CN218479495U - Assembled building outer wall construction equipment - Google Patents
Assembled building outer wall construction equipment Download PDFInfo
- Publication number
- CN218479495U CN218479495U CN202222868458.1U CN202222868458U CN218479495U CN 218479495 U CN218479495 U CN 218479495U CN 202222868458 U CN202222868458 U CN 202222868458U CN 218479495 U CN218479495 U CN 218479495U
- Authority
- CN
- China
- Prior art keywords
- wall construction
- scaffold
- wire rope
- baffle
- guardrail
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Types And Forms Of Lifts (AREA)
Abstract
The utility model discloses an assembled building outer wall construction device, which relates to the technical field of outer wall construction and solves the problems that the prior scaffold is inconvenient to lift materials and generally needs to manually convey the materials to the scaffold, and comprises a bottom frame and a scaffold fixedly arranged above the bottom frame, wherein a guardrail is fixedly arranged at the edge of the upper surface of the scaffold, and a baffle plate which is in sliding connection with the guardrail is arranged on the upper surface of the scaffold; and a U-shaped frame is fixedly arranged on the upper surface of the bottom frame. The utility model discloses a hoist engine carries out the rolling to wire rope to it rises to drive the elevator bucket, promotes the elevator bucket to suitable high back when wire rope, and the stopper on wire rope surface drives the baffle and rises, thereby be convenient for the material in the elevator bucket unloads on the scaffold, and when the elevator bucket whereabouts, the baffle whereabouts thereupon, the constructor of cooperation guardrail on to the scaffold protects, and the security is high, and whole device operation is stable, the unrestrained condition of difficult material that appears, material saving.
Description
Technical Field
The utility model belongs to the technical field of the outer wall construction and specifically relates to an assembly type structure outer wall construction equipment is related to.
Background
The fabricated building is a building which is formed by transferring a large amount of field operation work in the traditional construction mode to a factory, processing and manufacturing building components and accessories (such as floor slabs, wall slabs, stairs, balconies and the like) in the factory, transporting the components and accessories to a building construction site, and assembling and installing the components and the accessories on the site in a reliable connection mode. At present, when the outer wall is constructed, a scaffold is usually required.
In realizing the utility model discloses the in-process, the inventor finds to have following problem at least in this technique, and current scaffold frame is inconvenient to promote the material, needs the manual work to transport the material on the scaffold frame usually. Accordingly, a fabricated building exterior wall construction device is now proposed.
SUMMERY OF THE UTILITY MODEL
In order to improve the inconvenient material that promotes of current scaffold frame, need the manual work to transport the problem on the scaffold frame with the material usually, the utility model provides an assembly type structure outer wall construction equipment.
The utility model provides an assembly type structure outer wall construction equipment adopts following technical scheme:
a fabricated building outer wall construction device comprises a bottom frame and a scaffold fixedly arranged above the bottom frame, wherein a guardrail is fixedly arranged at the edge of the upper surface of the scaffold, and a baffle plate in sliding connection with the guardrail is arranged on the upper surface of the scaffold;
the utility model discloses a safety protection device for railway vehicles, including chassis, U-shaped frame, hoist engine, baffle, elevator, wire rope, the last fixed surface of chassis installs the U-shaped frame, the top fixed mounting of U-shaped frame has the hoist engine, around being equipped with wire rope on the hoist engine, the inside slidable mounting of U-shaped frame has the elevator bucket, wire rope's bottom and the four corners of elevator bucket are through being connected rope fixed connection, the bottom fixed mounting in the baffle outside has the go-between, wire rope runs through in the inside of go-between, the wire rope surface is located the below fixedly connected with stopper of go-between.
Through adopting above-mentioned technical scheme, the hoist engine carries out the rolling to wire rope to it rises to drive the elevator bucket, promotes the elevator bucket to suitable high back when wire rope, and the stopper on wire rope surface drives the baffle and rises, thereby the material in the elevator bucket of being convenient for unloads on the scaffold, and when the elevator bucket whereabouts, the baffle whereabouts thereupon, and the cooperation guardrail protects the constructor on the scaffold.
Optionally, the two sides of the U-shaped frame are fixedly provided with sliding rods, the two sides of the lifting bucket are fixedly provided with sliding sleeves, and the sliding sleeves are slidably sleeved on the outer surfaces of the sliding rods.
By adopting the technical scheme, the stability of the elevator bucket during movement is ensured by the arrangement of the sliding rod and the sliding sleeve.
Optionally, a plurality of balls are rotatably mounted on the inner wall of the sliding sleeve.
Through adopting above-mentioned technical scheme, the frictional force between sliding sleeve and the slide bar has been reduced in the setting of ball.
Optionally, a slide rail is fixedly mounted on the guardrail, slide bars are fixedly connected to two sides of the baffle, and the slide bars are slidably connected with the slide rail.
Through adopting above-mentioned technical scheme, the setting of slide rail and draw runner has guaranteed the stability when baffle reciprocates.
Optionally, a protective pad is provided at the bottom of the lift bucket.
Through adopting above-mentioned technical scheme, the setting of protection pad has avoided the direct collision between lift bucket bottom and the chassis.
Optionally, the front and the back of the lift bucket are both movably provided with door plates.
Through adopting above-mentioned technical scheme, the setting of two door plants is favorable to the loading and unloading of the inside material of elevator bucket.
Optionally, a plurality of rollers are rotatably mounted on the inner side of the door panel.
Through adopting above-mentioned technical scheme, changeing the setting of roller, further improved the convenience of material loading and unloading.
Optionally, the first ring bodies are fixedly connected to the two sides of the top of the door plate, the second ring bodies are fixedly connected to the two sides of the lifting bucket, and the first ring bodies and the second ring bodies are connected through bolts.
Through adopting above-mentioned technical scheme, change the setting of roller, further improved the convenience of material loading and unloading.
To sum up, the utility model discloses following beneficial effect has:
the utility model discloses a hoist engine carries out the rolling to wire rope to it rises to drive the elevator bucket, promotes the elevator bucket to suitable high back when wire rope, and the stopper on wire rope surface drives the baffle and rises, thereby the material in the elevator bucket of being convenient for unloads on the scaffold, and when the elevator bucket whereabouts, the baffle whereabouts thereupon, and the cooperation guardrail protects the constructor on the scaffold, and in addition, the front of elevator bucket and the equal movable mounting in the back have the door plant, are favorable to the loading and unloading of the inside material of elevator bucket.
Drawings
Fig. 1 is a schematic view of the structure of the present invention.
Fig. 2 is a schematic view of the connection structure of the roller and the door plate of the present invention.
Fig. 3 is a schematic view of the sliding sleeve of the present invention.
Description of reference numerals:
1. a chassis; 2. a scaffold; 3. a guardrail; 4. a baffle plate; 5. a U-shaped frame; 6. a winch; 7. a wire rope; 8. a lift bucket; 9. connecting ropes; 10. a connecting ring; 11. a limiting block; 12. a slide bar; 13. a sliding sleeve; 14. a slide rail; 15. a slide bar; 16. a protective pad; 17. a door panel; 18. rotating the roller; 19. a first ring body; 20. a second ring body; 21. a bolt; 22. and a ball.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1, an assembly type building exterior wall construction device includes an underframe 1 and a scaffold 2 fixedly installed above the underframe 1, a guardrail 3 is fixedly installed at an edge of an upper surface of the scaffold 2, and a baffle 4 slidably connected with the guardrail 3 is installed on an upper surface of the scaffold 2. Fixed mounting has slide rail 14 on the guardrail 3, the equal fixedly connected with draw runner 15 in both sides of baffle 4, and draw runner 15 and slide rail 14 sliding connection, the stability when baffle 4 reciprocated has been guaranteed in slide rail 14 and the setting of draw runner 15.
Referring to fig. 1, a U-shaped frame 5 is fixedly mounted on the upper surface of a chassis 1, a winch 6 is fixedly mounted at the top of the U-shaped frame 5, a steel wire rope 7 is wound on the winch 6, an elevator bucket 8 is slidably mounted inside the U-shaped frame 5, the bottom of the steel wire rope 7 is fixedly connected with four corners of the elevator bucket 8 through a connecting rope 9, and the winch 6 winds the steel wire rope 7, so that the elevator bucket 8 is driven to ascend, and materials are conveyed. The bottom of the elevator bucket 8 is provided with a protective pad 16, and the arrangement of the protective pad 16 avoids direct collision between the bottom of the elevator bucket 8 and the underframe 1.
Referring to fig. 1 and 2, the front and back of the elevator bucket 8 are movably provided with door plates 17, and the arrangement of the two door plates 17 is beneficial to loading and unloading of materials in the elevator bucket 8. A plurality of rotating rollers 18 are rotatably arranged on the inner side of the door plate 17, and the arrangement of the rotating rollers 18 further improves the convenience of material loading and unloading. The equal fixedly connected with first ring body 19 in both sides at door plant 17 top, the equal fixedly connected with second ring body 20 in both sides of lift bucket 8 connect through bolt 21 between first ring body 19 and the second ring body 20, and the setting of this kind of structure has made things convenient for being connected between door plant 17 and the lift bucket 8.
Referring to fig. 1 and 3, sliding rods 12 are fixedly mounted on both sides of the u-shaped frame 5, sliding sleeves 13 are fixedly mounted on both sides of the elevator bucket 8, the sliding sleeves 13 are slidably sleeved on the outer surfaces of the sliding rods 12, and the sliding rods 12 and the sliding sleeves 13 ensure the stability of the elevator bucket 8 during movement. The inner wall of the sliding sleeve 13 is rotatably provided with a plurality of balls 22, and the arrangement of the balls 22 reduces the friction force between the sliding sleeve 13 and the sliding rod 12.
Referring to fig. 1, the bottom fixed mounting in the baffle 4 outside has go-between 10, wire rope 7 runs through in the inside of go-between 10, 7 surfaces of wire rope are located the below fixedly connected with stopper 11 of go-between 10, promote the lift bucket 8 to suitable high back when wire rope 7, 11 stopper on 7 surfaces of wire rope drive baffle 4 and rise, thereby be convenient for the material in the lift bucket 8 unloads on the scaffold 2, and when the fall of lift bucket 8, baffle 4 whereabouts thereupon, cooperation guardrail 3 protects the constructor on the scaffold 2.
The utility model discloses an implement the principle and do: hoist engine 6 rolls wire rope 7, thereby it rises to drive elevator bucket 8, promote elevator bucket 8 to suitable high back when wire rope 7, stopper 11 on wire rope 7 surface drives baffle 4 and rises, thereby be convenient for the material in the elevator bucket 8 to unload on scaffold 2, and when elevator bucket 8 whereabouts, baffle 4 whereabouts thereupon, cooperation guardrail 3 protects the constructor on scaffold 2, and, the equal movable mounting in front and the back of elevator bucket 8 has door plant 17, be favorable to the loading and unloading of the inside material of elevator bucket 8, a plurality of commentaries on classics roller 18 is installed in the inboard rotation of door plant 17, change the setting of roller 18, the convenience of material loading and unloading has further been improved.
Above is the preferred embodiment of the utility model, not limit according to this the utility model discloses a protection scope, the event: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides an assembly type structure outer wall construction equipment, includes scaffold (2) of chassis (1) and fixed mounting in chassis (1) top, its characterized in that: a guardrail (3) is fixedly arranged at the edge of the upper surface of the construction frame (2), and a baffle (4) which is connected with the guardrail (3) in a sliding manner is arranged on the upper surface of the construction frame (2);
the utility model discloses a hoist and elevator car, including chassis (1), upper surface fixed mounting has U-shaped frame (5), the top fixed mounting of U-shaped frame (5) has hoist engine (6), on hoist engine (6) around being equipped with wire rope (7), the inside slidable mounting of U-shaped frame (5) has elevator bucket (8), the bottom of wire rope (7) and the four corners of elevator bucket (8) are through being connected rope (9) fixed connection, the bottom fixed mounting in the baffle (4) outside has go-between (10), wire rope (7) run through in the inside of go-between (10), wire rope (7) surface is located below fixedly connected with stopper (11) of go-between (10).
2. The fabricated building exterior wall construction device according to claim 1, wherein: the improved lifting device is characterized in that sliding rods (12) are fixedly mounted on two sides of the U-shaped frame (5), sliding sleeves (13) are fixedly mounted on two sides of the lifting bucket (8), and the sliding sleeves (13) are slidably mounted on the outer surfaces of the sliding rods (12).
3. The fabricated building exterior wall construction device according to claim 2, wherein: the inner wall of the sliding sleeve (13) is rotatably provided with a plurality of balls (22).
4. The fabricated building exterior wall construction device according to claim 1, wherein: fixed mounting has slide rail (14) on guardrail (3), the equal fixedly connected with draw runner (15) in both sides of baffle (4), draw runner (15) and slide rail (14) sliding connection.
5. The assembly type building exterior wall construction device according to claim 1, wherein: the bottom of the lifting bucket (8) is provided with a protective pad (16).
6. The fabricated building exterior wall construction device according to claim 1, wherein: the front and the back of the lifting bucket (8) are both movably provided with door plates (17).
7. The fabricated building exterior wall construction device according to claim 6, wherein: the inner side of the door panel (17) is rotatably provided with a plurality of rotating rollers (18).
8. The fabricated building exterior wall construction device according to claim 6, wherein: the elevator is characterized in that first ring bodies (19) are fixedly connected to two sides of the top of the door plate (17), second ring bodies (20) are fixedly connected to two sides of the elevator bucket (8), and the first ring bodies (19) are connected with the second ring bodies (20) through bolts (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222868458.1U CN218479495U (en) | 2022-10-28 | 2022-10-28 | Assembled building outer wall construction equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222868458.1U CN218479495U (en) | 2022-10-28 | 2022-10-28 | Assembled building outer wall construction equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218479495U true CN218479495U (en) | 2023-02-14 |
Family
ID=85172033
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222868458.1U Active CN218479495U (en) | 2022-10-28 | 2022-10-28 | Assembled building outer wall construction equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218479495U (en) |
-
2022
- 2022-10-28 CN CN202222868458.1U patent/CN218479495U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR102270800B1 (en) | Sagging Prevention System for Elevators | |
CN214031331U (en) | Transportation system applied to building construction site | |
CN111453585A (en) | Assembled intelligent single-tower nested double-cage construction elevator | |
CN206203696U (en) | A kind of gantry crane for being easy to small spatial stability operation | |
CN218479495U (en) | Assembled building outer wall construction equipment | |
CN219823333U (en) | Lifting mechanism of well construction lifter | |
CN207130627U (en) | The overhead job platform of bridge construction | |
CN113213315B (en) | Transfer method for building partition plate | |
CN213774378U (en) | Assembled building safety construction platform | |
CN201972714U (en) | Underground multifunctional stirring handling device for coal mine | |
CN210417783U (en) | Ferry type warehouse | |
CN207774541U (en) | A kind of home lift | |
CN209259612U (en) | A kind of feeding device for construction | |
CN212668216U (en) | High altitude construction car for construction convenient to transportation building rubbish | |
CN205802824U (en) | A kind of manual pulley device | |
CN110733957A (en) | chain type lifter | |
CN212374664U (en) | Assembled intelligent single-tower nested double-cage construction elevator | |
CN218623202U (en) | Movable protection operation platform for construction site | |
CN215048364U (en) | Extension mechanism of elevator | |
CN212982177U (en) | Novel guide rail type household elevator | |
CN103350940A (en) | Elevator structure vertical conveying system | |
CN220334670U (en) | Lifting machine that goods transportation loaded | |
CN111942829B (en) | Transportation device for rapidly positioning equipment in prefabricated cabin | |
CN214360013U (en) | Building construction material loading machine | |
CN216945404U (en) | Unloading platform with transmission function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |