CN218479656U - Novel construction guardrail of town road construction - Google Patents

Novel construction guardrail of town road construction Download PDF

Info

Publication number
CN218479656U
CN218479656U CN202222013938.XU CN202222013938U CN218479656U CN 218479656 U CN218479656 U CN 218479656U CN 202222013938 U CN202222013938 U CN 202222013938U CN 218479656 U CN218479656 U CN 218479656U
Authority
CN
China
Prior art keywords
mounting
adjusting screw
adjusting
baffle
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222013938.XU
Other languages
Chinese (zh)
Inventor
周祥
蒋铁
吴观庆
刘琛鹏
覃孟婵
王乾
郑学海
喻周
邱慧珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Zhejiang Huadong Engineering Construction Management Co Ltd
PowerChina Huadong Engineering Shenzhen Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Zhejiang Huadong Engineering Construction Management Co Ltd
PowerChina Huadong Engineering Shenzhen Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd, Zhejiang Huadong Engineering Construction Management Co Ltd, PowerChina Huadong Engineering Shenzhen Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN202222013938.XU priority Critical patent/CN218479656U/en
Application granted granted Critical
Publication of CN218479656U publication Critical patent/CN218479656U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model provides a novel construction guardrail for municipal road construction, which comprises a movable base, wherein the top of the movable base is provided with an installation column, the inside of the installation column is movably connected with an adjusting screw rod, the adjusting screw rod extends out of the top of the installation column, the upper end part of the adjusting screw rod is fixedly provided with a connecting column, the top of the installation column is provided with an adjusting screw sleeve, the adjusting screw sleeve is in threaded connection with the adjusting screw rod, and the adjusting screw sleeve can control the height of the adjusting screw rod; the side of erection column and spliced pole all is provided with the installation component, can dismantle between the installation component of two adjacent erection columns and be connected with first baffle, can dismantle between the installation component of two adjacent spliced poles and be connected with the second baffle. The utility model discloses can adjust the height of guardrail baffle, and the guardrail baffle is easily dismantled.

Description

Novel construction guardrail of town road construction
Technical Field
The utility model relates to a municipal works equipment technical field, concretely relates to novel construction guardrail of town road construction.
Background
The guardrail is the important equipment in the town road work progress, but current guardrail structure is fairly simple, before the use, often needs the user to move the guardrail post, and is very inconvenient, and the height of current guardrail is fixed moreover, can't adjust the height of guardrail according to user's user demand.
SUMMERY OF THE UTILITY MODEL
Not enough to exist among the prior art, the utility model aims to provide a novel construction guardrail of town road construction. The utility model discloses can adjust the height of guardrail baffle, and the guardrail baffle can be dismantled.
In order to solve the technical problem, the utility model discloses a following technical scheme realizes:
the utility model provides a novel construction guardrail of town road construction which characterized in that: the adjustable height adjusting device comprises a movable base, wherein a mounting column is arranged at the top of the movable base, an adjusting screw rod is movably connected in the mounting column and extends out of the top of the mounting column, a connecting column is fixedly arranged at the upper end of the adjusting screw rod, an adjusting screw sleeve is arranged at the top of the mounting column and is in threaded connection with the adjusting screw rod, and the adjusting screw sleeve can control the height of the adjusting screw rod; the side of erection column and spliced pole all is provided with the installation component, can dismantle between the installation component of two adjacent erection columns and be connected with first baffle, can dismantle between the installation component of two adjacent spliced poles and be connected with the second baffle.
Further: the mounting structure is characterized in that a limiting groove is formed in the inner wall of the mounting column, a moving block is arranged at the bottom end of the adjusting screw, and limiting blocks matched with the limiting groove are arranged on two sides of the moving block.
And further: the mounting assembly comprises a mounting shell and a mounting clamping piece arranged in the mounting shell, clamping blocks are arranged at two ends of the mounting clamping piece, and the clamping blocks are arranged to protrude towards the outer side of the end part of the mounting shell; the both sides of first baffle and second baffle all are provided with the installation piece, the baffle passes through the installation piece and can dismantle with the installation component and be connected.
Further: the mounting clamping piece comprises two groups of adjusting rod assemblies which are oppositely arranged in the mounting shell, the adjusting rod assemblies are provided with connecting plates, two adjusting rods are arranged on the connecting plates, and the two adjusting rods are positioned at the end points of the diagonal lines of the connecting plates; the mounting shell is internally provided with a rotating assembly, the rotating assembly is arranged between the two groups of adjusting rod assemblies, and adjusting rods of the two groups of adjusting assemblies are rotatably connected with the rotating assembly.
And further: the adjusting rod is provided with teeth; the rotating assembly comprises a rotating rod, two gears are fixedly connected to the rotating rod along the length direction of the rotating rod, and each gear is correspondingly meshed with the adjusting rods of the two groups of adjusting assemblies; a square groove is formed in the installation shell, and the rotating rod is located at the opening of the square groove in the installation shell.
And further: the mounting shell is provided with a spring limiting plate, the first surface of the connecting plate is provided with the clamping block, the second surface of the connecting plate is provided with a spring, and the spring is positioned between the spring limiting plate and the second surface; the plane size of the connecting plate is matched with the section size of the mounting shell.
Further: the mounting device is characterized in that mounting baffles are arranged at two ends of the mounting shell, and the mounting blocks are located between the mounting baffles and the clamping blocks.
Further: and a manual brake wheel is arranged at the bottom of the movable base.
Compared with the prior art, the utility model, have following advantage and beneficial effect:
the utility model discloses a set up on the erection column and adjust swivel nut and adjusting screw, can adjust the height of guardrail baffle, and make the guardrail baffle easily dismantle and install through setting up the installation component, satisfy user's demand. The utility model discloses a set up manual brake wheel and carry out the auto-lock to this device, remove when this device uses, guarantee its stability.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is an enlarged view of FIG. 1A;
FIG. 3 is an enlarged schematic view of FIG. 1B;
FIG. 4 is a schematic view of the construction of the mounting clip;
fig. 5 is a schematic view of the mounting housing and spring assembly.
Reference numerals: 1. a movable base; 2. a manual brake wheel; 3. a connecting plate; 4. a spring limiting plate; 5. installing a baffle; 6. mounting a column; 7. connecting columns; 8. adjusting a threaded sleeve; 9. adjusting the screw rod; 10. a second baffle; 11. a limiting groove; 12. a limiting block; 13. a moving block; 14. installing a shell; 15. mounting blocks; 16. an adjustment lever assembly; 17. a clamping block; 18. a spring; 19. adjusting a rod; 20. a square groove; 21. rotating the rod; 22. a gear; 23. a first baffle.
Detailed Description
In order to make the technical solution of the present invention better understood by those skilled in the art, the following preferred embodiments of the present invention are described with reference to specific examples, but it should be understood that the drawings are for illustrative purposes only and are not to be construed as limiting the present invention; for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product; it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted. The positional relationships depicted in the drawings are for illustrative purposes only and are not to be construed as limiting the invention.
The following description is made with reference to the accompanying drawings and examples, but not to be construed as limiting the invention.
As shown in fig. 1 to 5, a novel construction guardrail for town road construction comprises a movable base 1, wherein a mounting column 6 is arranged at the top of the movable base 1, an adjusting screw 9 is movably connected inside the mounting column 6, the adjusting screw 9 extends out of the top of the mounting column 6, a connecting column 7 is fixedly arranged at the upper end of the adjusting screw 9, an adjusting screw sleeve 8 is arranged at the top of the mounting column 6, the adjusting screw sleeve 8 is in threaded connection with the adjusting screw 9, and the adjusting screw sleeve 8 can control the height of the adjusting screw 9; the side of erection column 6 and spliced pole 7 all is provided with the installation component, can dismantle between the installation component of two adjacent erection columns 6 and be connected with first baffle 23, can dismantle between the installation component of two adjacent spliced poles 7 and be connected with second baffle 10.
The length of the first baffle 23 and the second baffle 10 is 1.2-1.5 m, and the distance between the first baffle and the second baffle is close to the distance between two arms of a person.
The inner wall of the mounting column 6 is provided with a limiting groove 11, the bottom end of the adjusting screw 9 is provided with a moving block 13, and two sides of the moving block 13 are provided with limiting blocks 12 matched with the limiting groove 11. The limiting groove 11 can be a T-shaped groove, and the limiting block 12 can be a T-shaped block matched with the T-shaped groove, so that the adjusting screw rod 9 can only move along the axial direction.
The user rotates and adjusts swivel nut 8, and adjusting screw 9 moves along with adjusting swivel nut 8 downwards or upwards to adjust the distance between erection column 6 and the spliced pole 7, and then adjust the distance between first baffle 23 and the second baffle 10.
The mounting assembly comprises a mounting shell 14 and a mounting clamping piece arranged in the mounting shell 14, clamping blocks 17 are arranged at two ends of the mounting clamping piece, and the clamping blocks 17 protrude towards the outer side of the end part of the mounting shell 14; the two sides of the first baffle 23 and the second baffle 10 are both provided with mounting blocks 15, and the first baffle 23 and the second baffle 10 are detachably connected with a mounting assembly through the mounting blocks 15.
The mounting clamping piece comprises two groups of adjusting rod assemblies 16 which are oppositely arranged in the mounting shell 14, a connecting plate 3 is arranged on each adjusting rod assembly 16, two adjusting rods 19 are arranged on each connecting plate 3, and the two adjusting rods 19 are positioned at the end points of the diagonal line of the connecting plate 3; the inside of the mounting shell 14 is also provided with a rotating assembly, the rotating assembly is positioned between the two groups of adjusting rod assemblies 16, and the adjusting rods 19 of the two groups of adjusting assemblies are rotatably connected with the rotating assembly.
The adjusting rod 19 is provided with teeth; the rotating assembly comprises a rotating rod 21, two gears 22 are fixedly connected to the rotating rod 21 along the length direction of the rotating rod 21, and each gear 22 is correspondingly meshed with the adjusting rods 19 of the two groups of adjusting assemblies; the mounting shell 14 is provided with a square groove 20, and the rotating rod 21 is located at the opening of the square groove 20 inside the mounting shell 14.
A spring limiting plate 4 is arranged on the mounting shell 14, the fixture block 17 is arranged on the first surface of the connecting plate 3, the spring 18 is arranged on the second surface of the connecting plate 3, and the spring 18 is positioned between the spring limiting plate 4 and the second surface; the planar dimensions of the connecting plate 3 match the cross-sectional dimensions of the mounting housing 14.
The two ends of the mounting shell 14 are provided with mounting baffles 5, and the mounting blocks 15 are located between the mounting baffles 5 and the clamping blocks 17.
Before installing first baffle 23 or second baffle 10, earlier install the fastener and pack into installation casing 14 in, spring 18 is in between spring limiting plate 4 and the second face, fixture block 17 is completely in installation casing 14 this moment, earlier place the installation piece correspondence of first baffle 23 or second baffle 10 in installation baffle 5 one side, rotatory dwang 21, dwang 21 drives gear 22 and rotates, gear 22 drives regulation pole 19 and removes, the connecting plate of both sides removes to opposite direction, make fixture block 17 remove to the outside of installation casing 14, contact with installation piece 15, and it is spacing to carry out it, realize the quick installation of first baffle 23 or second baffle 10.
When dismantling first baffle 23 or second baffle 10, rotatory dwang 21 earlier, dwang 21 drives gear 22 and rotates, gear 22 drives regulation pole 19 and removes, the connecting plate of both sides removes to the direction in opposite directions, make fixture block 17 remove to the inside of installation casing 14, break away from mutually with installation piece 15, installation piece 15 can be followed the both ends of installation strip 14 and outwards taken out this moment, thereby first baffle 23 or second baffle 10 alright quick dismantlement, the turnover of the integrated device of being convenient for is used.
And a manual brake wheel 2 is arranged at the bottom of the movable base 1. After the device is moved to a designated position, the manual brake wheel 2 is manually locked, so that the movable base 1 is conveniently stabilized, and the device is prevented from moving when in use.
According to the utility model discloses a description and attached drawing, the field technical personnel make or use very easily the utility model discloses a novel construction guardrail of town road construction to can produce the positive effect recorded in the utility model.
The above is only the preferred embodiment of the present invention, not to the limitation of the present invention in any form, all the technical matters of the present invention all fall into the protection scope of the present invention to any simple modification and equivalent change of the above embodiments.

Claims (8)

1. The utility model provides a novel construction guardrail of town road construction which characterized in that: the adjustable height adjusting device comprises a movable base (1), wherein a mounting column (6) is arranged at the top of the movable base (1), an adjusting screw (9) is movably connected inside the mounting column (6), the adjusting screw (9) extends out of the top of the mounting column (6), a connecting column (7) is fixedly arranged at the upper end of the adjusting screw (9), an adjusting screw sleeve (8) is arranged at the top of the mounting column (6), the adjusting screw sleeve (8) is in threaded connection with the adjusting screw (9), and the adjusting screw sleeve (8) can control the height of the adjusting screw (9); the side of erection column (6) and spliced pole (7) all is provided with the installation component, can dismantle between the installation component of two adjacent erection columns (6) and be connected with first baffle (23), can dismantle between the installation component of two adjacent spliced poles (7) and be connected with second baffle (10).
2. The novel construction guardrail of claim 1, which is characterized in that: the inner wall of the mounting column (6) is provided with a limiting groove (11), the bottom end of the adjusting screw (9) is provided with a moving block (13), and two sides of the moving block (13) are provided with limiting blocks (12) matched with the limiting groove (11).
3. The novel construction guardrail of claim 1, which is characterized in that: the mounting assembly comprises a mounting shell (14) and mounting clamping pieces arranged inside the mounting shell (14), clamping blocks (17) are arranged at two ends of each mounting clamping piece, and the clamping blocks (17) are arranged to protrude towards the outer side of the end part of the mounting shell (14); the two sides of the first baffle (10) and the second baffle (10) are provided with mounting blocks (15), and the baffles (10) are detachably connected with the mounting assembly through the mounting blocks (15).
4. The novel construction guardrail of claim 3, which is characterized in that: the mounting clamping piece comprises two groups of adjusting rod assemblies (16) which are oppositely arranged in a mounting shell (14), a connecting plate (3) is arranged on each adjusting rod assembly (16), two adjusting rods (19) are arranged on each connecting plate (3), and the two adjusting rods (19) are positioned at the end points of the diagonal of the connecting plate (3); the mounting shell (14) is internally provided with a rotating assembly, the rotating assembly is positioned between the two groups of adjusting rod assemblies (16), and adjusting rods (19) of the two groups of adjusting assemblies are rotatably connected with the rotating assembly.
5. The novel construction guardrail of claim 4, which is characterized in that: the adjusting rod (19) is provided with teeth; the rotating assembly comprises a rotating rod (21), two gears (22) are fixedly connected to the rotating rod (21) along the length direction of the rotating rod (21), and each gear (22) is correspondingly meshed with the adjusting rods (19) of the two groups of adjusting rod assemblies (16); a square groove (20) is formed in the mounting shell (14), and the rotating rod (21) is located at the opening of the square groove (20) in the mounting shell (14).
6. The novel construction guardrail of claim 4 for town road construction, which is characterized in that: a spring limiting plate (4) is arranged on the mounting shell (14), the fixture block (17) is arranged on the first surface of the connecting plate (3), a spring (18) is arranged on the second surface of the connecting plate (3), and the spring (18) is located between the spring limiting plate (4) and the second surface; the plane size of the connecting plate (3) is matched with the section size of the mounting shell (14).
7. The novel construction guardrail of claim 3, which is characterized in that: the mounting structure is characterized in that mounting baffles (5) are arranged at two ends of the mounting shell (14), and the mounting blocks (15) are located between the mounting baffles (5) and the clamping blocks (17).
8. The novel construction guardrail of claim 1, which is characterized in that: and a manual brake wheel (2) is arranged at the bottom of the movable base (1).
CN202222013938.XU 2022-07-29 2022-07-29 Novel construction guardrail of town road construction Active CN218479656U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222013938.XU CN218479656U (en) 2022-07-29 2022-07-29 Novel construction guardrail of town road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222013938.XU CN218479656U (en) 2022-07-29 2022-07-29 Novel construction guardrail of town road construction

Publications (1)

Publication Number Publication Date
CN218479656U true CN218479656U (en) 2023-02-14

Family

ID=85166460

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222013938.XU Active CN218479656U (en) 2022-07-29 2022-07-29 Novel construction guardrail of town road construction

Country Status (1)

Country Link
CN (1) CN218479656U (en)

Similar Documents

Publication Publication Date Title
CN218479656U (en) Novel construction guardrail of town road construction
CN215876694U (en) Dust fall equipment is used to municipal administration pipeline job site
CN210766297U (en) Highway engineering film paving device
CN216215754U (en) Temporary platform frame for high-altitude cable construction
CN213279069U (en) Fixing device for cable on building wall
CN215012138U (en) Landscape afforestation trees strutting arrangement
CN214425482U (en) Monitoring equipment
CN112227737B (en) Operation method of wallboard fixing bracket with splicing structure for constructional engineering
CN219992263U (en) Road and bridge noise reduction device
CN218204014U (en) Safety warning device is used in building engineering construction
CN113944191B (en) Adjustable equipment horizontal arm rod for construction based on pipe well and adjusting method thereof
CN213712512U (en) Adjustable control cabinet support
CN215583727U (en) Architectural design show shelf
CN215499878U (en) Convenient lane controller who overhauls
CN220928808U (en) Building engineering faces limit fence device
CN215485205U (en) Energy-saving storage type traffic enclosure
CN220414930U (en) Temporary plugging device for concrete filled steel tube column
CN218327297U (en) Strutting arrangement for electromechanical construction
CN215121446U (en) Protective box for inversion power distribution device
CN219157466U (en) Movable warning sign for highway construction
CN215482152U (en) Highway engineering concrete placement is with strutting arrangement
CN214433032U (en) Portable drawing display device for architectural design
CN215104484U (en) Template support frame for highway bridge construction
CN210118107U (en) Hydraulic auxiliary device for dismounting oil production well head
CN220979010U (en) Transmission line shaft tower mounting base of convenient calibration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant