CN218508971U - Electric power tower construction work platform - Google Patents

Electric power tower construction work platform Download PDF

Info

Publication number
CN218508971U
CN218508971U CN202222914690.4U CN202222914690U CN218508971U CN 218508971 U CN218508971 U CN 218508971U CN 202222914690 U CN202222914690 U CN 202222914690U CN 218508971 U CN218508971 U CN 218508971U
Authority
CN
China
Prior art keywords
electric power
power tower
operation platform
fixedly mounted
staff
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222914690.4U
Other languages
Chinese (zh)
Inventor
刘勇买
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Guita Tower Co ltd
Original Assignee
Guangxi Guita Tower Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Guita Tower Co ltd filed Critical Guangxi Guita Tower Co ltd
Priority to CN202222914690.4U priority Critical patent/CN218508971U/en
Application granted granted Critical
Publication of CN218508971U publication Critical patent/CN218508971U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses an electric power tower construction work platform, including the electric power tower main part, the fixed cross lantern ring that has cup jointed in bottom of electric power tower main part, the surface demountable installation of the cross lantern ring has stabilising arrangement, stabilising arrangement's afterbody fixed mounting has the work platform subassembly. Among the above-mentioned scheme, the staff opens earlier in the emergency exit stands to the operation platform, close the emergency exit again, will insert the hook and mention and rotate after that, make the position of inserting the hook and eye-splice correspond, the spring compression this moment, then loosen the eye-splice, make the eye-splice pass through the pulling force of spring, stable in inserting the eye-splice, extend through electric telescopic handle after that, make staff level rise to suitable height and carry out the construction operation, in the work progress, the staff can place the instrument frame with part and instrument in, utilize above-mentioned structure, the staff can be stable stand in the operation platform construction operation, the consumption to shank strength has been reduced, the staff of being convenient for operates for a long time, and the danger of construction has been reduced.

Description

Electric power tower construction work platform
Technical Field
The utility model relates to an electric power tower construction technical field, more specifically says, the utility model relates to an electric power tower construction work platform.
Background
An electric power tower is a support for overhead electric wires, but in the construction process of the existing single-pole electric power tower, a worker usually needs to ascend by using a pole ascending device and then use various maintenance tools for construction operation, and the ascending operation by using the pole ascending device consumes a large amount of leg force, is not suitable for long-time operation and is high in danger.
SUMMERY OF THE UTILITY MODEL
In order to overcome prior art's above-mentioned defect, the embodiment of the utility model provides an electric power tower construction work platform to solve the electric power tower of single-rod type in the work progress, generally need the staff to use the pole device of ascending a height, reuse multiple repair tools to carry out construction work, and use the pole device of ascending a height operation great to shank strength consumption, unsuitable long-time operation, dangerous great.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides an electric power tower construction work platform, includes the electric power tower main part, the cross lantern ring has been cup jointed to the bottom of electric power tower main part is fixed, the surface demountable installation of cross lantern ring has stabilising arrangement, stabilising arrangement's afterbody fixed mounting has the operation platform subassembly.
Wherein, stabilising arrangement includes the steady rest, the left side fixed mounting of steady rest has drive arrangement, drive arrangement's middle part fixed mounting has the double thread screw rod, the screw thread piece is installed to the equal screw thread in the left and right sides of double thread screw rod, the front side fixed mounting of screw thread piece has fixed cover.
The outer surface of the thread block is movably sleeved on the inner surface of the stabilizing frame, the inner surface of the fixing sleeve is detachably mounted on the outer surface of the cross-shaped sleeve ring, and the shape and the size of the fixing sleeve are matched with those of the cross-shaped sleeve ring.
Wherein, the operation platform subassembly includes the base, the equal fixed mounting in four corners of base bottom has the universal wheel, the equal fixed cup joint in the left and right sides of base has electric telescopic handle, the operation platform has been placed to the inboard of base, the equal fixed mounting in the left and right sides of operation platform has the tool rest, the emergency exit is installed in the front portion rotation of operation platform, the right side fixed mounting of operation platform has fixed subassembly, the back fixed mounting of base is at the back of steady rest, electric telescopic handle's top fixed mounting is in the bottom of tool rest.
The fixed assembly comprises an insertion block, an insertion hook is movably sleeved on the inner surface of the insertion block, a spring is fixedly connected to the bottom of the insertion hook, and an insertion buckle is detachably mounted on the left side of the insertion hook.
Wherein, the right side fixed mounting of inserted block is on the right side of emergency exit, the caudal side fixed mounting of eye-splice is on the right side of operation platform, the top fixed connection of spring is in the bottom of inserted block.
The utility model discloses an above-mentioned technical scheme's beneficial effect as follows:
in the scheme, when a worker needs to carry out construction operation on the electric power tower main body, the worker firstly pushes the operation platform assembly to the corresponding position through the universal wheel, then drives the double-thread screw rod to rotate through the driving device, the transmission thread blocks synchronously move oppositely along the inner wall of the stabilizing frame, the fixing sleeve is buckled on the cross-shaped sleeve ring, and the operation platform assembly and the electric power tower main body are fixed;
after fixing operation platform subassembly and electric power tower main part together, the staff opens the emergency exit and stands in the operation platform, close the emergency exit again, to insert the hook and mention and rotate after that, make the position of inserting the hook and buckle correspond, the spring compression this moment, then loosen and insert the hook, make and insert the pulling force that the hook passed through the spring, stable the inserting is detained, extend through electric telescopic handle after that, make staff level rise to suitable height and carry out construction operation, in the work progress, the staff can be with in part and the instrument placement tool rest, utilize above-mentioned structure, the staff can be stable stand construction operation in the operation platform, the consumption to shank strength has been reduced, be convenient for the staff long-time operation, and the danger of construction has been reduced.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic view of the split structure of the present invention;
FIG. 3 is a schematic view of the structure of the stabilizer of the present invention;
FIG. 4 is a schematic structural view of the work platform assembly of the present invention;
fig. 5 is a schematic structural view of the fixing assembly of the present invention.
[ reference numerals ]
1. A power tower main body; 11. a cross-shaped lantern ring; 2. a stabilizing device; 21. a stabilizer frame; 22. a drive device; 23. a double-thread screw; 24. a thread block; 25. fixing a sleeve; 3. a work platform assembly; 31. a base; 32. a universal wheel; 33. an electric telescopic rod; 34. an operation platform; 35. a tool holder; 36. a safety door; 37. a fixing component; 371. inserting a block; 372. inserting a hook; 373. a spring; 374. and (4) inserting and buckling.
Detailed Description
To make the technical problems, technical solutions and advantages of the present invention clearer, the following description is made in conjunction with the accompanying drawings and specific embodiments.
As attached figure 1 to figure 5 the embodiment of the utility model provides an electric power tower construction work platform, including electric power tower main part 1, the fixed cover in bottom of electric power tower main part 1 has connect the cross lantern ring 11, the surface demountable installation of cross lantern ring 11 has stabilising arrangement 2, stabilising arrangement 2's afterbody fixed mounting has operation platform subassembly 3.
Wherein, stabilising arrangement 2 includes stabilizer 21, stabilizer 21's left side fixed mounting has drive arrangement 22, drive arrangement 22's middle part fixed mounting has double thread screw rod 23, thread block 24 is installed to the equal screw thread in the left and right sides of double thread screw rod 23, the front side fixed mounting of thread block 24 has fixed cover 25, through setting up cross lantern ring 11, drive arrangement 22, double thread screw rod 23, thread block 24, fixed cover 25, reaches the effect of fixing operation platform subassembly 3 stable in the original place, and stabilizer 21 plays the spacing effect of direction to thread block 24.
The outer surface of the thread block 24 is movably sleeved on the inner surface of the stabilizing frame 21, the inner surface of the fixing sleeve 25 is detachably mounted on the outer surface of the cross-shaped sleeve ring 11, and the shape and the size of the fixing sleeve 25 are matched with those of the cross-shaped sleeve ring 11.
Wherein, operation platform subassembly 3 includes base 31, the equal fixed mounting in four corners of base 31 bottom has universal wheel 32, the equal fixed cup joints of base 31's the left and right sides has electric telescopic handle 33, operation platform 34 has been placed to base 31's inboard, the equal fixed mounting in both sides has tool rest 35 about operation platform 34, emergency exit 36 is installed in the front portion rotation of operation platform 34, the right side fixed mounting of operation platform 34 has fixed subassembly 37, base 31's back fixed mounting is at the back of steady rest 21, the top fixed mounting of electric telescopic handle 33 is in the bottom of tool rest 35, through setting up electric telescopic handle 33, reaches the effect that makes the vertical rise of operation platform 34 level, through setting up universal wheel 32, reaches the effect of being convenient for remove and carrying operation platform subassembly 3, through setting up tool rest 35, reaches the effect that the staff of being convenient for places part and construction tool.
Wherein, fixed subassembly 37 is including inserting piece 371, the internal surface activity of inserting piece 371 has cup jointed and has inserted hook 372, the bottom fixedly connected with spring 373 of inserting hook 372, the left side demountable installation of inserting hook 372 has eye-splice 374, through setting up inserting piece 371, inserting hook 372, eye-splice 374, reaches the effect of fixed emergency exit 36.
The right side of the insert 371 is fixedly installed on the right side of the safety door 36, the tail side of the insert 374 is fixedly installed on the right side of the operation platform 34, and the top end of the spring 373 is fixedly connected to the bottom of the insert 371.
The working process of the utility model is as follows:
when a worker needs to perform construction operation on the electric power tower main body 1, the worker firstly pushes the operation platform assembly 3 to a corresponding position through the universal wheel 32, then drives the double-threaded screw 23 to rotate through the driving device 22, and the transmission threaded blocks 24 synchronously move in opposite directions along the inner wall of the stabilizing frame 21, so that the fixing sleeve 25 is buckled on the cross-shaped sleeve ring 11, and the operation platform assembly 3 and the electric power tower main body 1 are fixed;
after the operation platform assembly 3 and the electric power tower main body 1 are fixed together, an operator opens the safety door 36 and stands in the operation platform 34, then closes the safety door 36, lifts up and rotates the insertion hook 372, so that the insertion hook 372 corresponds to the insertion buckle 374, the spring 373 is compressed at the moment, then the insertion hook 372 is loosened, the insertion hook 372 is stably inserted into the insertion buckle 374 through the tensile force of the spring 373, then the electric telescopic rod 33 is extended, the horizontal height of the operator is raised to a proper height for construction operation, and in the construction process, the operator can place parts and tools in the tool rack 35.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," "connecting," and "connecting" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be directly connected, and "upper," "lower," "left," and "right" are only used to indicate relative positional relationships, and when the absolute position of the object to be described is changed, the relative positional relationships may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides an electric power tower construction work platform, includes electric power tower main part (1), its characterized in that, the fixed cross lantern ring (11) that has cup jointed in bottom of electric power tower main part (1), the surface demountable installation of cross lantern ring (11) has stabilising arrangement (2), the afterbody fixed mounting of stabilising arrangement (2) has operation platform subassembly (3).
2. The electric power tower construction work platform as claimed in claim 1, wherein the stabilizing device (2) comprises a stabilizing frame (21), a driving device (22) is fixedly mounted on the left side of the stabilizing frame (21), a double-threaded screw (23) is fixedly mounted in the middle of the driving device (22), threaded blocks (24) are threadedly mounted on the left side and the right side of the double-threaded screw (23), and a fixing sleeve (25) is fixedly mounted on the front side of the threaded blocks (24).
3. The electric power tower construction work platform as claimed in claim 2, wherein the outer surface of the thread block (24) is movably sleeved on the inner surface of the stabilizing frame (21), the inner surface of the fixing sleeve (25) is detachably mounted on the outer surface of the cross-shaped sleeve ring (11), and the shape and size of the fixing sleeve (25) are matched with the shape and size of the cross-shaped sleeve ring (11).
4. The electric power tower construction operation platform as claimed in claim 1, wherein the operation platform assembly (3) comprises a base (31), universal wheels (32) are fixedly mounted at four corners of the bottom of the base (31), electric telescopic rods (33) are fixedly sleeved on the left side and the right side of the base (31), an operation platform (34) is placed on the inner side of the base (31), tool racks (35) are fixedly mounted on the left side and the right side of the operation platform (34), a safety door (36) is rotatably mounted at the front portion of the operation platform (34), a fixing assembly (37) is fixedly mounted on the right side of the operation platform (34), the back of the base (31) is fixedly mounted on the back of the stabilizing frame (21), and the top end of the electric telescopic rod (33) is fixedly mounted at the bottom of the tool racks (35).
5. The electric power tower construction operation platform as claimed in claim 4, wherein the fixing assembly (37) comprises an insertion block (371), an insertion hook (372) is movably sleeved on the inner surface of the insertion block (371), a spring (373) is fixedly connected to the bottom of the insertion hook (372), and an insertion buckle (374) is detachably mounted on the left side of the insertion hook (372).
6. The power tower construction operation platform according to claim 5, wherein the right side of the insertion block (371) is fixedly installed at the right side of the safety door (36), the tail side of the insertion buckle (374) is fixedly installed at the right side of the operation platform (34), and the top end of the spring (373) is fixedly connected to the bottom of the insertion block (371).
CN202222914690.4U 2022-11-03 2022-11-03 Electric power tower construction work platform Active CN218508971U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222914690.4U CN218508971U (en) 2022-11-03 2022-11-03 Electric power tower construction work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222914690.4U CN218508971U (en) 2022-11-03 2022-11-03 Electric power tower construction work platform

Publications (1)

Publication Number Publication Date
CN218508971U true CN218508971U (en) 2023-02-21

Family

ID=85220313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222914690.4U Active CN218508971U (en) 2022-11-03 2022-11-03 Electric power tower construction work platform

Country Status (1)

Country Link
CN (1) CN218508971U (en)

Similar Documents

Publication Publication Date Title
CN218508971U (en) Electric power tower construction work platform
CN211554267U (en) High-power supply maintenance platform
CN212041262U (en) Automatic adjusting device is used to wire winding point
CN212298588U (en) Pipeline detection device for municipal administration
CN212072018U (en) Mounting support for electric power overhaul robot
CN211310618U (en) Lifting device is used in switch board installation of mounting height be convenient for adjust
CN209989035U (en) Subway tunnel communication system construction operation equipment
CN210819445U (en) Bearing platform in frame production
CN113216585A (en) Adjustable high-stability safety platform for building construction
CN215903483U (en) Relay protection tool platform
CN214456626U (en) Full-electric aluminum alloy aerial work platform for building
CN212532218U (en) Dedicated jacking equipment of electromechanical installation
CN211813154U (en) Mounting mechanism for electric hoist
CN215711378U (en) Two-position balanced jack support fixing base
CN218643833U (en) Outdoor decoration antidetonation type hanging flower basket
CN219973856U (en) Building engineering building climbing frame
CN221001890U (en) Outer wall construction platform for civil engineering
CN217074163U (en) Trolley for overhauling transformer substation
CN215886211U (en) Curtain hoist device for construction
CN214006461U (en) Movable type device of ascending a height
CN214879758U (en) Novel tower crane equipment capable of automatically searching blind area hanging position
CN114920163B (en) Multifunctional yaw clamp dismounting tool
CN211004181U (en) Tool for high-voltage integrated four-in-one parts
CN217292091U (en) Auxiliary mounting tool for automobile headlamp
CN219509120U (en) Safe type high-rise building climbs frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant