CN218521959U - Building insulation board installation mechanism - Google Patents

Building insulation board installation mechanism Download PDF

Info

Publication number
CN218521959U
CN218521959U CN202222232167.3U CN202222232167U CN218521959U CN 218521959 U CN218521959 U CN 218521959U CN 202222232167 U CN202222232167 U CN 202222232167U CN 218521959 U CN218521959 U CN 218521959U
Authority
CN
China
Prior art keywords
gear
connecting rod
screw thread
insulation board
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222232167.3U
Other languages
Chinese (zh)
Inventor
朱良吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suqian Tianshang New Building Material Co ltd
Original Assignee
Suqian Tianshang New Building Material Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suqian Tianshang New Building Material Co ltd filed Critical Suqian Tianshang New Building Material Co ltd
Priority to CN202222232167.3U priority Critical patent/CN218521959U/en
Application granted granted Critical
Publication of CN218521959U publication Critical patent/CN218521959U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a building insulation board installation mechanism, comprising a frame body, be equipped with installation mechanism on the left side wall of support body, installation mechanism is including rotating the dwang of installing inside the support body, the one end fixed mounting that the support body was kept away from to the dwang has the carousel, fixed mounting has first gear on the left side wall of dwang, first gear engagement has quantity to be two second gear, the one end fixedly connected with screw thread bucket of first gear is kept away from to the second gear, it is two supporting shoe to rotate the supporting shoe that is connected with quantity on the periphery wall of screw thread bucket. This building insulation board installation mechanism makes the rotation that first gear drove the second gear through the dwang, and the rotation that the screw thread bucket passes through the second gear makes it at the fixed plate inside rotation, and the connecting rod with screw thread bucket threaded connection can stretch out and draw back because the direction of rotation of screw thread bucket, and the grip block can receive the connecting rod influence to enlarge or reduce the centre gripping scope this moment, can adapt to the heated board of multiple size.

Description

Building insulation board installation mechanism
Technical Field
The utility model relates to a building insulation board technical field specifically is a building insulation board installation mechanism.
Background
The heat-insulating board is a rigid foamed plastic board which is made by using polystyrene resin as a raw material, adding other raw and auxiliary materials and polymer, heating, mixing, injecting a catalyst, extruding and molding, has the moisture-proof and waterproof properties, and can reduce the thickness of an outer enclosure structure of a building so as to increase the indoor use area.
The heated board need align into same water flat line every board at the in-process of installation, can't fix around the heated board when the heated board is installed at present, produces the deviation easily when the installation, has leaded to the heated board not in the coplanar after the installation to certain economic loss has been caused, so has proposed a building heated board installation mechanism.
SUMMERY OF THE UTILITY MODEL
The utility model provides a not enough to prior art, the utility model provides a building insulation board installation mechanism possesses high-efficient installation heated board, adapts to the heated board installation of multiple difference and prevents advantages such as deviation that appear when installing, has solved the heated board and can't fix around the heated board when the installation, produces the deviation easily when the installation, has leaded to the heated board to install the problem of back not at the coplanar.
In order to achieve the above object, the utility model provides a following technical scheme: an installation mechanism for a building insulation board comprises a frame body, wherein an installation mechanism is arranged on the left side wall of the frame body;
the utility model discloses a support body, including the rotation of installation mechanism, the dwang is installed at the inside dwang of support body, the one end fixed mounting that the support body was kept away from to the dwang has the carousel, fixed mounting has first gear on the left side wall of dwang, first gear engagement has quantity to be two second gears, the one end fixedly connected with screw thread bucket of first gear is kept away from to the second gear, it is two supporting shoe to rotate to be connected with quantity on the periphery wall of screw thread bucket, fixedly connected with fixed plate on the periphery wall of supporting shoe, fixed mounting has quantity to be two stoppers on the interior perisporium of fixed plate, threaded connection has the connecting rod on the interior perisporium of screw thread bucket, one side fixedly connected with grip block that the screw thread bucket was kept away from to the connecting rod, one side fixed mounting that the connecting rod was kept away from to the grip block has the telescopic link, the one end that the grip block was kept away from to the telescopic link rotates and installs the pulley.
Further, the fixed plate is fixedly installed on the outer wall of the left side of the rack body, and the length of the fixed plate is half of the length of the rack body.
Further, the through-hole has been seted up to the right side outer wall of fixed plate, the size of first gear and the big or small looks adaptation of through-hole, the perforation has all been seted up at the top of fixed plate and bottom both ends, the size of perforation and the big or small looks adaptation of connecting rod.
Further, the distance that the connecting rod extends to the outside of the fixing plate does not exceed the distance from the fixing plate to the top of the frame body.
Further, the top and the bottom outer wall of support body have all been seted up the spout, the size of spout and the big or small looks adaptation of telescopic link.
Furthermore, spacing hole has been seted up on the stopper inner wall, the connecting rod run through the inner wall of stopper and with the size looks adaptation in spacing hole, the diameter in spacing hole is less than the diameter of screw thread bucket.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. this building insulation board installation mechanism makes the rotation that first gear drove the second gear through the dwang, and the rotation that the screw thread bucket passes through the second gear makes it at the fixed plate inside rotation, and the connecting rod with screw thread bucket threaded connection can stretch out and draw back because the direction of rotation of screw thread bucket, and the grip block can receive the connecting rod influence to enlarge or reduce the centre gripping scope this moment, can adapt to the heated board of multiple size.
2. This building insulation board installation mechanism is fixed with the heated board centre gripping through the grip block, through the extension rod that the support body top extends, extension rod meeting overlap joint is on the heated board of having installed the completion, through the angle of contrast installation, the deviation that appears when reducing the heated board installation.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic structural view of fig. 1A according to the present invention.
In the figure: 1. a frame body; 2. an installation mechanism; 201. rotating the rod; 202. a turntable; 203. a first gear; 204. a second gear; 205. a threaded barrel; 206. a support block; 207. a connecting rod; 208. a clamping plate; 209. a limiting block; 210. a telescopic rod; 211. a pulley; 212. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the present embodiment of an installation mechanism for a building insulation board includes a frame body 1, and an installation mechanism 2 is disposed on a left side wall of the frame body 1.
Installation mechanism 2 is including rotating dwang 201 of installing at support body 1 inside, the one end fixed mounting that support body 1 was kept away from to dwang 201 has carousel 202, fixed mounting has first gear 203 on the left side wall of dwang 201, first gear 203 meshes the second gear 204 that has quantity to be two, the one end fixedly connected with screw thread bucket 205 that first gear 203 was kept away from to second gear 204, it is two supporting shoe 206 to rotate the connection number on the periphery wall of screw thread bucket 205, fixedly connected with fixed plate 212 on the periphery wall of supporting shoe 206, fixed plate 212 fixed mounting is on the left side outer wall of support body 1, the length of fixed plate 212 is half of support body 1 length, the through-hole has been seted up to the right side outer wall of fixed plate 212, the size of first gear 203 and the big or small looks adaptation of through-hole, the perforation size has all been seted up at fixed plate 212 top and bottom both ends, the size looks adaptation of perforation and connecting rod 207, fixed mounting has the stopper 209 that quantity is two on the internal perisporium of fixed plate 212.
Threaded connection has connecting rod 207 on threaded barrel 205's the internal perisporium, spacing hole has been seted up on the stopper 209 inner wall, connecting rod 207 run through stopper 209 the inner wall and with the size looks adaptation in spacing hole, the diameter in spacing hole is less than threaded barrel 205's diameter, connecting rod 207 extends to the outside distance of fixed plate 212 and can not exceed the distance at fixed plate 212 to 1 top of support body, threaded barrel 205's one side fixedly connected with grip block 208 is kept away from to connecting rod 207, one side fixed mounting that connecting rod 207 was kept away from to grip block 208 has telescopic link 210, the spout has all been seted up to the top of support body 1 and bottom outer wall, the size of spout and telescopic link 210's big or small looks adaptation, the one end that grip block 208 was kept away from to telescopic link 210 rotates and installs pulley 211.
In this embodiment, the support body 1 includes the frame, and fixed mounting has the extension rod on the left side wall of top frame.
In this embodiment, the pulley 211 slides inside the frame body 1, and plays a certain supporting role for the clamping plate 208, and the pulley 211 also facilitates the movement of the clamping plate 208.
It should be noted that, the first gear 203 connected by the rotating rod 201, the two second gears 204 engaged with the first gear 203, and the length of the connecting rod 207 can be adjusted by the second gear 204, which is convenient for adjusting the height of the clamping plate 208.
The working principle of the above embodiment is as follows:
adjust the height degree of grip block 208 after the size of heated board is compared earlier, rotate carousel 202 back, dwang 201 can drive first gear 203 and rotate, first gear 203 can make second gear 204 rotate this moment, threaded barrel 205 has begun to rotate this moment, connecting rod 207 with threaded barrel 205 threaded connection is because threaded barrel 205's rotation, it is flexible to make connecting rod 207 outside or inside threaded barrel 205, grip block 208 can be because connecting rod 207's flexible and the same direction removal this moment, after grip block 208's interval has been adjusted, with the top extension rod overlap joint of support body 1 on the heated board of installation completion this moment, promote this moment that heated board 201 this moment of heated board can be in same water flat line with the heated board of installation completion, then with the inside of inflation screw driving into heated board, then it is not hard up to support body 1, the installation of heated board has been accomplished this moment.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising a … …" does not exclude the presence of another identical element in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building insulation board installation mechanism, includes support body (1), its characterized in that: an installation mechanism (2) is arranged on the left side wall of the frame body (1);
installation mechanism (2) install dwang (201) at support body (1) inside including rotating, the one end fixed mounting that support body (1) was kept away from in dwang (201) has carousel (202), fixed mounting has first gear (203) on the left side wall of dwang (201), first gear (203) meshing has second gear (204) that a quantity is two, the one end fixedly connected with screw thread bucket (205) of first gear (203) are kept away from in second gear (204), it is two supporting shoe (206) to rotate to be connected with quantity on the periphery wall of screw thread bucket (205), fixedly connected with fixed plate (212) on the periphery wall of supporting shoe (206), fixed mounting has stopper (209) that a quantity is two on the interior perisporium of fixed plate (212), threaded connection has connecting rod (207) on the interior perisporium of screw thread bucket (205), one side fixedly connected with grip block (208) that screw thread bucket (205) were kept away from in connecting rod (207) is held to grip block (208), one side fixedly connected with telescopic link (210) that connecting rod (207) kept away from connecting rod (207) have telescopic link (210), the one end rotation that clamp block (208) were kept away from grip block (211) is installed.
2. The building insulation board mounting mechanism according to claim 1, wherein: the fixing plate (212) is fixedly installed on the outer wall of the left side of the rack body (1), and the length of the fixing plate (212) is half of that of the rack body (1).
3. The building insulation board mounting mechanism according to claim 1, wherein: the through hole has been seted up to the right side outer wall of fixed plate (212), the size of first gear (203) and the size looks adaptation of through hole, the perforation has all been seted up at the top and the bottom both ends of fixed plate (212), the size looks adaptation of perforated size and connecting rod (207).
4. The building insulation board mounting mechanism according to claim 1, wherein: the distance that the connecting rod (207) extends to the outside of the fixing plate (212) does not exceed the distance that the fixing plate (212) extends to the top of the frame body (1).
5. The building insulation board mounting mechanism according to claim 1, wherein: the top and the bottom outer wall of the frame body (1) are both provided with sliding grooves, and the size of the sliding grooves is matched with that of the telescopic rod (210).
6. The building insulation board mounting mechanism according to claim 1, wherein: the limiting device is characterized in that a limiting hole is formed in the inner wall of the limiting block (209), the connecting rod (207) penetrates through the inner wall of the limiting block (209) and is matched with the limiting hole in size, and the diameter of the limiting hole is smaller than that of the threaded barrel (205).
CN202222232167.3U 2022-08-24 2022-08-24 Building insulation board installation mechanism Active CN218521959U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222232167.3U CN218521959U (en) 2022-08-24 2022-08-24 Building insulation board installation mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222232167.3U CN218521959U (en) 2022-08-24 2022-08-24 Building insulation board installation mechanism

Publications (1)

Publication Number Publication Date
CN218521959U true CN218521959U (en) 2023-02-24

Family

ID=85243725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222232167.3U Active CN218521959U (en) 2022-08-24 2022-08-24 Building insulation board installation mechanism

Country Status (1)

Country Link
CN (1) CN218521959U (en)

Similar Documents

Publication Publication Date Title
CN218521959U (en) Building insulation board installation mechanism
CN212602183U (en) Quick clamping device is used in processing of plastics pipe fitting
CN217292797U (en) Turning device for processing autoclaved aerated concrete blocks
CN205272542U (en) Plastic conduit fixing device
CN214615231U (en) Polystyrene foam moulding construction structure
CN217777120U (en) Clamping device for plastic pipe cutting machine
CN220841087U (en) Clara pipe shedder
CN211599922U (en) Automatic winding tool for water pipe leaking stoppage adhesive tape
CN113211514A (en) Heated board processingequipment
CN212176095U (en) Heat insulation board embedded part convenient for mounting heat insulation board
CN218719341U (en) PVC feed pipe fixed knot of wall installation constructs
CN213166975U (en) Glass steel former convenient to exert pressure
CN217679740U (en) Fixing and supporting device for installation of heat insulation board
CN220371964U (en) Bending equipment for chemical equipment production
CN220844780U (en) Winding device for preparing grade glass fiber cloth
CN215094823U (en) Extruder for ultra-high molecular weight polyethylene pipe
CN111251587A (en) Elliptical deformation correcting device for modified polypropylene pipe
CN217811681U (en) Starting bracket special for external wall insulation board
CN218255457U (en) Arc-shaped insulation board processing device
CN217435017U (en) Flaring device for plastic pipe end
CN215882497U (en) High-quality PET sheet co-extrusion extruder
CN217573773U (en) Energy-concerving and environment-protective type heated board foaming setting device
CN212123213U (en) Heated board adds recruitment stop device
CN220052822U (en) Double-screw extruder for plastic particle production
CN219138031U (en) Thermal insulation wall convenient to install

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant