CN218509001U - Flower basket type overhanging I-beam - Google Patents

Flower basket type overhanging I-beam Download PDF

Info

Publication number
CN218509001U
CN218509001U CN202222996726.8U CN202222996726U CN218509001U CN 218509001 U CN218509001 U CN 218509001U CN 202222996726 U CN202222996726 U CN 202222996726U CN 218509001 U CN218509001 U CN 218509001U
Authority
CN
China
Prior art keywords
encorbelmenting
wall
flower basket
basket type
seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222996726.8U
Other languages
Chinese (zh)
Inventor
索亚楠
高枫
孔庆山
王殿林
刘壮
李熠凡
苏峥宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202222996726.8U priority Critical patent/CN218509001U/en
Application granted granted Critical
Publication of CN218509001U publication Critical patent/CN218509001U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to an overhanging beam and the joint support technical field who climbs the frame specifically are a basket type I-beam of encorbelmenting, with high-rise outer wall fixed connection's the I-beam of encorbelmenting, the tip upper end of the I-beam of encorbelmenting is connected with the down tube, and the interlude of down tube is provided with basket of flowers bolt, and the other end fixed connection upper outer wall of down tube, beneficial effect are: through the I-beam of encorbelmenting that sets up basket formula, simple structure, the shaping of being convenient for through set up the down tube on the I-beam to form and pull pretension pulling force, provide the support of pulling to climbing the frame, thereby be convenient for climb the fixed mounting of a hookup location, improved the stability of climbing the frame installation, improved the security of high-rise outer wall construction greatly.

Description

Basket type overhanging I-beam
Technical Field
The utility model relates to an outrigger and the joint support technical field who climbs the frame specifically are a basket of flowers I-beam of encorbelmenting.
Background
The building has unique advantages in the high-rise buildings at present. The high-rise building often can appear structure adduction layer, and the structure is internal to be contracted and is leaded to full steel to climb the frame and can't continue to climb, and the construction technology degree of difficulty is big.
The steel stand column conversion system is usually arranged at the position of a shrinking layer in the structure in the prior art, a climbing frame guide rail originally arranged on a structural beam, a plate, a column and a wall is attached to a support and fixed on a steel stand column through a climbing hanger, the climbing of the shrinking layer position in the structure of the full-steel climbing frame is realized, the steel stand column is adopted as the climbing frame to attach the conversion system, the process is complex, and the labor intensity of operators is high.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a basket of flowers formula I-beam of encorbelmenting to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme:
the utility model provides a basket of flowers formula I-beam of encorbelmenting, includes the I-beam of encorbelmenting with high-rise outer wall fixed connection, the tip upper end of the I-beam of encorbelmenting is connected with the down tube, the interlude of down tube is provided with the turnbuckle, and the other end fixed connection upper outer wall of down tube.
Preferably, the I-beam of encorbelmenting comprises horizontal I-beam, back riser and preceding riser fixed welding are on horizontal I-beam front and back terminal surface.
Preferably, a plurality of groups of through holes distributed in a matrix mode are formed in the rear vertical plate, embedded screws corresponding to the through holes are embedded and poured on the high-rise outer wall, and the embedded screws are inserted into the through holes and fixedly connected with the rear vertical plate.
Preferably, the front vertical plate is provided with a pair of mounting holes, and the mounting holes are connected with the climbing frame guide rail attachment support and the climbing hanger through bolts.
Preferably, the upper end of the connecting position of the front vertical plate and the transverse I-shaped beam is provided with a reinforcing seat, the reinforcing seat is arranged to be in a right-angled plate shape, one side of the reinforcing seat is attached to the upper end face of the transverse I-shaped beam, and the vertical plate of the reinforcing seat is attached to the front vertical plate.
Preferably, the reinforcing seat is provided with a hinged seat, and one end of the inclined rod is rotatably installed on the hinged seat.
Preferably, the end part of the diagonal rod is provided with a mounting plate, and the mounting plate is mounted on the upper outer wall through bolts.
Preferably, the I-beams of encorbelmenting are provided with two sets ofly, and two sets of I-beams of encorbelmenting are parallel to each other and set up, through connecting I-beam fixed connection between the adjacent I-beam of encorbelmenting.
Preferably, a side frame is arranged on the side wall of the cantilever I-shaped beam, a clamping groove is formed in the side frame, two ends of the connecting I-shaped beam are inserted into the clamping grooves, and the connecting I-shaped beam is connected with the side frame through bolts.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses a set up the I-beam of encorbelmenting of basket of flowers formula, simple structure, the shaping of being convenient for is through setting up the down tube on the I-beam to form and pull the pretension pulling force, provide the support of pulling to climbing the frame, thereby be convenient for climb the fixed mounting of a hookup location, improved the stability of climbing the frame installation, improved the security of high-rise outer wall construction greatly.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic view of a three-dimensional structure of an overhanging I-beam of the present invention;
fig. 3 is a schematic perspective view of the present invention;
fig. 4 is a schematic view of the spatial structure of the slanting pole of the present invention.
In the figure: 1. a transverse I-beam; 2. a rear vertical plate; 3. a front vertical plate; 4. connecting the I-beam; 5. a reinforcement base; 6. pre-burying a screw; 7. hinging seat; 8. a diagonal bar; 9. a turn buckle; 10. mounting a plate; 11. a side frame; 12. a card slot; 13. and (7) installing holes.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution:
the utility model provides a basket type I-beam that encorbelments, include the I-beam that encorbelments with high-rise outer wall fixed connection, the tip upper end of the I-beam that encorbelments is connected with down tube 8, the interlude of down tube 8 is provided with basket of flowers bolt 9, the other end fixed connection upper outer wall of down tube 8, through the I-beam that encorbelments who sets up the basket of flowers formula, moreover, the steam generator is simple in structure, and the shaping of being convenient for, utilize basket of flowers bolt 9 to be convenient for adjust the length of down tube 8, thereby the adaptation is installed with the building height of different floors, through set up down tube 8 on the I-beam, thereby form and pull pretension pulling force, provide the support of pulling to climbing frame, thereby be convenient for the fixed mounting of climbing frame hookup location, the stability of climbing frame installation has been improved, the security of high-rise outer wall construction has been improved greatly.
Further optimal design, the I-beam of encorbelmenting is by horizontal I-beam 1, back riser 2 and preceding riser 3 are constituteed, back riser 2 and preceding riser 3 fixed welding are on the preceding rear end face of horizontal I-beam 1, be provided with the multiunit through hole of matrix distribution on the back riser 2, pre-buried pouring has the pre-buried screw rod 6 that corresponds with the through hole on the high-rise outer wall, pre-buried screw rod 6 pegs graft in the through hole and fixed connection back riser 2, be provided with a pair of mounting hole 13 on the preceding riser 3, bolted connection climbs a guide rail and adheres to the support and the pendant that climbs on the mounting hole 13.
The cantilever I-beam is formed by welding and combining I-steel and steel plates, and has the advantages of simple manufacture and processing, less steel consumption and low cost; the welding amount is small, the environment is protected, the embedded screw 6 and the nut are respectively connected and fixed with the main body structure, the climbing frame guide rail attachment support and the climbing hanger, the quick mounting and the quick dismounting can be realized, and the labor and the time are saved; good turnover performance and low cost.
Further optimal design, the upper end of the connecting position of the front vertical plate 3 and the transverse I-shaped beam 1 is provided with a reinforcing seat 5, the reinforcing seat 5 is arranged to be in a right-angle plate shape, one side of the reinforcing seat 5 is attached to the upper end face of the transverse I-shaped beam 1, and the vertical plate of the reinforcing seat 5 is attached to the front vertical plate 3.
The installation strength of the front vertical plate 3 is improved by arranging the reinforcing seat 5, and connection falling off caused by the acting force of the climbing frame is avoided.
Further optimization design, the reinforced seat 5 is provided with a hinged seat 7, one end of the inclined rod 8 is rotatably installed on the hinged seat 7, the end part of the inclined rod 8 is provided with an installation plate 10, and the installation plate 10 is installed on the upper outer wall through bolts.
The angle of the inclined rod 8 can be adjusted conveniently by arranging the hinged support 7, and the other end of the inclined rod 8 can be fixedly arranged by arranging the mounting plate 10.
Further optimal design, the I-beams that encorbelment are provided with two sets ofly, and the I-beam that encorbelments is parallel to each other between two sets of I-beams that encorbelment, through connecting I-beam 4 fixed connection between the adjacent I-beam that encorbelments, is provided with side bearer 11 on the lateral wall of the I-beam that encorbelments, is provided with draw-in groove 12 on the side bearer 11, and the both ends of connecting I-beam 4 are pegged graft in draw-in groove 12, and connect bolted connection between I-beam 4 and the side bearer 11.
Through setting up the I-beam of encorbelmenting into two sets ofly to increase the quantity of mounted position, improve the support intensity of encorbelmenting, improve more stable support intensity.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a basket formula I-beam of encorbelmenting, includes the I-beam of encorbelmenting with high-rise outer wall fixed connection, its characterized in that: the upper end of the end part of the cantilever I-shaped beam is connected with an inclined rod (8), the middle section of the inclined rod (8) is provided with a turn buckle (9), and the other end of the inclined rod (8) is fixedly connected with an upper outer wall.
2. The flower basket type cantilever I-beam of claim 1, wherein: the I-beam of encorbelmenting comprises horizontal I-beam (1), back riser (2) and preceding riser (3) fixed welding are on terminal surface around horizontal I-beam (1).
3. The flower basket type cantilever I-beam of claim 2, wherein: the rear vertical plate (2) is provided with a plurality of groups of through holes distributed in a matrix mode, embedded screws (6) corresponding to the through holes are embedded and poured on the high-rise outer wall, and the embedded screws (6) are inserted into the through holes and fixedly connected with the rear vertical plate (2).
4. The flower basket type cantilever I-beam of claim 2, wherein: the front vertical plate (3) is provided with a pair of mounting holes (13), and the mounting holes (13) are connected with climbing frame guide rail attachment supports and climbing hangers through bolts.
5. The flower basket type cantilever I-beam of claim 4, wherein: preceding riser (3) are provided with horizontal I-beam (1) hookup location's upper end and strengthen seat (5), strengthen seat (5) and set up to rectangular plate shape, strengthen the up end of the horizontal I-beam (1) of one side laminating of seat (5), strengthen riser (3) before the vertical board laminating of seat (5).
6. The flower basket type cantilever I-beam of claim 5, wherein: the reinforced seat (5) is provided with a hinged seat (7), and one end of the inclined rod (8) is rotatably arranged on the hinged seat (7).
7. The flower basket type cantilever I-beam of claim 6, wherein: the end part of the diagonal rod (8) is provided with a mounting plate (10), and the mounting plate (10) is mounted on the upper outer wall through bolts.
8. The flower basket type cantilever I-beam of claim 7, wherein: the I-beams of encorbelmenting are provided with two sets ofly, and two sets of I-beams of encorbelmenting are parallel to each other and set up, through connecting I-beam (4) fixed connection between the adjacent I-beam of encorbelmenting.
9. The i-beam of encorbelmenting of gaily decorated basket formula of claim 8, characterized in that: the side wall of the cantilever I-shaped beam is provided with a side frame (11), the side frame (11) is provided with a clamping groove (12), two ends of the connecting I-shaped beam (4) are inserted into the clamping groove (12), and the connecting I-shaped beam (4) is connected with the side frame (11) through bolts.
CN202222996726.8U 2022-11-11 2022-11-11 Flower basket type overhanging I-beam Active CN218509001U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222996726.8U CN218509001U (en) 2022-11-11 2022-11-11 Flower basket type overhanging I-beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222996726.8U CN218509001U (en) 2022-11-11 2022-11-11 Flower basket type overhanging I-beam

Publications (1)

Publication Number Publication Date
CN218509001U true CN218509001U (en) 2023-02-21

Family

ID=85220471

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222996726.8U Active CN218509001U (en) 2022-11-11 2022-11-11 Flower basket type overhanging I-beam

Country Status (1)

Country Link
CN (1) CN218509001U (en)

Similar Documents

Publication Publication Date Title
CN218509001U (en) Flower basket type overhanging I-beam
CN217028088U (en) Cantilever tripod template support
CN215907358U (en) Auxiliary operation platform for bottom construction of high-altitude overhanging structure
CN214739017U (en) Steel tube bundle combined shear wall and steel beam connecting device
CN209780174U (en) Scaffold for building construction
CN208604911U (en) A kind of novel suspention beam bracket
CN206917125U (en) A kind of assembled stair
CN215717199U (en) Steel backing is consolidated with template support of being convenient for adjust to building stand is stupefied
CN218595978U (en) Can have enough to meet need formula chain block suspended structure
CN216040725U (en) Novel No. 0 piece of continuous beam is under construction with support bracket
CN115110676B (en) Hanging frame supporting glass curtain wall system uniformly stressed and construction method thereof
CN219363075U (en) Quick-mounting platform structure of tower crane
CN218668470U (en) Wall-attached seat for attached lifting scaffold
CN217762423U (en) Novel cantilever type pipe support
CN214446314U (en) Detachable prefabricated component storage rack
CN215803090U (en) Hanging basket support frame
CN215107481U (en) Prefabricated outer wall auxiliary positioning combined member
CN217353461U (en) Support frame reinforced structure encorbelments
CN220133473U (en) Movable frame for building construction
CN213115437U (en) Wall-attached type operation platform module under overhanging roof
CN212773349U (en) Construction frame reinforcing apparatus
CN220014395U (en) Can have enough to meet need mounting bracket by intelligent integrated platform system bailey frame of equipping
CN219343684U (en) Detachable curtain wall mounting structure
CN220686736U (en) Supporting beam for template support and support system
CN216664661U (en) Curtain wall rigid hanging plate adjustable system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant