CN218498747U CN202222851271.0U CN202222851271U CN218498747U CN 218498747 U CN218498747 U CN 218498747U CN 202222851271 U CN202222851271 U CN 202222851271U CN 218498747 U CN218498747 U CN 218498747U
Authority
CN
China
Prior art keywords
fixing
fixed
stainless steel
cable
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222851271.0U
Other languages
Chinese (zh)
Inventor
杨金红
韩亭云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Hongfeng Electric Power Technology Co ltd
Original Assignee
Shandong Hongfeng Electric Power Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Hongfeng Electric Power Technology Co ltd filed Critical Shandong Hongfeng Electric Power Technology Co ltd
Priority to CN202222851271.0U priority Critical patent/CN218498747U/en
Application granted granted Critical
Publication of CN218498747U publication Critical patent/CN218498747U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a cable testing bridge technical field just discloses stainless steel cable testing bridge, including the installation shell, the top of installation shell is provided with the top cap, the top fixed mounting of top cap has the gallows, first through-hole has been seted up on the right side of top cap, the inside of installation shell is provided with cable fixture, the right side top of installation shell is provided with connection installation mechanism, cable fixture includes fixed subassembly and centre gripping subassembly, the centre gripping subassembly sets up the inboard at fixed subassembly. This stainless steel cable testing bridge, through the cable fixture that sets up, in the use, through placing the cable between grip block and fixed plate, the grip block is pressed to elasticity through fixed spring to it is fixed with the cable centre gripping to make the grip block, and every grip block is furnished with solitary fixed spring, and it can carry out automatically regulated according to the diameter of cable, thereby is convenient for carry out synchronous centre gripping fixedly to the cable of different diameters.

Description

Stainless steel cable bridge rack
Technical Field
The utility model relates to a cable testing bridge technical field specifically is stainless steel cable testing bridge.
Background
The cable bridge is divided into structures such as a groove type structure, a tray type structure, a ladder type structure, a grid type structure and the like, and consists of a support, a supporting arm, an installation accessory and the like. The inner bridge of the building can be independently erected and also can be laid on various buildings and pipe rack supports, and the inner bridge has the characteristics of simple structure, attractive appearance, flexible configuration, convenience in maintenance and the like.
According to the stainless steel cable testing bridge that national patent net disclosed describes in (No. CN 214674068U), the utility model discloses a stainless steel cable testing bridge, include the diaphragm and be located the gallows that the diaphragm top symmetry set up, the bottom of diaphragm is equipped with the T type spout that the symmetry set up, just the bottom of diaphragm is equipped with the casing, the casing is open-ended cavity structure in top, just the top symmetry of casing be equipped with T type spout assorted T type slider, the bottom in the casing is equipped with the baffle of a plurality of vertical settings, one side of baffle all is equipped with the movable block of vertical setting, the movable block pass through clamping mechanism with the casing is connected, clamping mechanism is including being located the connecting plate on movable block top. Has the beneficial effects that: through the matching design of the clamping mechanism, the baffle and the movable block, the distance between the baffle and the movable block can be adjusted, and then the cable is clamped and fixed, so that the cable is prevented from falling off; and the T-shaped sliding groove is matched with the T-shaped sliding block, and the shell is convenient to mount and dismount.
In view of the above description, the inventors consider that the following problems exist:
above-mentioned utility model in the use, the centre gripping is fixed to the cable through the baffle that sets up and movable block, and cooperate drive movable block unidirectional movement through gear and pawl and make it fixed with the cable, but it is at the removal in-process, it carries out synchronous motion to drive a plurality of movable blocks, make can not carry out the regulation of adaptability according to categorised cable, thereby lead to when the cable thickness is inhomogeneous, can only carry out effectual centre gripping to the coarsest cable, secondly, the utility model discloses in the use, T type spout and T shape slider through setting up fix a position the installation between diaphragm and the casing, and fix through fixing bolt, what can know according to the common knowledge, the position that the cable testing bridge set up usually is higher, and then make and operate inconveniently when installing casing and diaphragm, consequently, need change a stainless steel cable testing bridge and put forward and go out above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a stainless steel cable testing bridge to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the stainless steel cable bridge comprises an installation shell, wherein a top cover is arranged at the top of the installation shell, a hanging bracket is fixedly arranged at the top of the top cover, a first through hole is formed in the right side of the top cover, a cable clamping mechanism is arranged inside the installation shell, and a connecting and installing mechanism is arranged at the top of the right side of the installation shell.
The cable clamping mechanism comprises a fixing component and a clamping component, and the clamping component is arranged on the inner side of the fixing component.
Connection installation mechanism includes the gag lever post, gag lever post fixed mounting is in the inboard at installation shell right-hand member top, the left side fixed mounting of gag lever post has the dog, the right side intermediate position department fixed mounting of dog has the dead lever, the outside slidable mounting of dead lever has the sliding pin, fixed mounting has reset spring between the left side of sliding pin and the dog right side, the right side top fixed mounting of installation shell has the fixed block.
Preferably, the fixed subassembly includes the fixed plate, fixed plate fixed mounting is inboard in installation shell bottom, the inside fixed mounting of fixed plate has the fixed axle, just the fixed axle sets up between the installation shell left and right sides inner wall, is convenient for make fixed plate fixed mounting in the inside of installation shell.
Preferably, the centre gripping subassembly includes the connecting axle, connecting axle fixed mounting is between the installation shell left and right sides inner wall, the outside slidable mounting of connecting axle has the grip block, fixed mounting has fixed spring between the left side of grip block and the fixed plate, is convenient for make the grip block with the fixed centre gripping of cable in the inside of installation shell.
Preferably, the clamping plate, the connecting shaft and the fixing shaft are provided with through holes at corresponding positions respectively, and the connecting shaft and the fixing shaft penetrate through the through holes respectively, so that the clamping plate can slide in a limiting manner.
Preferably, the number of the fixed plates is three, the number of the clamping plates is four, the right side of each clamping plate is provided with a groove, and the left side of each fixed plate and the right side inner wall of each mounting shell are provided with grooves, so that cables with different diameters can be clamped conveniently.
Preferably, through holes are formed in the corresponding positions of the sliding pin, the limiting rod and the fixing rod, and the limiting rod and the fixing rod respectively penetrate through the through holes, so that the sliding pin can slide in a limiting mode.
Preferably, the top of the sliding pin is provided with a through groove at a position corresponding to the fixing block, and the fixing block is slidably mounted in the through groove, so that the connection strength of the sliding pin is improved through the fixing block.
Compared with the prior art, the utility model provides a stainless steel cable testing bridge possesses following beneficial effect:
1. this stainless steel cable testing bridge, through the cable fixture who sets up, in the use, through placing the cable between grip block and fixed plate, the grip block is pressed through fixed spring's elasticity to make the grip block fixed with the cable centre gripping, and every grip block is furnished with solitary fixed spring, and it can carry out automatically regulated according to the diameter of cable, thereby is convenient for carry out synchronous centre gripping fixedly to the cable of different diameters.
2. This stainless steel cable testing bridge through the connection installation mechanism who sets up, in the use, presses through reset spring and moves the sliding pin, makes the sliding pin automatic insertion to the recess of top cap right side bottom to be convenient for make top cap and installation shell install fast, improve workman's installation effectiveness, when dismantling, only need insert the screwdriver in the first through-hole simultaneously, make it press the sliding pin can with the top cap separation.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained without inventive exercise based on the drawings:
FIG. 1 is a schematic view of the appearance structure of the present invention;
FIG. 2 is an exploded view of the present invention;
FIG. 3 is a schematic view of the structure of the utility model taken out of the top cover from the bottom;
fig. 4 is a schematic view of the appearance structure of the cable clamping mechanism of the present invention;
fig. 5 is the appearance structure schematic diagram of the connection installation structure of the present invention.
In the figure: 1. mounting a shell; 2. a top cover; 3. a hanger; 4. a first through hole; 5. a cable clamping mechanism; 51. a fixing assembly; 511. a fixing plate; 512. a fixed shaft; 52. a clamping assembly; 521. a connecting shaft; 522. a clamping plate; 523. a fixed spring; 6. a connecting and mounting mechanism; 61. a limiting rod; 62. a stopper; 63. fixing the rod; 64. a return spring; 65. a slide pin; 66. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," "secured," and the like are to be construed broadly, e.g., as being fixedly connected, detachably connected, or integrated; can be mechanically or electrically connected; they may be directly connected or indirectly connected through intervening media, or may be connected through the use of two elements or the interaction of two elements. The specific meaning of the above terms in the present invention can be understood according to specific situations by those skilled in the art.
The first embodiment is as follows:
referring to fig. 1-4, the present invention provides a technical solution: stainless steel cable testing bridge, including installation shell 1, the top of installation shell 1 is provided with top cap 2, and the top fixed mounting of top cap 2 has gallows 3, and first through-hole 4 has been seted up on the right side of top cap 2, and the inside of installation shell 1 is provided with cable fixture 5, and the right side top of installation shell 1 is provided with connection installation mechanism 6.
The cable clamping mechanism 5 comprises a fixing component 51 and a clamping component 52, and the clamping component 52 is arranged on the inner side of the fixing component 51.
Further, the fixing assembly 51 includes a fixing plate 511, the fixing plate 511 is fixedly installed at the inner side of the bottom of the mounting case 1, a fixing shaft 512 is fixedly installed inside the fixing plate 511, and the fixing shaft 512 is disposed between the inner walls of the left and right sides of the mounting case 1, so that the fixing plate 511 is fixedly installed inside the mounting case 1.
Further, the clamping assembly 52 comprises a connecting shaft 521, the connecting shaft 521 is fixedly installed between the inner walls of the left side and the right side of the installation shell 1, a clamping plate 522 is slidably installed outside the connecting shaft 521, and a fixing spring 523 is fixedly installed between the left side of the clamping plate 522 and the fixing plate 511, so that the clamping plate 522 can fixedly clamp the cable inside the installation shell 1.
Furthermore, through holes are respectively formed in the corresponding positions of the clamping plate 522, the connecting shaft 521 and the fixing shaft 512, and the connecting shaft 521 and the fixing shaft 512 respectively penetrate through the through holes, so that the clamping plate 522 can slide in a limiting manner.
The second embodiment:
referring to fig. 5, in combination with the first embodiment, further, the connection and installation mechanism 6 includes a limiting rod 61, the limiting rod 61 is fixedly installed on the inner side of the top of the right end of the installation shell 1, a stopper 62 is fixedly installed on the left side of the limiting rod 61, a fixing rod 63 is fixedly installed at the middle position of the right side of the stopper 62, a sliding pin 65 is slidably installed outside the fixing rod 63, a return spring 64 is fixedly installed between the left side of the sliding pin 65 and the right side of the stopper 62, and a fixing block 66 is fixedly installed on the top of the right side of the installation shell 1.
Further, the fixed plate 511 is provided with three, the clamping plate 522 is provided with four, and the right side of the clamping plate 522 is provided with a groove, which is formed in the inner wall of the left side of the fixed plate 511 and the right side of the mounting shell 1, so that cables with different diameters can be clamped respectively.
Furthermore, through holes are formed in the positions of the sliding pin 65 corresponding to the limiting rod 61 and the fixing rod 63, and the limiting rod 61 and the fixing rod 63 respectively penetrate through the through holes, so that the sliding pin 65 can slide in a limiting mode conveniently.
Further, the top of the sliding pin 65 and the corresponding position of the fixing block 66 are provided with a through groove, and the fixing block 66 is slidably mounted in the through groove, so that the connection strength of the sliding pin 65 is improved through the fixing block 66.
In actual operation, when the device is used, the cable is placed between the clamping plate 522 and the fixing plate 511, the clamping plate 522 is pressed by the elastic force of the fixing spring 523 to slide towards the right side, so that the cable is pressed by the clamping plate 522, and the cable is fixedly clamped in the mounting shell 1 by the clamping plate 522;
insert the recess of top cap 2 left side bottom through the left lug of installing shell 1, press the sliding pin 65 afterwards, make the right side terminal surface of sliding pin 65 flush with the right side terminal surface of installing shell 1, put into the right side top of installing shell 1 with the right side of top cap 2 again, elasticity through reset spring 64 makes sliding pin 65 automatic re-setting insert in the recess on top cap 2 right side, thereby make installing shell 1 and top cap 2 quick fixation, when dismantling, through inserting the screwdriver in first through-hole 4, make it press sliding pin 65 and top cap 2 separation, can make top cap 2 and the separation of installing shell 1 dismantle.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element described by the phrase "comprising a. -" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.

Claims (7)

1. Stainless steel cable testing bridge, including installation shell (1), its characterized in that: a top cover (2) is arranged at the top of the mounting shell (1), a hanging bracket (3) is fixedly mounted at the top of the top cover (2), a first through hole (4) is formed in the right side of the top cover (2), a cable clamping mechanism (5) is arranged in the mounting shell (1), and a connecting and mounting mechanism (6) is arranged at the top of the right side of the mounting shell (1);
the cable clamping mechanism (5) comprises a fixing component (51) and a clamping component (52), and the clamping component (52) is arranged on the inner side of the fixing component (51);
connecting installation mechanism (6) includes gag lever post (61), gag lever post (61) fixed mounting is in the inboard at installation shell (1) right-hand member top, the left side fixed mounting of gag lever post (61) has dog (62), the right side intermediate position department fixed mounting of dog (62) has dead lever (63), the outside slidable mounting of dead lever (63) has sliding pin (65), fixed mounting has reset spring (64) between the left side of sliding pin (65) and dog (62) right side, the right side top fixed mounting of installation shell (1) has fixed block (66).
2. The stainless steel cable tray of claim 1, wherein: fixed subassembly (51) are including fixed plate (511), fixed plate (511) fixed mounting is inboard in installation shell (1) bottom, the inside fixed mounting of fixed plate (511) has fixed axle (512), just fixed axle (512) set up between installation shell (1) left and right sides inner wall.
3. The stainless steel cable tray of claim 2, wherein: the clamping assembly (52) comprises a connecting shaft (521), the connecting shaft (521) is fixedly installed between the inner walls of the left side and the right side of the installation shell (1), a clamping plate (522) is installed outside the connecting shaft (521) in a sliding mode, and a fixing spring (523) is fixedly installed between the left side of the clamping plate (522) and the fixing plate (511).
4. The stainless steel cable tray of claim 3, wherein: through holes are respectively formed in the corresponding positions of the clamping plate (522), the connecting shaft (521) and the fixing shaft (512), and the connecting shaft (521) and the fixing shaft (512) respectively penetrate through the through holes.
5. The stainless steel cable tray of claim 3, wherein: the fixing plate (511) is provided with three, the clamping plates (522) are provided with four, the right sides of the clamping plates (522) are provided with grooves, and the left sides of the fixing plates (511) and the inner walls of the right sides of the mounting shells (1) are provided with grooves.
6. The stainless steel cable tray of claim 1, wherein: through holes are formed in the positions, corresponding to the limiting rod (61) and the fixing rod (63), of the sliding pin (65), and the limiting rod (61) and the fixing rod (63) penetrate through the through holes respectively.
7. The stainless steel cable tray of claim 1, wherein: the top of the sliding pin (65) is provided with a through groove at the position corresponding to the fixing block (66), and the fixing block (66) is slidably mounted in the through groove.
CN202222851271.0U 2022-10-28 2022-10-28 Stainless steel cable bridge rack Active CN218498747U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222851271.0U CN218498747U (en) 2022-10-28 2022-10-28 Stainless steel cable bridge rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222851271.0U CN218498747U (en) 2022-10-28 2022-10-28 Stainless steel cable bridge rack

Publications (1)

Publication Number Publication Date
CN218498747U true CN218498747U (en) 2023-02-17

Family

ID=85195532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222851271.0U Active CN218498747U (en) 2022-10-28 2022-10-28 Stainless steel cable bridge rack

Country Status (1)

Country Link
CN (1) CN218498747U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116565775A (en) * 2023-07-10 2023-08-08 河北庞皓电工科技有限公司 Erection equipment for aluminum alloy conductor installation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116565775A (en) * 2023-07-10 2023-08-08 河北庞皓电工科技有限公司 Erection equipment for aluminum alloy conductor installation
CN116565775B (en) * 2023-07-10 2023-09-15 河北庞皓电工科技有限公司 Erection equipment for aluminum alloy conductor installation

Similar Documents

Publication Publication Date Title
CN218498747U (en) Stainless steel cable bridge rack
CN113323252A (en) Adjustable top hanger and mounting method
CN212258339U (en) Combined cable bridge
CN213777055U (en) Sensor with quick assembly disassembly structure
CN212691412U (en) Mounting structure of catering oil smoke monitoring probe
CN210016201U (en) Wire arranging frame easy to assemble and disassemble
CN220022123U (en) Cable construction mounting fixture
CN219394286U (en) Cable bridge mounting device
CN215581227U (en) Wireless switch
CN216743901U (en) Fixed cover structure of lighting device
CN213692982U (en) Intelligent wiring and line concentration device for building
CN215106350U (en) Novel fixed structural part for building curtain wall
CN220557670U (en) Invisible hanging structure for stainless steel furniture
CN216929478U (en) Special bridge joint for three-way cable
CN215888892U (en) Adjustable top is hung
CN217984381U (en) Tray type cable bridge
CN218327235U (en) Smoke alarm installation device
CN214671104U (en) Idle parking stall suggestion device that wisdom property management was used
CN214369174U (en) Outdoor video monitor easy to assemble
CN212012887U (en) Security protection supervisory equipment is used to district
CN218510621U (en) Quick-assembly and quick-disassembly mounting seat for console suspension equipment
CN213125457U (en) Cable mounting bracket
CN219659839U (en) Hanging rod for communication equipment
CN220133238U (en) Suspended ceiling anti-falling structure with adjustable
CN215907164U (en) Dual-purpose keel mounting hook

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant