CN218439202U - Yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment - Google Patents
Yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment Download PDFInfo
- Publication number
- CN218439202U CN218439202U CN202222428960.0U CN202222428960U CN218439202U CN 218439202 U CN218439202 U CN 218439202U CN 202222428960 U CN202222428960 U CN 202222428960U CN 218439202 U CN218439202 U CN 218439202U
- Authority
- CN
- China
- Prior art keywords
- drilling machine
- machine body
- stopper
- hydraulic engineering
- drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 87
- 230000002265 prevention Effects 0.000 title claims description 20
- 230000000694 effects Effects 0.000 abstract description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 4
- 239000002689 soil Substances 0.000 description 4
- 239000002023 wood Substances 0.000 description 3
- 244000025254 Cannabis sativa Species 0.000 description 2
- 235000012766 Cannabis sativa ssp. sativa var. sativa Nutrition 0.000 description 2
- 235000012765 Cannabis sativa ssp. sativa var. spontanea Nutrition 0.000 description 2
- 235000009120 camo Nutrition 0.000 description 2
- 235000005607 chanvre indien Nutrition 0.000 description 2
- 239000011487 hemp Substances 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model belongs to the technical field of the yellow river hydraulic engineering flood control of speedily carrying out rescue work, especially, be a yellow river hydraulic engineering flood control stake drilling equipment, including the drilling machine body, still install spacing subassembly on the drilling machine body, spacing subassembly includes stopper, bracing piece, sleeve, support frame, spring, backup pad and tapered rod, the lower surface sliding connection of drilling machine body has the stopper, the drilling machine body runs through the stopper, four outside fixedly connected with of stopper are symmetrical form range the bracing piece, the terminal fixedly connected with of bracing piece the sleeve, the user can restrict the position of drilling machine through this spacing subassembly to ensure the position that the difficult skew of drilling should have, and then ensure the pile effect, the fixed subassembly of cooperation centre gripping can carry out the centre gripping fixed to the drilling machine, thereby reduce rocking of drilling machine, further ensured drilling quality and pile effect.
Description
Technical Field
The utility model belongs to the technical field of the flood prevention of speedily carrying out rescue work of yellow river hydraulic engineering, concretely relates to yellow river hydraulic engineering flood prevention stake drilling equipment that speedily carries out rescue work.
Background
In the yellow river hydraulic engineering emergency rescue flood prevention, the emergency materials mainly comprise stones, lead wires, hemp ropes, wooden piles, generator sets and the like, the existing modes are that a handheld drilling machine is used for drilling holes, then the materials such as the wooden piles are used for fixing a dam body, but when water flow is in a torrent state, the handheld drilling machine is easy to be impacted by water flow to cause the drilled holes to deviate from the positions to be drilled, and therefore the piling effect is influenced.
In order to solve the problems, the application provides a device for drilling flood control timber piles for emergency rescue in the water conservancy projects of the yellow river.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment has thereby restriction and fixed drilling machine and ensures the characteristics of drilling position.
In order to achieve the above object, the utility model provides a following technical scheme: a yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment comprises a drilling machine body, wherein a limiting assembly is further mounted on the drilling machine body;
spacing subassembly includes stopper, bracing piece, sleeve, support frame, spring, backup pad and toper pole, the lower surface sliding connection of drilling machine body has the stopper, the drilling machine body runs through the stopper, four outside fixedly connected with of stopper are symmetrical form and arrange the bracing piece, the terminal fixedly connected with of bracing piece the sleeve, four the sleeve all with support frame sliding connection, the lateral wall cover of support frame is equipped with the spring, the both ends of spring respectively with the sleeve with support frame fixed connection, four bottom face fixedly connected with of support frame are symmetrical form and arrange the backup pad, the lower surface fixedly connected with align to grid of backup pad the toper pole.
As the utility model relates to a yellow river hydraulic engineering speedily carries out rescue work flood prevention stake drilling equipment is preferred, spacing subassembly still includes first slipmat, the last fixed surface of stopper is connected with first slipmat, first slipmat with drilling machine body sliding connection.
As the utility model relates to a yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment is preferred, still includes the fixed subassembly of centre gripping, the fixed subassembly of centre gripping includes screw rod and clamp splice, the inboard of stopper is connected with two through first bearing rotation and is the symmetrical form and arranges the screw rod, two the screw rod all is the symmetrical form with two and arranges clamp splice threaded connection.
As the utility model relates to a yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment is preferred, the fixed subassembly of centre gripping still includes the slide bar, the inboard sliding connection of clamp splice has two to be symmetrical form range the slide bar, the slide bar runs through two respectively the clamp splice, the both ends of slide bar all with stopper fixed connection.
As the utility model relates to a yellow river hydraulic engineering speedily carries out rescue work flood prevention stake drilling equipment is preferred, the fixed subassembly of centre gripping still includes the second slipmat, the clamp splice is close to a side fixedly connected with of drilling machine body the second slipmat.
Compared with the prior art, the beneficial effects of the utility model are that:
set up spacing subassembly on this device, the user can restrict the position of drilling machine through this spacing subassembly to ensure that the difficult skew of drilling should have the position, and then ensure the effect of piling, the fixed subassembly of cooperation centre gripping can carry out the centre gripping to the drilling machine and fix, thereby reduce rocking of drilling machine, further ensured drilling quality and the effect of piling.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
FIG. 1 is a schematic view of the present invention;
fig. 2 is a schematic structural view of the middle support plate of the present invention;
FIG. 3 is a schematic view of the supporting rod of the present invention;
fig. 4 is a schematic structural diagram of a point a in fig. 3 according to the present invention.
In the figure:
1. a drilling machine body;
2. a limiting component; 21. a limiting block; 22. a support bar; 23. a sleeve; 24. a support frame; 25. a spring; 26. a support plate; 27. a tapered rod; 28. a first non-slip mat;
3. clamping and fixing the assembly; 31. a screw; 32. a clamping block; 33. a slide bar; 34. and a second non-slip mat.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
As shown in fig. 1:
a yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment includes drilling machine body 1.
In this embodiment: in the yellow river hydraulic engineering emergency rescue flood prevention, the emergency materials mainly include building stones, lead wires, hemp ropes, wooden piles, generating sets and the like, the existing modes are that the handheld drilling machine body 1 is used for drilling holes, then the wooden piles and other materials are used for fixing the dam body, but when water flow turbulence is urgent, the handheld drilling machine body 1 is easily impacted by water flow to cause the drilled holes to deviate from the positions to be drilled, and therefore the piling effect is influenced.
It should be noted that: the drill body 1 is composed of a gasoline engine, an oil tank, a transmission, a drill bit and the like.
Further, the method comprises the following steps:
a limiting component 2 is arranged on the drilling machine body 1.
Further, the following steps:
as shown in fig. 1, 2 and 3:
this spacing subassembly 2 includes stopper 21, bracing piece 22, sleeve 23, support frame 24, spring 25, backup pad 26 and tapered rod 27, the lower surface sliding connection of drilling machine body 1 has stopper 21, drilling machine body 1 runs through stopper 21, four bracing pieces 22 that are the symmetrical form range of outside fixedly connected with of stopper 21, the terminal fixedly connected with sleeve 23 of bracing piece 22, four sleeves 23 all with support frame 24 sliding connection, the lateral wall cover of support frame 24 is equipped with spring 25, spring 25's both ends respectively with sleeve 23 and support frame 24 fixed connection, four backup pads 26 that are the symmetrical form range of bottom face fixedly connected with of support frame 24, the lower surface fixedly connected with align to grid's tapered rod 27 of backup pad 26.
In this embodiment: firstly, the support frame 24 is placed at a position needing drilling, the center of the limiting block 21 is aligned to a point needing drilling, then the four support plates 26 are stepped down, when the support plates 26 are stepped down, the tapered rod 27 is inserted into soil downwards and drives the support frame 24 to move downwards, when the four support plates 26 are completely inserted into soil, the support frame 24 is fixed, then the drilling machine body 1 is placed above the limiting block 21, the drilling machine body 1 is pressed downwards to drive the limiting block 21, the support rod 22 and the sleeve 23 to move downwards, the sleeve 23 presses the spring 25 when moving downwards, drilling can be carried out when a drill bit on the drilling machine body 1 contacts the ground, the support frame 24 is fixed in the mode, then the drilling machine body 1 penetrates through the limiting block 21, the limiting block 21 and the support frame 24 can limit the position of the drilling machine, the drilling machine is enabled to be not prone to deviate from a corresponding position, and the pile driving effect is ensured.
It should be noted that: the support frame 24 comprises four montants and eight horizontal poles, and two back font structures about eight horizontal poles make up, and montant and horizontal pole are the round bar, can reduce rivers to the impact of support frame 24 to ensure the fixed effect of support frame 24 on ground or submarine.
Further, the method comprises the following steps of;
in an alternative embodiment, the limiting block 2 further comprises a first anti-skid pad 28, the upper surface of the limiting block 21 is fixedly connected with the first anti-skid pad 28, and the first anti-skid pad 28 is slidably connected with the drill body 1.
In this embodiment: the first anti-slip pad 28 can make the drilling machine body 1 flexibly contact with the limiting block 21, so that the surface of the drilling machine cannot be scratched, and meanwhile, the shaking of the drilling machine body 1 can be reduced.
Further, the method comprises the following steps of;
as shown in fig. 2, 3 and 4:
the yellow river hydraulic engineering emergency flood prevention timber pile drilling device further comprises a clamping and fixing assembly 3, wherein the clamping and fixing assembly 3 comprises a screw rod 31 and clamping blocks 32, the inner side of the limiting block 21 is rotatably connected with the two symmetrically arranged screw rods 31 through a first bearing, the two screw rods 31 are both in threaded connection with the two symmetrically arranged clamping blocks 32,
in this embodiment: the two screw rods 31 are rotated simultaneously, the screw rods 31 drive the two clamping blocks 32 to move towards the middle simultaneously when rotating, and the two clamping blocks 32 clamp and fix the drilling machine body 1 when moving towards the middle simultaneously, so that the shaking of the drilling machine body 1 is reduced, and the drilling quality and the piling effect are further ensured.
It should be noted that: the threads on the screw rods 31 are symmetrically arranged, and the left and right threads are opposite in direction, so that when the two screw rods 31 are rotated simultaneously, the two clamping blocks 32 move towards the middle simultaneously.
It should be noted that: the clamping block 32 is of an arc-shaped structure, and the radian is consistent with that of the drilling machine body 1, so that the contact area between the clamping block and the drilling machine body 1 can be increased, and the clamping and fixing effects are improved.
Further, the method comprises the following steps of;
in an optional embodiment, the clamping and fixing assembly 3 further includes a sliding rod 33, two sliding rods 33 arranged symmetrically are slidably connected to the inner sides of the clamping blocks 32, the sliding rods 33 respectively penetrate through the two clamping blocks 32, and both ends of the sliding rod 33 are fixedly connected to the limiting block 21.
In this embodiment: the sliding rod 33 can improve the stability of the clamping block 32 in the moving process and reduce the shaking of the clamping block 32.
In an alternative embodiment, the clamping fixture 3 further comprises a second non-slip pad 34, and the clamping block 32 is fixedly connected with the second non-slip pad 34 near one side of the drilling machine body 1.
In this embodiment: the second anti-slip pad 34 can increase the friction force between the clamping block 32 and the drill body 1, thereby improving the clamping and fixing effect on the drill body 1.
The working principle is as follows: when wood pile drilling is carried out in emergency and flood prevention of the water conservancy project of the yellow river, firstly, the support frame 24 is placed at a position where the wood pile drilling is needed, the center of the limiting block 21 is aligned with a point where the wood pile drilling is needed, then the four support plates 26 are stepped down, when the support plates 26 are stepped down, the tapered rod 27 is inserted into soil downwards, the support frame 24 is driven to move downwards, when the four support plates 26 are completely inserted into the soil, the support frame 24 is fixed, then the drilling machine body 1 is placed above the limiting block 21, the lower surface of the drilling machine body 1 is in contact with the first anti-skid pad 28, meanwhile, the two screw rods 31 are rotated, when the screw rods 31 are rotated, the two clamping blocks 32 are driven to move towards the middle on the sliding rods 33 at the same time, when the two clamping blocks 32 move towards the middle at the same time, the drilling machine body 1 is clamped and fixed through the two second anti-skid pads 34, so that the drilling machine body 1 is shaken, then the drilling machine body 1 is pressed downwards, the limiting block 21, the support rod 22 and the sleeve 23 are driven to move downwards, when a drill bit on the drilling machine body 1 is in contact with the ground, the drilling machine 24, the mode, the drilling machine is not easy to fix, the support frame 24, the limiting block 21 can be penetrated, and the position of the limiting block 21, and the limiting block 21 can be deviated from the drilling effect can be ensured, and the position of the support frame 24.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described above, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (5)
1. The utility model provides a yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment, includes drilling machine body (1), its characterized in that: the drilling machine body (1) is also provided with a limiting assembly (2);
spacing subassembly (2) include stopper (21), bracing piece (22), sleeve (23), support frame (24), spring (25), backup pad (26) and toper pole (27), the lower surface sliding connection of drilling machine body (1) has stopper (21), drilling machine body (1) runs through stopper (21), four outside fixedly connected with of stopper (21) are symmetrical form and arrange bracing piece (22), the terminal fixedly connected with of bracing piece (22) sleeve (23), four sleeve (23) all with support frame (24) sliding connection, the lateral wall cover of support frame (24) is equipped with spring (25), the both ends of spring (25) respectively with sleeve (23) with support frame (24) fixed connection, four bottom face fixedly connected with of support frame (24) are symmetrical form and arrange backup pad (26), the lower surface fixedly connected with align to grid of backup pad (26) toper pole (27).
2. The yellow river hydraulic engineering emergency flood prevention stake drilling equipment of claim 1, characterized in that: the limiting assembly (2) further comprises a first anti-skid pad (28), the upper surface of the limiting block (21) is fixedly connected with the first anti-skid pad (28), and the first anti-skid pad (28) is connected with the drilling machine body (1) in a sliding mode.
3. The yellow river hydraulic engineering emergency flood prevention stake drilling equipment of claim 1, characterized in that: still include the fixed subassembly of centre gripping (3), the fixed subassembly of centre gripping (3) includes screw rod (31) and clamp splice (32), the inboard of stopper (21) is rotated through first bearing and is connected with two and is the symmetry form and arranges screw rod (31), two screw rod (31) all are the symmetry form with two and arrange clamp splice (32) threaded connection.
4. The yellow river hydraulic engineering emergency flood prevention stake drilling equipment of claim 3, characterized in that: the fixed subassembly of centre gripping (3) still includes slide bar (33), the inboard sliding connection of clamp splice (32) has two to be the symmetrical form and arranges slide bar (33), slide bar (33) run through two respectively clamp splice (32), the both ends of slide bar (33) all with stopper (21) fixed connection.
5. The yellow river hydraulic engineering emergency flood prevention stake drilling equipment of claim 3, characterized in that: the clamping and fixing assembly (3) further comprises a second anti-skid pad (34), and one side face, close to the drilling machine body (1), of the clamping block (32) is fixedly connected with the second anti-skid pad (34).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222428960.0U CN218439202U (en) | 2022-09-14 | 2022-09-14 | Yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222428960.0U CN218439202U (en) | 2022-09-14 | 2022-09-14 | Yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218439202U true CN218439202U (en) | 2023-02-03 |
Family
ID=85105693
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222428960.0U Expired - Fee Related CN218439202U (en) | 2022-09-14 | 2022-09-14 | Yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218439202U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2024216684A1 (en) * | 2023-04-20 | 2024-10-24 | 天津珈知源科技有限公司 | Auxiliary positioning apparatus for engineering drill, and engineering drill |
-
2022
- 2022-09-14 CN CN202222428960.0U patent/CN218439202U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2024216684A1 (en) * | 2023-04-20 | 2024-10-24 | 天津珈知源科技有限公司 | Auxiliary positioning apparatus for engineering drill, and engineering drill |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218439202U (en) | Yellow river hydraulic engineering emergency rescue flood prevention stake drilling equipment | |
CN210090067U (en) | Drilling rig for geotechnical engineering investigation | |
CN102373705A (en) | Pile sinking device and method for outer digging pre-stressed centrifugal pipe pile and square pile | |
CN214997691U (en) | Automatic sliding form device for mine roadway | |
CN217174748U (en) | Anti-floating anchor rod waterproof structure | |
CN214170435U (en) | Ground perforating device for building site | |
CN212797217U (en) | Ocean engineering exhibition wing anchor | |
CN104452760A (en) | Noiseless steel sheet pile pressing equipment and construction method thereof | |
CN106759201B (en) | Wind-powered electricity generation and the embedding rock jack up operation platform of bridge | |
CN215252995U (en) | Tower crane foundation structure for deep water bare rock riverbed framed bent pier rigid frame bridge construction | |
CN206328738U (en) | Marine embedding rock job platform | |
CN212002453U (en) | Hydraulic engineering construction is with supporting protection device | |
CN214784122U (en) | Building foundation pile with low pile cap | |
CN213296347U (en) | Construction device for pile foundation engineering | |
CN219710260U (en) | Construction device for sampling rock and soil at pile end of ultra-deep bored concrete pile | |
CN218581574U (en) | Oil-well rig plays to rise stabilising arrangement | |
CN217104928U (en) | Slope protection bearing structure that hydraulic engineering used | |
CN219011112U (en) | River course bank protection reinforced structure | |
CN217419652U (en) | Excavation supporting structure for deep silted geological foundation pit | |
CN208363064U (en) | Floating type deep-water bridge foundation operation platform | |
CN217733895U (en) | Temporary road flood prevention device for hydraulic engineering | |
CN214883061U (en) | Bridge reinforcing device capable of improving bearing capacity | |
CN211370304U (en) | Positioning device for drilling engineering construction pile | |
CN212801505U (en) | Binary pile for foundation treatment | |
CN218112924U (en) | Hydraulic positioning pile of dredger |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230203 |
|
CF01 | Termination of patent right due to non-payment of annual fee |