CN218531957U - A coiler for air conditioner pipeline production usefulness - Google Patents

A coiler for air conditioner pipeline production usefulness Download PDF

Info

Publication number
CN218531957U
CN218531957U CN202223143922.7U CN202223143922U CN218531957U CN 218531957 U CN218531957 U CN 218531957U CN 202223143922 U CN202223143922 U CN 202223143922U CN 218531957 U CN218531957 U CN 218531957U
Authority
CN
China
Prior art keywords
coiler
air conditioner
fixedly connected
conditioner pipeline
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202223143922.7U
Other languages
Chinese (zh)
Inventor
花军宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xialing Air Conditioner Handan Co ltd
Original Assignee
Xialing Air Conditioner Handan Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xialing Air Conditioner Handan Co ltd filed Critical Xialing Air Conditioner Handan Co ltd
Priority to CN202223143922.7U priority Critical patent/CN218531957U/en
Application granted granted Critical
Publication of CN218531957U publication Critical patent/CN218531957U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model relates to a coiler technical field provides a coiler for air conditioner pipeline production usefulness, including coiler body, support frame, one side of support frame is provided with adjustment mechanism. The coiler of air conditioner pipeline production usefulness plays the effect of cleaning the frame inside with air conditioner pipeline installation through the surface at air conditioner pipeline sets up adjustment mechanism, and will clean the frame and set up to arc form and quantity and set up to two, corresponding cover is in the outside position of waiting to process air conditioner pipeline simultaneously, thereby realize the effect of cleaning fast impurity such as air conditioner pipeline surface dust, prevent that air conditioner pipeline surface adnexed dust from leading to the emergence of air conditioner pipeline surface fish tail and wearing and tearing phenomenon at the coil pipe during operation, play the effect of following the frame of cleaning of changing according to the size of actual air conditioner pipeline diameter through setting up nut and bolt, the practicality is higher, and set up the suction box in the bottom of cleaning brush and play the effect of in time adsorbing the dust that the cleaning brush cleaned down.

Description

A coiler for air conditioner pipeline production usefulness
Technical Field
The utility model relates to a coiler technical field, it is specific, relate to a coiler for air conditioner pipeline production usefulness.
Background
The coil pipe process of copper pipe is connected to the air conditioner generally, and manual traditional coil pipe equipment of sending into with the connecting pipe adopts artifical foot switch, then slowly the coil pipe, and the cooling tube is all installed to machines such as common air conditioners on the market, and this kind of cooling tube is not only long, and is thick moreover, leads to being difficult to direct artificial crooked packing, and the packing transportation after giving production brings very big inconvenience. Therefore, the coil pipe machine for bending the flexible pipe is provided, the pipe of the coil pipe machine is coiled into a circle, and some parts of the pipe are required to be clean even in production, otherwise, the pipe cannot be cleaned after subsequent assembly, such as the production of the coil pipe.
Chinese patent discloses a coiler, publication number CN 208408068U, it will be solved that among the prior art common coiler is the operation of keeping flat, the user has utilized the coiler to take out after the bending of tubular product manually, lead to its coil pipe efficiency significantly reduced, this application is fine has solved this problem, but at the in-process of air conditioner pipeline transportation, impurity such as the easy adhesion stereoplasm dust impurity of its surface, it can be in air conditioner pipeline coil pipe in-process with air conditioner pipeline surface fish tail not clear away in time before carrying out the coil pipe.
Therefore, a coiled tubing machine for air conditioning pipeline production is needed.
SUMMERY OF THE UTILITY MODEL
The utility model provides a coiler for air conditioner pipeline production usefulness has solved a coiler surface adhesion stereoplasm dust impurity for air conditioner pipeline production usefulness among the correlation technique and has not cleared away the problem that can be at air conditioner pipeline coil pipe in-process air conditioner pipeline surface fish tail in time before carrying out the coil pipe.
The technical scheme of the utility model as follows: the utility model provides a coiler for air conditioner pipeline production usefulness, includes coiler body, support frame, one side of support frame is provided with adjustment mechanism, adjustment mechanism is including changing the hand, the inner wall fixedly connected with lead screw of changing the hand, the lead screw is kept away from the one end of changing the hand and is run through the inner wall of support frame, the surperficial threaded connection of lead screw has the movable block, the bottom fixedly connected with slide bar of movable block, one side fixedly connected with fixed plate of support frame, the fixed surface of slide bar is connected with the U-shaped pole, the one end fixedly connected with mounting panel of U-shaped pole, one side that the U-shaped pole was kept away from to the mounting panel is equipped with cleans the frame.
Preferably, clean the one end fixedly connected with bolt of frame, the mounting hole has been seted up on the surface of mounting panel, the surface of mounting panel is equipped with the nut, nut and bolt threaded connection, the nut is hugged closely with the surface of mounting panel, can become flexible the bolt through rotating the nut and follow the effect of changing the frame of cleaning according to the size of air conditioner pipeline diameter.
Preferably, the inner wall of the cleaning frame is fixedly connected with a cleaning brush, so that the cleaning brush plays a role in cleaning impurities such as dust and the like on the surface of the air-conditioning pipeline.
Preferably, the bottom of cleaning the frame is equipped with the suction box, the bottom of suction box and the top fixed connection of coiler body, the top fixedly connected with dust absorption pipe of suction box, the top fixedly connected with wide wind fill of dust absorption pipe plays the effect of the dust of absorption cleaning brush under sweeping.
Preferably, the top of the coiler body is fixedly connected with a base, and the top of the base is fixedly connected with the bottom of the support frame.
Preferably, the surface of the screw rod is rotatably connected with the inner wall of the support frame through a bearing.
Preferably, the surface of the fixed plate is provided with a sliding groove, and the sliding rod is connected with the sliding groove in a sliding manner to play a limiting role.
Preferably, the outer frame of the cleaning frame is semicircular.
The utility model discloses a theory of operation and beneficial effect do:
1. this a coiler for air conditioner pipeline production usefulness sets up adjustment mechanism through the surface at air conditioner pipeline and plays and clean the inside effect of frame with air conditioner pipeline installation to clean the frame and set up to arc form and quantity and set up to two, corresponding cover is in the outside position of waiting to process air conditioner pipeline simultaneously, thereby realizes carrying out the effect of cleaning fast to impurity such as air conditioner pipeline surface dust, prevents that the adnexed dust of air conditioner pipeline surface from leading to the emergence of air conditioner pipeline surface fish tail and wearing and tearing phenomenon at the coil pipe during operation.
2. This a coiler for air conditioner pipeline production usefulness plays the effect of following the frame that cleans of trading according to the size of actual air conditioner pipeline diameter through setting up the nut and bolt, and the practicality is higher to set up the dust suction box in the bottom of cleaning brush and play the effect of the dust that in time adsorbs the cleaning brush and clean down.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic top view of the present invention;
fig. 3 is a schematic view of the bottom view structure of the present invention;
fig. 4 is an enlarged schematic structural diagram of the present invention a.
In the figure: the pipe coiling machine comprises a pipe coiling machine body 1, a base 2, a support frame 3, an adjusting mechanism 4, a rotating handle 401, a screw rod 402, a movable block 403, a sliding rod 404, a fixing plate 405, a U-shaped rod 406, a mounting plate 407, a cleaning frame 408, a cleaning brush 5, a nut 6, a dust collection box 7, a dust collection pipe 8 and a wide air duct 9.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below by referring to the drawings are exemplary intended for explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", "clockwise", "counterclockwise", "axial", "radial", "circumferential", and the like, indicate the orientation or positional relationship indicated based on the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the device or element referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore, should not be construed as limiting the present invention.
In the present invention, unless otherwise expressly stated or limited, the terms "mounted," "connected," and "fixed" are to be construed broadly and may, for example, be fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
As shown in fig. 1 to 4, the embodiment provides a pipe coiling machine for air conditioner pipeline production, which includes a pipe coiling machine body 1 and a support frame 3, wherein a base 2 is fixedly connected to the top of the pipe coiling machine body 1, and the top of the base 2 is fixedly connected to the bottom of the support frame 3;
one end of the cleaning frame 408 is fixedly connected with a bolt, the surface of the mounting plate 407 is provided with a mounting hole, the surface of the mounting plate 407 is provided with a nut 6, the nut 6 is in threaded connection with the bolt, the nut 6 is tightly attached to the surface of the mounting plate 407, and the bolt can be loosened by rotating the nut 6 to perform the function of replacing the cleaning frame 408 according to the diameter of the air-conditioning pipeline;
an adjusting mechanism 4 is arranged on one side of the support frame 3, the adjusting mechanism 4 comprises a rotating handle 401, a screw rod 402 is fixedly connected to the inner wall of the rotating handle 401, the surface of the screw rod 402 is rotatably connected with the inner wall of the support frame 3 through a bearing, one end, far away from the rotating handle 401, of the screw rod 402 penetrates through the inner wall of the support frame 3, a movable block 403 is in threaded connection with the surface of the screw rod 402, a slide rod 404 is fixedly connected to the bottom of the movable block 403, a fixed plate 405 is fixedly connected to one side of the support frame 3, a sliding groove is formed in the surface of the fixed plate 405, the slide rod 404 is in sliding connection with the sliding groove and plays a limiting role, a U-shaped rod 406 is fixedly connected to the surface of the slide rod 404, a mounting plate 407 is fixedly connected to one end of the U-shaped rod 406, a cleaning frame 408 is arranged on one side, far away from the U-shaped rod 406, of the mounting plate 407, the outer frame of the cleaning frame 408 is in a semicircular shape, a cleaning brush 5 is fixedly connected to the inner wall of the cleaning frame 408 and plays a role in cleaning dust and other impurities on the surface of the air-conditioning pipeline;
the bottom of cleaning frame 408 is equipped with dust collection box 7, the bottom of dust collection box 7 and the top fixed connection of coiler body 1, the top fixedly connected with dust absorption pipe 8 of dust collection box 7, the top fixedly connected with wide wind fill 9 of dust absorption pipe 8 play the effect of the dust that the absorption brush 5 cleaned down.
In this embodiment, when in use, the adjusting mechanism 4 is disposed at the pipe inlet of the coiler body 1, the cleaning frame 408 is replaced according to the diameter of the actual air-conditioning pipe, the nut 6 is rotated after selecting an appropriate size to fix the bolt (not shown in the figure) at one end of the cleaning frame 408, and then when impurities such as dust on the surface of the air-conditioning pipe need to be cleaned, the rotating hands 401 at both sides are rotated to rotate the screw rod 402, the screw rod 402 rotates to drive the movable block 403 on the surface to move inwards on the surface of the screw rod 402, and the sliding rod 404 at the bottom of the movable block 403 drives the U-shaped rod 406 to push the cleaning frame 408 on the surface of the mounting plate 407 to move inwards, so that the contact surface of the cleaning brush 5 on the inner wall of the cleaning brush 408 is in contact with the air-conditioning pipe, when the air-conditioning pipe is processed, the cleaning brush 408 surrounding the outer surface of the air-conditioning pipe is in contact with the outer surface of the air-conditioning pipe to clean the air-conditioning pipe, and the cleaned dust is timely sucked from the top of the dust collecting duct 8 through the dust collecting box 7 to clean the top of the air-collecting duct 9.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a coiler for air conditioner pipeline production usefulness, a serial communication port, including coiler body (1), support frame (3), one side of support frame (3) is provided with adjustment mechanism (4), adjustment mechanism (4) are including runner (401), the inner wall fixedly connected with lead screw (402) of runner (401), the inner wall that support frame (3) were run through to the one end of runner (401) is kept away from in lead screw (402), the surface thread connection of lead screw (402) has movable block (403), the bottom fixedly connected with slide bar (404) of movable block (403), one side fixedly connected with fixed plate (405) of support frame (3), the fixed surface of slide bar (404) is connected with U-shaped pole (406), the one end fixedly connected with mounting panel (407) of U-shaped pole (406), one side that U-shaped pole (406) was kept away from in mounting panel (407) is equipped with cleans frame (408).
2. The coiler for the production of air-conditioning pipelines according to claim 1, wherein a bolt is fixedly connected to one end of the cleaning frame (408), a mounting hole is formed in the surface of the mounting plate (407), a nut (6) is arranged on the surface of the mounting plate (407), the nut (6) is in threaded connection with the bolt, and the nut (6) is tightly attached to the surface of the mounting plate (407).
3. The coiler for the production of air-conditioning pipes according to claim 1, characterized in that a cleaning brush (5) is fixedly connected to the inner wall of the cleaning frame (408).
4. The coiler for the production of air-conditioning pipelines according to claim 1, characterized in that a dust suction box (7) is arranged at the bottom of the cleaning frame (408), the bottom of the dust suction box (7) is fixedly connected with the top of the coiler body (1), a dust suction pipe (8) is fixedly connected with the top of the dust suction box (7), and a wind blowing hopper (9) is fixedly connected with the top of the dust suction pipe (8).
5. The coiler for the production of air-conditioning pipes according to claim 1, characterized in that a base (2) is fixedly connected to the top of the coiler body (1), and the top of the base (2) is fixedly connected to the bottom of the supporting frame (3).
6. The coiler for the production of air-conditioning ducts according to claim 1, characterized in that the surface of said screw (402) is rotatably connected to the inner wall of the supporting frame (3) by means of bearings.
7. The coiling machine for air-conditioning pipeline production as recited in claim 1, characterized in that the surface of the fixed plate (405) is provided with a sliding groove, and the sliding rod (404) is connected with the sliding groove in a sliding manner.
8. The coiler for the production of air-conditioning pipes according to claim 1, characterized in that the outer frame of said cleaning frame (408) is semicircular.
CN202223143922.7U 2022-11-25 2022-11-25 A coiler for air conditioner pipeline production usefulness Active CN218531957U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202223143922.7U CN218531957U (en) 2022-11-25 2022-11-25 A coiler for air conditioner pipeline production usefulness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202223143922.7U CN218531957U (en) 2022-11-25 2022-11-25 A coiler for air conditioner pipeline production usefulness

Publications (1)

Publication Number Publication Date
CN218531957U true CN218531957U (en) 2023-02-28

Family

ID=85264600

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202223143922.7U Active CN218531957U (en) 2022-11-25 2022-11-25 A coiler for air conditioner pipeline production usefulness

Country Status (1)

Country Link
CN (1) CN218531957U (en)

Similar Documents

Publication Publication Date Title
CN101256008B (en) Indoor set of air-conditioner with filtering net dust collector
CN112222693A (en) Novel welding wire send silk quick-witted equipment
CN101256009B (en) Indoor set of air-conditioner with dust collector
CN218531957U (en) A coiler for air conditioner pipeline production usefulness
CN219899206U (en) Polyethylene film cleaning mechanism
CN112190203A (en) Outer wall cleaning device for building
CN219383728U (en) Material conveying table with automatic cleaning function
CN217830501U (en) Automatic powder spraying device for stainless steel pipe fitting of outdoor furniture
CN215280100U (en) Cutting device is used in processing of corrosion-resistant steel pipe
CN215031937U (en) Portable air pipe cleaning equipment
CN109701963A (en) A kind of stainless steel screwed tube external screw thread descaling device
CN115213476A (en) Plate machining device for furniture plates
CN211822458U (en) Boiler flue cleaning equipment
CN110617494B (en) Boiler flue cleaning equipment
CN113751386A (en) Automatic cleaning device for stamping die
CN219093180U (en) Radiating pipe making machine
CN113843667A (en) Nonrust steel pipe grinding device
CN215295157U (en) Energy-saving clean air conditioning unit
CN219965873U (en) 360-degree roughening machine for glass fiber blank pipe
CN220461802U (en) Straightening device for stainless steel processing
CN216179434U (en) Pipe inner wall rust removal device
CN220968419U (en) Automatic dust collector of filter screen
CN221210939U (en) Long tube polishing equipment
CN219485114U (en) Polishing device for pipe spraying
CN111573166B (en) Automatic vibration feeding counting device for copper straight pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant