CN218467297U - Folding type movable protective fence - Google Patents

Folding type movable protective fence Download PDF

Info

Publication number
CN218467297U
CN218467297U CN202222795216.4U CN202222795216U CN218467297U CN 218467297 U CN218467297 U CN 218467297U CN 202222795216 U CN202222795216 U CN 202222795216U CN 218467297 U CN218467297 U CN 218467297U
Authority
CN
China
Prior art keywords
wall
board
plate
fixed
bevel gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222795216.4U
Other languages
Chinese (zh)
Inventor
杨斌
杨博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Chenghai Bridge And Tunnel Engineering Group Co ltd
Original Assignee
Shanghai Chenghai Bridge And Tunnel Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Chenghai Bridge And Tunnel Engineering Group Co ltd filed Critical Shanghai Chenghai Bridge And Tunnel Engineering Group Co ltd
Priority to CN202222795216.4U priority Critical patent/CN218467297U/en
Application granted granted Critical
Publication of CN218467297U publication Critical patent/CN218467297U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a foldable portable rail guard relates to rail guard technical field, and is higher to current rail guard height, stands when buildding comparatively hard and do not possess the removal function, need lift the rail guard when adjusting the position and remove, not convenient enough problem, now proposes following scheme, including first board and connecting plate, first board top outer wall one end articulates there is the second board, first board bottom outer wall is opened flutedly, open recess top inner wall middle part has the mounting groove, mounting groove inner wall is fixed with the mounting panel, mounting panel top outer wall is pegged graft through the bearing and is had the threaded rod. The utility model discloses a wholly divide into two parts of folding first board and second board with the rail guard, only need when buildding with the second board stand fixed can, light laborsaving, the moving mechanism of the over-and-under type that still sets up can promote the rail guard and wholly remove.

Description

一种折叠式移动式防护栏A foldable movable guardrail

技术领域technical field

本实用新型涉及防护栏技术领域,尤其涉及一种折叠式移动式防护栏。The utility model relates to the technical field of guardrails, in particular to a foldable movable guardrail.

背景技术Background technique

在公路施工的建筑工地周边都需要用防护栏将工地围起来,一方面是对在工地内施工的工人起到保护作用,另一方面也避免普通车辆或行人进入工地内不熟悉情况,造成工地事故,但是现有的防护栏在使用的过程中还存在下述不足:Around the construction site of road construction, it is necessary to use protective fences to surround the construction site. On the one hand, it protects the workers working on the construction site, and on the other hand, it also prevents ordinary vehicles or pedestrians from entering the construction site. accidents, but the existing guardrails also have the following deficiencies during use:

防护栏高度较高一般都在两米左右,搭建时立起来较为吃力,同时也不具备移动功能,防护栏立起后与其他防护栏拼接在一起需要调整位置时,需要将防护栏抬起来进行移动,不够方便。The height of the guardrail is generally about two meters high. It is difficult to stand up when erecting, and it does not have the function of moving. When the guardrail is erected and spliced with other guardrails and needs to be adjusted, the guardrail needs to be lifted. It is not convenient enough to move.

实用新型内容Utility model content

针对现有技术不足,本实用新型提供了一种折叠式移动式防护栏,通过将防护栏整体分为可折叠的第一板和第二板两个部分,在搭建时只需将第二板立起固定即可,轻松省力,还设置的升降式的移动机构可推动防护栏整体进行移动,克服了现有技术的不足,有效解决了防护栏高度较高,搭建时立起来较为吃力和不具备移动功能,在调整位置时需要将防护栏抬起来进行移动,不够方便的问题。Aiming at the deficiencies of the prior art, the utility model provides a foldable movable protective fence. By dividing the protective fence into two parts, the foldable first board and the second board, the second board only needs to be It can be erected and fixed, which is easy and labor-saving. The lifting type moving mechanism is also set up to push the guardrail to move as a whole, which overcomes the shortcomings of the existing technology and effectively solves the problem that the height of the guardrail is high and it is difficult and uncomfortable to stand up when erecting. It has a moving function, and it is not convenient enough to lift the guardrail to move when adjusting the position.

为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:

一种折叠式移动式防护栏,包括第一板和连接板,所述第一板顶部外壁一端铰接有第二板,所述第一板底部外壁开有凹槽,所述凹槽顶部内壁中部开有安装槽,所述安装槽内壁固定有安装板,所述安装板顶部外壁通过轴承插接有螺纹杆,所述第一板一侧外壁通过轴承插接有转杆,所述转杆一端固定有第一伞齿轮,所述螺纹杆顶部一端固定有第二伞齿轮,所述螺纹杆上螺接有移动机构。A foldable movable guardrail, comprising a first plate and a connecting plate, a second plate is hinged at one end of the top outer wall of the first plate, a groove is formed on the bottom outer wall of the first plate, and the middle part of the inner wall at the top of the groove is There is a mounting groove, the inner wall of the mounting groove is fixed with a mounting plate, the outer wall of the top of the mounting plate is inserted with a threaded rod through a bearing, the outer wall of one side of the first plate is inserted with a rotating rod through a bearing, and one end of the rotating rod A first bevel gear is fixed, a second bevel gear is fixed at one end of the top of the threaded rod, and a moving mechanism is screwed on the threaded rod.

通过上述方案,通过将防护栏整体分为可折叠的第一板和第二板两个部分,在搭建时只需将第二板立起即可,轻松省力,通过连接板将第一板和第二板固定在一起,完成防护栏的搭建,方便快捷,在需要对立起的防护栏进行移动调整位置时,只需转动转杆,通过转杆的转动来带动螺纹杆转动,让螺接在螺纹杆上的移动机构向下移动,使得移动机构内的移动轮与地面接触,并将第一板撑起来,这时就可推动防护栏整体进行移动,方便移动和调整位置与其他防护栏拼接在一起,位置调整好之后,可再将移动机构升起,使得第一板底部与地面接触,方便固定。Through the above scheme, by dividing the guardrail into two parts, the foldable first board and the second board, it is only necessary to stand up the second board during construction, which is easy and labor-saving, and the first board and the second board are connected through the connecting board. The second plate is fixed together to complete the construction of the guardrail, which is convenient and quick. When it is necessary to move and adjust the position of the erected guardrail, you only need to turn the rotating rod to drive the threaded rod to rotate through the rotation of the rotating rod, so that the screw is connected to the The moving mechanism on the threaded rod moves downward, so that the moving wheel in the moving mechanism contacts the ground and props up the first plate. At this time, the whole guardrail can be pushed to move, which is convenient for moving and adjusting the position and splicing with other guardrails Together, after the position is adjusted, the moving mechanism can be raised again, so that the bottom of the first plate is in contact with the ground, which is convenient for fixing.

优选的,所述第一板一侧外壁开有第一槽,所述第一槽一侧内壁开有第一螺纹孔,所述第二板一侧外壁开有第二槽,所述第二槽一侧内壁开有第二螺纹孔。Preferably, the outer wall of one side of the first plate is provided with a first groove, the inner wall of one side of the first groove is provided with a first threaded hole, the outer wall of one side of the second plate is provided with a second groove, and the second The inner wall on one side of the groove is provided with a second threaded hole.

通过上述方案,第二板立在第一板上后,第二槽与第一槽连接在一起,形成一个长槽这时可将连接板放入长槽内固定起来,进而将第一板和第二板固定连接起来,保持竖直状态。Through the above scheme, after the second plate stands on the first plate, the second groove and the first groove are connected together to form a long groove. At this time, the connecting plate can be put into the long groove and fixed, and then the first plate and the first groove are connected together. The second plate is fixedly connected to maintain a vertical state.

优选的,所述移动机构包括滑块,固定于滑块底部外壁两端的支撑板,固定于两个支撑板底部外壁上的升降板,固定于升降板底部外壁四角的移动轮。Preferably, the moving mechanism includes a slider, support plates fixed at both ends of the bottom outer wall of the slider, lifting plates fixed on the bottom outer walls of the two support plates, and moving wheels fixed at four corners of the bottom outer wall of the lifting plate.

通过上述方案,螺纹杆转动之后,滑块受安装槽限位影响,不与螺纹杆一起转动,而顺着安装槽内壁进行上或下移动,可通过调整螺纹杆转动方向,使得滑块向下移动,进而带动支撑板、升降板和移动轮向下移动,移动轮与地面接触,并将第一板撑起来,可推动防护栏整体进行移动。Through the above scheme, after the threaded rod rotates, the slider is affected by the limit of the installation groove, and does not rotate together with the threaded rod, but moves up or down along the inner wall of the installation groove, and the slider can be adjusted downward by adjusting the rotation direction of the threaded rod Move, and then drive the supporting plate, the lifting plate and the moving wheel to move downward, the moving wheel contacts the ground, and props up the first plate, which can push the guardrail to move as a whole.

优选的,所述第一板两侧外壁底部均焊接有固定板,两个所述固定板底部外壁两端均开有固定孔。Preferably, the bottoms of the outer walls on both sides of the first plate are welded with fixing plates, and both ends of the bottom outer walls of the two fixing plates are provided with fixing holes.

通过上述方案,在对防护栏位置调整好之后,可通过固定孔将防护栏固定于地面。Through the above solution, after the position of the guardrail is adjusted, the guardrail can be fixed on the ground through the fixing holes.

优选的,所述连接板一侧外壁固定有把手,所述连接板一侧外壁两端均开有螺纹通孔。Preferably, a handle is fixed on one side of the outer wall of the connecting plate, and threaded through holes are opened at both ends of the one side of the outer wall of the connecting plate.

通过上述方案,连接板放入长槽内之后,两个螺纹通孔分别与第一螺纹孔和第二螺纹孔对齐,这时就可往两个螺纹通孔内螺入螺栓,将连接板、第一板和第二板固定连接起来,通过设置的把手方便拉动防护栏进行移动。Through the above scheme, after the connecting plate is put into the long groove, the two threaded through holes are respectively aligned with the first threaded hole and the second threaded hole. At this time, bolts can be screwed into the two threaded through holes, and the connecting plate, The first board and the second board are fixedly connected, and the guard rail is conveniently pulled to move through the provided handle.

优选的,所述第一伞齿轮和第二伞齿轮相啮合。Preferably, the first bevel gear meshes with the second bevel gear.

通过上述方案,转杆转动带动第一伞齿轮转动,第一伞齿轮转动带动第二伞齿轮转动,第二伞齿轮转动带动螺纹杆转动。Through the above solution, the rotation of the rotating rod drives the rotation of the first bevel gear, the rotation of the first bevel gear drives the rotation of the second bevel gear, and the rotation of the second bevel gear drives the rotation of the threaded rod.

本实用新型的有益效果为:The beneficial effects of the utility model are:

1、通过将防护栏整体分为可折叠的第一板和第二板两个部分,在搭建时只需将第二板立起即可,轻松省力,通过连接板将第一板和第二板固定在一起,完成防护栏的搭建,方便快捷。1. By dividing the guardrail into two parts, the foldable first board and the second board, you only need to stand up the second board during construction, which is easy and labor-saving, and the first board and the second board are connected through the connecting board. The boards are fixed together to complete the construction of the guardrail, which is convenient and quick.

2、通过设置的升降式的移动机构,可在需要对立起的防护栏进行移动调整位置时,向下移动,使得移动机构内的移动轮与地面接触,并将第一板撑起来,这时就可推动防护栏整体进行移动,方便移动和调整位置与其他防护栏拼接在一起,位置调整好之后,可再将移动机构升起,使得第一板底部与地面接触,方便固定。2. Through the set up and down moving mechanism, when it is necessary to move and adjust the position of the erected guardrail, it can be moved downwards, so that the moving wheels in the moving mechanism are in contact with the ground, and the first plate is propped up. At this time Just can promote guardrail to move as a whole, move and adjust position conveniently and splicing together with other guardrails, after the position is adjusted, can raise moving mechanism again, make the bottom of the first board contact with the ground, convenient to fix.

附图说明Description of drawings

图1为本实用新型提出的一种折叠式移动式防护栏的第一视角立体剖视图;Fig. 1 is a perspective sectional view of a foldable movable guardrail proposed by the utility model at a first viewing angle;

图2为本实用新型提出的一种折叠式移动式防护栏的第二视角立体剖视图;Fig. 2 is a perspective sectional view of a second viewing angle of a foldable movable guardrail proposed by the utility model;

图3为本实用新型提出的一种折叠式移动式防护栏的立体外视图;Fig. 3 is a three-dimensional external view of a foldable movable guardrail proposed by the utility model;

图4为本实用新型提出的一种折叠式移动式防护栏的连接板立体图;Fig. 4 is a perspective view of a connecting plate of a foldable movable guardrail proposed by the utility model;

图5为本实用新型提出的一种折叠式移动式防护栏的第二板竖立立体图。Fig. 5 is an upright perspective view of the second plate of a foldable movable guardrail proposed by the present invention.

图中:1、第一板;2、第二板;3、连接板;4、凹槽;5、安装槽;6、安装板;7、螺纹杆;8、转杆;9、第一伞齿轮;10、第二伞齿轮;11、第一槽;12、第一螺纹孔;13、第二槽;14、第二螺纹孔;15、滑块;16、支撑板;17、升降板;18、固定板;19、固定孔;20、把手;21、螺纹通孔。In the figure: 1, the first plate; 2, the second plate; 3, the connecting plate; 4, the groove; 5, the installation groove; 6, the installation plate; 7, the threaded rod; 8, the rotating rod; 9, the first umbrella Gear; 10, the second bevel gear; 11, the first groove; 12, the first threaded hole; 13, the second groove; 14, the second threaded hole; 15, the slider; 16, the supporting plate; 17, the lifting plate; 18, fixed plate; 19, fixed hole; 20, handle; 21, threaded through hole.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example.

参照图1-5,一种折叠式移动式防护栏,包括第一板1和连接板3,第一板1两侧外壁底部均焊接有固定板18,两个固定板18底部外壁两端均开有固定孔19,在对防护栏位置调整好之后,可通过固定孔19将防护栏固定于地面,连接板3一侧外壁固定有把手20,连接板3一侧外壁两端均开有螺纹通孔21,连接板3放入长槽内之后,两个螺纹通孔21分别与第一螺纹孔12和第二螺纹孔14对齐,这时就可往两个螺纹通孔21内螺入螺栓,将连接板3、第一板1和第二板2固定连接起来,通过设置的把手20方便拉动防护栏进行移动;Referring to Figures 1-5, a foldable movable guardrail includes a first plate 1 and a connecting plate 3, the bottom of the outer walls on both sides of the first plate 1 are welded with fixed plates 18, and the two ends of the outer walls of the bottom of the two fixed plates 18 are connected to each other. Have fixing hole 19, after the position of guardrail is adjusted, guardrail can be fixed on the ground by fixing hole 19, and connecting plate 3 one side outer walls are fixed with handle 20, and connecting plate 3 one side outer walls both ends are provided with screw thread After the through hole 21 and the connecting plate 3 are put into the long groove, the two threaded through holes 21 are respectively aligned with the first threaded hole 12 and the second threaded hole 14, and at this time, bolts can be screwed into the two threaded through holes 21. , the connecting plate 3, the first plate 1 and the second plate 2 are fixedly connected, and the handle 20 provided is convenient for pulling the guardrail to move;

第一板1顶部外壁一端铰接有第二板2,第一板1一侧外壁开有第一槽11,第一槽11一侧内壁开有第一螺纹孔12,第二板2一侧外壁开有第二槽13,第二槽13一侧内壁开有第二螺纹孔14,第二板2立在第一板1上后,第二槽13与第一槽11连接在一起,形成一个长槽这时可将连接板3放入长槽内固定起来,进而将第一板1和第二板2固定连接起来,保持竖直状态;One end of the top outer wall of the first plate 1 is hinged with the second plate 2, the outer wall on one side of the first plate 1 has a first groove 11, the inner wall on one side of the first groove 11 has a first threaded hole 12, and the outer wall on one side of the second plate 2 There is a second groove 13, and the inner wall of the second groove 13 has a second threaded hole 14. After the second plate 2 stands on the first plate 1, the second groove 13 is connected with the first groove 11 to form a At this time, the connecting plate 3 can be put into the long groove and fixed in the long groove, and then the first plate 1 and the second plate 2 are fixedly connected to keep the vertical state;

第一板1底部外壁开有凹槽4,凹槽4顶部内壁中部开有安装槽5,安装槽5内壁固定有安装板6,安装板6顶部外壁通过轴承插接有螺纹杆7,第一板1一侧外壁通过轴承插接有转杆8,转杆8一端固定有第一伞齿轮9,螺纹杆7顶部一端固定有第二伞齿轮10,第一伞齿轮9和第二伞齿轮10相啮合,转杆8转动带动第一伞齿轮9转动,第一伞齿轮9转动带动第二伞齿轮10转动,第二伞齿轮10转动带动螺纹杆7转动;The outer wall of the bottom of the first plate 1 has a groove 4, and the middle part of the inner wall of the top of the groove 4 has a mounting groove 5. The inner wall of the mounting groove 5 is fixed with a mounting plate 6, and the outer wall of the top of the mounting plate 6 is inserted with a threaded rod 7 through a bearing. The outer wall of one side of the plate 1 is inserted with a rotating rod 8 through a bearing, the first bevel gear 9 is fixed on one end of the rotating rod 8, the second bevel gear 10 is fixed on the top end of the threaded rod 7, the first bevel gear 9 and the second bevel gear 10 Mesh with each other, the rotation of the rotating rod 8 drives the first bevel gear 9 to rotate, the rotation of the first bevel gear 9 drives the rotation of the second bevel gear 10, and the rotation of the second bevel gear 10 drives the rotation of the threaded rod 7;

螺纹杆7上螺接有移动机构,移动机构包括滑块15,固定于滑块15底部外壁两端的支撑板16,固定于两个支撑板16底部外壁上的升降板17,固定于升降板17底部外壁四角的移动轮,螺纹杆7转动之后,滑块15受安装槽5限位影响,不与螺纹杆7一起转动,而顺着安装槽5内壁进行上或下移动,可通过调整螺纹杆7转动方向,使得滑块15向下移动,进而带动支撑板16、升降板17和移动轮向下移动,移动轮与地面接触,并将第一板1撑起来,可推动防护栏整体进行移动;Threaded rod 7 is screwed with moving mechanism, and moving mechanism comprises slide block 15, is fixed on the support plate 16 of slide block 15 bottom outer wall two ends, is fixed on the lift plate 17 on the bottom outer wall of two support plates 16, is fixed on lift plate 17 The moving wheels at the four corners of the outer wall of the bottom, after the threaded rod 7 rotates, the slider 15 is affected by the limit of the installation groove 5, and does not rotate together with the threaded rod 7, but moves up or down along the inner wall of the installation groove 5, which can be adjusted by adjusting the threaded rod 7 The direction of rotation makes the slider 15 move downward, and then drives the support plate 16, the lifting plate 17 and the moving wheel to move downward, the moving wheel contacts the ground, and props up the first plate 1, which can push the guardrail to move as a whole ;

通过将防护栏整体分为可折叠的第一板1和第二板2两个部分,在搭建时只需将第二板2立起即可,轻松省力,通过连接板3将第一板1和第二板2固定在一起,完成防护栏的搭建,方便快捷,在需要对立起的防护栏进行移动调整位置时,只需转动转杆8,通过转杆8的转动来带动螺纹杆7转动,让螺接在螺纹杆7上的移动机构向下移动,使得移动机构内的移动轮与地面接触,并将第一板1撑起来,这时就可推动防护栏整体进行移动,方便移动和调整位置与其他防护栏拼接在一起,位置调整好之后,可再将移动机构升起,使得第一板1底部与地面接触,方便固定。By dividing the guardrail as a whole into two parts, the foldable first board 1 and the second board 2, the second board 2 only needs to be erected during construction, which is easy and labor-saving, and the first board 1 is connected through the connecting board 3 It is fixed together with the second plate 2 to complete the construction of the guardrail, which is convenient and quick. When it is necessary to move and adjust the position of the erected guardrail, you only need to turn the rotating rod 8, and the rotation of the rotating rod 8 drives the threaded rod 7 to rotate. , let the moving mechanism screwed on the threaded rod 7 move downward, so that the moving wheels in the moving mechanism contact the ground, and the first plate 1 is propped up, at this time the whole guardrail can be pushed to move, which is convenient for moving and The adjusted position is spliced together with other guardrails. After the position is adjusted, the moving mechanism can be raised again so that the bottom of the first board 1 contacts the ground for easy fixing.

工作原理:通过将防护栏整体分为可折叠的第一板1和第二板2两个部分,在搭建时只需将第二板2立起,第二板2立在第一板1上后,第二槽13与第一槽11连接在一起,形成一个长槽这时可将连接板3放入长槽内,连接板3放入长槽内之后,两个螺纹通孔21分别与第一螺纹孔12和第二螺纹孔14对齐,这时就可往两个螺纹通孔21内螺入螺栓,将连接板3、第一板1和第二板2固定连接起来,保持竖直状态,完成防护栏的搭建;Working principle: By dividing the guardrail into two parts, the foldable first board 1 and the second board 2, only the second board 2 needs to be erected during construction, and the second board 2 stands on the first board 1 Finally, the second groove 13 is connected with the first groove 11 to form a long groove. At this time, the connecting plate 3 can be put into the long groove. After the connecting plate 3 is put into the long groove, the two threaded through holes 21 are respectively connected with The first threaded hole 12 is aligned with the second threaded hole 14, and at this moment, bolts can be screwed into the two threaded through holes 21, and the connecting plate 3, the first plate 1 and the second plate 2 are fixedly connected and kept vertical Status, complete the construction of the fence;

在需要对立起的防护栏进行移动调整位置时,可转动转杆8,转杆8转动带动第一伞齿轮9转动,第一伞齿轮9转动带动第二伞齿轮10转动,第二伞齿轮10转动带动螺纹杆7转动,螺纹杆7转动之后,滑块15受安装槽5限位影响,不与螺纹杆7一起转动,而顺着安装槽5内壁进行上或下移动,可通过调整螺纹杆7转动方向,使得滑块15向下移动,进而带动支撑板16、升降板17和移动轮向下移动,移动轮与地面接触,并将第一板1撑起来,可推动防护栏整体进行移动,位置调整好之后,可再反向转动转杆8,将移动轮升起,使得第一板1底部与地面接触,通过固定孔19将防护栏固定于地面。When it is necessary to move and adjust the position of the erected guardrail, the rotating rod 8 can be rotated, the rotating rod 8 rotates to drive the first bevel gear 9 to rotate, the first bevel gear 9 rotates to drive the second bevel gear 10 to rotate, and the second bevel gear 10 The rotation drives the threaded rod 7 to rotate. After the threaded rod 7 rotates, the slider 15 is affected by the limit of the installation groove 5, and does not rotate together with the threaded rod 7, but moves up or down along the inner wall of the installation groove 5. It can be adjusted by adjusting the threaded rod. 7 The direction of rotation makes the slider 15 move downward, and then drives the support plate 16, the lifting plate 17 and the moving wheel to move downward, the moving wheel contacts the ground, and props up the first plate 1, which can push the guardrail to move as a whole After the position is adjusted, the rotating rod 8 can be rotated in the opposite direction again to raise the moving wheel, so that the bottom of the first plate 1 contacts the ground, and the guardrail is fixed on the ground through the fixing hole 19.

以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above is only a preferred embodiment of the utility model, but the scope of protection of the utility model is not limited thereto. Any equivalent replacement or change of the new technical solution and the concept of the utility model shall be covered by the protection scope of the utility model.

Claims (6)

1. The utility model provides a foldable portable rail guard, includes first board (1) and connecting plate (3), its characterized in that, first board (1) top outer wall one end articulates there is second board (2), first board (1) bottom outer wall is opened flutedly (4), open recess (4) top inner wall middle part has mounting groove (5), mounting groove (5) inner wall is fixed with mounting panel (6), threaded rod (7) are pegged graft through the bearing to mounting panel (6) top outer wall, first board (1) one side outer wall has bull stick (8) through the bearing is pegged graft, bull stick (8) one end is fixed with first bevel gear (9), threaded rod (7) top one end is fixed with second bevel gear (10), the spiro union has moving mechanism on threaded rod (7).
2. A folding movable guard rail according to claim 1, wherein the first plate (1) has a first slot (11) formed in an outer wall thereof on one side thereof, the first slot (11) has a first screw hole (12) formed in an inner wall thereof on one side thereof, the second plate (2) has a second slot (13) formed in an outer wall thereof on one side thereof, and the second slot (13) has a second screw hole (14) formed in an inner wall thereof on one side thereof.
3. A folding type movable guard rail according to claim 1, wherein the moving mechanism comprises a slider (15), support plates (16) fixed to both ends of the outer wall of the bottom of the slider (15), a lifting plate (17) fixed to the outer walls of the bottoms of the two support plates (16), and moving wheels fixed to four corners of the outer wall of the bottom of the lifting plate (17).
4. A folding movable protective fence according to claim 1 characterized in that the bottom of the outer wall at both sides of the first plate (1) is welded with a fixing plate (18), and both ends of the outer wall at the bottom of the two fixing plates (18) are provided with fixing holes (19).
5. A folding movable guard rail according to claim 1, wherein a handle (20) is fixed on the outer wall of one side of the connecting plate (3), and both ends of the outer wall of one side of the connecting plate (3) are provided with threaded through holes (21).
6. A folding mobile protective fence according to claim 1 wherein the first bevel gear (9) and the second bevel gear (10) engage.
CN202222795216.4U 2022-10-24 2022-10-24 Folding type movable protective fence Expired - Fee Related CN218467297U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222795216.4U CN218467297U (en) 2022-10-24 2022-10-24 Folding type movable protective fence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222795216.4U CN218467297U (en) 2022-10-24 2022-10-24 Folding type movable protective fence

Publications (1)

Publication Number Publication Date
CN218467297U true CN218467297U (en) 2023-02-10

Family

ID=85148598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222795216.4U Expired - Fee Related CN218467297U (en) 2022-10-24 2022-10-24 Folding type movable protective fence

Country Status (1)

Country Link
CN (1) CN218467297U (en)

Similar Documents

Publication Publication Date Title
CN215594899U (en) Supporting template for constructional engineering
CN218467297U (en) Folding type movable protective fence
CN113605240A (en) Assembled bridge construction is with scaffold that has protective structure
CN209670301U (en) A kind of scaffold with stress monitoring protection
CN216277092U (en) Building engineering strutting arrangement
CN109024297A (en) A kind of bridge construction workbench of safety and stability
CN216341387U (en) Protection fixing device for construction
CN220504697U (en) A kind of construction engineering construction fence
CN217299741U (en) Civil engineering construction supporting structure
CN217997845U (en) a construction beam
CN210395112U (en) Bridge construction work platform
CN220336395U (en) A kind of road construction frame
CN209539366U (en) A kind of traffic vcehicular tunnel maintenance and reinforcement platform
CN220954512U (en) Construction platform for building construction
CN220705096U (en) A climbing device
CN217734771U (en) Building engineering construction climbing device
CN217924715U (en) Scaffold for building
CN215014640U (en) Route display device for highway design
CN213464207U (en) A workstation for engineering cost
CN223647838U (en) A temporary mining support platform equipped with a fall protection structure
CN219586607U (en) A safety warning mechanism for bridge construction
CN220201368U (en) Auxiliary lifting frame for electromechanical maintenance of expressway
CN221481510U (en) A beam frame for building construction
CN116914612B (en) Auxiliary disassembly and assembly platform for transformer maintenance
CN223281839U (en) A building installation protection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230210

CF01 Termination of patent right due to non-payment of annual fee