CN218562667U - Install in ultra-thin clean wallboard system of CNC pavement - Google Patents

Install in ultra-thin clean wallboard system of CNC pavement Download PDF

Info

Publication number
CN218562667U
CN218562667U CN202222828714.4U CN202222828714U CN218562667U CN 218562667 U CN218562667 U CN 218562667U CN 202222828714 U CN202222828714 U CN 202222828714U CN 218562667 U CN218562667 U CN 218562667U
Authority
CN
China
Prior art keywords
fossil fragments
cnc
clean wallboard
ultra
clean
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222828714.4U
Other languages
Chinese (zh)
Inventor
马晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Elco Engineering Technology Co ltd
Original Assignee
Elco Engineering Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Elco Engineering Technology Co ltd filed Critical Elco Engineering Technology Co ltd
Priority to CN202222828714.4U priority Critical patent/CN218562667U/en
Application granted granted Critical
Publication of CN218562667U publication Critical patent/CN218562667U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

In order to solve the problem that current wallboard equipment is complicated, with high costs, the utility model provides an install in ultra-thin clean wallboard system of CNC pavement, including many fossil fragments, the clean wallboard of polylith, ground rail, all be equipped with a clean wallboard between two adjacent fossil fragments, can dismantle between clean wallboard and two adjacent fossil fragments and be connected, many fossil fragments interval parallel arrangement, many fossil fragments are fixed with the civil engineering partition wall through a plurality of leveling structures, and many fossil fragments bottom are equipped with the ground rail, the ground rail pastes with fossil fragments and clean wallboard and leans on to play the supporting role.

Description

Install in ultra-thin clean wallboard system of CNC pavement
Technical Field
The utility model relates to a technical field is built to the structure, and more specifically relates to an install in ultra-thin clean wallboard system of CNC pavement.
Background
The clean factory building of medicine all requires certain clean control to the peripheral CNC pavement of toilet, and CNC pavement one side is the toilet, and the opposite side is the general district, and both are cut apart with the brick wall generally. In order to ensure that the CNC walkway also has the condition of clean control, a rock wool sandwich color steel plate partition wall with the thickness of 50mm is usually installed along the side of a civil engineering wall, so that the inner wall of the CNC walkway is ensured to be a color steel plate, the investment cost of a clean room is increased, and the use area of the CNC walkway is reduced.
SUMMERY OF THE UTILITY MODEL
In view of this, in order to solve the complicated, with high costs problem of current wallboard equipment, the utility model provides an install in ultra-thin clean wallboard system of CNC pavement, including many fossil fragments 1, the clean wallboard of polylith 2, ground rail 3, its characterized in that: all be equipped with a clean wallboard 2 between two adjacent fossil fragments 1, can dismantle between clean wallboard 2 and two adjacent fossil fragments 1 and be connected, many fossil fragments 1 interval parallel arrangement, many fossil fragments 1 are fixed with civil engineering partition wall 5 through a plurality of leveling structure 4, and 1 bottoms of many fossil fragments are equipped with ground rail 3, ground rail 3 pastes with fossil fragments 1 and clean wallboard 2 and leans on to play the supporting role.
The utility model provides an install in ultra-thin clean wallboard system of CNC pavement, includes many fossil fragments 1, polylith clean wallboard 2, ground rail 3, its characterized in that: all be equipped with a clean wallboard 2 between two adjacent fossil fragments 1, can dismantle between clean wallboard 2 and two adjacent fossil fragments 1 and be connected, many 1 interval parallel arrangement of fossil fragments, many fossil fragments 1 are fixed with civil engineering partition wall 5 through a plurality of leveling structure 4, and 1 bottoms of many fossil fragments are equipped with ground rail 3, ground rail 3 pastes with fossil fragments 1 and clean wallboard 2 and leans on to play the supporting role.
Further, 1 cross section of fossil fragments is special-shaped structure, including trapezium structure 6 and spring plate clip 7, trapezium structure 6 and spring plate clip 7 integrated into one piece, and trapezium structure 6 is semi-enclosed cavity structures, and 6 upper portions of trapezium structure are equipped with opening part 8, and 8 upwards extensions department of opening part are equipped with a shell fragment 9, and spring plate clip 7 comprises two shell fragments 9 intervals.
Furthermore, the elastic sheet 9 is of an outward-turned hook structure, so that the installation is convenient.
Furthermore, the spring plate clip 7 is of an isosceles triangle structure, and the base angle of the triangle is 39-41 degrees, so that the keel 1 is stable in structure and not easy to deform.
Further, leveling structure 4 includes bolt main part 10, first nut 11, second nut 12, during bolt main part 10 one end was squeezed into civil engineering partition wall 5 wall bodies, adjust the horizontal depth of 4 vertical directions of leveling structure through first nut 11 for all first nuts 11 are apart from the wall distance and are equal, are in same water flat line in vertical direction, and first nut 11 is located fossil fragments 1 and hugs closely fossil fragments 1 outward, and second nut 12 is located 6 cavitys in the trapezium structure of fossil fragments 1 for fixed fossil fragments 1 and lock.
Further, 2 both sides of clean wallboard all are equipped with first hem 13, and fossil fragments 1 and clean wallboard 2 pass through the tight first hem 13 of cartridge clip 7 clamp and reach fixed effect.
Further, the top of the clean wall plate 2 is provided with a second folding edge 14, and the second folding edge 14 is used for blocking dust.
Furthermore, the clean wallboard 2 is a color steel plate with the thickness of 9-11 mm.
Furthermore, the trapezoid structure 6 is an isosceles trapezoid, so that the strength of the keel 1 is increased, the keel is not easy to deform, and meanwhile, the trapezoid structure 6 ensures that the cavity structure is large enough, so that the second nut 12 can be fixed conveniently; the base angle of the trapezoid structure 6 is 74-76 degrees, so that the opening degrees of the two waists of the trapezoid structure 6 are convenient for the installation of the second nut 12.
Furthermore, grooves are formed in the vertical direction of one side, facing the CNC walkway, of the keel 1 at intervals, so that a sleeve tool can conveniently enter the cavity structure to tighten the second nut 12, and operation is convenient.
Further, ground rail 3 includes 3 bodies of ground rail and baffle, and the baffle is located perpendicularly and is close to 5 one sides of civil engineering partition wall, hugs closely fossil fragments 1 simultaneously for check-up fossil fragments 1 is at same horizontal plane.
The utility model has the advantages that: the utility model provides an install in ultra-thin clean wallboard system of CNC pavement, including many fossil fragments 1, polylith clean wallboard 2, ground rail 3, its characterized in that: all be equipped with a clean wallboard 2 between two adjacent fossil fragments 1, can dismantle between clean wallboard 2 and two adjacent fossil fragments 1 and be connected, many fossil fragments 1 interval parallel arrangement, many fossil fragments 1 are fixed with civil engineering partition wall 5 through a plurality of leveling structure 4, and 1 bottoms of many fossil fragments are equipped with ground rail 3, ground rail 3 pastes with fossil fragments 1 and clean wallboard 2 and leans on to play the supporting role.
Drawings
Fig. 1 is the utility model discloses an install in ultra-thin clean wallboard system's of CNC pavement structure diagram.
Fig. 2 is the utility model discloses an install in fossil fragments (area bolt) structure picture of ultra-thin clean wallboard system of CNC pavement.
Fig. 3 is the utility model discloses an install in fossil fragments sectional view of ultra-thin clean wallboard system of CNC pavement.
Fig. 4 is the utility model discloses an install in fossil fragments (area bolt) cross-sectional view of ultra-thin clean wallboard system of CNC pavement.
Description of the main elements
Keel 1
Clean wallboard 2
Ground rail 3
Leveling structure 4
Civil engineering partition wall 5
Ladder structure 6
Spring clip 7
At the opening part 8
Spring plate 9
Bolt body 10
First nut 11
Second nut 12
First folded edge 13
Second flange 14
The following detailed description of the invention will be further described in conjunction with the above-identified drawings.
Detailed Description
The following examples are described to aid in the understanding of the present application and are not, and should not be construed to, limit the scope of the present application in any way.
In the description that follows, those skilled in the art will recognize that components may be described throughout this discussion as separate functional units (which may include sub-units), but those skilled in the art will recognize that various components or portions thereof may be divided into separate components or may be integrated together (including integrated within a single system or component).
Also, connections between components or systems within the figures are not intended to be limited to direct connections. Rather, data between these components may be modified, reformatted, or otherwise changed by the intermediate components. Additionally, additional or fewer connections may be used. It should also be noted that the terms "coupled," "connected," or "input" and "fixed" should be understood to encompass direct connections, indirect connections, or fixed through one or more intermediaries.
In the description of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "side", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on orientations or positional relationships shown in the drawings or orientations or positional relationships that are commonly known or used in the product of the application, and are only used for convenience of description and simplification of the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present application. Furthermore, the terms "first," "second," "third," and the like are used solely to distinguish one from another and are not to be construed as indicating or implying relative importance. Furthermore, the terms "horizontal", "vertical" and the like do not imply that the components are required to be absolutely horizontal or pendant, but rather may be slightly inclined. For example, "horizontal" merely means that the direction is more horizontal than "vertical" and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.
The specific embodiment is as follows:
as shown in fig. 1, it is a structural diagram of the ultra-thin clean wallboard system installed in the CNC walkway of the present invention; as shown in fig. 2, it is a keel 1 (with bolt) structure diagram of the ultra-thin clean wallboard system installed in the CNC walkway of the present invention; as shown in fig. 3, it is a cross-sectional view of a keel 1 of the ultra-thin clean wallboard system installed in the CNC walkway of the present invention; as shown in fig. 4, it is the keel 1 (with bolt) cross-sectional view of the ultra-thin clean wallboard system installed in the CNC walkway of the present invention.
The utility model provides an install in ultra-thin clean wallboard system of CNC pavement, includes many fossil fragments 1, polylith clean wallboard 2, ground rail 3, its characterized in that: all be equipped with a clean wallboard 2 between two adjacent fossil fragments 1, can dismantle between clean wallboard 2 and two adjacent fossil fragments 1 and be connected, many fossil fragments 1 interval parallel arrangement, many fossil fragments 1 are fixed with civil engineering partition wall 5 through a plurality of leveling structure 4, and 1 bottoms of many fossil fragments are equipped with ground rail 3, ground rail 3 pastes with fossil fragments 1 and clean wallboard 2 and leans on to play the supporting role.
The cross section of the keel 1 is of a special-shaped structure and comprises a trapezoid structure 6 and an elastic sheet clamp 7, the trapezoid structure 6 and the elastic sheet clamp 7 are integrally formed, the trapezoid structure 6 is of a semi-closed cavity structure, an opening 8 is formed in the upper portion of the trapezoid structure 6, an elastic sheet 9 is arranged at the position, extending upwards, of the opening 8, and the elastic sheet clamp 7 is formed by two elastic sheets 9 at intervals.
The elastic sheet 9 is of an outward-turned hook structure, so that the installation is convenient.
The elastic sheet clips 7 are of isosceles triangle structures, and the base angles of the triangles are 39-41 degrees, so that the keel 1 is stable in structure and not easy to deform.
Leveling structure 4 includes bolt main part 10, first nut 11, second nut 12, and during the civil engineering partition wall 5 wall bodies were squeezed into to 10 one end of bolt main part, adjust the horizontal degree of depth of 4 vertical directions of leveling structure through first nut 11 for all first nuts 11 are apart from the wall distance and are equal, are in same water flat line at vertical direction, and first nut 11 is located fossil fragments 1 and hugs closely fossil fragments 1 outward, and second nut 12 is located 6 cavities of the trapezium structure of fossil fragments 1, is used for fixed fossil fragments 1 and lock.
Clean 2 both sides of wallboard all are equipped with first hem 13, and fossil fragments 1 and clean wallboard 2 press from both sides tight first hem 13 through elastic sheet clamp 7 and reach fixed effect.
The top of the clean wallboard 2 is provided with a second folding edge 14, and the second folding edge 14 is used for blocking dust.
The clean wallboard 2 is a color steel plate with the thickness of 9-11 mm.
The trapezoid structure 6 is in an isosceles trapezoid shape, so that the strength of the keel 1 is increased, the keel is not easy to deform, and meanwhile, the trapezoid structure 6 ensures that the cavity structure is large enough, so that the second nut 12 can be fixed conveniently; the base angle of the trapezoid structure 6 is 74-76 degrees, so that the opening degrees of the two waists of the trapezoid structure 6 are convenient for the installation of the second nut 12.
Keel 1 is seted up flutedly towards the interval in the vertical direction of CNC pavement one side for the sleeve instrument conveniently gets into cavity structures and screws up second nut 12, convenient operation.
Ground rail 3 includes 3 bodies of ground rail and baffle, and the baffle is located perpendicularly and is close to 5 one sides of civil engineering partition wall, hugs closely fossil fragments 1 simultaneously for check-up fossil fragments 1 is at same horizontal plane.
The utility model has the advantages that: the utility model provides an install in ultra-thin clean wallboard system of CNC pavement, including many fossil fragments 1, the clean wallboard of polylith 2, ground rail 3, its characterized in that: all be equipped with a clean wallboard 2 between two adjacent fossil fragments 1, can dismantle between clean wallboard 2 and two adjacent fossil fragments 1 and be connected, many fossil fragments 1 interval parallel arrangement, many fossil fragments 1 are fixed with civil engineering partition wall 5 through a plurality of leveling structure 4, and 1 bottoms of many fossil fragments are equipped with ground rail 3, ground rail 3 pastes with fossil fragments 1 and clean wallboard 2 and leans on to play the supporting role.
The above-mentioned embodiments only represent some embodiments of the present invention, and the description thereof is specific and detailed, but not to be construed as limiting the scope of the present invention. It should be noted that, for those skilled in the art, without departing from the concept of the present invention, several variations and modifications can be made, which all fall within the scope of the present invention. Therefore, the protection scope of the present invention should be subject to the appended claims.

Claims (9)

1. The utility model provides an install in ultra-thin clean wallboard system of CNC pavement, includes many fossil fragments (1), the clean wallboard of polylith (2), ground rail (3), its characterized in that: all be equipped with a clean wallboard (2) between two adjacent fossil fragments (1), can dismantle between clean wallboard (2) and two adjacent fossil fragments (1) and be connected, many fossil fragments (1) interval parallel arrangement, many fossil fragments (1) are fixed with civil engineering partition wall (5) through a plurality of leveling structure (4), and many fossil fragments (1) bottom is equipped with ground rail (3), ground rail (3) paste with fossil fragments (1) and clean wallboard (2) and lean on to play the supporting role.
2. The ultra-thin clean wallboard system installed to CNC walkways of claim 1 wherein: fossil fragments (1) cross section is the odd-shaped structure, including trapezium structure (6) and cartridge clip (7), trapezium structure (6) and cartridge clip (7) integrated into one piece, and trapezium structure (6) are semi-enclosed cavity structures, and trapezium structure (6) upper portion is equipped with opening part (8), and opening part (8) upwards extend the department and are equipped with an shell fragment (9), and cartridge clip (7) comprise two shell fragments (9) interval.
3. The ultra-thin clean wallboard system installed to CNC walkways of claim 2 wherein: the elastic sheet (9) is of an outward-turned hook structure, so that the installation is convenient.
4. The ultra-thin clean wallboard system installed to CNC walkways of claim 2 wherein: the spring clip (7) is of an isosceles triangle structure, and the base angle of the triangle is 39-41 degrees, so that the keel (1) is stable in structure and not easy to deform.
5. The ultra-thin clean wallboard system installed to CNC walkways of claim 1 wherein: leveling structure (4) are including bolt main part (10), first nut (11), second nut (12), during civil engineering partition wall (5) wall body is squeezed into to bolt main part (10) one end, adjust the horizontal depth of leveling structure (4) vertical direction through first nut (11), make all first nuts (11) apart from the wall distance equal, be in same water flat line in vertical direction, fossil fragments (1) are hugged closely outward in first nut (11) are located fossil fragments (1), trapezoidal structure (6) cavity of fossil fragments (1) is located in second nut (12), be used for fixed fossil fragments (1) and lock and die.
6. The ultra-thin clean wallboard system installed to CNC walkway of claim 1, wherein: clean wallboard (2) both sides all are equipped with first limit (13) of folding, and fossil fragments (1) and clean wallboard (2) press from both sides tight first limit (13) of folding through spring plate holder (7) and reach fixed effect.
7. The ultra-thin clean wallboard system installed to CNC walkways of claim 1 wherein: the top of the clean wallboard (2) is provided with a second folded edge (14), and the second folded edge (14) is used for blocking dust.
8. The ultra-thin clean wallboard system installed to CNC walkway of claim 1, wherein: the clean wallboard (2) is a color steel plate, and the thickness is 9-11 mm.
9. The ultra-thin clean wallboard system installed to CNC walkways of claim 2 wherein: the trapezoid structure (6) is in an isosceles trapezoid shape, so that the strength of the keel (1) is increased, the keel is not prone to deformation, and meanwhile the trapezoid structure (6) ensures that the cavity structure is large enough to facilitate fixing of the second nut (12); the base angle of the trapezoid structure (6) is 74-76 degrees, so that the opening degrees of two waists of the trapezoid structure (6) are convenient for the installation of the second nut (12).
CN202222828714.4U 2022-10-26 2022-10-26 Install in ultra-thin clean wallboard system of CNC pavement Active CN218562667U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222828714.4U CN218562667U (en) 2022-10-26 2022-10-26 Install in ultra-thin clean wallboard system of CNC pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222828714.4U CN218562667U (en) 2022-10-26 2022-10-26 Install in ultra-thin clean wallboard system of CNC pavement

Publications (1)

Publication Number Publication Date
CN218562667U true CN218562667U (en) 2023-03-03

Family

ID=85319331

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222828714.4U Active CN218562667U (en) 2022-10-26 2022-10-26 Install in ultra-thin clean wallboard system of CNC pavement

Country Status (1)

Country Link
CN (1) CN218562667U (en)

Similar Documents

Publication Publication Date Title
EP1376029A2 (en) Frame with support for solar panel
US3602468A (en) Roof support assembly for chimneys
CN218562667U (en) Install in ultra-thin clean wallboard system of CNC pavement
CN211621944U (en) Connecting device for assembly type building and assembly type building
CN115450353A (en) Install in ultra-thin clean wallboard system of CNC pavement
CN218541308U (en) Groove structure convenient for installation of ultrathin clean wallboard
CN215888870U (en) Integrated extrusion type cascade connection piece
CN213806307U (en) Metal plate mounting hook pendant based on clamping type keel system
CN208594714U (en) A kind of installation system that ceramic wafer is shared with ceramic thin plate
CN210621569U (en) Template connecting structure
CN112343278A (en) Metal plate mounting hook pendant based on clamping type keel system and facing wall construction method
CN220203147U (en) Keel connecting block and hoisting structure
CN217500750U (en) Integral type fitment structure
JP5859098B1 (en) Roof mounting fixture
CN216446310U (en) Concealed frame ceiling structure
CN211774599U (en) Assembled circular arc wall corner connecting structure
JP4173417B2 (en) Building decorative wall panel, its mounting structure and mounting method, and building decorative wall structure and its mounting method
CN216239287U (en) Grade-falling suspended ceiling
CN219825806U (en) Suspended ceiling plate capable of improving connection stability
CN209259437U (en) Elevator device
CN215166997U (en) Outer trim mounting structure and curtain
CN218116899U (en) Fitment curtain fixing device
CN213806310U (en) Quick installation's aluminum plate subassembly of dismantling
JPH05331934A (en) Metal fixture of hollow extruded plate and fitting structure
CN219298441U (en) Connecting seat and I-beam connecting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant