CN218468404U - Purify air supply duct's for engineering novel mounting structure - Google Patents

Purify air supply duct's for engineering novel mounting structure Download PDF

Info

Publication number
CN218468404U
CN218468404U CN202222267099.4U CN202222267099U CN218468404U CN 218468404 U CN218468404 U CN 218468404U CN 202222267099 U CN202222267099 U CN 202222267099U CN 218468404 U CN218468404 U CN 218468404U
Authority
CN
China
Prior art keywords
shaped frame
fixedly connected
arc
groove
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222267099.4U
Other languages
Chinese (zh)
Inventor
唐晓伟
陈新国
卢瑞东
陈荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jieshun Electromechanical Engineering Co ltd
Original Assignee
Jiangsu Jieshun Electromechanical Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Jieshun Electromechanical Engineering Co ltd filed Critical Jiangsu Jieshun Electromechanical Engineering Co ltd
Priority to CN202222267099.4U priority Critical patent/CN218468404U/en
Application granted granted Critical
Publication of CN218468404U publication Critical patent/CN218468404U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses a purify novel mounting structure of supply air duct for engineering, including roof and second U-shaped frame, the bilateral symmetry fixedly connected with L shape bolt fastening seat of roof, the bottom fixed mounting of roof has first U-shaped frame, the upper end of first U-shaped frame inner chamber is rotated through the bearing and is connected with two-way screw rod, the both ends symmetry fixedly connected with hex bolts of two-way screw rod, the rectangle logical groove has been seted up to the both ends symmetry of first U-shaped frame bottom. This purify novel mounting structure of supply air duct for engineering, through the second U-shaped frame that sets up, rectangle go into groove, first U-shaped frame, two-way screw rod, hex bolts, movable plate, rectangle card go into the piece, the rectangle lead to mutually supporting of groove can conveniently adjust the mounting height of pipeline, and then adapt to different mounted positions, only need rotatory two-way screw rod can realize the regulation of height, convenient operation is swift, has improved work efficiency.

Description

Purify air supply duct's for engineering novel mounting structure
Technical Field
The utility model relates to a purify supply air duct mounting structure field for the engineering, in particular to purify novel mounting structure of supply air duct for the engineering.
Background
The purification engineering refers to controlling the cleanliness and temperature and humidity of the atmosphere contacted with the product, so that the product can be produced and manufactured in a good environmental space, the design and construction process of the environmental space can be called as the purification engineering, at present, the most commonly used purification engineering is an air supply pipeline, and the air supply pipeline needs a special installation structure to be installed at a proper position when in use.
In chinese utility model patent application no: CN202220917067.1 discloses a mounting structure of an air supply pipeline for purification engineering, which comprises a mounting plate and a mounting unit; mounting a plate: the lower surface of the sliding block is provided with a C-shaped guide rail, and the lower end of the C-shaped guide rail is connected with sliding blocks which are longitudinally and symmetrically distributed in a sliding manner; an installation unit: the sliding block comprises a top seat, a base and a connecting assembly, wherein the top seat is respectively arranged on the lower surface of the sliding block, the base is respectively positioned at the lower end of the top seat, and the top seat and the base which vertically correspond to each other are connected through the connecting assembly; wherein: coupling assembling includes L type threaded rod, L type fixed sleeve and thread bush, L type threaded rod horizontal symmetry respectively sets up in the footstock about the surface, and L type fixed sleeve horizontal symmetry respectively sets up in the surface about the base, this purify supply air duct's for engineering mounting structure, can adjust the height of supply air duct installation according to the live thing in place, conveniently dismantles to maintenance efficiency has been improved. Although the device can carry out the regulation of height, but need operate four stop collars and four locking cover one by one when the height-adjusting, comparatively waste time and energy, influence efficiency, in addition, the device is relatively poor through footstock and base when fixing the pipeline buffering effect, causes the damage deformation to the pipeline easily.
Therefore, it is necessary to provide a new installation structure of the blowing duct for purification engineering to solve the above problems.
SUMMERY OF THE UTILITY MODEL
A primary object of the utility model is to provide a purify novel mounting structure of supply air duct for engineering can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a novel mounting structure of an air supply pipeline for purification engineering comprises a top plate and a second U-shaped frame, wherein L-shaped bolt fixing seats are symmetrically and fixedly connected to two sides of the top plate, a first U-shaped frame is fixedly mounted at the bottom of the top plate, the upper end of an inner cavity of the first U-shaped frame is rotatably connected with a bidirectional screw rod through a bearing, hexagonal bolts are symmetrically and fixedly connected to two ends of the bidirectional screw rod, rectangular through grooves are symmetrically formed in two ends of the bottom of the first U-shaped frame, movable plates are symmetrically and slidably connected to the left end and the right end of the inner cavity of the first U-shaped frame, rectangular clamping blocks are symmetrically and fixedly connected to the lower ends of the two movable plates on the opposite sides, and rectangular clamping grooves are symmetrically formed in two side wall bodies of the inner cavity of the second U-shaped frame;
the fixing base is gone up to the bottom fixedly connected with of second U-shaped frame, it is provided with down the fixing base to go up under the fixing base, it all is provided with the arc wall with relative one side of lower fixing base to go up the fixing base, the inner chamber of arc wall is provided with the arc grip block, the inboard wall body fixedly connected with arc rubber piece of arc grip block, be provided with buffer spring between the inner wall of arc grip block and arc wall, go up the left and right sides symmetry fixedly connected with fixed block of fixing base, the bottom fixedly connected with die-pin of fixing base down, the one-way screw rod of bottom fixedly connected with of fixed block, the outside threaded connection of lower extreme of one-way screw rod has hexagon nut.
Preferably, the upper ends of the two moving plates are respectively in threaded connection with the outer portions of the left end and the right end of the two-way screw, and the two ends of the two-way screw extend to the outer side of the first U-shaped frame.
Preferably, the upper end of the second U-shaped frame passes through the rectangular through groove and extends to the inner cavity of the first U-shaped frame, and the second U-shaped frame is attached to the inner wall of the rectangular through groove and is in sliding connection with the inner wall of the rectangular through groove.
Preferably, with one side the quantity in rectangle draw-in groove is ten at least to the rectangle draw-in groove evenly sets up, every the quantity of the rectangle card income piece of movable plate lateral wall is three, and three rectangle card income piece evenly sets up, and rectangle card income piece and rectangle draw-in groove joint cooperation.
Preferably, the number of the buffer springs between the arc-shaped clamping plate and the inner wall of the arc-shaped groove is at least three, the buffer springs are uniformly distributed, and the upper fixing seat and the lower fixing seat are the same in size.
Preferably, the left end and the right end of the support rod are respectively movably sleeved outside the two one-way screws.
Advantageous effects
Compared with the prior art, the utility model provides a purify novel mounting structure of supply air duct for engineering possesses following beneficial effect:
1. this purify novel mounting structure of supply air duct for engineering, through the second U-shaped frame that sets up, rectangle go into groove, first U-shaped frame, two-way screw rod, hex bolts, movable plate, rectangle card go into the piece, the rectangle lead to mutually supporting of groove can conveniently adjust the mounting height of pipeline, and then adapt to different mounted positions, only need rotatory two-way screw rod can realize the regulation of height, convenient operation is swift, has improved work efficiency.
2. This purify novel mounting structure of supply air duct for engineering can realize fixing the centre gripping of pipeline through mutually supporting of the last fixing base that sets up, lower fixing base, die-pin, hexagon nut, one-way screw rod, arc grip block, buffer spring, arc block rubber, and buffer spring shrink produces reverse effort during the centre gripping, has increased the stability of pipeline promptly, has avoided causing the damage to the pipeline again.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a schematic structural view of a first U-shaped frame of the present invention;
FIG. 3 is a schematic structural view of a second U-shaped frame of the present invention;
fig. 4 is a schematic view of the overall structure of the upper fixing seat and the lower fixing seat of the present invention.
In the figure: 1. a top plate; 2. an L-shaped bolt fixing seat; 3. a first U-shaped frame; 4. a bidirectional screw; 5. a hexagon bolt; 6. moving the plate; 7. a second U-shaped frame; 8. an upper fixed seat; 9. a lower fixed seat; 10. a rectangular clamping block; 11. a rectangular through groove; 12. a rectangular clamping groove; 13. an arc-shaped slot; 14. an arc-shaped clamping plate; 15. a buffer spring; 16. an arc-shaped rubber block; 17. a support rod; 18. a fixed block; 19. a unidirectional screw; 20. a hexagonal nut.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
As shown in figures 1-4, a novel mounting structure of a blast pipeline for purification engineering comprises a top plate 1 and a second U-shaped frame 7, L-shaped bolt fixing seats 2 are symmetrically and fixedly connected with two sides of the top plate 1, a first U-shaped frame 3 is fixedly mounted at the bottom of the top plate 1, a bidirectional screw 4 is rotatably connected with the upper end of the inner cavity of the first U-shaped frame 3 through a bearing, two ends of the bidirectional screw 4 extend to the outer side of the first U-shaped frame 3, hexagonal bolts 5 are symmetrically and fixedly connected with two ends of the bidirectional screw 4, rectangular through grooves 11 are symmetrically formed at two ends of the bottom of the first U-shaped frame 3, the upper end of the second U-shaped frame 7 extends to the inner cavity of the first U-shaped frame 3 through the rectangular through grooves 11, the second U-shaped frame 7 is attached to and slidably connected with the inner wall of the rectangular through grooves 11, movable plates 6 are symmetrically and slidably connected with the left and right ends of the inner cavity of the first U-shaped frame 3, the upper ends of the two movable plates 6 are respectively in threaded connection with the left and right ends of the bidirectional screw 4, the lower ends of the opposite sides of the two moving plates 6 are symmetrically and fixedly connected with rectangular clamping blocks 10, the wall bodies at two sides of the inner cavity of the second U-shaped frame 7 are symmetrically provided with rectangular clamping grooves 12, the number of the rectangular clamping grooves 12 at the same side is at least ten, the rectangular clamping grooves 12 are uniformly arranged, the number of the rectangular clamping blocks 10 on the side wall of each moving plate 6 is three, the three rectangular clamping blocks 10 are uniformly arranged, the rectangular clamping blocks 10 are clamped and matched with the rectangular clamping grooves 12, the mounting height of the pipeline can be conveniently adjusted by the mutual matching of the arranged second U-shaped frame 7, the rectangular clamping grooves 12, the first U-shaped frame 3, the two-way screw rods 4, the hexagon bolts 5, the moving plates 6, the rectangular clamping blocks 10 and the rectangular through grooves 11, so as to adapt to different mounting positions, and the height adjustment can be realized by only rotating one two-way screw rod 4, the operation is convenient and quick, and the working efficiency is improved;
the bottom fixedly connected with of second U-shaped frame 7 goes up fixing base 8, it is provided with down fixing base 9 to go up under fixing base 8, the big small size of going up fixing base 8 and fixing base 9 is the same down, it all is provided with arc 13 with the relative one side of fixing base 9 down to go up fixing base 8, the inner chamber of arc 13 is provided with arc clamping plate 14, the quantity of buffer spring 15 between arc clamping plate 14 and the arc 13 inner wall is three at least, and buffer spring 15 evenly distributed, the inboard wall body fixedly connected with arc rubber piece 16 of arc clamping plate 14, be provided with buffer spring 15 between the inner wall of arc clamping plate 14 and arc 13, the left and right sides symmetry fixedly connected with fixed block 18 of going up fixing base 8, the bottom fixedly connected with die-pin 17 of fixing base 9 down, the bottom fixedly connected with one-way screw 19 of fixed block 18, die-pin 17 about both ends are movable sleeve respectively locates the outside of two one-way screw 19, the outside threaded connection of lower extreme of one-way screw 19 has hexagon nut 20, through the last fixing base 8 that sets up, lower fixing base 9, die-way die-pin 17, hexagon nut 20, one-way screw 19, arc clamping plate 14, arc clamping spring 15, the fixed block can realize the damage to the pipeline when the fixed clamp that the fixed clamp spring 15 has increased the fixed pipeline, the fixed pipeline that the fixed pipeline has produced.
It should be noted that, the utility model relates to a purify novel mounting structure of supply air duct for engineering, insert the inner chamber of first U-shaped frame 3 from rectangle through groove 11 with the upper end of second U-shaped frame 7 during the use, adjust suitable height, then anticlockwise through hex bolts 5 rotation two-way screw rod 4, two-way screw rod 4 drives two movable plates 6 and is close to the displacement mutually, and then rectangle bayonet 10 gets into the inner chamber of corresponding department rectangle bayonet 12, if there is the dislocation then fine setting second U-shaped frame 7 from top to bottom in rectangle bayonet 10 and rectangle bayonet 12, then pass the pipeline between two arc grip blocks 14, upwards hold up down fixing base 9 and make two arc rubber pieces 16 and pipeline laminating, then rotation hex nuts 20 one by one, hex nuts 20 upwards displacement, and then hex nuts 20 can drive down fixing base 9 upwards displacement through die-pin 17, buffer spring 15 can shrink gradually, until firm, the stability of pipeline has been increased promptly, avoided causing the damage to the pipeline again.
The foregoing shows and describes the basic principles and principal features of the invention, together with the advantages thereof. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a purify novel mounting structure of supply air duct for engineering, includes roof (1) and second U-shaped frame (7), its characterized in that: the two sides of the top plate (1) are symmetrically and fixedly connected with L-shaped bolt fixing seats (2), the bottom of the top plate (1) is fixedly provided with a first U-shaped frame (3), the upper end of the inner cavity of the first U-shaped frame (3) is rotatably connected with a bidirectional screw (4) through a bearing, two ends of the bidirectional screw (4) are symmetrically and fixedly connected with hexagon bolts (5), two ends of the bottom of the first U-shaped frame (3) are symmetrically provided with rectangular through grooves (11), the left end and the right end of the inner cavity of the first U-shaped frame (3) are symmetrically and slidably connected with moving plates (6), the lower ends of the two opposite sides of the moving plates (6) are symmetrically and fixedly connected with rectangular clamping blocks (10), and two side wall bodies of the inner cavity of the second U-shaped frame (7) are symmetrically provided with rectangular clamping grooves (12);
fixing base (8) are gone up to the bottom fixedly connected with of second U-shaped frame (7), go up fixing base (8) and be provided with down fixing base (9) under, the relative one side of going up fixing base (8) and fixing base (9) down all is provided with arc wall (13), the inner chamber of arc wall (13) is provided with arc grip block (14), the inboard wall body fixedly connected with arc rubber block (16) of arc grip block (14), be provided with buffer spring (15) between the inner wall of arc grip block (14) and arc wall (13), the left and right sides symmetry fixedly connected with fixed block (18) of going up fixing base (8), the bottom fixedly connected with die-pin (17) of fixing base (9) down, the one-way screw rod (19) of the bottom fixedly connected with of fixed block (18), the outside threaded connection of lower extreme of one-way screw rod (19) has hexagon nut (20).
2. The new installation structure of the blast pipe for purification engineering according to claim 1, characterized in that: the upper ends of the two moving plates (6) are respectively in threaded connection with the outer portions of the left end and the right end of the bidirectional screw (4), and the two ends of the bidirectional screw (4) extend to the outer side of the first U-shaped frame (3).
3. The novel installation structure of the blowing duct for purification engineering according to claim 1, characterized in that: the upper end of the second U-shaped frame (7) penetrates through the rectangular through groove (11) and extends to the inner cavity of the first U-shaped frame (3), and the second U-shaped frame (7) is attached to the inner wall of the rectangular through groove (11) and is in sliding connection with the inner wall of the rectangular through groove.
4. The new installation structure of the blast pipe for purification engineering according to claim 1, characterized in that: with one side the quantity of rectangle draw-in groove (12) is ten at least to rectangle draw-in groove (12) evenly sets up, every the quantity of the rectangle card income piece (10) of moving plate (6) lateral wall is three, and three rectangle card income piece (10) evenly sets up, and rectangle card income piece (10) and rectangle draw-in groove (12) joint cooperation.
5. The new installation structure of the blast pipe for purification engineering according to claim 1, characterized in that: the number of the buffer springs (15) between the arc-shaped clamping plate (14) and the inner wall of the arc-shaped groove (13) is at least three, the buffer springs (15) are uniformly distributed, and the upper fixing seat (8) and the lower fixing seat (9) are the same in size.
6. The new installation structure of the blast pipe for purification engineering according to claim 1, characterized in that: the left end and the right end of the supporting rod (17) are respectively movably sleeved outside the two one-way screw rods (19).
CN202222267099.4U 2022-08-26 2022-08-26 Purify air supply duct's for engineering novel mounting structure Active CN218468404U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222267099.4U CN218468404U (en) 2022-08-26 2022-08-26 Purify air supply duct's for engineering novel mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222267099.4U CN218468404U (en) 2022-08-26 2022-08-26 Purify air supply duct's for engineering novel mounting structure

Publications (1)

Publication Number Publication Date
CN218468404U true CN218468404U (en) 2023-02-10

Family

ID=85139812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222267099.4U Active CN218468404U (en) 2022-08-26 2022-08-26 Purify air supply duct's for engineering novel mounting structure

Country Status (1)

Country Link
CN (1) CN218468404U (en)

Similar Documents

Publication Publication Date Title
CN104588461B (en) Automatic U-shaped bends forming machine
CN218468404U (en) Purify air supply duct's for engineering novel mounting structure
CN203380630U (en) Fixture for numerical control machining center
CN217344553U (en) Overturning clamping tool for LED module processing
CN215371294U (en) Building water supply and drainage pipeline installation fixing device
CN214873409U (en) Adjustable mould
CN211465536U (en) Hardware machining clamp
CN210209809U (en) Grinding device convenient to operate for valve production
CN219572253U (en) Indoor air purification equipment convenient to installation
CN220313131U (en) Positioning device for bearing seat machining
CN219275679U (en) Engine installing support convenient to adjust
CN219485449U (en) Positioning structure for processing plate of aluminum alloy ship
CN214641791U (en) Positioning fixture for machining
CN206084488U (en) Automatic fixture of work piece
CN212298555U (en) Flame spraying centralized air supply device for casting and rolling machine
CN220976291U (en) Hoisting and transferring clamp for stamping parts
CN220039224U (en) Movable supporting structure of heat exchanger
CN216372089U (en) Tool for processing irregular-moment insert reverse side with lifting hole
CN216155277U (en) Lifting appliance for building dimming glass
CN220928175U (en) Cantilever beam supporting and fixing structure
CN215357585U (en) Automatic polishing device for surface of outer top plate of container
CN219766810U (en) Adjustable tool rest of numerical control lathe
CN211846342U (en) A sucking disc adjustment mechanism for glass moves equipment
CN211991544U (en) Adjustable symmetrical bidirectional clamp
CN214746426U (en) Central air conditioning fixed bolster

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant