CN218466226U - Device for controlling uneven settlement of connection part of old and new roadbed - Google Patents
Device for controlling uneven settlement of connection part of old and new roadbed Download PDFInfo
- Publication number
- CN218466226U CN218466226U CN202221780805.9U CN202221780805U CN218466226U CN 218466226 U CN218466226 U CN 218466226U CN 202221780805 U CN202221780805 U CN 202221780805U CN 218466226 U CN218466226 U CN 218466226U
- Authority
- CN
- China
- Prior art keywords
- roadbed
- supporting plate
- backup pad
- old
- new
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model provides a control new and old road bed links up inhomogeneous settlement's of department device, include: the first support plate, the second support plate and the third support plate are in a stair shape, and are sequentially and gradually arranged in a descending manner; dull and stereotyped former roadbed mechanism of laminating for make first backup pad, second backup pad, the former roadbed of third backup pad laminating completely, be provided with the former roadbed mechanism of a dull and stereotyped laminating between first backup pad and the second backup pad, also be provided with the former roadbed mechanism of a dull and stereotyped laminating between second backup pad and the third backup pad. The utility model provides a platform that former road bed mechanism of the former road bed of the dull and stereotyped laminating of device setting of new and old road bed linking department of control makes the former road bed excavation of each backup pad laminating, the intact laminating of former road bed of being convenient for and new road bed, reduces the uneven settlement of new and old road bed.
Description
Technical Field
The utility model relates to a road bed auxiliary device field especially relates to a device of uneven settlement of new and old road bed linking department of control.
Background
With the rapid development of socioeconomic in China, most of the functions of the existing roads can not meet the increasing traffic demand of the society, so that the original roads are imperatively upgraded and modified. The key of the engineering reconstruction is the widening of the highway subgrade, namely the design and the construction. After many years of traffic, the subgrade settlement is basically completed, and the widening section of the subgrade inevitably generates cracks represented by longitudinal cracks due to the uneven settlement of a new subgrade and an old subgrade, so that the highway is damaged. Therefore, design optimization and construction quality must be enhanced when the highway subgrade is widened, and settlement is minimized to ensure the quality of the highway. General personnel can measure and loft the position that needs to widen to the original roadbed, mark out the position that needs to widen, dig the domatic along the original roadbed side slope angle step by step, and the platform between the domatic at different levels descends from the road surface to lower width step by step. A flat plate is generally adopted for fixing the slope surfaces, so that the uneven settlement can be greatly reduced when sand is paved. However, since the slope is excavated by the personnel on the original roadbed, the states of the platforms excavated on the original roadbed are not necessarily as expected, and a mechanism capable of adjusting the states of the platforms is required to improve the uneven settlement prevention device for the old roadbed and the new roadbed.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome the defect that prior art exists, the utility model provides a device that new and old road bed linking department of control is inhomogeneous to subside.
In order to solve the technical problem, the utility model adopts the technical scheme that: an apparatus for controlling differential settlement at the junction of old and new roadbeds, comprising:
the first support plate, the second support plate and the third support plate are in a stair shape, and are sequentially and gradually arranged in a descending manner;
the flat plate attaching original roadbed mechanism is used for enabling a first supporting plate, a second supporting plate and a third supporting plate to be completely attached to an original roadbed, a flat plate attaching original roadbed mechanism is arranged between the first supporting plate and the second supporting plate, and a flat plate attaching original roadbed mechanism is also arranged between the second supporting plate and the third supporting plate;
dull and stereotyped former way basic mechanism of laminating is including fixing first extension board on the first backup pad, it is connected with the second threaded rod to rotate on the first extension board, threaded connection has two latch segments on the second threaded rod, the notch has been seted up at first backup pad top, the spacing sliding connection of spacing spout has a sliding block in the top of first backup pad, the sliding block is connected with the second backup pad, two the latch segment can with the sliding block is fixed to it is fixed after the horizontal offset position of adjustment second backup pad and first backup pad.
Further, former road bed mechanism of dull and stereotyped laminating still includes first threaded rod, the sliding block top seted up with the screw hole that the notch is linked together, screw hole female connection has first threaded rod, the bottom fixedly connected with cylinder of first threaded rod, cylindrical outer wall sliding connection has the round cover, the round cover passes through the bearing and rotates the connection and be in on the second backup pad.
Furthermore, the outer wall of the cylinder is fixedly connected with a second extension plate, the inner wall of the round sleeve is provided with a groove, and the second extension plate is connected in the groove in a limiting and sliding manner.
Furthermore, fixing holes are formed in the first supporting plate, the second supporting plate and the third supporting plate and are matched with the wooden piles to fix the first supporting plate, the second supporting plate and the third supporting plate on the original roadbed.
Furthermore, the top of the first threaded rod is fixedly connected with a rotating wheel.
Further, the second threaded rod is provided with two, and the cooperation the latch segment is fixed the both sides of sliding block.
Furthermore, the outer wall of the locking block is engraved with printing lines, so that the locking block can be rotated by a person conveniently.
Compared with the prior art, the beneficial effects of the utility model include: the arranged first supporting plate, the second supporting plate and the third supporting plate are matched with a flat plate to be attached to an original roadbed mechanism, so that each supporting plate is attached to a platform excavated by an original roadbed, the original roadbed and a new roadbed can be conveniently and completely attached, and the uneven settlement of the new roadbed and the old roadbed is reduced;
the first supporting plate, the second supporting plate and the third supporting plate which are arranged can be adjusted in a left-right displacement mode and in an up-down displacement mode, and therefore the laminating with an original roadbed is facilitated.
Drawings
The disclosure of the present invention is explained with reference to the drawings. It is to be understood that the drawings are designed solely for the purposes of illustration and not as a definition of the limits of the invention. In the drawings, like reference numerals are used to refer to like parts. Wherein:
fig. 1 schematically shows a first overall structural diagram according to an embodiment of the present invention;
fig. 2 schematically shows a second overall structural diagram according to an embodiment of the present invention;
fig. 3 schematically shows a third overall structural diagram according to an embodiment of the present invention;
fig. 4 schematically shows an enlarged structural diagram of a place a according to an embodiment of the present invention;
fig. 5 schematically shows a schematic top view of a first support plate according to an embodiment of the present invention;
fig. 6 schematically shows a matching structure diagram of a cylinder and a round sleeve according to an embodiment of the present invention.
The reference numbers in the figures: 1. a second support plate; 2. a first support plate; 3. a third support plate; 4. a rotating wheel; 5. a first threaded rod; 6. A cylinder; 7. a round sleeve; 8. a slider; 9. a threaded hole; 10. a first extension plate; 11. a second threaded rod; 12. a locking block; 13. a limiting chute; 14. a fixing hole; 15. a second extension plate; 16. a groove; 17. a notch.
Detailed Description
It is easily understood that, according to the technical solution of the present invention, a plurality of alternative structural modes and implementation modes can be proposed by those skilled in the art without changing the spirit of the present invention. Therefore, the following detailed description and the accompanying drawings are merely illustrative of the technical solutions of the present invention, and should not be considered as limiting or restricting the technical solutions of the present invention in their entirety or in any other way.
An embodiment according to the present invention is shown in conjunction with fig. 1 to 6. An apparatus for controlling differential settlement at the junction of old and new roadbeds, comprising:
the first supporting plate 2, the second supporting plate 1 and the third supporting plate 3 are in a stair shape, and the first supporting plate 2, the second supporting plate 1 and the third supporting plate 3 are sequentially and gradually arranged in a descending manner;
the flat plate attaching original roadbed mechanism is used for enabling a first supporting plate 2, a second supporting plate 1 and a third supporting plate 3 to be completely attached to an original roadbed, a flat plate attaching original roadbed mechanism is arranged between the first supporting plate 2 and the second supporting plate 1, and a flat plate attaching original roadbed mechanism is also arranged between the second supporting plate 1 and the third supporting plate 3;
former road base mechanism of dull and stereotyped laminating is including fixing the first extension board 10 on first backup pad 2, it is connected with second threaded rod 11 to rotate on the first extension board 10, threaded connection has two latch segments 12 on the second threaded rod 11, notch 17 has been seted up at 2 tops of first backup pad, there is sliding block 8 at the top of first backup pad 2 through 13 spacing sliding connection of spacing spout, sliding block 8 is connected with second backup pad 1, two latch segments 12 can be fixed with sliding block 8, thereby it is fixed after the horizontal offset position of adjustment second backup pad 1 and first backup pad 2. With the rapid development of socioeconomic in China, most of the functions of the existing roads can not meet the increasing traffic demand of the society, so that the original roads are imperatively upgraded and modified. The key of the engineering reconstruction is the widening of the highway subgrade, namely the design and the construction. After many years of traffic, the subgrade settlement is basically completed, and the widening section of the subgrade inevitably generates cracks represented by longitudinal cracks due to the uneven settlement of a new subgrade and an old subgrade, so that the highway is damaged. Therefore, design optimization and construction quality during highway subgrade widening must be enhanced, and settlement is reduced to the minimum so as to ensure the quality of the highway. General personnel can be to the original roadbed need widen the position and measure the lofting, mark out and need widen the position, dig the domatic along original roadbed side slope angle step by step, and the platform between the domatic at different levels descends by step from the road surface to lower width. The surface of different slopes is generally fixed by a flat plate, so that the uneven settlement can be greatly reduced by paving sand and stones. However, since the slope is excavated by the personnel on the original roadbed, the states of the platforms excavated on the original roadbed are not necessarily as expected, and a mechanism capable of adjusting the states of the platforms is required to improve the uneven settlement prevention device for the old roadbed and the new roadbed. First with first backup pad 2, second backup pad 1, each platform that former road bed excavated is put to third backup pad 3, then for making first backup pad 2, second backup pad 1, the better laminating of third backup pad 3 is on the platform, remove sliding block 8, sliding block 8 drives second backup pad 1 and removes left or right side, it makes third backup pad 3 remove left or right side to remove sliding block 8 in the second backup pad 1, then rotate two latch segments 12, two latch segments 12 pass through screw-thread fit, make sliding block 8 fixed. Thereby completing the attachment of the device to each platform excavated by the original roadbed. The ground piles are used for fixing the ground piles on the original roadbed, and gravels are paved and compressed.
Specifically, as shown in fig. 4, the former roadbed mechanism of dull and stereotyped laminating still includes first threaded rod 5, and the screw hole 9 that is linked together with notch 17 is seted up at 8 tops of sliding block, and screw hole 9 internal thread is connected with first threaded rod 5, and the bottom fixedly connected with cylinder 6 of first threaded rod 5, the outer wall sliding connection of cylinder 6 has round cover 7, and round cover 7 passes through the bearing and rotates the connection on second backup pad 1. The first threaded rod 5 is rotated, and the round sleeve 7 on the second support plate 1 is rotated through the circumference by matching with the threaded hole 9 in the sliding block 8, so that the distance between the two support plates can be adjusted up or down. Thereby make horizontal position and height position between two backup pads all adjustable, be convenient for make the platform laminating of the device and the last a plurality of levels of digging of former road bed.
Specifically, as shown in fig. 6, the outer wall of the cylinder 6 is fixedly connected with a second extending plate 15, the inner wall of the round sleeve 7 is provided with a groove 16, and the second extending plate 15 is in limited sliding connection in the groove 16. So that the first threaded rod 5 steadily makes the distance between the two support plates smaller or larger.
Specifically, as shown in fig. 1, fixing holes 14 are formed in the first support plate 2, the second support plate 1, and the third support plate 3, and the fixing holes 14 cooperate with the wooden piles to fix the first support plate 2, the second support plate 1, and the third support plate 3 on the original roadbed. So that each support plate is stably fixed on the original roadbed.
Specifically, as shown in fig. 1, a rotating wheel 4 is fixedly connected to the top of the first threaded rod 5. Rotation of the first threaded rod 5 is facilitated.
Specifically, as shown in fig. 1, two second threaded rods 11 are provided, and cooperate with the locking blocks 12 to fix both sides of the sliding block 8. So that the sliding block 8 is stably fixed.
Specifically, as shown in fig. 1, the outer wall of the locking block 12 is marked with a print, so that a person can rotate the locking block 12 conveniently.
In the embodiment, with the rapid development of socioeconomic performance in China, most of the functions of the existing roads cannot meet the increasing traffic demand of the society, so that the original roads are inevitably upgraded and modified. The key of the engineering reconstruction is the widening of the highway subgrade, namely the design and the construction. After many years of traffic, the subgrade settlement is basically completed, and the widening section of the subgrade inevitably generates cracks represented by longitudinal cracks due to the uneven settlement of a new subgrade and an old subgrade, so that the highway is damaged. Therefore, design optimization and construction quality must be enhanced when the highway subgrade is widened, and settlement is minimized to ensure the quality of the highway. General personnel can be to the original road bed need widen the position and measure the lofting, mark out and need widen the position, dig the domatic step by step along original road bed side slope angle, and the platform between the domatic at all levels is by the road surface to width degressive step by step down. A flat plate is generally adopted for fixing the slope surfaces, so that the uneven settlement can be greatly reduced when sand is paved. However, since the slope is excavated by the personnel on the original roadbed, the states of the platforms excavated on the original roadbed are not necessarily as expected, and a mechanism capable of adjusting the states of the platforms is required to improve the uneven settlement prevention device for the old roadbed and the new roadbed. First with first backup pad 2, second backup pad 1, on each platform that former road bed excavated was put to third backup pad 3, then for making first backup pad 2, second backup pad 1, the better laminating of third backup pad 3 is on the platform, remove sliding block 8, sliding block 8 drives second backup pad 1 and removes left or right side, it makes third backup pad 3 remove left or right side to remove sliding block 8 in the second backup pad 1, then rotate two latch segments 12, two latch segments 12 pass through screw-thread fit, make sliding block 8 fixed. Then, the first threaded rod 5 is rotated, the threaded holes 9 in the sliding blocks 8 are matched, and the round sleeve 7 on the second support plate 1 is rotated through the circumference, so that the distance between the two support plates can be adjusted up or down. Thereby make horizontal position and high position between two backup pads all adjustable, be convenient for make the device laminate with the platform of a plurality of levels of digging on the former road bed. The ground piles are used for fixing the ground piles on the original roadbed, and gravels are paved and compressed.
The technical scope of the present invention is not limited to the content in the above description, and those skilled in the art can make various modifications and changes to the above embodiments without departing from the technical spirit of the present invention, and these modifications and changes should fall within the protection scope of the present invention.
Claims (7)
1. A device for controlling uneven settlement at the junction of a new roadbed and an old roadbed, which is characterized by comprising:
the first supporting plate (2), the second supporting plate (1) and the third supporting plate (3) are in a stair shape, and the first supporting plate (2), the second supporting plate (1) and the third supporting plate (3) are sequentially and gradually arranged in a descending manner;
the flat plate attaching original roadbed mechanism is used for enabling a first supporting plate (2), a second supporting plate (1) and a third supporting plate (3) to be completely attached to an original roadbed, a flat plate attaching original roadbed mechanism is arranged between the first supporting plate (2) and the second supporting plate (1), and a flat plate attaching original roadbed mechanism is also arranged between the second supporting plate (1) and the third supporting plate (3);
dull and stereotyped former way base mechanism of laminating is including fixing first extension board (10) on first backup pad (2), it is connected with second threaded rod (11) to rotate on first extension board (10), threaded connection has two latch segments (12) on second threaded rod (11), notch (17) have been seted up at first backup pad (2) top, the top of first backup pad (2) has sliding block (8) through spacing sliding connection of spacing spout (13), sliding block (8) are connected with second backup pad (1), two latch segments (12) can with sliding block (8) are fixed to it is fixed after the horizontal offset position of adjustment second backup pad (1) and first backup pad (2).
2. The device for controlling the uneven settlement at the joint of the old and new roadbed and the new roadbed according to claim 1, wherein the flat plate attaching original roadbed mechanism further comprises a first threaded rod (5), a threaded hole (9) communicated with the notch (17) is formed in the top of the sliding block (8), the first threaded rod (5) is connected in the threaded hole (9) in a threaded mode, a cylinder (6) is fixedly connected to the bottom of the first threaded rod (5), a round sleeve (7) is connected to the outer wall of the cylinder (6) in a sliding mode, and the round sleeve (7) is rotatably connected to the second supporting plate (1) through a bearing.
3. The device for controlling the uneven settlement at the junction of the old and new roadbed and the new roadbed as claimed in claim 2, wherein the outer wall of the cylinder (6) is fixedly connected with a second extension plate (15), the inner wall of the round sleeve (7) is provided with a groove (16), and the second extension plate (15) is in limited sliding connection in the groove (16).
4. The device for controlling the uneven settlement at the joints of the old and new road beds as claimed in claim 2, wherein the first support plate (2), the second support plate (1) and the third support plate (3) are provided with fixing holes (14), and the fixing holes (14) are matched with wood piles to fix the first support plate (2), the second support plate (1) and the third support plate (3) on the original road bed.
5. The device for controlling the uneven settlement at the junction of the old and new roadbed as claimed in claim 2, wherein the top of the first threaded rod (5) is fixedly connected with a rotating wheel (4).
6. A device for controlling the uneven settlement at the junction of a new roadbed and an old roadbed as claimed in claim 1, characterized in that the second threaded rod (11) is provided with two, and the two sides of the sliding block (8) are fixed by matching with the locking block (12).
7. The device for controlling the uneven settlement of the connection between the old and the new roadbed as claimed in claim 1, wherein the outer wall of the locking block (12) is engraved with printing so as to facilitate the rotation of the locking block (12) by personnel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221780805.9U CN218466226U (en) | 2022-07-11 | 2022-07-11 | Device for controlling uneven settlement of connection part of old and new roadbed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202221780805.9U CN218466226U (en) | 2022-07-11 | 2022-07-11 | Device for controlling uneven settlement of connection part of old and new roadbed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218466226U true CN218466226U (en) | 2023-02-10 |
Family
ID=85136167
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202221780805.9U Active CN218466226U (en) | 2022-07-11 | 2022-07-11 | Device for controlling uneven settlement of connection part of old and new roadbed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218466226U (en) |
-
2022
- 2022-07-11 CN CN202221780805.9U patent/CN218466226U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Adlinge et al. | Pavement deterioration and its causes | |
CN106939541A (en) | A kind of semi-rigid semi-flexible Widening of Freeway pavement structure and method | |
CN102979121B (en) | Four-wheel copy foldable land leveler | |
CN201296895Y (en) | Vertical cracking pavement repair structure | |
CN205152761U (en) | A curb former for paver | |
CN218466226U (en) | Device for controlling uneven settlement of connection part of old and new roadbed | |
CN112176813B (en) | Asphalt concrete pavement maintenance structure and method thereof | |
CN214737083U (en) | Soft soil roadbed and normal roadbed juncture prevent subsiding structure | |
CN108642975A (en) | A method of for being lifted Settlement diseases railway bed | |
CN201321595Y (en) | Road base course spreader | |
CN213538565U (en) | Road bridge linkage segment becomes rigidity road bed | |
CN202989973U (en) | Four-wheel profile foldable grader | |
CN116289342A (en) | Track engineering construction process | |
CN216275035U (en) | Ballastless transition section track structure of ballastless track high-speed railway station turnout area | |
CN214831692U (en) | Roadbed rolling device for double-layer continuous paving construction of road | |
CN212452725U (en) | Highway bridge foundation pile reinforcing apparatus | |
CN211227990U (en) | Lifting type supporting device for pavement paving | |
CN219101350U (en) | Pushing box culvert | |
CN221798039U (en) | Composite layer foundation for hoisting | |
CN215794128U (en) | Flat-bottom track shoe of excavator | |
CN221029346U (en) | Highway subgrade widening structure | |
CN221545169U (en) | Rigid roadbed and flexible roadbed junction structure | |
CN207452608U (en) | It is a kind of can the softening of anti-roadbed express highway roadbed structure | |
CN115852781B (en) | Screed lifting device of paver | |
CN213867148U (en) | Ground infrastructure is consolidated in slip casting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |