CN218466532U - Pile foundation construction positioning tool - Google Patents

Pile foundation construction positioning tool Download PDF

Info

Publication number
CN218466532U
CN218466532U CN202222836204.1U CN202222836204U CN218466532U CN 218466532 U CN218466532 U CN 218466532U CN 202222836204 U CN202222836204 U CN 202222836204U CN 218466532 U CN218466532 U CN 218466532U
Authority
CN
China
Prior art keywords
fixation clamp
clamp
pile
fixation
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222836204.1U
Other languages
Chinese (zh)
Inventor
刘永超
李刚
刘洁
陆鸿宇
张阳
杜治达
王玉琢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Original Assignee
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIANCHENG JIYE GROUP CO Ltd filed Critical TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority to CN202222836204.1U priority Critical patent/CN218466532U/en
Application granted granted Critical
Publication of CN218466532U publication Critical patent/CN218466532U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a pile foundation construction positioning tool, including the fixation clamp, fixing bolt, fixation nut, two locating levers and a connecting rod, the fixation clamp, connect the hinge, positioning nut, and fixed stabilizer blade, through the outside with the fixation clamp nested cover at the foundation pile during use, put into the fixation clamp inboard and dock with the foundation pile through the bottom of lifting machine with the precast pile, be connected with fixation nut through fixing bolt and fix the fixation clamp with the foundation pile fixed and with the fixation clamp fixed bottom the precast pile, support the fixation clamp through the locating lever, and be connected the location with the fixation clamp, make the fixation clamp keep vertical with the fixation clamp, thereby in-process of being connected the fixation with the foundation pile and precast pile when pile foundation construction, need not keep the rigidity of foundation pile and precast pile through workman's manual operation, reach the technological effect of using manpower sparingly and improving the efficiency of construction.

Description

Pile foundation construction positioning tool
Technical Field
The utility model relates to a pile foundation construction field especially relates to a pile foundation construction positioning tool.
Background
Pile foundation construction, which refers to the construction process of a building foundation; the pile foundation is composed of pile and pile cap, and is made up by using reinforced concrete, steel and wood as column pile body, then using pile-sinking machine to drive or press it into the ground layer until it is firm, or making hole first and then pouring concrete column pile body so as to raise bearing capacity of pile cap.
The pile foundation construction process usually includes the process flows such as measurement unwrapping wire, lift by crane precast pile, pile extension, and at traditional work progress, the pile extension adopts electric welding or flange joint usually, adopts the manual precast pile who is hoisted by the loop wheel machine of workman's hand-held usually in the connection process, makes the bottom and the foundation pile butt joint location of precast pile, need consume the manpower in actual operation, for improving this problem, saves required manual operation, consequently provides a pile foundation construction positioning tool.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model provides a pile foundation construction positioning tool has produced the technological effect of using manpower sparingly and improving the efficiency of construction.
In order to solve the technical problem, the utility model provides a following technical scheme: the utility model provides a pile foundation construction positioning tool, includes the fixation clamp, fixation clamp side-mounting has fixing bolt, fixing bolt side nestification has fixation nut, two locating levers and a connecting rod are installed at the top of fixation clamp, the fixation clamp is installed at the connecting rod top, the locating clamp is provided with the connection hinge with the junction of connecting rod, set nut is installed respectively to the top and the bottom of fixation clamp, and the outside of fixation clamp is provided with fixed stabilizer blade.
As a preferred technical scheme of the utility model, fixation clamp and fixation clamp all set up to the structure of opening and shutting of two halves, the bottom swing joint of fixation clamp and connecting rod, and fixing bolt passes the opening part of fixation clamp and fixation clamp to with fixation nut threaded connection.
As a preferred technical scheme of the utility model, the locating lever is provided with two to the symmetry sets up the both sides at the opening part of fixation clamp, and the top of locating lever is provided with helicitic texture.
As a preferred technical scheme of the utility model, the top of connecting rod is provided with helicitic texture to the connecting rod passes the connection hinge.
As a preferred technical scheme of the utility model, set nut is provided with the multiunit, nestification is in the screw thread department at locating lever top respectively to and the helicitic texture department at the connecting rod top of nestification.
As a preferred technical scheme of the utility model, fixed stabilizer blade encircles and distributes in the outside of fixation clamp, and the end of fixed stabilizer blade sets up to closed angle shape structure.
Compared with the prior art, the utility model discloses the beneficial effect that can reach is:
1. the utility model discloses a with the fixation clamp nested outside the foundation pile, put into the locating clip inboard and with the butt joint of foundation pile with the bottom of precast pile through the lifting machine, be connected through fixing bolt and fixation nut with fixation clamp and with the fixation clamp with the precast pile bottom fixed, support the locating clip through the locating lever, and be connected the location with the fixation clamp and fix a position, make locating clip and fixation clamp keep vertical, thereby in the course of being connected the foundation pile with the precast pile and fixing when pile foundation construction, need not keep the position of foundation pile and precast pile fixed through workman's manual operation, reach the technological effect that uses manpower sparingly and improve the efficiency of construction;
2. the utility model discloses a connect hinge and connecting rod swing joint, the connecting rod can remove in connecting the hinge, makes the height-adjustable of fixation clamp on the connecting rod, through the set nut of the fixation clamp bottom of screwing and the set nut at fixation clamp top, makes the fixation clamp highly fixed at the locating lever top, through supporting the bottom surface with fixed stabilizer blade, supports the fixation clamp, makes the fixation clamp more stable with the fixed of foundation pile, prevents the fixation clamp landing to reach the technological effect that conveniently adjusts the fixed height and improve the stationary stability.
Drawings
Fig. 1 is a complete structural schematic diagram of the present invention;
fig. 2 is a top view structural diagram of the present invention;
fig. 3 is a front view structural diagram of the present invention.
Wherein: 1. a fixing clip; 2. fixing the bolt; 3. fixing a nut; 4. positioning a rod; 5. a connecting rod; 6. positioning clips; 7. a connecting hinge; 8. positioning a nut; 9. and fixing the support legs.
Detailed Description
In order to make the technical means, the creation features, the achievement purposes and the functions of the invention easy to understand, the invention is further explained below with reference to the specific embodiments, but the following embodiments are only the preferred embodiments of the invention, not all. Based on the embodiments in the implementation, other embodiments obtained by those skilled in the art without any creative work belong to the protection scope of the present invention. The experimental methods in the following examples are conventional methods unless otherwise specified, and materials, reagents and the like used in the following examples are commercially available unless otherwise specified.
Example (b):
as shown in fig. 1-3, a pile foundation construction positioning tool, including fixation clamp 1, fixation clamp 1 side-mounting has fixing bolt 2, fixation bolt 2 side nestification has fixation nut 3, two locating levers 4 and a connecting rod 5 are installed to the top of fixation clamp 1, locating clamp 6 is installed at connecting rod 5 top, locating clamp 6 is provided with connection hinge 7 with the junction of connecting rod 5, locating nut 8 is installed respectively to the top and the bottom of locating clamp 6, and the outside of fixation clamp 1 is provided with fixed stabilizer blade 9, through the outside of nesting fixation clamp 1 in the foundation pile during the use, put into locating clamp 6 inboard and with the foundation pile butt joint with the bottom of precast pile through the lifting machine, be connected with fixation nut 3 through fixing bolt 2 and with fixation clamp 1 and the foundation pile is fixed and fix locating clamp 6 with the precast pile bottom.
In other embodiments, the fixing clamp 1 and the positioning clamp 6 are both provided as two halves of an opening and closing structure, the fixing clamp 1 is movably connected with the bottom of the connecting rod 5, the fixing bolt 2 penetrates through the openings of the fixing clamp 1 and the positioning clamp 6 and is in threaded connection with the fixing nut 3, and the fixing clamp 1 is fixedly connected with the foundation pile by screwing the fixing nut 3 and the fixing bolt 2.
In other embodiments, the positioning rod 4 is provided with two positions, symmetrically arranged at two sides of the opening of the fixing clip 1, and the top of the positioning rod 4 is provided with a thread structure, so that the positioning clip 6 is supported by the positioning rod 4, and the positioning clip 6 is connected and positioned with the fixing clip 1, so that the positioning clip 6 and the fixing clip 1 are kept vertical.
In other embodiments, the top of the connecting rod 5 is provided with a thread structure, the connecting rod 5 passes through the connecting hinge 7, the positioning clamp 6 is movably connected with the connecting rod 5 through the connecting hinge 7, the connecting rod 5 can move in the connecting hinge 7, and the height of the positioning clamp 6 on the connecting rod 5 can be adjusted.
In other embodiments, the positioning nuts 8 are provided with a plurality of sets, which are respectively nested at the thread positions at the top of the positioning rod 4 and at the thread structure positions at the top of the connecting rod 5, and the positioning clamp 6 is fixed at the top of the positioning rod 4 by screwing the positioning nuts 8 at the bottom of the positioning clamp 6 and the positioning nuts 8 at the top of the positioning clamp 6.
In other embodiments, the fixing legs 9 are distributed around the outer side of the fixing clip 1, and the ends of the fixing legs 9 are arranged in a pointed structure, so that the fixing clip 1 is supported by supporting the fixing legs 9 to the bottom surface, the fixing clip 1 is more stably fixed with the foundation pile, and the fixing clip 1 is prevented from sliding off.
The utility model discloses a theory of operation: during the use, put into 6 inboards of fixation clamp and dock with the foundation pile through the bottom of lifting machine precast pile, be connected with fixation nut 3 through fixing bolt 2 and be fixed fixation clamp 1 with the foundation pile and fix fixation clamp 6 with the precast pile bottom, through screwing fixation nut 3 and fixing bolt 2 with fixation clamp 1 and foundation pile fixed connection, support fixation clamp 6 through locating lever 4, and fix a position fixation clamp 6 with fixation clamp 1, make fixation clamp 6 and fixation clamp 1 keep vertical, fixation clamp 6 is through connecting hinge 7 and connecting rod 5 swing joint, connecting rod 5 can remove in connecting hinge 7, make the height-adjustable of fixation clamp 6 on connecting rod 5, through the set nut 8 of screwing fixation clamp 6 bottom and the set nut 8 at the set nut 6 top, make the height-fixed of fixation clamp 6 at the top of locating lever 4, through supporting fixed stabilizer blade 9 to the bottom surface, support fixation clamp 1, make fixation clamp 1 more stable with the fixation of foundation pile, prevent fixation clamp 1 from landing.
In the present application, unless expressly stated or limited otherwise, the recitation of a first feature "on" or "under" a second feature may include the recitation of the first and second features being in direct contact, and may also include the recitation of the first and second features not being in direct contact, but being in contact with another feature between them. Also, the first feature "on," "above" and "over" the second feature may include the first feature being directly above and obliquely above the second feature, or simply indicating that the first feature is at a higher level than the second feature. A first feature being "under," "below," and "beneath" a second feature includes the first feature being directly under and obliquely below the second feature, or simply meaning that the first feature is at a lesser elevation than the second feature.
The foregoing shows and describes the basic principles, essential features, and advantages of the invention. It should be understood by those skilled in the art that the present invention is not limited by the above embodiments, and the description in the above embodiments and the description is only preferred examples of the present invention, and is not intended to limit the present invention, and that the present invention can have various changes and modifications without departing from the spirit and scope of the present invention, and these changes and modifications all fall into the scope of the claimed invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a pile foundation construction positioning tool, includes fixation clamp (1), its characterized in that: fixing bolt (2) are installed to fixation clamp (1) side, fixing bolt (2) side nestification has fixation nut (3), two locating levers (4) and a connecting rod (5) are installed at the top of fixation clamp (1), locating clamp (6) is installed at connecting rod (5) top, locating clamp (6) is provided with connection hinge (7) with the junction of connecting rod (5), set nut (8) are installed respectively to the top and the bottom of locating clamp (6), and the outside of fixation clamp (1) is provided with fixed stabilizer blade (9).
2. The pile foundation construction positioning tool of claim 1, characterized in that: fixation clamp (1) and locating clip (6) all set up to the open and shut structure of two halves, the bottom swing joint of fixation clamp (1) and connecting rod (5), and fixing bolt (2) pass the opening part of fixation clamp (1) and locating clip (6) to with fixation nut (3) threaded connection.
3. The pile foundation construction positioning tool of claim 1, characterized in that: the positioning rod (4) is provided with two positions which are symmetrically arranged on two sides of the opening of the fixing clamp (1), and the top of the positioning rod (4) is provided with a thread structure.
4. The pile foundation construction positioning tool of claim 1, wherein: the top of the connecting rod (5) is provided with a thread structure, and the connecting rod (5) penetrates through the connecting hinge (7).
5. The pile foundation construction positioning tool of claim 1, wherein: the positioning nuts (8) are provided with a plurality of groups and are respectively nested at the thread positions at the tops of the positioning rods (4) and the thread structures at the tops of the connecting rods (5).
6. The pile foundation construction positioning tool of claim 1, characterized in that: the fixing support legs (9) are distributed on the outer side of the fixing clamp (1) in a surrounding mode, and the tail ends of the fixing support legs (9) are arranged to be in a pointed structure.
CN202222836204.1U 2022-10-27 2022-10-27 Pile foundation construction positioning tool Active CN218466532U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222836204.1U CN218466532U (en) 2022-10-27 2022-10-27 Pile foundation construction positioning tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222836204.1U CN218466532U (en) 2022-10-27 2022-10-27 Pile foundation construction positioning tool

Publications (1)

Publication Number Publication Date
CN218466532U true CN218466532U (en) 2023-02-10

Family

ID=85148642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222836204.1U Active CN218466532U (en) 2022-10-27 2022-10-27 Pile foundation construction positioning tool

Country Status (1)

Country Link
CN (1) CN218466532U (en)

Similar Documents

Publication Publication Date Title
CN105088970B (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN218466532U (en) Pile foundation construction positioning tool
CN205421023U (en) Public road bridge roof beam strutting arrangement
CN105951683A (en) Construction method for corbel steel reinforcements of gate pier
CN206607895U (en) A kind of construction platform
CN211775861U (en) Supporting device capable of being directionally and accurately converted for building floor slab pouring
CN205772979U (en) Frock for the lifting of piping lane steel structure frame secondary beam
CN204112752U (en) A kind of deviation correcting device of steel structure girder lifting docking
CN114717956A (en) Bridge pier column diaphragm construction umbrella-type support system
CN210127053U (en) Concrete lifting device for building construction
CN208266906U (en) A kind of spliced tower crane fixed supporting leg frame
CN209583386U (en) Prefabricated part hanging tool and Lift-on/Lift-off System
CN202073877U (en) Cable-rope-free clamp with independent masts special for hoisting rigid steel column
CN216739291U (en) Pier body adjusting device
CN201649748U (en) Storage tank and container bottom ring wallboard verticality adjusting supporting device
CN218145384U (en) Lifting station position correcting device in lifting appliance for sleeper mould
CN206784593U (en) A kind of steel construction coupled column
CN111774803A (en) Mail steamer sheet metal upset frock
CN214089866U (en) Adjustable steel reinforcement cage transfers supplementary fixed stay construction platform device
CN219771610U (en) Base structure of winch rotary crane
CN212176557U (en) Caisson reinforcing apparatus
CN219823433U (en) Large-sized gantry crane for lifting container
CN209508789U (en) Adjusting supporting device and box beam adjusting supporting device
CN218776007U (en) Steel structure welding device
CN108411847A (en) A kind of pile cover integral inverted hangs bottom system and its application method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant