CN218573999U - Fire-fighting pipeline preparation facilities - Google Patents

Fire-fighting pipeline preparation facilities Download PDF

Info

Publication number
CN218573999U
CN218573999U CN202222084292.4U CN202222084292U CN218573999U CN 218573999 U CN218573999 U CN 218573999U CN 202222084292 U CN202222084292 U CN 202222084292U CN 218573999 U CN218573999 U CN 218573999U
Authority
CN
China
Prior art keywords
fixedly connected
pipeline
linkage
base
extends
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222084292.4U
Other languages
Chinese (zh)
Inventor
常玉曦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Hairun Xin'an Fire Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222084292.4U priority Critical patent/CN218573999U/en
Application granted granted Critical
Publication of CN218573999U publication Critical patent/CN218573999U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The utility model discloses a fire control pipeline preparation facilities, the on-line screen storage device comprises a base, the driving groove has been seted up in the inside left side of base, the linkage groove has been seted up on the inside right side of base, the utility model relates to a pipeline preparation technical field. This fire pipeline preparation facilities, through starter motor, motor start drives the rotation of two-way threaded rod, two-way threaded rod rotates and makes two stop collars remove to the centre simultaneously, the stop collar removes and carries out the centre gripping with the pipeline at base top, then the electric telescopic handle who starts both sides makes the electric telescopic handle shrink, open the solenoid valve on conveying pipeline surface simultaneously, the electric telescopic handle shrink drives the stop collar and rotates, the inside pipeline of stop collar rises and rotates this moment, spout lacquer accessible shower nozzle blowout after the solenoid valve on conveying pipeline surface is opened simultaneously, this structure can reach and carry out the effect of centre gripping to arbitrary length pipeline, the effect of spraying paint has evenly been reached to the pipeline surface simultaneously.

Description

Fire-fighting pipeline preparation facilities
Technical Field
The utility model relates to a pipeline preparation technical field specifically is a fire control pipeline preparation facilities.
Background
The fire control pipeline is in the aspect of being used for the fire control, connect fire-fighting equipment, the equipment, carry the fire control water of putting out a fire, the pipeline material of gas or other medium, because special demand, the thickness and the material of fire control pipeline all have special requirements, and spout red oil paint, carry the fire control water, when spraying paint to the fire control pipeline because partial pipeline is heavier and different in size, be not convenient for overturn and spray paint subaerial to the pipeline, consequently need artifical manual to spray paint to the pipeline surface after hoisting the pipeline again, not only consume a large amount of manpowers, the efficiency of pipeline preparation has been reduced simultaneously, consequently, need design a fire control pipeline preparation facilities and solve above problem.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a fire-fighting pipeline preparation facilities has solved current fire-fighting pipeline and need artifical manual spraying paint to the pipeline surface after lifting up the pipeline when preparation again, not only consumes a large amount of manpowers, has reduced the problem of the efficiency of pipeline preparation simultaneously.
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a fire-fighting pipeline preparation facilities, includes the base, the drive groove has been seted up in the inside left side of base, the linkage groove has been seted up on the inside right side of base, the left side fixed mounting of drive inslot chamber has the motor, the output shaft of motor passes through the two-way threaded rod of shaft coupling fixedly connected with, the right-hand member of two-way threaded rod runs through drive groove and linkage groove in proper order and extends to the inside of linkage groove, the one end that two-way threaded rod extends to the linkage inslot portion passes through the bearing spare and rotates the right side of connecting in linkage inslot chamber, the equal threaded connection in both sides on two-way threaded rod surface has the thread bush, the top fixedly connected with traction lever of thread bush, the top of traction lever runs through the linkage groove and extends to the outside in linkage groove, the traction lever extends to the outside one end fixedly connected with traction plate of linkage frame, the first expansion gap that cooperatees and use with the traction lever has all been seted up to the both sides at base top, the equal fixedly connected with heel post in both sides at base top, the top fixedly connected with linkage frame of heel post.
Preferably, the both sides at linkage frame top are all through seting up opening fixedly connected with electric telescopic handle, the below fixedly connected with telescopic link at electric telescopic handle rear portion, the one end of telescopic link runs through the hitch plate and extends to the inside of hitch plate, the telescopic link extends to the inside one end of hitch plate and rotates through the bearing spare and is connected with the gear, the rear side fixedly connected with and the meshing board that the gear engaged with of hitch plate inner chamber, one side fixedly connected with dwang of gear, the one end of dwang runs through the hitch plate and extends to the outside of hitch plate, the dwang extends to the outside one end fixedly connected with stop collar of hitch plate, the second expansion joint has all been seted up to the both sides of hitch plate.
Preferably, the top of linkage frame is through seting up opening fixedly connected with conveying pipeline, the bottom mounting intercommunication of conveying pipeline has the material storage pipe, the fixed intercommunication in bottom of material storage pipe has row material pipe, and arranges the material pipe and be provided with a plurality of, arrange the outside that the bottom of material pipe runs through linkage frame and extend to the linkage frame, it has the shower nozzle to arrange the fixed intercommunication of the one end that the material pipe extends to the linkage frame outside.
Preferably, one side of the traction plate is fixedly connected with a U-shaped rod.
Preferably, one end of the U-shaped rod penetrates through the bearing column, the linkage frame and the material storage pipe in sequence and extends to the interior of the material storage pipe.
Preferably, a sealing sleeve matched with the material storage pipe for use is fixedly connected above the surface of the U-shaped rod.
Advantageous effects
The utility model provides a fire-fighting pipeline preparation facilities. Compared with the prior art, the method has the following beneficial effects:
(1) This fire pipeline preparation facilities, through starter motor, motor start drives the rotation of two-way threaded rod, two-way threaded rod rotates and makes two stop collars remove to the centre simultaneously, the stop collar removes and carries out the centre gripping with the pipeline at base top, then the electric telescopic handle who starts both sides makes the electric telescopic handle shrink, open the solenoid valve on conveying pipeline surface simultaneously, the electric telescopic handle shrink drives the stop collar and rotates, the inside pipeline of stop collar rises and rotates this moment, spout the blowout of lacquer accessible shower nozzle after the solenoid valve on conveying pipeline surface is opened simultaneously, this structure can reach and carry out the effect of centre gripping to arbitrary length pipeline, the effect of evenly spraying paint to the pipeline surface has been reached simultaneously, the efficiency of preparing the pipeline has effectively been improved.
(2) This fire control pipeline preparation facilities, through starter motor, the motor starts to drive two-way threaded rod and rotates, two-way threaded rod rotates and makes two thread bushings move to the centre simultaneously, the thread bushing removes and drives the traction lever and removes, the traction lever removes and drives the traction plate and remove, the traction plate removes and drives U type pole and remove, U type pole removes through inserting the seal cover in the stock pipe, thereby reach the effect of controlling shower nozzle number of use according to the length of pipeline, effectively reached the condition emergence of having avoided paint wasting of resources.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view of the base, traction plate and linkage frame structure of the present invention;
FIG. 3 is an enlarged view of a portion A of FIG. 2;
FIG. 4 is a side view of the electric telescopic rod and telescopic rod structure of the present invention;
fig. 5 is a cross-sectional view of the storage tube structure of the present invention.
In the figure: 1. a base; 2. a load-bearing column; 3. a linkage frame; 4. a delivery pipe; 5. a material storage pipe; 6. a discharge pipe; 7. a spray head; 8. a linkage groove; 9. a drive slot; 10. a motor; 11. a bidirectional threaded rod; 12. a threaded sleeve; 13. a draw bar; 14. a first movable port; 15. a traction plate; 16. an electric telescopic rod; 17. a telescopic rod; 18. a gear; 19. an engagement plate; 20. rotating the rod; 21. a limiting sleeve; 22. a second movable port; 23. a U-shaped rod; 24. and (5) sealing the sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides a technical solution: the utility model provides a fire-fighting pipeline preparation device, including base 1, drive groove 9 has been seted up in the inside left side of base 1, linkage groove 8 has been seted up on the inside right side of base 1, the left side fixed mounting in drive groove 9 inner chamber has motor 10, motor 10 is servo motor, the output shaft of motor 10 passes through shaft coupling fixedly connected with two-way threaded rod 11, the right-hand member of two-way threaded rod 11 runs through drive groove 9 and linkage groove 8 in proper order and extends to the inside of linkage groove 8, two-way threaded rod 11 extends to the inside one end of linkage groove 8 and passes through the bearing piece and rotate and connect in the right side of linkage groove 8 inner chamber, the equal threaded connection in both sides on two-way threaded rod 11 surface has threaded bush 12, the top fixedly connected with traction lever 13 of threaded bush 12, the top of traction lever 13 runs through linkage groove 8 and extends to the outside of linkage groove 8, traction lever 13 extends to the outside one end fixedly connected with traction plate 15 of linkage frame 3, the both sides at base 1 top all have seted up first expansion joint 14 that cooperatees with traction lever 13 and use, the both sides at base 1 top, the top fixedly connected with heel post 2, the top fixedly connected with linkage frame 3 of base 2.
Further, in order to reach the effect that can evenly spray paint to the pipeline, the both sides at linkage frame 3 top are all through seting up opening fixedly connected with electric telescopic handle 16, below fixedly connected with telescopic link 17 at electric telescopic handle 16 rear portion, telescopic link 17 is square telescopic link, the one end of telescopic link 17 runs through the carriage 15 and extends to the inside of carriage 15, telescopic link 17 extends to the inside one end of carriage 15 and passes through bearing spare rotation and be connected with gear 18, rear side fixedly connected with and the 18 engaged with engagement plate 19 of gear of carriage 15 inner chamber, one side fixedly connected with dwang 20 of gear 18, the one end of dwang 20 runs through carriage 15 and extends to the outside of carriage 15, dwang 20 extends to the outside of carriage 15 outside one end fixedly connected with stop collar 21, second expansion joint 22 has all been seted up to carriage 15's both sides, the top of linkage frame 3 is through seting up opening fixedly connected with conveying pipeline 4, the fixed surface of conveying pipeline 4 installs the solenoid valve, the top of conveying pipeline 4 is linked together with the spray can, the bottom fixed intercommunication of conveying pipeline 4 has material storage pipe 5, and the bottom fixed intercommunication of material pipe 6 extends to the material discharge frame 3 and has the outside discharge pipe 3 and extends to the discharge link 3 and has the material pipe 3.
Furthermore, in order to achieve the effect of avoiding paint spraying waste, one side of the traction plate 15 is fixedly connected with a U-shaped rod 23, one end of the U-shaped rod 23 sequentially penetrates through the bearing column 2, the linkage frame 3 and the material storage pipe 5 and extends into the material storage pipe 5, a sealing sleeve 24 matched with the material storage pipe 5 is fixedly connected above the surface of the U-shaped rod 23, and the sealing sleeve 24 is tightly attached to the inner wall of the material storage pipe 5.
And those not described in detail in this specification are well within the skill of those in the art.
When the spraying device is used, a pipeline is placed on the top of the base 1, then the motor 10 is started, the motor 10 is started to drive the two-way threaded rod 11 to rotate, the two threaded sleeves 12 move towards the middle simultaneously due to the rotation of the two-way threaded rod 11, the traction rod 13 moves due to the movement of the threaded sleeves 12, the traction rod 13 moves due to the movement of the traction rod 15, the traction plate 15 moves due to the movement of the limiting sleeve 21, the pipeline on the top of the base 1 is clamped, the traction plate 15 moves due to the movement of the U-shaped rod 23, the U-shaped rod 23 moves due to the insertion of the sealing sleeve 24 into the material storage pipe 5, the effect of controlling the number of the nozzles 7 according to the length of the pipeline is achieved, after the pipeline is clamped, the electric telescopic rods 16 are simultaneously started to contract, the electromagnetic valves on the surfaces of the material conveying pipes 4 are simultaneously opened, the electric telescopic rods 16 contract to drive the telescopic rods 17 to ascend, the telescopic rods 17 ascend due to the ascending of the gears 18, the gears 18 rotate to drive the gears 20 to rotate, the limiting sleeves 21 to rotate, the pipelines in the pipelines are ascended and the electromagnetic valves on the surfaces of the conveying pipes 4, the spraying effect of the conveying pipes can be uniformly sprayed, and then the conveying surface of the conveying pipes 7 can be sprayed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a fire control pipeline preparation facilities, includes base (1), its characterized in that: a driving groove (9) is arranged on the left side in the base (1), a linkage groove (8) is arranged on the right side in the base (1), a motor (10) is fixedly arranged on the left side of the inner cavity of the driving groove (9), an output shaft of the motor (10) is fixedly connected with a bidirectional threaded rod (11) through a coupler, the right end of the bidirectional threaded rod (11) penetrates through the driving groove (9) and the linkage groove (8) in sequence and extends into the linkage groove (8), one end of the bidirectional threaded rod (11) extending to the interior of the linkage groove (8) is rotatably connected to the right side of the inner cavity of the linkage groove (8) through a bearing piece, both sides of the surface of the bidirectional threaded rod (11) are in threaded connection with threaded sleeves (12), the top of the threaded sleeve (12) is fixedly connected with a traction rod (13), the top end of the traction rod (13) penetrates through the linkage groove (8) and extends to the outside of the linkage groove (8), one end of the traction rod (13) extending to the outside of the linkage frame (3) is fixedly connected with a traction plate (15), two sides of the top of the base (1) are respectively provided with a first movable opening (14) which is matched with the traction rod (13) for use, both sides of the top of the base (1) are fixedly connected with bearing columns (2), the top end of the bearing column (2) is fixedly connected with a linkage frame (3).
2. A fire fighting pipeline preparation device according to claim 1, characterized in that: both sides at linkage frame (3) top are all through seting up opening fixedly connected with electric telescopic handle (16), below fixedly connected with telescopic link (17) at electric telescopic handle (16) rear portion, the one end of telescopic link (17) runs through hitch plate (15) and extends to the inside of hitch plate (15), telescopic link (17) extend to the inside one end of hitch plate (15) and rotate through the bearing spare and are connected with gear (18), rear side fixedly connected with and gear (18) engaged with engagement plate (19) of hitch plate (15) inner chamber, one side fixedly connected with dwang (20) of gear (18), the one end of dwang (20) runs through hitch plate (15) and extends to the outside of hitch plate (15), dwang (20) extend to the outside one end fixedly connected with stop collar (21) of hitch plate (15), second expansion joint (22) have all been seted up to the both sides of hitch plate (15).
3. A fire fighting pipeline preparation device according to claim 1, characterized in that: linkage frame (3) top is through seting up opening fixedly connected with conveying pipeline (4), the bottom mounting intercommunication of conveying pipeline (4) has storage pipe (5), the bottom mounting intercommunication of storage pipe (5) has row material pipe (6), and arranges material pipe (6) and be provided with a plurality of, the bottom of arranging material pipe (6) runs through linkage frame (3) and extends to the outside of linkage frame (3), it has shower nozzle (7) to arrange the fixed intercommunication of one end that material pipe (6) extended to linkage frame (3) outside.
4. A fire fighting pipeline preparation device according to claim 3, characterized in that: one side of the traction plate (15) is fixedly connected with a U-shaped rod (23).
5. A fire fighting pipeline preparation device according to claim 4, characterized in that: one end of the U-shaped rod (23) penetrates through the bearing column (2), the linkage frame (3) and the material storage pipe (5) in sequence and extends to the interior of the material storage pipe (5).
6. A fire fighting pipeline preparation device according to claim 4, characterized in that: and a sealing sleeve (24) matched with the material storage pipe (5) for use is fixedly connected above the surface of the U-shaped rod (23).
CN202222084292.4U 2022-08-09 2022-08-09 Fire-fighting pipeline preparation facilities Active CN218573999U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222084292.4U CN218573999U (en) 2022-08-09 2022-08-09 Fire-fighting pipeline preparation facilities

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222084292.4U CN218573999U (en) 2022-08-09 2022-08-09 Fire-fighting pipeline preparation facilities

Publications (1)

Publication Number Publication Date
CN218573999U true CN218573999U (en) 2023-03-07

Family

ID=85361758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222084292.4U Active CN218573999U (en) 2022-08-09 2022-08-09 Fire-fighting pipeline preparation facilities

Country Status (1)

Country Link
CN (1) CN218573999U (en)

Similar Documents

Publication Publication Date Title
CN111570149B (en) Environment-friendly three-way pipe machining device
CN218573999U (en) Fire-fighting pipeline preparation facilities
CN112619948A (en) Automatic flatness detection and repair equipment for steel pipe paint spraying
CN111266261A (en) Oiling station is used in gear production
CN206949391U (en) One kind automation natural casing processing unit (plant)
CN112873898B (en) Device for efficiently weaving formed carbon fiber tube and forming method thereof
CN216323943U (en) Aircraft pipe belt cleaning device
CN212417387U (en) Construction blasting is with dustproof watering device
CN212441769U (en) Metal pipeline anticorrosive treatment device
CN112413152A (en) Valve easy to clean rust and scale attached to inner wall of valve
CN217550152U (en) Steel pipe outer surface plastic-coated processing equipment for plastic-coated steel pipe production and manufacturing process
CN209171211U (en) A kind of water body treating disinfector
CN113102346B (en) High-efficient belt cleaning device that carbon-fibre composite goods were used
CN206455147U (en) A kind of casting pattern appearance spraying equipment
CN213306153U (en) Soil restoration is with spraying even restoration medicament sprinkler
CN217047872U (en) Building fire-proof material is with fire prevention multiply wood processingequipment
CN214710223U (en) Cleaning equipment of meat products
CN220924126U (en) Double-bolt and electric drive train water adding equipment
CN218013465U (en) Sewage treatment agent sprinkler
CN114700206B (en) Magnetic adsorption wall-climbing spraying robot and application method thereof
CN217921853U (en) Uniform coating equipment for inner wall of quartz tube
CN218838127U (en) Concrete pipe pile mould cleaning device
CN220716929U (en) Stainless steel cleaning machine without dead angle
CN220111426U (en) Novel coating equipment for biomass fireproof plate
CN218012496U (en) Double-shaft mixer with humidifying device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230915

Address after: Room 035, Area A, Building 6, No. 5 Kangda Street, Hanyang District, Wuhan, Hubei 430050

Patentee after: Hubei Hairun Xin'an Fire Engineering Co.,Ltd.

Address before: 618000 Building 1, south of Baihe Lane, Zhongshan Street, Deyang City, Sichuan Province

Patentee before: Chang Yuxi