CN218467318U - Building construction protective fence - Google Patents

Building construction protective fence Download PDF

Info

Publication number
CN218467318U
CN218467318U CN202222929788.7U CN202222929788U CN218467318U CN 218467318 U CN218467318 U CN 218467318U CN 202222929788 U CN202222929788 U CN 202222929788U CN 218467318 U CN218467318 U CN 218467318U
Authority
CN
China
Prior art keywords
base
dwang
telescopic link
fender rod
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222929788.7U
Other languages
Chinese (zh)
Inventor
程德超
轩文丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Zhixuan Construction Engineering Co ltd
Original Assignee
Anhui Zhixuan Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Zhixuan Construction Engineering Co ltd filed Critical Anhui Zhixuan Construction Engineering Co ltd
Priority to CN202222929788.7U priority Critical patent/CN218467318U/en
Application granted granted Critical
Publication of CN218467318U publication Critical patent/CN218467318U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a construction rail guard is built in room, including base, fender rod, dwang, controller and telescopic link, the sliding tray has been seted up on the base top, base front end and handle rear end bottom fixed connection, the base top is located the sliding tray right-hand member and is equipped with the controller, the base top is equipped with the multiunit fender rod, the fender rod left end all is equipped with the dwang, the dwang left end all is equipped with the telescopic link, the equal fixedly connected with fixed plate of telescopic link left end, four group's through-holes have all been seted up on the fixed plate, the utility model discloses a cooperation between base, gyro wheel, handle, fender rod, controller and the sliding tray for need protect man-hour to the outside in the construction is built in the room, through the removal of controlling the multiunit fender rod, can be according to the quick installation work who carries out the protection network of size of difference, through the cooperation between base and gyro wheel and the handle, make the utility model discloses it is nimble more convenient to wholly use.

Description

Building construction protective fence
Technical Field
The utility model relates to a construction technical field specifically is a construction rail guard is built in room.
Background
The house building construction is called house building construction entirely, mainly indicate to have the top cap, the beam column, the wall, the ground and can form the inner space, satisfy the engineering that people live in, production, study, public activity etc. needs, in the in-process of building construction, it is kept apart to need to use the rail guard in the outside of building engineering usually, prevent falling of workman and construction article, improve the security of building construction, and the rail guard that most building sites used at present still uses the installation of ordinary steel pipe scaffold frame and safety net, it is not very convenient in the use, and need all dismantle the transport when removing the rail guard, waste time and energy.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a construction rail guard is built in room to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a construction rail guard is built in room, includes base, fender rod, dwang, controller and telescopic link, the sliding tray has been seted up on the base top, base front end and handle rear end bottom fixed connection, the base top is located the sliding tray right-hand member and is equipped with the controller, the base top is equipped with the multiunit fender rod, the fender rod left end all is equipped with the dwang, the dwang left end all is equipped with the telescopic link, the equal fixedly connected with fixed plate of telescopic link left end, four group's through-holes have all been seted up on the fixed plate.
Preferably, the bottom of the base is provided with a groove, three groups of rollers are arranged in the groove, and the front end inside the base is provided with a servo motor.
Preferably, the rear end of the servo motor is fixedly connected with a threaded rod, the rear end of the threaded rod is connected to the inner wall of the rear end of the base through a bearing, and the servo motor is electrically connected with the controller.
Preferably, the threaded rod intermediate position fixedly connected with stopper, both ends are equipped with three sets of thread bush and three sets of thread bush in front end and three sets of thread bush opposite settings in rear end respectively on the threaded rod around lieing in the stopper.
Preferably, the thread bush all is through connecting band fixed connection in proper order, the connecting band is made for the rubber material, the thread bush top all with protection rod bottom fixed connection.
Preferably, the protection rod left end all rotates with the dwang through the pivot to be connected, the telescopic link right-hand member all is located inside the dwang, all be equipped with the damping fin in dwang medial surface and telescopic link contact gap and dwang and the protection rod contact gap.
Compared with the prior art, the beneficial effects of the utility model are that: a protective guard for building construction, which comprises a protective guard,
1. the utility model discloses a cooperation between base, gyro wheel, handle, fender rod, controller and the sliding tray for need protect the outside in the construction in the room and add man-hour, through the removal of control multiunit fender rod, can be according to the quick installation work who carries out the protection network of different sizes, through the cooperation between base and gyro wheel and the handle, make the utility model discloses whole use is more nimble convenient, and cooperation between base and the rail guard makes when the construction of building begins and finishes, the workman need not carry the guardrail and carry out complete dismantlement, very big promotion the work efficiency of building construction rail guard installation, further reduction the labour capacity of personnel's installation rail guard, overall structure is simple stable, has fine practicality;
2. the utility model discloses a fender rod, the dwang, the damping fin, a rotating shaft, cooperation between telescopic link and the fixed plate, make when carrying out the installation work of building construction rail guard in the room, can be fast and stable carry out the installation of rail guard, through the cooperation between multiunit fender rod and the dwang, because the same protection network of interval is laid more evenly, reduction job site personnel debris that can be very big danger that causes when falling, can carry out nimble flexible adjustment according to the width of on-the-spot protection network through the cooperation between multiunit dwang and the telescopic link, setting through the fixed plate can be to wholly stabilizing firm fixed, very big promotion the room build job site's construction safety, the work load of workman's installation rail guard has effectively been reduced, moreover, the steam generator is simple in structure and stable, it is very convenient to use.
Drawings
FIG. 1 is a schematic view of the overall front view structure of the present invention;
FIG. 2 is a schematic view of the overall side view cross-section structure of the present invention;
FIG. 3 is a schematic view of the connection structure of the protection rod and the rotating rod of the present invention;
fig. 4 is the schematic view of the connection structure of the rotating rod and the telescopic rod of the present invention.
In the figure: 1. a base; 2. a guard bar; 3. rotating the rod; 4. a controller; 5. a telescopic rod; 6. a fixing plate; 7. a through hole; 8. a handle; 9. a sliding groove; 10. a servo motor; 11. a threaded rod; 12. a roller; 13. a groove; 14. a connecting belt; 15. a threaded sleeve; 16. a limiting block; 17. a bearing; 18. a rotating shaft; 19. a damping fin.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the utility model provides a building construction protective guard technical scheme: building construction protective guards; including base 1, fender rod 2, dwang 3, controller 4 and telescopic link 5, sliding tray 9 has been seted up on 1 top of base, base 1 front end and 8 rear end bottom fixed connection of handle, 1 top of base is located sliding tray 9 right-hand members and is equipped with controller 4, 1 top of base is equipped with multiunit fender rod 2, 2 left ends of fender rod all are equipped with dwang 3, 3 left ends of dwang all are equipped with telescopic link 5, the equal fixedly connected with fixed plate 6 in 5 left ends of telescopic link, four group's through-holes 7 have all been seted up on fixed plate 6.
The utility model discloses in: the bottom of the base 1 is provided with a groove 13, three groups of rollers 12 are arranged in the groove 13, and a servo motor 10 is arranged at the front end inside the base 1.
The utility model discloses in: the rear end of the servo motor 10 is fixedly connected with a threaded rod 11, the rear end of the threaded rod 11 is connected to the inner wall of the rear end of the base 1 through a bearing 17, and the servo motor 10 is electrically connected with the controller 4.
The utility model discloses in: the middle position of the threaded rod 11 is fixedly connected with a limiting block 16, three groups of thread sleeves 15 are respectively sleeved at the front end and the rear end of the threaded rod 11, which are positioned at the front end and the rear end of the limiting block 16, and the front end and the rear end of the three groups of thread sleeves 15 are oppositely arranged in thread.
The utility model discloses in: threaded sleeve 15 all is through connecting band 14 fixed connection in proper order, and connecting band 14 is made for the rubber material, and threaded sleeve 15 top all with guard bar 2 bottom fixed connection.
The utility model discloses in: the left end of the protection rod 2 is rotatably connected with the rotating rod 3 through the rotating shaft 18, the right end of the telescopic rod 5 is located inside the rotating rod 3, and damping fins 19 are arranged in the contact gaps between the inner side end face of the rotating rod 3 and the telescopic rod and between the rotating rod 3 and the protection rod 2.
The working principle is as follows: when needing to carry out the installation of rail guard in the construction is built in the room, at first will the utility model discloses promote to the outside of construction wall, then open controller 4 control servo motor 10 and begin work, servo motor 10 drives threaded rod 11 and rotates this moment, multiunit thread bush 15 on the threaded rod 11 moves to both sides through connecting band 14, multiunit thread bush 15 drives fender rod 2 and moves, then turn off controller 4 and make fender rod 2 keep fixed, then rotate dwang 3 to suitable angle, then pull out telescopic link 5 as required, after that stabilize through-hole 7 on the fixed plate 6 and fix, then adjust dwang 3 and telescopic link 5 in proper order and fix can, then install the protection network the utility model discloses on can accomplish the installation of building construction rail guard, through the adjustable of length and angle, can carry out nimble change according to the different demands of job site, overall structure is simple stable, it is very convenient to use, above just be the working process of whole device, and the content that does not make detailed description all belongs to the known prior art of technical personnel in the field in this specification.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a construction rail guard is built in room, includes base (1), fender rod (2), dwang (3), controller (4) and telescopic link (5), its characterized in that: sliding tray (9) have been seted up on base (1) top, base (1) front end and handle (8) rear end bottom fixed connection, base (1) top is located sliding tray (9) right-hand member and is equipped with controller (4), base (1) top is equipped with multiunit fender rod (2), fender rod (2) left end all is equipped with dwang (3), dwang (3) left end all is equipped with telescopic link (5), the equal fixedly connected with fixed plate (6) in telescopic link (5) left end, four group's through-holes (7) have all been seted up on fixed plate (6).
2. The building construction protective guard of claim 1, characterized in that: a groove (13) is formed in the bottom of the base (1), three groups of rollers (12) are arranged in the groove (13), and a servo motor (10) is arranged at the front end inside the base (1).
3. The building construction protective guard of claim 2, wherein: servo motor (10) rear end fixedly connected with threaded rod (11), threaded rod (11) rear end passes through bearing (17) and connects in base (1) rear end inner wall, servo motor (10) and controller (4) electric connection.
4. The building construction protective guard of claim 3, characterized in that: threaded rod (11) intermediate position fixedly connected with stopper (16), both ends are equipped with three sets of thread bush (15) and three sets of thread bush (15) in front and back end three sets of thread bush (15) opposite setting of screw thread on threaded rod (11) around lieing in stopper (16) respectively.
5. The building construction protective guard of claim 4, characterized in that: thread bush (15) all are through connecting band (14) fixed connection in proper order, connecting band (14) are made for the rubber material, thread bush (15) top all with guard bar (2) bottom fixed connection.
6. The building construction protective guard of claim 1, wherein: the utility model discloses a damping piece, including fender rod (2), dwang (3), telescopic link (5) right-hand member, fender rod (2) left end all rotates through pivot (18) and dwang (3) to be connected, inside telescopic link (5) right-hand member all was located dwang (3), all be equipped with damping fin (19) in dwang (3) medial surface and telescopic link (5) contact gap and dwang (3) and fender rod (2) contact gap.
CN202222929788.7U 2022-11-03 2022-11-03 Building construction protective fence Active CN218467318U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222929788.7U CN218467318U (en) 2022-11-03 2022-11-03 Building construction protective fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222929788.7U CN218467318U (en) 2022-11-03 2022-11-03 Building construction protective fence

Publications (1)

Publication Number Publication Date
CN218467318U true CN218467318U (en) 2023-02-10

Family

ID=85149723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222929788.7U Active CN218467318U (en) 2022-11-03 2022-11-03 Building construction protective fence

Country Status (1)

Country Link
CN (1) CN218467318U (en)

Similar Documents

Publication Publication Date Title
CN108466332B (en) Safe type timber cutting device for building engineering
CN218467318U (en) Building construction protective fence
CN209786633U (en) Line cleaning and maintaining equipment for power transmission line
CN208564029U (en) A kind of guardrail used in construction engineering
CN212054092U (en) Fender is enclosed with monitoring formula to building engineering construction
CN219665515U (en) Metal guardrail welding clamping device convenient to move
CN207633732U (en) A kind of scaffold of architectural engineering
CN115680256A (en) Construction platform for housing construction engineering
CN214834563U (en) Support for house building engineering
CN214885533U (en) Aluminum alloy template strutting arrangement for building
CN211687995U (en) Foldable building wallboard hoisting machine
CN211571418U (en) Self-propelled movable hanging basket for construction outside concrete guardrail of bridge
CN209854520U (en) Road surface fluting device for municipal works
CN112376873A (en) Outdoor decoration safety kit and working method thereof
CN221052386U (en) Bridge construction protector
CN218493302U (en) Guardrail for construction
CN211289399U (en) Liftable prevent security protection monitoring device who shelters from
CN216952495U (en) Be applied to intelligent supervision device of construction
CN218028837U (en) Automatic lifting construction platform for construction site
CN217894815U (en) Exempt from to climb ware mounting structure
CN220395360U (en) Construction safety protection net convenient to adjust
CN207775812U (en) Fast disassembly type water bar mechanism
CN212836590U (en) But height-adjusting's stable form engineering construction scaffold
CN213509704U (en) Building construction safety device
CN115199138B (en) Protective fence for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant