CN218438096U - Building site is with dismantling scaffold frame that connects soon - Google Patents

Building site is with dismantling scaffold frame that connects soon Download PDF

Info

Publication number
CN218438096U
CN218438096U CN202222370578.9U CN202222370578U CN218438096U CN 218438096 U CN218438096 U CN 218438096U CN 202222370578 U CN202222370578 U CN 202222370578U CN 218438096 U CN218438096 U CN 218438096U
Authority
CN
China
Prior art keywords
linkage
block
supporting
scaffold
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222370578.9U
Other languages
Chinese (zh)
Inventor
张禄
霍会坛
祁靖轩
徐畅
陈宝旭
王浩嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Port Group Port Engineering Co ltd
Original Assignee
Hebei Port Group Port Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Port Group Port Engineering Co ltd filed Critical Hebei Port Group Port Engineering Co ltd
Priority to CN202222370578.9U priority Critical patent/CN218438096U/en
Application granted granted Critical
Publication of CN218438096U publication Critical patent/CN218438096U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a construction site is with dismantling quick-connect scaffold, concretely relates to scaffold dismantlement technical field, including four supporting cylinders, each supporting cylinder's inside all is equipped with sliding connection's telescopic strut, one side embedding of telescopic strut is equipped with linkage dismantlement subassembly; the linkage disassembling component comprises a linkage disassembling rod embedded into one side of the telescopic supporting rod. The utility model discloses a set up linkage and dismantle the subassembly, the worker shape pole of pegging graft drives four locating pieces and removes, and the worker shape pole of pegging graft drives four locating pieces and removes like this, and linkage dismantlement pole no longer carries out the joint with telescopic strut, and two workmen upwards mention telescopic strut simultaneously, realize carrying out the linkage dismantlement to four telescopic strut of group and support cylinder junction, only need promote a position, can realize that four positions are whole to be dismantled, form the linkage dismantlement, and it is higher to dismantle efficiency, and is faster.

Description

Building site is with dismantling scaffold frame that connects soon
Technical Field
The utility model relates to a scaffold frame dismantles technical field, more specifically says, the utility model relates to a building site is with dismantling quick-connect scaffold frame.
Background
The scaffold refers to various supports erected for workers to operate and solve vertical and horizontal transportation in a building site, the scaffold needs to be often erected in the building site, so that a person can stand on the scaffold conveniently, and then construction operation is carried out on the position needing construction in the building site by using tools.
Patent application publication No. CN 212897468U's utility model patent discloses a detachable scaffold frame for building site relates to scaffold frame dismantlement technical field. Including base, bracing piece, telescopic link, connection quarter butt, station board and connection stock and base, bracing piece and telescopic link be provided with four, this detachable scaffold frame for building site, through setting up bracing piece and telescopic link, the swing joint of bracing piece and telescopic link can be fast effectual dismantles bracing piece and telescopic link, and the dismantlement mode is simple, has avoided extravagant manpower and materials and workman work efficiency to reduce to can save time, raise the efficiency. This detachable scaffold frame for building site is through setting up the telescopic link, by sliding on the telescopic link, first gim peg runs through the bracing piece and pegs graft with the fixed orifices, through setting up the second gim peg, and in the second gim peg extended to the jack through the connection disc, has reached the effect of fixed scaffold frame.
But at above-mentioned structure dismantlement in-process, because vaulting pole and telescopic link junction are four groups, like this when dismantling whole scaffold frame, need the staff to rotate the gim peg one by one and dismantle, it is lower to dismantle efficiency like this, is unfavorable for once only dismantling vaulting pole and telescopic link junction in batches.
SUMMERY OF THE UTILITY MODEL
The utility model discloses technical scheme is too single technical problem to prior art solution, provides and is showing and be different from prior art's solution, in order to overcome prior art's above-mentioned defect, the utility model provides a building site is with dismantling quick-connect scaffold to propose in solving above-mentioned background art because vaulting pole and telescopic link junction are four groups, when dismantling whole scaffold like this, need the staff to carry out the problem of rotatory dismantlement to the gim peg one by one.
In order to achieve the above purpose, the utility model provides a following technical scheme: a detachable quick-connection scaffold for a construction site comprises four supporting cylinders, wherein a telescopic supporting rod in sliding connection is arranged inside each supporting cylinder, and a linkage detaching assembly is embedded into one side of each telescopic supporting rod;
the linkage disassembly assembly comprises a linkage disassembly rod embedded into one side of the telescopic support rod, a fixing ring is installed on the outer wall of the linkage disassembly rod and located at one side of the support cylinder, an extrusion spring used for rebounding is arranged on one side of the fixing ring, an extrusion ring is welded on the outer wall of the linkage disassembly rod and located at one end of the extrusion spring, a positioning block is fixed on one side of the extrusion ring, the top end of the positioning block is movably inserted into the insertion I-shaped rod with a cross section shape established as an I-shaped shape, the fixing ring is movably connected with the linkage disassembly rod, the outer wall of the linkage disassembly rod is polished, the fixing ring is fixedly welded with the support cylinder, and the inner wall of the fixing ring is polished.
Preferably, each bottom of the supporting cylinder is provided with a supporting bottom block, the cross section area of the supporting bottom block is larger than that of the bottom of the supporting cylinder, the top of the supporting cylinder is fixed with a supporting top block, a rectangular support with a rectangular cross section is movably inserted into the top of the supporting top block, and the top of the rectangular support is movably clamped with a clamping platform.
Preferably, the outer wall of a supporting cylinder is fixed with spacing groove block, spacing groove block one side is equipped with the linkage groove block, and the top of spacing groove block installs a horizontal embedding piece of pegging graft mutually, has the pulling concave block in the top welding of a horizontal embedding piece, the bottom of a horizontal embedding piece is handled through the radius angle.
The utility model discloses a technological effect and advantage:
1. by arranging the linkage disassembly assembly, the splicing H-shaped rod drives the four positioning blocks to move, so that the splicing H-shaped rod drives the four positioning blocks to move, the linkage disassembly rod is not clamped with the telescopic support rods any more, two workers lift the telescopic support rods upwards at the same time, linkage disassembly of joints of the four groups of telescopic support rods and the support cylinder is realized, and the four points can be completely disassembled by only pushing one point, so that linkage disassembly is formed, the disassembly efficiency is higher, and the speed is higher;
2. the locating piece drives linkage groove piece and removes to horizontal embedding groove piece one end below position department, and the joint is realized to the inside position department that horizontal embedding was propped up piece and was inserted spacing groove piece and linkage groove piece, and a workman also can dismantle again after spacing to the junction of a support section of thick bamboo and telescopic support by oneself, also is applicable to a workman and dismantles the operation.
Drawings
Fig. 1 is a schematic diagram of the external three-dimensional structure of the present invention.
Fig. 2 is a schematic view of the vertical cross-section structure of the joint of the telescopic strut and the supporting cylinder of the present invention.
Fig. 3 is a schematic view of the vertical cross-section cut-off structure of the joint of the supporting cylinder and the telescopic supporting rod of the present invention.
Fig. 4 is an enlarged schematic structural diagram of a in fig. 1 according to the present invention.
The reference signs are: 1. a support cylinder; 2. a telescopic strut; 3. a linkage dismounting rod; 4. a fixing ring; 5. a compression spring; 6. an extrusion ring; 7. positioning blocks; 8. inserting an I-shaped rod; 9. a support bottom block; 10. supporting the top block; 11. a rectangular bracket; 12. clamping the platform; 13. a limiting groove block; 14. a linkage groove block; 15. transversely embedding the support blocks; 16. the concave block is pulled.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
As shown in the accompanying drawings 1-4, the detachable quick-connection scaffold for the construction site is provided with a linkage detaching assembly, the assembly can be rapidly detached from the scaffold in a multi-point position synchronous manner, the detaching efficiency is higher, time and labor are saved, and the specific structure of the assembly is as follows:
in some embodiments, as shown in fig. 1-2, the linkage detaching assembly includes a linkage detaching rod 3 embedded in one side of the telescopic strut 2, a fixing ring 4 is installed on an outer wall of the linkage detaching rod 3 and located at one side of the support cylinder 1, an extrusion spring 5 for springback is arranged on one side of the fixing ring 4, an extrusion ring 6 is welded on an outer wall of the linkage detaching rod 3 and located at one end of the extrusion spring 5, a positioning block 7 is fixed on one side of the extrusion ring 6, and an insertion i-shaped rod 8 with an i-shaped cross section is movably inserted into the top end of the positioning block 7;
in the use process of the embodiment, when the joints of the four telescopic struts 2 and the support cylinder 1 need to be disassembled, one worker is located on one side of the inserting I-shaped rod 8, and the other worker is located on the other side of the inserting I-shaped rod 8, namely the inserting I-shaped rod 8 can be pushed by the foot, the inserting I-shaped rod 8 drives the four positioning blocks 7 to move, the positioning blocks 7 drive the extrusion ring 6 to move, the extrusion ring 6 drives the linkage disassembling rod 3 to move, the extrusion ring 6 can drive the extrusion spring 5 to stretch, the extrusion spring 5 is fixed by the fixing ring 4, one end of the extrusion spring 5 is fixed on the fixing ring 4, the other end of the extrusion spring 5 realizes stretching operation, the linkage disassembling rod 3 can move out of the joints of the telescopic struts 2, the linkage disassembling rod 3 is not clamped with the telescopic struts 2, the two workers lift the telescopic struts 2 upwards simultaneously, the telescopic struts 2 are quickly separated from the support cylinder 1, the joints of the four telescopic struts 2 and the support cylinder 1 can be quickly disassembled, and the joints of the four telescopic struts 2 and the support cylinder 1 can be quickly disassembled by directly pushing the inserting I-shaped rod 8 into the support cylinder 1 during installation.
In some embodiments, as shown in fig. 1, the bottom end of each supporting cylinder 1 is provided with a supporting bottom block 9, the cross-sectional area of the supporting bottom block 9 is larger than that of the bottom end of the supporting cylinder 1, so that the supporting bottom block 9 can support the supporting cylinder 1, the stability of the bottom of the supporting cylinder 1 in use is improved, the top end of the supporting cylinder 1 is fixed with a supporting top block 10, a rectangular support 11 with a rectangular cross section is movably inserted into the top end of the supporting top block 10, a clamping platform 12 is movably clamped on the top end of the rectangular support 11, so that the rectangular support 11 is directly inserted into the supporting top block 10, the clamping platform 12 is directly inserted into the rectangular support 11, and a user stands above the clamping platform 12 for use.
In some embodiments, as shown in fig. 4, a limiting groove block 13 is fixed on the outer wall of the supporting cylinder 1, a linkage groove block 14 is arranged on one side of the limiting groove block 13, a transverse embedded support block 15 which is inserted is installed above the limiting groove block 13, a pulling concave block 16 is welded at the top end of the transverse embedded support block 15, and the bottom end of the transverse embedded support block 15 is subjected to fillet treatment;
in the use process of the embodiment, when only one worker needs to detach the supporting cylinder 1 and the telescopic supporting rod 2, the inserting and connecting I-shaped rod 8 can be pushed firstly, the inserting and connecting I-shaped rod 8 drives the positioning block 7 to move, the positioning block 7 drives the linkage groove block 14 to move to the position below one end of the transverse embedding supporting block 15, then the pulling concave block 16 is held to drive the transverse embedding supporting block 15 to move downwards, the transverse embedding supporting block 15 is inserted into the inner positions of the limiting groove block 13 and the linkage groove block 14, so that a gap is formed between the limiting groove block 13 and the linkage groove block 14, after the plurality of linkage detaching rods 3 do not rebound again to limit, the worker does not push the inserting and connecting I-shaped rod 8 any more, namely, the worker can lift the telescopic supporting rod 2 upwards by two hands to move upwards, and directly stand on the ground to push the telescopic supporting rod 2, the worker can limit the connecting position by himself and detach the connecting position, and the device is suitable for detaching the worker.
The points to be finally explained are: first, in the description of the present application, it should be noted that, unless otherwise specified and limited, the terms "mounted," "connected," and "connected" should be understood broadly, and may be a mechanical connection or an electrical connection, or a communication between two elements, and may be a direct connection, and "upper," "lower," "left," and "right" are only used to indicate a relative positional relationship, and when the absolute position of the object to be described is changed, the relative positional relationship may be changed;
secondly, the method comprises the following steps: in the drawings of the disclosed embodiments of the present invention, only the structures related to the disclosed embodiments are referred to, and other structures can refer to the common design, and under the condition of no conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
and finally: the above description is only for the preferred embodiment of the present invention and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (7)

1. The utility model provides a building site is with dismantling scaffold frame that connects soon, includes four support cylinder (1), every the inside of support cylinder (1) all is equipped with sliding connection's telescopic strut (2), its characterized in that: a linkage dismounting component is embedded into one side of the telescopic supporting rod (2);
linkage disassembly assembly sets up linkage disassembly bar (3) in telescopic strut (2) one side including the embedding, the outer wall of linkage disassembly bar (3) just is located one side position department of a support section of thick bamboo (1) and installs solid fixed ring (4), and one side of solid fixed ring (4) is equipped with extrusion spring (5) that are used for kick-backing, the outer wall of linkage disassembly bar (3) just is located the welding of one end position department of extrusion spring (5) and has extrusion ring (6), is fixed with locating piece (7) in one side of extrusion ring (6), the top activity of locating piece (7) is pegged graft and is had the grafting worker shape pole (8) that the cross sectional shape established to worker shape.
2. The detachable quick-connection scaffold for the construction site according to claim 1, wherein: the fixing ring (4) is movably connected with the linkage dismounting rod (3), and the outer wall of the linkage dismounting rod (3) is polished.
3. The detachable quick-connection scaffold for the construction site according to claim 1, wherein: the fixing ring (4) and the supporting cylinder (1) are fixed in a welding mode, and the inner wall of the fixing ring (4) is polished.
4. The detachable quick-connection scaffold for the construction site according to claim 1, wherein: each bottom of the supporting cylinder (1) is provided with a supporting bottom block (9), and the cross section area of the supporting bottom block (9) is larger than that of the bottom of the supporting cylinder (1).
5. The detachable quick-connecting scaffold for the construction site according to claim 1, characterized in that: the top of the supporting cylinder (1) is fixed with a supporting top block (10), a rectangular support (11) with a rectangular cross section is movably inserted into the top of the supporting top block (10), and a clamping platform (12) is movably clamped on the top of the rectangular support (11).
6. The detachable quick-connection scaffold for the construction site according to claim 1, wherein: the outer wall of a supporting cylinder (1) is fixed with limiting groove block (13), one side of the limiting groove block (13) is provided with a linkage groove block (14), a transverse embedding support block (15) which is mutually spliced is installed above the limiting groove block (13), and a pulling concave block (16) is welded at the top end of the transverse embedding support block (15).
7. The detachable quick-connection scaffold for the construction site according to claim 6, wherein: the bottom end of the transverse embedded support block (15) is subjected to rounding treatment.
CN202222370578.9U 2022-09-07 2022-09-07 Building site is with dismantling scaffold frame that connects soon Active CN218438096U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222370578.9U CN218438096U (en) 2022-09-07 2022-09-07 Building site is with dismantling scaffold frame that connects soon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222370578.9U CN218438096U (en) 2022-09-07 2022-09-07 Building site is with dismantling scaffold frame that connects soon

Publications (1)

Publication Number Publication Date
CN218438096U true CN218438096U (en) 2023-02-03

Family

ID=85102645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222370578.9U Active CN218438096U (en) 2022-09-07 2022-09-07 Building site is with dismantling scaffold frame that connects soon

Country Status (1)

Country Link
CN (1) CN218438096U (en)

Similar Documents

Publication Publication Date Title
CN109339425B (en) Supporting platform for building construction and installation method thereof
CN218438096U (en) Building site is with dismantling scaffold frame that connects soon
CN213597553U (en) Fixing support for building engineering template
CN104989098A (en) Laminated plate support frame
CN209990179U (en) Construction safety protection support frame
CN112177378A (en) Support frame for construction
CN214786123U (en) Hydraulic hoisting ceiling system
CN211597685U (en) Scaffold convenient to assemble and disassemble for green building
CN213654364U (en) Many function combination formula removes protection canopy
CN115787474A (en) Bridge pier column moving operation platform and construction method
CN210141020U (en) A assembled building room roof beam supports steelframe for green building
JP2015045131A (en) Underground beam bar arrangement method using vertically separable frame for underground beam bar arrangement and the frame
CN212388363U (en) A auxiliary device for construction of hollow mound cross slab of bridge
CN210263824U (en) Scaffold frame of building engineering construction usefulness
CN216713748U (en) Platform combination device and combined platform equipment
CN212795378U (en) Vertical steel bar connection operating means of prefabricated post of normal position
CN112663943A (en) Building structure wall construction method
CN210177920U (en) Scaffold frame for assembly type building
CN212077647U (en) Quick support for construction of cast-in-place beam of bridge engineering
CN212507261U (en) Scaffold for building construction
CN216641467U (en) Assembled building frame for unloading platform
CN212802448U (en) Assembled outer wall scaffold
CN220790530U (en) Temporary operation platform for high-altitude operation
CN219343967U (en) Externally hung scaffold mounting device
CN219471510U (en) Scaffold prop up and stand device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant