CN218467297U - Folding type movable protective fence - Google Patents
Folding type movable protective fence Download PDFInfo
- Publication number
- CN218467297U CN218467297U CN202222795216.4U CN202222795216U CN218467297U CN 218467297 U CN218467297 U CN 218467297U CN 202222795216 U CN202222795216 U CN 202222795216U CN 218467297 U CN218467297 U CN 218467297U
- Authority
- CN
- China
- Prior art keywords
- wall
- board
- plate
- fixed
- bevel gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及防护栏技术领域,尤其涉及一种折叠式移动式防护栏。The utility model relates to the technical field of guardrails, in particular to a foldable movable guardrail.
背景技术Background technique
在公路施工的建筑工地周边都需要用防护栏将工地围起来,一方面是对在工地内施工的工人起到保护作用,另一方面也避免普通车辆或行人进入工地内不熟悉情况,造成工地事故,但是现有的防护栏在使用的过程中还存在下述不足:Around the construction site of road construction, it is necessary to use protective fences to surround the construction site. On the one hand, it protects the workers working on the construction site, and on the other hand, it also prevents ordinary vehicles or pedestrians from entering the construction site. accidents, but the existing guardrails also have the following deficiencies during use:
防护栏高度较高一般都在两米左右,搭建时立起来较为吃力,同时也不具备移动功能,防护栏立起后与其他防护栏拼接在一起需要调整位置时,需要将防护栏抬起来进行移动,不够方便。The height of the guardrail is generally about two meters high. It is difficult to stand up when erecting, and it does not have the function of moving. When the guardrail is erected and spliced with other guardrails and needs to be adjusted, the guardrail needs to be lifted. It is not convenient enough to move.
实用新型内容Utility model content
针对现有技术不足,本实用新型提供了一种折叠式移动式防护栏,通过将防护栏整体分为可折叠的第一板和第二板两个部分,在搭建时只需将第二板立起固定即可,轻松省力,还设置的升降式的移动机构可推动防护栏整体进行移动,克服了现有技术的不足,有效解决了防护栏高度较高,搭建时立起来较为吃力和不具备移动功能,在调整位置时需要将防护栏抬起来进行移动,不够方便的问题。Aiming at the deficiencies of the prior art, the utility model provides a foldable movable protective fence. By dividing the protective fence into two parts, the foldable first board and the second board, the second board only needs to be It can be erected and fixed, which is easy and labor-saving. The lifting type moving mechanism is also set up to push the guardrail to move as a whole, which overcomes the shortcomings of the existing technology and effectively solves the problem that the height of the guardrail is high and it is difficult and uncomfortable to stand up when erecting. It has a moving function, and it is not convenient enough to lift the guardrail to move when adjusting the position.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种折叠式移动式防护栏,包括第一板和连接板,所述第一板顶部外壁一端铰接有第二板,所述第一板底部外壁开有凹槽,所述凹槽顶部内壁中部开有安装槽,所述安装槽内壁固定有安装板,所述安装板顶部外壁通过轴承插接有螺纹杆,所述第一板一侧外壁通过轴承插接有转杆,所述转杆一端固定有第一伞齿轮,所述螺纹杆顶部一端固定有第二伞齿轮,所述螺纹杆上螺接有移动机构。A foldable movable guardrail, comprising a first plate and a connecting plate, a second plate is hinged at one end of the top outer wall of the first plate, a groove is formed on the bottom outer wall of the first plate, and the middle part of the inner wall at the top of the groove is There is a mounting groove, the inner wall of the mounting groove is fixed with a mounting plate, the outer wall of the top of the mounting plate is inserted with a threaded rod through a bearing, the outer wall of one side of the first plate is inserted with a rotating rod through a bearing, and one end of the rotating rod A first bevel gear is fixed, a second bevel gear is fixed at one end of the top of the threaded rod, and a moving mechanism is screwed on the threaded rod.
通过上述方案,通过将防护栏整体分为可折叠的第一板和第二板两个部分,在搭建时只需将第二板立起即可,轻松省力,通过连接板将第一板和第二板固定在一起,完成防护栏的搭建,方便快捷,在需要对立起的防护栏进行移动调整位置时,只需转动转杆,通过转杆的转动来带动螺纹杆转动,让螺接在螺纹杆上的移动机构向下移动,使得移动机构内的移动轮与地面接触,并将第一板撑起来,这时就可推动防护栏整体进行移动,方便移动和调整位置与其他防护栏拼接在一起,位置调整好之后,可再将移动机构升起,使得第一板底部与地面接触,方便固定。Through the above scheme, by dividing the guardrail into two parts, the foldable first board and the second board, it is only necessary to stand up the second board during construction, which is easy and labor-saving, and the first board and the second board are connected through the connecting board. The second plate is fixed together to complete the construction of the guardrail, which is convenient and quick. When it is necessary to move and adjust the position of the erected guardrail, you only need to turn the rotating rod to drive the threaded rod to rotate through the rotation of the rotating rod, so that the screw is connected to the The moving mechanism on the threaded rod moves downward, so that the moving wheel in the moving mechanism contacts the ground and props up the first plate. At this time, the whole guardrail can be pushed to move, which is convenient for moving and adjusting the position and splicing with other guardrails Together, after the position is adjusted, the moving mechanism can be raised again, so that the bottom of the first plate is in contact with the ground, which is convenient for fixing.
优选的,所述第一板一侧外壁开有第一槽,所述第一槽一侧内壁开有第一螺纹孔,所述第二板一侧外壁开有第二槽,所述第二槽一侧内壁开有第二螺纹孔。Preferably, the outer wall of one side of the first plate is provided with a first groove, the inner wall of one side of the first groove is provided with a first threaded hole, the outer wall of one side of the second plate is provided with a second groove, and the second The inner wall on one side of the groove is provided with a second threaded hole.
通过上述方案,第二板立在第一板上后,第二槽与第一槽连接在一起,形成一个长槽这时可将连接板放入长槽内固定起来,进而将第一板和第二板固定连接起来,保持竖直状态。Through the above scheme, after the second plate stands on the first plate, the second groove and the first groove are connected together to form a long groove. At this time, the connecting plate can be put into the long groove and fixed, and then the first plate and the first groove are connected together. The second plate is fixedly connected to maintain a vertical state.
优选的,所述移动机构包括滑块,固定于滑块底部外壁两端的支撑板,固定于两个支撑板底部外壁上的升降板,固定于升降板底部外壁四角的移动轮。Preferably, the moving mechanism includes a slider, support plates fixed at both ends of the bottom outer wall of the slider, lifting plates fixed on the bottom outer walls of the two support plates, and moving wheels fixed at four corners of the bottom outer wall of the lifting plate.
通过上述方案,螺纹杆转动之后,滑块受安装槽限位影响,不与螺纹杆一起转动,而顺着安装槽内壁进行上或下移动,可通过调整螺纹杆转动方向,使得滑块向下移动,进而带动支撑板、升降板和移动轮向下移动,移动轮与地面接触,并将第一板撑起来,可推动防护栏整体进行移动。Through the above scheme, after the threaded rod rotates, the slider is affected by the limit of the installation groove, and does not rotate together with the threaded rod, but moves up or down along the inner wall of the installation groove, and the slider can be adjusted downward by adjusting the rotation direction of the threaded rod Move, and then drive the supporting plate, the lifting plate and the moving wheel to move downward, the moving wheel contacts the ground, and props up the first plate, which can push the guardrail to move as a whole.
优选的,所述第一板两侧外壁底部均焊接有固定板,两个所述固定板底部外壁两端均开有固定孔。Preferably, the bottoms of the outer walls on both sides of the first plate are welded with fixing plates, and both ends of the bottom outer walls of the two fixing plates are provided with fixing holes.
通过上述方案,在对防护栏位置调整好之后,可通过固定孔将防护栏固定于地面。Through the above solution, after the position of the guardrail is adjusted, the guardrail can be fixed on the ground through the fixing holes.
优选的,所述连接板一侧外壁固定有把手,所述连接板一侧外壁两端均开有螺纹通孔。Preferably, a handle is fixed on one side of the outer wall of the connecting plate, and threaded through holes are opened at both ends of the one side of the outer wall of the connecting plate.
通过上述方案,连接板放入长槽内之后,两个螺纹通孔分别与第一螺纹孔和第二螺纹孔对齐,这时就可往两个螺纹通孔内螺入螺栓,将连接板、第一板和第二板固定连接起来,通过设置的把手方便拉动防护栏进行移动。Through the above scheme, after the connecting plate is put into the long groove, the two threaded through holes are respectively aligned with the first threaded hole and the second threaded hole. At this time, bolts can be screwed into the two threaded through holes, and the connecting plate, The first board and the second board are fixedly connected, and the guard rail is conveniently pulled to move through the provided handle.
优选的,所述第一伞齿轮和第二伞齿轮相啮合。Preferably, the first bevel gear meshes with the second bevel gear.
通过上述方案,转杆转动带动第一伞齿轮转动,第一伞齿轮转动带动第二伞齿轮转动,第二伞齿轮转动带动螺纹杆转动。Through the above solution, the rotation of the rotating rod drives the rotation of the first bevel gear, the rotation of the first bevel gear drives the rotation of the second bevel gear, and the rotation of the second bevel gear drives the rotation of the threaded rod.
本实用新型的有益效果为:The beneficial effects of the utility model are:
1、通过将防护栏整体分为可折叠的第一板和第二板两个部分,在搭建时只需将第二板立起即可,轻松省力,通过连接板将第一板和第二板固定在一起,完成防护栏的搭建,方便快捷。1. By dividing the guardrail into two parts, the foldable first board and the second board, you only need to stand up the second board during construction, which is easy and labor-saving, and the first board and the second board are connected through the connecting board. The boards are fixed together to complete the construction of the guardrail, which is convenient and quick.
2、通过设置的升降式的移动机构,可在需要对立起的防护栏进行移动调整位置时,向下移动,使得移动机构内的移动轮与地面接触,并将第一板撑起来,这时就可推动防护栏整体进行移动,方便移动和调整位置与其他防护栏拼接在一起,位置调整好之后,可再将移动机构升起,使得第一板底部与地面接触,方便固定。2. Through the set up and down moving mechanism, when it is necessary to move and adjust the position of the erected guardrail, it can be moved downwards, so that the moving wheels in the moving mechanism are in contact with the ground, and the first plate is propped up. At this time Just can promote guardrail to move as a whole, move and adjust position conveniently and splicing together with other guardrails, after the position is adjusted, can raise moving mechanism again, make the bottom of the first board contact with the ground, convenient to fix.
附图说明Description of drawings
图1为本实用新型提出的一种折叠式移动式防护栏的第一视角立体剖视图;Fig. 1 is a perspective sectional view of a foldable movable guardrail proposed by the utility model at a first viewing angle;
图2为本实用新型提出的一种折叠式移动式防护栏的第二视角立体剖视图;Fig. 2 is a perspective sectional view of a second viewing angle of a foldable movable guardrail proposed by the utility model;
图3为本实用新型提出的一种折叠式移动式防护栏的立体外视图;Fig. 3 is a three-dimensional external view of a foldable movable guardrail proposed by the utility model;
图4为本实用新型提出的一种折叠式移动式防护栏的连接板立体图;Fig. 4 is a perspective view of a connecting plate of a foldable movable guardrail proposed by the utility model;
图5为本实用新型提出的一种折叠式移动式防护栏的第二板竖立立体图。Fig. 5 is an upright perspective view of the second plate of a foldable movable guardrail proposed by the present invention.
图中:1、第一板;2、第二板;3、连接板;4、凹槽;5、安装槽;6、安装板;7、螺纹杆;8、转杆;9、第一伞齿轮;10、第二伞齿轮;11、第一槽;12、第一螺纹孔;13、第二槽;14、第二螺纹孔;15、滑块;16、支撑板;17、升降板;18、固定板;19、固定孔;20、把手;21、螺纹通孔。In the figure: 1, the first plate; 2, the second plate; 3, the connecting plate; 4, the groove; 5, the installation groove; 6, the installation plate; 7, the threaded rod; 8, the rotating rod; 9, the first umbrella Gear; 10, the second bevel gear; 11, the first groove; 12, the first threaded hole; 13, the second groove; 14, the second threaded hole; 15, the slider; 16, the supporting plate; 17, the lifting plate; 18, fixed plate; 19, fixed hole; 20, handle; 21, threaded through hole.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.
参照图1-5,一种折叠式移动式防护栏,包括第一板1和连接板3,第一板1两侧外壁底部均焊接有固定板18,两个固定板18底部外壁两端均开有固定孔19,在对防护栏位置调整好之后,可通过固定孔19将防护栏固定于地面,连接板3一侧外壁固定有把手20,连接板3一侧外壁两端均开有螺纹通孔21,连接板3放入长槽内之后,两个螺纹通孔21分别与第一螺纹孔12和第二螺纹孔14对齐,这时就可往两个螺纹通孔21内螺入螺栓,将连接板3、第一板1和第二板2固定连接起来,通过设置的把手20方便拉动防护栏进行移动;Referring to Figures 1-5, a foldable movable guardrail includes a first plate 1 and a connecting
第一板1顶部外壁一端铰接有第二板2,第一板1一侧外壁开有第一槽11,第一槽11一侧内壁开有第一螺纹孔12,第二板2一侧外壁开有第二槽13,第二槽13一侧内壁开有第二螺纹孔14,第二板2立在第一板1上后,第二槽13与第一槽11连接在一起,形成一个长槽这时可将连接板3放入长槽内固定起来,进而将第一板1和第二板2固定连接起来,保持竖直状态;One end of the top outer wall of the first plate 1 is hinged with the
第一板1底部外壁开有凹槽4,凹槽4顶部内壁中部开有安装槽5,安装槽5内壁固定有安装板6,安装板6顶部外壁通过轴承插接有螺纹杆7,第一板1一侧外壁通过轴承插接有转杆8,转杆8一端固定有第一伞齿轮9,螺纹杆7顶部一端固定有第二伞齿轮10,第一伞齿轮9和第二伞齿轮10相啮合,转杆8转动带动第一伞齿轮9转动,第一伞齿轮9转动带动第二伞齿轮10转动,第二伞齿轮10转动带动螺纹杆7转动;The outer wall of the bottom of the first plate 1 has a
螺纹杆7上螺接有移动机构,移动机构包括滑块15,固定于滑块15底部外壁两端的支撑板16,固定于两个支撑板16底部外壁上的升降板17,固定于升降板17底部外壁四角的移动轮,螺纹杆7转动之后,滑块15受安装槽5限位影响,不与螺纹杆7一起转动,而顺着安装槽5内壁进行上或下移动,可通过调整螺纹杆7转动方向,使得滑块15向下移动,进而带动支撑板16、升降板17和移动轮向下移动,移动轮与地面接触,并将第一板1撑起来,可推动防护栏整体进行移动;Threaded
通过将防护栏整体分为可折叠的第一板1和第二板2两个部分,在搭建时只需将第二板2立起即可,轻松省力,通过连接板3将第一板1和第二板2固定在一起,完成防护栏的搭建,方便快捷,在需要对立起的防护栏进行移动调整位置时,只需转动转杆8,通过转杆8的转动来带动螺纹杆7转动,让螺接在螺纹杆7上的移动机构向下移动,使得移动机构内的移动轮与地面接触,并将第一板1撑起来,这时就可推动防护栏整体进行移动,方便移动和调整位置与其他防护栏拼接在一起,位置调整好之后,可再将移动机构升起,使得第一板1底部与地面接触,方便固定。By dividing the guardrail as a whole into two parts, the foldable first board 1 and the
工作原理:通过将防护栏整体分为可折叠的第一板1和第二板2两个部分,在搭建时只需将第二板2立起,第二板2立在第一板1上后,第二槽13与第一槽11连接在一起,形成一个长槽这时可将连接板3放入长槽内,连接板3放入长槽内之后,两个螺纹通孔21分别与第一螺纹孔12和第二螺纹孔14对齐,这时就可往两个螺纹通孔21内螺入螺栓,将连接板3、第一板1和第二板2固定连接起来,保持竖直状态,完成防护栏的搭建;Working principle: By dividing the guardrail into two parts, the foldable first board 1 and the
在需要对立起的防护栏进行移动调整位置时,可转动转杆8,转杆8转动带动第一伞齿轮9转动,第一伞齿轮9转动带动第二伞齿轮10转动,第二伞齿轮10转动带动螺纹杆7转动,螺纹杆7转动之后,滑块15受安装槽5限位影响,不与螺纹杆7一起转动,而顺着安装槽5内壁进行上或下移动,可通过调整螺纹杆7转动方向,使得滑块15向下移动,进而带动支撑板16、升降板17和移动轮向下移动,移动轮与地面接触,并将第一板1撑起来,可推动防护栏整体进行移动,位置调整好之后,可再反向转动转杆8,将移动轮升起,使得第一板1底部与地面接触,通过固定孔19将防护栏固定于地面。When it is necessary to move and adjust the position of the erected guardrail, the rotating rod 8 can be rotated, the rotating rod 8 rotates to drive the
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. Any equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222795216.4U CN218467297U (en) | 2022-10-24 | 2022-10-24 | Folding type movable protective fence |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222795216.4U CN218467297U (en) | 2022-10-24 | 2022-10-24 | Folding type movable protective fence |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218467297U true CN218467297U (en) | 2023-02-10 |
Family
ID=85148598
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222795216.4U Expired - Fee Related CN218467297U (en) | 2022-10-24 | 2022-10-24 | Folding type movable protective fence |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218467297U (en) |
-
2022
- 2022-10-24 CN CN202222795216.4U patent/CN218467297U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN215594899U (en) | Supporting template for constructional engineering | |
| CN218467297U (en) | Folding type movable protective fence | |
| CN113605240A (en) | Assembled bridge construction is with scaffold that has protective structure | |
| CN209670301U (en) | A kind of scaffold with stress monitoring protection | |
| CN216277092U (en) | Building engineering strutting arrangement | |
| CN109024297A (en) | A kind of bridge construction workbench of safety and stability | |
| CN216341387U (en) | Protection fixing device for construction | |
| CN220504697U (en) | A kind of construction engineering construction fence | |
| CN217299741U (en) | Civil engineering construction supporting structure | |
| CN217997845U (en) | a construction beam | |
| CN210395112U (en) | Bridge construction work platform | |
| CN220336395U (en) | A kind of road construction frame | |
| CN209539366U (en) | A kind of traffic vcehicular tunnel maintenance and reinforcement platform | |
| CN220954512U (en) | Construction platform for building construction | |
| CN220705096U (en) | A climbing device | |
| CN217734771U (en) | Building engineering construction climbing device | |
| CN217924715U (en) | Scaffold for building | |
| CN215014640U (en) | Route display device for highway design | |
| CN213464207U (en) | A workstation for engineering cost | |
| CN223647838U (en) | A temporary mining support platform equipped with a fall protection structure | |
| CN219586607U (en) | A safety warning mechanism for bridge construction | |
| CN220201368U (en) | Auxiliary lifting frame for electromechanical maintenance of expressway | |
| CN221481510U (en) | A beam frame for building construction | |
| CN116914612B (en) | Auxiliary disassembly and assembly platform for transformer maintenance | |
| CN223281839U (en) | A building installation protection structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230210 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |