CN218467142U - Over-and-under type building concrete placement funnel - Google Patents

Over-and-under type building concrete placement funnel Download PDF

Info

Publication number
CN218467142U
CN218467142U CN202222661349.2U CN202222661349U CN218467142U CN 218467142 U CN218467142 U CN 218467142U CN 202222661349 U CN202222661349 U CN 202222661349U CN 218467142 U CN218467142 U CN 218467142U
Authority
CN
China
Prior art keywords
funnel
roof
gear
round hole
building concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222661349.2U
Other languages
Chinese (zh)
Inventor
魏灵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Yili Concrete Technology Co ltd
Original Assignee
Chengdu Yili Concrete Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Yili Concrete Technology Co ltd filed Critical Chengdu Yili Concrete Technology Co ltd
Priority to CN202222661349.2U priority Critical patent/CN218467142U/en
Application granted granted Critical
Publication of CN218467142U publication Critical patent/CN218467142U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model belongs to the technical field of pour the funnel, in particular to over-and-under type building concrete pours funnel. The improved structure of the lifting mechanism comprises a base plate, the bottom plate top is close to the edge and has been seted up the mounting groove, install hydraulic pressure elevating system in the mounting groove, the hydraulic pressure elevating system top is rotated and is connected with the roof, one side that hydraulic pressure elevating system was kept away from at the roof top has seted up the round hole, be equipped with the funnel in the round hole, one side that the round hole was kept away from at the roof top is installed servo motor, the transmission is connected with the bull stick on servo motor's the output, the other end of bull stick runs through to the below of roof, the bull stick is located and has cup jointed first gear on one section body of rod of roof below, the meshing is connected with the second gear on the output of first gear. The utility model discloses a set up hydraulic pressure elevating system, can adjust the height of funnel for the device adapts to the not mouth of pouring of co-altitude, has improved the adaptability of device.

Description

Over-and-under type building concrete placement funnel
Technical Field
The utility model belongs to the technical field of pour the funnel, in particular to over-and-under type building concrete pours funnel.
Background
Pouring is a common process in building construction, namely pouring concrete into a building from a pouring opening at the top of the building.
In the prior art, publication no: CN 216811001U's chinese utility model discloses a bolt-pipe concrete antidetonation wall is with pouring funnel for realize avoiding the concrete to spill to pour mouthful outside, include: funnel body 1, the bottom of funnel body 1 is provided with mounting bracket 4, be equipped with the guider that can accurate installation location on mounting bracket 4, funnel body 1 is connected with the adjusting device of adjustment mounted position, funnel body 1 is connected with locking device.
Although the technical scheme solves the problem that concrete is thrown to the outside of the pouring opening, the whole height of the device cannot be adjusted, and when a building with a high pouring opening such as a wall body is required to be poured, the pouring funnel needs to be transferred to the top of the wall body by some hoisting devices such as cranes and the like for fixing. Therefore, the lifting building concrete pouring funnel is provided.
SUMMERY OF THE UTILITY MODEL
To the above problem, the utility model provides an over-and-under type building concrete placement funnel, comprising a base plate, the bottom plate top is close to the edge and has seted up the mounting groove, install hydraulic pressure elevating system in the mounting groove, hydraulic pressure elevating system top is rotated and is connected with the roof, one side that hydraulic pressure elevating system was kept away from at the roof top has seted up the round hole, be equipped with the funnel in the round hole, one side that the round hole was kept away from at the roof top is installed servo motor, the transmission is connected with the bull stick on servo motor's the output, the other end of bull stick runs through to the below of roof, and has cup jointed the spacing ring, the bull stick has cup jointed first gear on one section body of rod of roof below, the meshing is connected with the second gear on the output of first gear, the second gear cup joints on hydraulic pressure elevating system.
Furthermore, a first spring is sleeved on a section of the rod body of the hydraulic lifting mechanism, which is positioned outside the mounting groove.
Furthermore, the top and the bottom of the funnel are both positioned outside the round hole, and the top of the funnel is communicated with a concrete pump pipe.
Furthermore, a plurality of groups of clamping blocks are symmetrically arranged on the side wall, close to the top, of the funnel, a plurality of groups of clamping grooves with the same number as the clamping blocks are formed in the top of the top plate, and each group of clamping blocks are movably clamped in a group of clamping grooves corresponding to the clamping blocks.
Furthermore, a first elastic plate is arranged at the bottom of the clamping block, a plurality of groups of elastic columns are evenly distributed at the bottom of the first elastic plate, and a group of second springs are sleeved on each group of elastic columns.
Furthermore, a second elastic plate is arranged below the first elastic plate, and two ends of each group of elastic columns are fixedly connected to the first elastic plate and the second elastic plate respectively.
The utility model has the advantages that:
1. through setting up hydraulic pressure elevating system, can adjust the height of funnel for the device adapts to the not mouth of pouring of co-altitude, has improved the adaptability of device, and uses through the cooperation of servo motor, bull stick, first gear and second gear, makes the roof can rotate, is convenient for adjust the position of funnel, and then conveniently adjusts the height of funnel, has further improved the adaptability of device.
2. Can fix the funnel in the round hole through fixture block and draw-in groove, guaranteed the stability of device, set up first elastic plate, elastic column, second spring and second elastic plate between fixture block and draw-in groove, can absorb the power of pouring the in-process and producing because of vibrations, avoided this kind of power to cause the destruction to the device, prolonged the whole life of device.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention. The objectives and other advantages of the invention will be realized and attained by the structure particularly pointed out in the written description and claims hereof as well as the appended drawings.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly described below, and it is obvious that the drawings in the following description are some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 shows a schematic structural view of a pouring funnel according to an embodiment of the invention;
fig. 2 shows a schematic cross-sectional view of a pouring funnel according to an embodiment of the invention;
figure 3 shows an enlarged view at figure 2A of a pouring funnel according to an embodiment of the invention;
fig. 4 shows a schematic top view of a pouring funnel according to an embodiment of the invention.
In the figure: 1. a base plate; 2. mounting grooves; 3. a hydraulic lifting mechanism; 4. a first spring; 5. a top plate; 6. a circular hole; 7. a funnel; 8. a concrete pump pipe; 9. a servo motor; 10. a rotating rod; 11. a limiting ring; 12. a first gear; 13. a second gear; 14. a clamping block; 15. a card slot; 16. a first elastic plate; 17. an elastic column; 18. a second spring; 19. a second elastic plate.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the embodiments of the present invention are clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides an over-and-under type building concrete pouring funnel, including bottom plate 1, it is exemplary, as described in figure 1, figure 2, figure 3 and figure 4. The top of the bottom plate 1 is close to the edge and is provided with a mounting groove 2, a hydraulic lifting mechanism 3 is installed in the mounting groove 2, the top of the hydraulic lifting mechanism 3 is rotatably connected with a top plate 5, and a first spring 4 is sleeved on a section of rod body of the hydraulic lifting mechanism 3, which is positioned outside the mounting groove 2. One side, away from hydraulic lifting mechanism 3, of the top of top plate 5 has been seted up round hole 6, be equipped with funnel 7 in the round hole 6, the top and the bottom of funnel 7 all are located the outside of round hole 6, the top of funnel 7 intercommunication has concrete pump pipe 8. One side of round hole 6 is kept away from at 5 tops of roof installs servo motor 9, the transmission is connected with bull stick 10 on servo motor 9's the output, the other end of bull stick 10 runs through to the below of roof 5, and has cup jointed spacing ring 11, bull stick 10 has cup jointed first gear 12 on being located the one section body of rod of roof 5 below, the meshing is connected with second gear 13 on the output of first gear 12, second gear 13 cup joints on hydraulic lifting mechanism 3.
A plurality of groups of clamping blocks 14 are symmetrically arranged on the side wall, close to the top, of the funnel 7, a plurality of groups of clamping grooves 15 with the same number of clamping blocks 14 are formed in the top of the top plate 5, and each group of clamping blocks 14 are movably clamped in a group of corresponding clamping grooves 15. The bottom of the clamping block 14 is provided with a first elastic plate 16, a plurality of groups of elastic columns 17 are evenly distributed at the bottom of the first elastic plate 16, each group of elastic columns 17 is sleeved with a group of second springs 18, a second elastic plate 19 is arranged below the first elastic plate 16, and two ends of each group of elastic columns 17 are fixedly connected to the first elastic plate 16 and the second elastic plate 19 respectively.
Utilize the utility model provides an over-and-under type building concrete pouring funnel, its theory of operation as follows:
during the use, accessible hydraulic lifting mechanism 3 is with the high reduction of roof 5, place funnel 7 in round hole 6, and it is fixed through fixture block 14 and draw-in groove 15, roof 5 rotates, make funnel 7 be located bottom plate 1 directly over, remove the device to the next door of concreting thing, communicate concrete pump pipe 8 and funnel 7, raise funnel 7 through hydraulic lifting mechanism 3, make the height that highly is higher than the mouth of pouring of funnel 7 bottom, rotate roof 5, make the bottom of funnel 7 be located directly over the mouth of pouring, adjust the height of funnel 7 once more, make the bottom of funnel 7 be located the mouth of pouring, and begin to pour work. The servo motor 9 and the hydraulic lifting mechanism 3 are both electrically connected with the control mechanism.
Through setting up hydraulic pressure elevating system 3, can adjust the height of funnel 7 for the device adapts to the not mouth of pouring of co-altitude, has improved the adaptability of device, and uses through servo motor 9, bull stick 10, first gear 12 and second gear 13's cooperation, is convenient for adjust the position of funnel 7, and then conveniently adjusts the height of funnel 7, has further improved the adaptability of device.
Can fix funnel 7 in round hole 6 through fixture block 14 and draw-in groove 15, improve the stability of device, set up first elastic plate 16, elastic column 17, second spring 18 and second elastic plate 19 between fixture block 14 and draw-in groove 15, can absorb the power of pouring the in-process because of vibrations produce, avoided this kind of power to cause the destruction to the device, prolonged the whole life of device.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a over-and-under type building concrete placement funnel which characterized in that: including bottom plate (1), bottom plate (1) top is close to the edge and has seted up mounting groove (2), install hydraulic lifting mechanism (3) in mounting groove (2), hydraulic lifting mechanism (3) top is rotated and is connected with roof (5), one side that hydraulic lifting mechanism (3) were kept away from at roof (5) top has seted up round hole (6), be equipped with funnel (7) in round hole (6), servo motor (9) are installed to one side that round hole (6) were kept away from at roof (5) top, the transmission is connected with bull stick (10) on the output of servo motor (9), the other end of bull stick (10) runs through to the below of roof (5), and has cup jointed spacing ring (11), first gear (12) have been cup jointed on one section body of rod that bull stick (10) are located roof (5) below, the meshing is connected with second gear (13) on the output of first gear (12), second gear (13) cup joint on hydraulic lifting mechanism (3).
2. The elevating building concrete pouring funnel according to claim 1, wherein: the hydraulic lifting mechanism (3) is sleeved with a first spring (4) on a section of rod body positioned outside the mounting groove (2).
3. The elevating building concrete pouring funnel according to claim 1, wherein: the top and the bottom of funnel (7) all are located the outside of round hole (6), the top intercommunication of funnel (7) has concrete pump pipe (8).
4. The elevating building concrete pouring funnel according to claim 1, wherein: a plurality of groups of clamping blocks (14) are symmetrically installed on the side wall, close to the top, of the funnel (7), a plurality of groups of clamping grooves (15) with the same number of the clamping blocks (14) are formed in the top of the top plate (5), and each group of clamping blocks (14) are movably clamped in a group of clamping grooves (15) corresponding to the clamping blocks.
5. The elevating building concrete pouring funnel according to claim 4, wherein: the bottom of the clamping block (14) is provided with a first elastic plate (16), a plurality of groups of elastic columns (17) are evenly distributed at the bottom of the first elastic plate (16), and each group of elastic columns (17) is sleeved with a group of second springs (18).
6. The elevating building concrete pouring funnel according to claim 5, wherein: and a second elastic plate (19) is arranged below the first elastic plate (16), and two ends of each group of elastic columns (17) are respectively and fixedly connected to the first elastic plate (16) and the second elastic plate (19).
CN202222661349.2U 2022-10-10 2022-10-10 Over-and-under type building concrete placement funnel Active CN218467142U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222661349.2U CN218467142U (en) 2022-10-10 2022-10-10 Over-and-under type building concrete placement funnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222661349.2U CN218467142U (en) 2022-10-10 2022-10-10 Over-and-under type building concrete placement funnel

Publications (1)

Publication Number Publication Date
CN218467142U true CN218467142U (en) 2023-02-10

Family

ID=85146739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222661349.2U Active CN218467142U (en) 2022-10-10 2022-10-10 Over-and-under type building concrete placement funnel

Country Status (1)

Country Link
CN (1) CN218467142U (en)

Similar Documents

Publication Publication Date Title
CN218467142U (en) Over-and-under type building concrete placement funnel
CN210477346U (en) Slurry blocking clamp
CN212897043U (en) Three-dimensional adjustable pottery board curtain of dismantling
CN208652035U (en) A kind of lifting steelframe for remotely intelligently monitoring
CN113308967B (en) Hydraulic vibration rammer compactor is used in building engineering construction
CN108798208A (en) A kind of combined type lifting railing
CN210885129U (en) Multi-station synchronous lifting device convenient to adjust
CN209760811U (en) Building templates link for civil engineering
CN214314281U (en) A circuit supporting structure for municipal works
CN211850802U (en) Aluminum alloy template wallboard bottom regulator
CN214298999U (en) Connecting assembly of tower crane and steel structure
CN220710841U (en) Lightning protection engineering construction location auxiliary device
CN217106182U (en) Basement outer wall body formwork support
CN210483976U (en) Water lifting device for water conservancy and hydropower
CN213805783U (en) Fast assembly formula integration promotes pump station
CN218912314U (en) Positioning structure for stiff steel column
CN211389302U (en) Plasterboard production line leveling plate driving device
CN212375893U (en) Hydraulic building suspension type cut-off wall foundation pit precipitation control device
CN209794046U (en) Grouting device for building prefabricated member
CN218342449U (en) Square pile forming equipment convenient to drawing of patterns that civil engineering used
CN213081196U (en) Locking clamp for machining cam shaft
CN219653661U (en) Slotting equipment for water conservancy
CN219887538U (en) Supporting and fixing device
CN218541202U (en) Single-hole anchor backing plate
CN220082650U (en) Mounting bracket of communication equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant