CN218441012U - Positioning bracket for water and electricity pipeline - Google Patents

Positioning bracket for water and electricity pipeline Download PDF

Info

Publication number
CN218441012U
CN218441012U CN202222451368.2U CN202222451368U CN218441012U CN 218441012 U CN218441012 U CN 218441012U CN 202222451368 U CN202222451368 U CN 202222451368U CN 218441012 U CN218441012 U CN 218441012U
Authority
CN
China
Prior art keywords
support frame
pressure boost
plate
water
dead lever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222451368.2U
Other languages
Chinese (zh)
Inventor
吴嗣有
姚军庆
张东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hongkang Construction And Installation Engineering Co ltd
Original Assignee
Anhui Hongkang Construction And Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hongkang Construction And Installation Engineering Co ltd filed Critical Anhui Hongkang Construction And Installation Engineering Co ltd
Priority to CN202222451368.2U priority Critical patent/CN218441012U/en
Application granted granted Critical
Publication of CN218441012U publication Critical patent/CN218441012U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a water and electricity pipeline location technical field just discloses a locating support for water and electricity pipeline, including bottom plate, support frame and dead lever, the support frame welding is on the top of bottom plate, the both ends of dead lever respectively with the top welding of two wherein inner walls of support frame, the bottom activity of dead lever is equipped with the pressure boost board, the pressure boost board is located the inside of support frame, a plurality of semi-circular arc draw-in groove has all been seted up to diapire in pressure boost board bottom and the support frame. This scheme drives circular briquetting through rotatory bolt and descends and exert a pressure to the pressure boost board for the pressure boost board descends and makes a plurality of the same water and electricity pipeline of size by the card in its bottom is seted up a plurality of semi-circular arc draw-in groove, and the pressure boost board is to a plurality of water and electricity pipeline pressure boost simultaneously, like this under the cooperation of support frame and pressure boost board, then can carry out centre gripping location and unsettled support to a plurality of water and electricity pipelines.

Description

Positioning bracket for water and electricity pipeline
Technical Field
The application relates to a water and electricity pipeline location technical field especially relates to a locating support for water and electricity pipeline.
Background
Before the construction of construction site, insert the water and electricity pipeline in advance to the construction site in be the indispensable process, when construction site is under construction like this, then can be to the timely power consumption of construction site, the water through the water and electricity pipeline, nevertheless insert to the construction site back at the water and electricity pipeline, just pave it subaerial at will, neatly arrange and fix a position it not, in the use of water and electricity pipeline water or circular telegram, the water and electricity pipeline extremely easily can remove subaerial at will, can lead to a plurality of water and electricity pipeline to be in the same place by the wrong synthesis like this, and can take place the friction with ground and lead to its surperficial by the wearing and tearing destruction.
SUMMERY OF THE UTILITY MODEL
In order to solve the above-mentioned problem of proposing, the present application provides a positioning bracket for a hydroelectric pipeline.
The application provides a positioning support for water and electricity pipeline adopts following technical scheme:
the utility model provides a positioning support for water and electricity pipeline, includes bottom plate, support frame and dead lever, the support frame welding is on the top of bottom plate, the both ends of dead lever respectively with the top welding of two wherein inner walls of support frame, the bottom activity of dead lever is equipped with pressure boost plate, pressure boost plate is located the inside of support frame, a plurality of half-circular arc draw-in groove has all been seted up to the diapire in pressure boost plate bottom and the support frame, a plurality of half-circular arc draw-in groove one-to-one that a plurality of half-circular arc draw-in groove seted up of pressure boost plate bottom respectively with the support frame in the diapire, hexagonal hole has been seted up at dead lever top middle part, the inside fixed hexagonal hole's of seting up in dead lever top middle part is equipped with hexagon nut, hexagon nut's internal thread runs through has the bolt, pressure boost plate top middle part is seted up flutedly, the welding of bolt bottom has circular pressure boost piece, circular pressure boost piece is located the inside that pressure boost plate top middle part seted up the recess.
Through adopting above-mentioned technical scheme, through arranging a plurality of the water and electricity pipelines that the size is the same respectively in a plurality of semi-circular arc draw-in grooves are seted up to the diapire in the support frame, rotatory bolt after that, the bolt is at the in-process that rotationally descends, exert a pressure to the pressure boost board through circular pressure boost piece, make the pressure boost board descend, and make a plurality of water and electricity pipelines that the size is the same, blocked in its bottom is seted up a plurality of semi-circular arc draw-in grooves, the pressure boost board is to a plurality of water and electricity pipelines pressure boost simultaneously, like this under the cooperation of support frame and pressure boost board, then can carry out the centre gripping location to a plurality of water and electricity pipelines.
Preferably, the inner top of the middle part of the top end of the pressurizing plate, which is provided with the groove, is fixedly embedded with a limiting ring, and the bottom end of the bolt rotatably penetrates through the limiting ring.
Through adopting above-mentioned technical scheme, the spacing ring is used for spacing circular pressure boost piece, avoids circular pressure boost piece to deviate from the inside of recess.
Preferably, the support frame wherein the middle part of two inner walls has all seted up the spacing groove, the stopper has all been welded at the both ends of pressure boost plate, two the stopper is sliding connection respectively in the inside of two spacing grooves.
Through adopting above-mentioned technical scheme, with two stopper difference sliding connection in the inside of two spacing grooves, can carry on spacingly to the pressure boost board for the pressure boost board only can vertically go up and down in the inside of support frame.
Preferably, the inner bottom walls of the plurality of semi-arc-shaped clamping grooves formed in the bottom end of the pressurizing plate and the inner bottom wall of the supporting frame are bonded with rubber pads.
Through adopting above-mentioned technical scheme, the rubber pad is used for increasing the frictional force when support frame, pressure boost board and water and electricity pipeline contact, avoids water and electricity pipeline and pressure boost board and support frame direct contact simultaneously.
Preferably, through holes are formed in four corners of the top end of the bottom plate.
By adopting the technical scheme, the bottom plate can be fixed on the wall body by utilizing the external expansion screws to penetrate through the four through holes and be embedded into the wall body.
To sum up, the application comprises the following beneficial technical effects:
through being equipped with the dead lever, hexagonal hole has been seted up at dead lever top middle part, the inside fixed of seting up hexagonal hole in dead lever top middle part is inlayed and is equipped with hexagon nut, it has the bolt to run through at hexagon nut's internal thread, it exerts a pressure to the pressure boost board to drive circular pressure boost piece decline through rotatory bolt, make the pressure boost board descend and make a plurality of the same water and electricity pipeline of size blocked in its bottom set up a plurality of half-circular arc draw-in groove, the pressure boost board is to a plurality of water and electricity pipeline pressure boost simultaneously, like this under the cooperation of support frame and pressure boost board, then can carry out centre gripping location and unsettled support to a plurality of water and electricity pipelines, and neatly arranged and can not take place the phenomenon of gathering together of crisscross.
Drawings
FIG. 1 is a schematic view of the overall structure of the application embodiment.
FIG. 2 is a schematic cross-sectional view of an embodiment of the present invention.
FIG. 3 is a schematic diagram of the combined structure of the bolt and the circular pressurizing block in the embodiment of the application.
Description of the reference numerals: 1. a base plate; 2. a support frame; 301. a fixing rod; 302. a pressure increasing plate; 303. a semi-arc slot; 304. a hexagonal nut; 305. a bolt; 306. a circular pressurizing block; 307. a limiting ring; 308. a rubber pad; 401. a limiting groove; 402. a limiting block; 5. and a through hole.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses a positioning support for hydroelectric pipeline. Referring to fig. 1-3, a positioning bracket for water and electricity pipelines comprises a bottom plate 1, a supporting frame 2 and a fixing rod 301, wherein the supporting frame 2 is welded at the top end of the bottom plate 1, two ends of the fixing rod 301 are respectively welded with the top ends of two inner walls of the supporting frame 2, a pressurizing plate 302 is movably arranged at the bottom of the fixing rod 301, the pressurizing plate 302 is positioned inside the supporting frame 2, a plurality of semi-circular arc-shaped clamping grooves 303 are respectively formed in the bottom end of the pressurizing plate 302 and the inner bottom wall of the supporting frame 2, the plurality of semi-circular arc-shaped clamping grooves 303 formed in the bottom end of the pressurizing plate 302 are respectively in one-to-one correspondence with the plurality of semi-circular arc-shaped clamping grooves 303 formed in the inner bottom wall of the supporting frame 2, and the plurality of water and electricity pipelines are respectively arranged in the plurality of semi-circular arc-shaped clamping grooves 303 formed in the bottom end of the pressurizing plate 302, so that the plurality of water and electricity pipelines can be prevented from being combined together;
referring to fig. 2 and 3, a hexagonal hole is formed in the middle of the top end of the fixing rod 301, a hexagon nut 304 is fixedly embedded in the hexagon hole formed in the middle of the top end of the fixing rod 301, a bolt 305 penetrates through internal threads of the hexagon nut 304, the hexagon nut 304 is used for enabling the bolt 305 and the pressure plate 302 to be in a vertical state, a groove is formed in the middle of the top end of the pressure plate 302, a circular pressure increasing block 306 is welded at the bottom end of the bolt 305, the circular pressure increasing block 306 is located in the groove formed in the middle of the top end of the pressure plate 302, the circular pressure increasing block 306 is driven to rotate and descend by the rotating bolt 305, the circular pressure increasing block 306 enters the groove formed in the middle of the top end of the pressure plate 302, the pressure increasing plate 302 is pressurized at the same time, the top portions of a plurality of hydropower pipelines with the same size can be clamped in a plurality of semicircular clamping grooves 303 formed in the bottom end of the pressure plate 302, meanwhile, the pressure increasing plate 302 continues to pressurize the plurality of hydropower pipelines, is matched with the support frame 2, and the plurality of hydropower pipelines can be clamped and positioned.
Referring to fig. 2, a limiting ring 307 is fixedly embedded in the top of the pressurizing plate 302, where the groove is formed in the middle of the top end, the bottom end of the bolt 305 rotatably penetrates through the limiting ring 307, and the limiting ring 307 can be used to prevent the circular pressurizing block 306 from coming off from the inside of the pressurizing plate 302, where the groove is formed in the middle of the top end, and meanwhile, the bolt 305 and the pressurizing plate 302 are movably connected.
Referring to fig. 1 and 2, the support frame 2 has two of them inner walls's middle part all seted up spacing groove 401, and pressure boost plate 302's both ends have all been welded stopper 402, and two stopper 402 sliding connection are in the inside of two spacing grooves 401 respectively, and pressure boost plate 302 then can only vertically go up and down in support frame 2's inside like this.
Referring to fig. 1 and 2, rubber pads 308 are bonded to the bottom end of the pressure increasing plate 302 and the inner bottom wall of the plurality of semi-circular arc-shaped clamping grooves 303 formed in the inner bottom wall of the support frame 2, so that direct contact between a water and electricity pipeline and the pressure increasing plate 302 and the support frame 2 is avoided, the surface of the water and electricity pipeline can be protected, and the situation that abrasion occurs due to direct contact between the water and electricity pipeline and the pressure increasing plate 302 and the support frame 2 is avoided.
Referring to fig. 1, through holes 5 are formed at four corners of the top end of the bottom plate 1, and the bottom plate 1 can be fixed on a wall by penetrating the four through holes 5 through external expansion screws and being embedded into the wall.
The implementation principle of this application embodiment a positioning support for water and electricity pipeline is: firstly, a plurality of water and electricity pipelines with the same size are respectively arranged in a plurality of semicircular clamping grooves 303 formed in the inner bottom wall of a support frame 2, then a bolt 305 is rotated, so that the bolt 305 applies downward pressure to a pressurizing plate 302 through a circular pressurizing block 306 in the rotating and descending process, the pressurizing plate 302 can descend, the top ends of the water and electricity pipelines with the same size are clamped in the semicircular clamping grooves 303 formed in the bottom ends of the water and electricity pipelines, meanwhile, the pressurizing plate 302 can continuously pressurize the water and electricity pipelines, the water and electricity pipelines can be clamped and positioned under the matching of the support frame 2 and the pressurizing plate 302, then, external expansion screws penetrate through the four through holes 5 and are embedded into a wall body, a bottom plate 1 can be fixed on the wall body, the bottom plate 1 is continuously kept parallel to the wall body and is kept vertical to the ground, and the water and electricity pipelines can be fixedly supported on the wall body.
It should be noted that, in this document, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a water and electricity is locating support for pipeline, includes bottom plate (1), support frame (2) and dead lever (301), its characterized in that, support frame (2) welding is on the top of bottom plate (1), the both ends of dead lever (301) respectively with the top welding of support frame (2) wherein two inner walls, the bottom activity of dead lever (301) is equipped with pressure boost plate (302), pressure boost plate (302) are located the inside of support frame (2), a plurality of semi-circular arc draw-in groove (303) have all been seted up to diapire in pressure boost plate (302) bottom and support frame (2), a plurality of semi-circular arc draw-in groove (303) that pressure boost plate (302) bottom was seted up respectively with a plurality of semi-circular arc draw-in groove (303) that the diapire was seted up in support frame (2) one-to pressure boost plate (302), hexagonal hole has been seted up at dead lever (301) top middle part, the inside of seting up hexagonal hole in dead lever (301) top middle part is fixed to be equipped with hexagon nut (304), the inside screw thread of hexagon nut (304) runs through bolt (305), pressure boost plate (302) top is located the inside recess (306).
2. A locating bracket for a hydroelectric line according to claim 1 in which: a limiting ring (307) is fixedly embedded in the inner top of the middle of the top end of the pressurizing plate (302) provided with a groove, and the bottom end of the bolt (305) rotatably penetrates through the limiting ring (307).
3. A locating bracket for a hydroelectric line according to claim 1 in which: limiting grooves (401) are formed in the middle of two inner walls of the supporting frame (2), limiting blocks (402) are welded at two ends of the pressurizing plate (302), and the limiting blocks (402) are connected to the inner portions of the two limiting grooves (401) in a sliding mode respectively.
4. A locating support for a hydroelectric pipeline as claimed in claim 1 in which: rubber pads (308) are bonded on the bottom end of the pressurizing plate (302) and the inner bottom wall of the plurality of semi-circular arc-shaped clamping grooves (303) formed in the inner bottom wall of the support frame (2).
5. A locating bracket for a hydroelectric line according to claim 1 in which: through holes (5) are formed in four corners of the top end of the bottom plate (1).
CN202222451368.2U 2022-09-16 2022-09-16 Positioning bracket for water and electricity pipeline Active CN218441012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222451368.2U CN218441012U (en) 2022-09-16 2022-09-16 Positioning bracket for water and electricity pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222451368.2U CN218441012U (en) 2022-09-16 2022-09-16 Positioning bracket for water and electricity pipeline

Publications (1)

Publication Number Publication Date
CN218441012U true CN218441012U (en) 2023-02-03

Family

ID=85104671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222451368.2U Active CN218441012U (en) 2022-09-16 2022-09-16 Positioning bracket for water and electricity pipeline

Country Status (1)

Country Link
CN (1) CN218441012U (en)

Similar Documents

Publication Publication Date Title
CN201181654Y (en) Spring clamper
CN218441012U (en) Positioning bracket for water and electricity pipeline
CN208214870U (en) A kind of removable clamp assembly
CN208663206U (en) A kind of fixed device of numerically-controlled machine tool
CN204545117U (en) A kind of steel mould fixture
CN212060596U (en) Monitoring device for geological disasters
CN204974838U (en) Reinforcing steel bar straightening device
CN115275861A (en) Novel live working with location drainage wire device
CN201266603Y (en) Clamper for packing ultrasound aluminum wire bonding equipment
CN2923160Y (en) Drilling-tapping clamp
CN216463940U (en) Multilateral anchor clamps of plain type are used in processing of polishing of thick metal
CN211978527U (en) Soil-rock mixture creep test fixture
CN216030416U (en) Workpiece clamping jig for PVD (physical vapor deposition) assembly
CN211259874U (en) Building water supply and drainage pipeline fixing device
CN105571825B (en) light distribution lamp frame
CN213981170U (en) Hydraulic pump convenient to installation
CN216134088U (en) Anti-breaking fixing device for data line processing
CN220470995U (en) Water leakage repairing device
CN110822327B (en) New energy-saving lamp convenient to install and installation method thereof
CN205051628U (en) Dual glass assembly installation device
CN221075513U (en) Pipeline fixing device
CN220882009U (en) Battery module clamping mechanism
CN215548671U (en) Servo manipulator fixing device is used in battery case processing
CN219325213U (en) Positioning jig for backlight module
CN206871449U (en) A kind of filling head bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant