Construction dust fall machine
Technical Field
The utility model relates to a dust device technical field specifically is a dust fall machine for building construction.
Background
With the rapid development of urban construction, building construction sites densely appear in cities; however, a large amount of dust is generated in building construction, a large amount of dust in the air causes great environmental pollution, and the health of constructors and surrounding residents is seriously affected, so that a special dust settling device is required to perform dust settling operation on a construction site.
Traditional dust fall equipment is when actually carrying out the use, and general dust fall scope is fixed, can not adjust the spraying dust fall scope of dust fall machine according to job site's actual conditions, when dust fall road width is comparatively wide, need carry out many times dust fall operation, and work efficiency is lower, when the dust fall road is narrower, can appear the dust fall spraying of overrange, can waste the raw materials.
SUMMERY OF THE UTILITY MODEL
The utility model provides a dust fall machine for building construction has solved the problem that goes out among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a construction dust fall machine, includes the mounting panel, still includes: the enclosing rods are arranged on two sides of the mounting plate, and the mounting beam is fixedly connected between the top ends of the enclosing plates; set up in dust fall mechanism of installation roof beam both sides including rotating the swing arm that sets up in installation roof beam one side, set up the transmission groove on the swing arm, swing arm top fixed connection spray tube, spray tube one end set up atomization component, fixed connection bracing piece between the mounting panel of swing arm one side and the installation roof beam, fixed connection fixed beam between the bracing piece, sliding connection movable rod on the fixed beam, movable rod one end slip cup joint the installation piece, and installation piece one side screw thread runs through and sets up the locating lever, installation piece lateral wall fixed connection movable arm, movable arm one end fixed connection fixed axle, fixed axle extend to in the transmission groove, mounting panel bottom fixed connection water tank, water tank top fixed connection aqueduct, aqueduct one end set up the water pump, water pump both ends fixed connection, flexible pipe one end and spray tube fixed connection, set up stirring components in the water tank, the outside one end of water tank sets up transmission components, and transmission components is connected with the movable rod.
As a preferred technical scheme of the utility model, atomization component is including fixed the atomization box that sets up in the spray tube top, and the atomization box is provided with a plurality ofly, and with the inside intercommunication of spray tube, the atomization box internal fixation sets up the atomizing fan.
As a preferred technical scheme of the utility model, the stirring subassembly sets up the stirring post in the water tank including rotating, stirring post both sides fixed connection stirring leaf, the water tank outer wall fixed connection driving motor of stirring post axial one end, driving motor's output shaft one end and stirring post tip fixed connection.
As a preferred technical scheme of the utility model, drive assembly sets up in the actuating lever of water tank outer wall including rotating, and the articulated gangbar of actuating lever one end slides on the mounting panel of gangbar one end and runs through and set up the piston rod, articulated transfer line between piston rod and the movable rod, gangbar one end is articulated with the piston rod.
As a preferred technical scheme of the utility model, fixed connection branch between bounding wall and the water tank, the branch bottom is rotated and is connected the walking wheel, the fixed valve pipe that sets up of water tank diapire.
The utility model discloses have following useful part: when using, remove the device to the dust fall region, then according to construction scope's width, adjust the level of installation piece, and use the locating lever to fix a position, then start driving motor and drive the stirring post and rotate, stir the dust fall medicament under the effect of stirring leaf, can guarantee that device spun dust fall machine is in the homogeneous state all the time, the stirring post drives the actuating lever and rotates, it reciprocates to drive the piston rod under the effect of gangbar, the piston rod drives the horizontal reciprocating motion of movable rod through the transfer line, under the effect of the fixed axle of movable arm one end, the spray tube swing at drive swing arm top, and then the dust fall medicament that sends into the spray tube through the water pump is evenly sprayed away, realize high-efficient comprehensive dust fall operation, in-process that the spraying operation goes on, operating personnel can be according to actual conditions, adjust the height of installation piece, and then can guarantee device's spraying scope and site environment phase-match, when guaranteeing high-efficient, practice thrift the raw materials, practicality and economic nature are higher.
Drawings
Fig. 1 is a schematic structural view of a main body of a dust falling machine for building construction.
Fig. 2 is a schematic structural diagram of a stirring assembly in the dust falling machine for building construction.
Fig. 3 is a schematic structural view of a spray pipe in a dust reducing machine for building construction.
In the figure: 1. mounting a plate; 2. a surrounding rod; 3. a swing arm; 4. a movable arm; 5. a transmission groove; 6. mounting a beam; 7. a spray tube; 8. an atomizing fan; 9. a telescopic pipe; 10. a water pump; 11. a fixed beam; 12. a valve tube; 13. a support bar; 14. a fixed shaft; 15. a movable rod; 16. a water conduit; 17. mounting blocks; 18. a transmission rod; 19. positioning a rod; 20. a piston rod; 21. a linkage rod; 22. a drive rod; 23. a water tank; 24. a strut; 25. an atomization box; 26. stirring the column; 27. stirring blades; 28. the motor is driven.
Detailed Description
The preferred embodiments of the present invention will be described in conjunction with the accompanying drawings, and it will be understood that they are presented herein only to illustrate and explain the present invention, and not to limit the present invention.
It should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of describing the present invention and simplifying the description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed in a specific orientation, and be operated, and thus should not be construed as limiting the present invention.
Examples
Referring to fig. 1-3, a dust falling machine for building construction includes a mounting plate 1, and further includes: the enclosing rods 2 are fixedly arranged on two sides of the mounting plate 1, and the mounting beam 6 is fixedly connected between the top ends of the enclosing plates; set up in dust fall mechanism of 6 both sides of installation roof beam, set up drive disk 5 on swing arm 3 in the swing arm of 6 one side of installation roof beam including rotating, swing arm 3 top fixed connection spray tube 7, spray tube 7 one end sets up atomizing component, fixed connection bracing piece 13 between mounting panel 1 and the installation roof beam 6 of 3 one sides of swing arm, fixed connection fixed beam 11 between the bracing piece 13, sliding connection movable rod 15 on the fixed beam 11, the installation piece 17 is cup jointed in the slip of 15 one ends of movable rod, and the screw thread runs through and sets up locating lever 19 on one side of the installation piece 17, installation piece 17 lateral wall fixed connection movable arm 4, 4 one end fixed connection fixed axles 14 of movable arm, fixed axle 14 extend to the drive disk 5 in, 1 bottom fixed connection water tank 23 of mounting panel, water tank 23 top fixed connection aqueduct 16, aqueduct 16 one end set up water pump 10, water pump 10 and 6 fixed connection of installation roof beam, the flexible pipe 9 one end of 10 both ends fixed connection of water pump, flexible pipe 9 and spray tube 7 fixed connection, and inside intercommunication, set up the stirring assembly in the water tank 23, the outside one end of water tank 23 sets up drive assembly, transmission assembly is connected with movable rod 15.
Atomization component is including fixed setting up in the atomizing box 25 at atomizer pipe 7 top, and atomizing box 25 is provided with a plurality ofly, and with the inside intercommunication of atomizer pipe 7, atomizing box 25 internal fixation sets up atomizing fan 8.
Stirring assembly sets up the stirring post 26 in water tank 23 including rotating, stirring post 26 both sides fixed connection stirring leaf 27, the water tank 23 outer wall fixed connection driving motor 28 of 26 axial one end of stirring post, the water tank 23 lateral wall is passed to driving motor 28's output shaft one end, and tip and stirring post 26 fixed connection.
Drive assembly sets up in the actuating lever 22 of water tank 23 outer wall including rotating, and the pivot one end and the 26 tip fixed connection of stirring post of actuating lever 22, the articulated gangbar 21 of actuating lever 22 one end, slide on the mounting panel 1 of gangbar 21 one end and run through and set up piston rod 20, articulated transfer line 18 between piston rod 20 and the movable rod 15, gangbar 21 one end is articulated with piston rod 20, under actuating lever 22's effect, can drive piston rod 20 up-and-down reciprocating motion through gangbar 21, and piston rod 20 can drive 15 horizontal reciprocating motion of movable rod through transfer line 18, drives 3 reciprocating swing arms of swing arm under the effect of fixed axle 14, and then drives the 7 omnidirectional spraying dust fall of flat spray pipe.
Fixed connection branch 24 between bounding wall and the water tank 23, the walking wheel is connected in the rotation of branch 24 bottom, the fixed valve pipe 12 that sets up of water tank 23 diapire, it is regional to the dust fall to remove the device, then according to construction scope's width, adjust installation piece 17's level, and use locating lever 19 to fix a position, then start driving motor 28 drives stirring post 26 and rotate, stir the dust fall medicament under stirring leaf 27's effect, can guarantee that device spun dust fall machine is in the homogeneous state all the time, stirring post 26 drives actuating lever 22 and rotates, it reciprocates to drive piston rod 20 under gangbar 21's effect, piston rod 20 drives the horizontal reciprocating motion of movable rod 15 through transfer line 18, under the effect of the fixed axle 14 of movable arm 4 one end, the spray tube 7 swing at 3 tops of drive swing arm, and then the dust fall medicament that sends spray tube 7 into through water pump 10 is gone out by even spraying, realize high-efficient comprehensive dust fall operation.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.