9) all fixed connection in the surface of nut (7), and a plurality of slider (9) are sliding connection respectively in a plurality of spout (8), and is a plurality of connecting rod (10) articulate respectively through hinge activity between a plurality of slider (9) and a plurality of firm board (4).
3. The marking pile for electric power survey positioning according to claim 2, characterized in that: a group of stabilizing strips (11) are fixedly connected to the stabilizing plates (4), and two stabilizing strips (11) are arranged on each group.
4. The electric power survey positioning mark pile as claimed in claim 3, wherein: threaded hole (12) are seted up to the bottom of inserted bar (2), fixedly connected with threaded rod (13) on plug (3), and threaded rod (13) threaded connection is in threaded hole (12).
5. The marking pile for positioning in electric power surveying as claimed in claim 4, wherein: the outer surface of inserted bar (2) is fixedly connected with a plurality of cuttings (14), and is a plurality of cuttings (14) are around the center pin evenly distributed of inserted bar (2).
6. The electric power survey positioning mark pile as claimed in claim 5, wherein: the top of commentaries on classics piece (6) can be dismantled and is connected with locator (15), locator (15) are located the upside of pile body (1).
CN202221036957.8U 2022-05-04 2022-05-04 Electric power surveys location and uses mark stake Active CN218585521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221036957.8U CN218585521U (en) 2022-05-04 2022-05-04 Electric power surveys location and uses mark stake

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221036957.8U CN218585521U (en) 2022-05-04 2022-05-04 Electric power surveys location and uses mark stake

Publications (1)

Publication Number Publication Date
CN218585521U true CN218585521U (en) 2023-03-07

Family

ID=85359454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221036957.8U Active CN218585521U (en) 2022-05-04 2022-05-04 Electric power surveys location and uses mark stake

Country Status (1)

Country Link
CN (1) CN218585521U (en)

Similar Documents

Publication Publication Date Title
CN218585521U (en) Electric power surveys location and uses mark stake
CN210090077U (en) Portable ground detects sampling device
CN214538910U (en) Indoor geotechnical model high-precision miniature test probe
CN211740061U (en) Agricultural economic management's ridge measuring device
CN214538655U (en) Sampling device for geological mineral exploration
CN214695256U (en) Civil engineering warning device
CN212296215U (en) Efficient and accurate prospecting system
CN112096279B (en) Electric power engineering surveys device
CN212565029U (en) Portable tripod for mapping engineering
CN211504747U (en) Road compactness test detection device
CN210322382U (en) Sampling device for geology
CN216952271U (en) Environmental monitoring supervisory equipment based on variety district examination appraisal
CN220320910U (en) Engineering investigation support
CN212377673U (en) A triangle fixed bolster for surveying and mapping operation
CN212827562U (en) Surveying and mapping achievement recording device
CN214944039U (en) Small-sized drilling tool for hydrogeological exploration
CN218002961U (en) Rammed soil fetching device for geological survey
CN213629681U (en) Electronic theodolite with distance measuring function
CN215569479U (en) Topographic map mapping device for power transmission and transformation circuit design
CN212742263U (en) Safety indicator board for petroleum construction site
CN214164596U (en) Geographic information map marking device
CN215718507U (en) Drilling rig for geotechnical engineering investigation
CN213710971U (en) Rotary drilling bit convenient to install
CN215636329U (en) Mounting bracket for wind direction and wind speed indicator
CN216280305U (en) Horizontal fixing device for land surveying and mapping

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant