CN218437099U - Foundation ditch quick installation supporting construction - Google Patents
Foundation ditch quick installation supporting construction Download PDFInfo
- Publication number
- CN218437099U CN218437099U CN202222675434.4U CN202222675434U CN218437099U CN 218437099 U CN218437099 U CN 218437099U CN 202222675434 U CN202222675434 U CN 202222675434U CN 218437099 U CN218437099 U CN 218437099U
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- installation
- bracing
- mounting
- fixed block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
The utility model discloses a quick mounting support structure of foundation ditch relates to the excavation supporting technology field, improves the lower problem of current support structure installation effectiveness, including foundation ditch, bottom plate, a backplate and bracing, the both ends of bracing all are provided with the installation piece, the fixed slot has all been seted up to the both sides of installation piece, the surface of bottom plate and a backplate all is provided with the mount pad, the mounting groove with installation piece looks adaptation is seted up at the middle part of mount pad, the spout has all been seted up to the both sides of mounting groove, the inside of spout is provided with the spring, the one end that the spring is close to the mounting groove is connected with the fixed block with fixed slot looks adaptation. The utility model discloses a setting of installation piece, fixed slot, mount pad, mounting groove, spring and fixed block only needs insert the fixed slot with the installation piece at bracing both ends in, makes the spring promote the fixed block and inserts in the fixed slot, can fix the both ends of bracing, realizes the quick installation of bracing, and the simple operation improves the installation effectiveness.
Description
Technical Field
The utility model belongs to the technical field of the excavation supporting and specifically relates to a quick mounting support structure of foundation ditch is related to.
Background
The foundation pit is a soil pit excavated at the design position of the foundation according to the elevation of the foundation and the plane size of the foundation. During civil engineering construction, a foundation pit often needs to be excavated on the ground, and the foundation pit needs to be supported after being excavated so as to prevent the foundation pit from collapsing. Most of the existing supporting structures adopt supporting plates to support the side wall of a foundation pit, and a plurality of inclined struts are required to support and reinforce the supporting plates.
In the realization the utility model discloses in-process, the inventor discovers that there is following problem in this technique at least, when the installation bracing, generally adopts the bolt to fix, because the quantity that the bracing needs the installation is more, leads to the operation comparatively loaded down with trivial details, and the installation effectiveness is lower, consequently, provides a foundation ditch quick installation supporting construction now.
SUMMERY OF THE UTILITY MODEL
In order to improve the lower problem of current supporting construction installation effectiveness, the utility model provides a quick mounting support structure of foundation ditch.
The utility model provides a supporting construction is installed fast to foundation ditch adopts following technical scheme:
a quick foundation pit mounting and supporting structure comprises a foundation pit, a bottom plate mounted on the bottom wall of the foundation pit and a supporting and protecting plate mounted on the side wall of the foundation pit, wherein an inclined strut is mounted between the bottom plate and the supporting and protecting plate;
the both ends of bracing all are provided with the installation piece, the fixed slot has all been seted up to the both sides of installation piece, the bottom plate all is provided with the mount pad with the surface of a backplate, the mounting groove with installation piece looks adaptation is seted up at the middle part of mount pad, the spout has all been seted up to the both sides of mounting groove, the inside of spout is provided with the spring, the one end that the spring is close to the mounting groove is connected with the fixed block with fixed slot looks adaptation, the fixed block is close to one side fixedly connected with pull rod of spring.
Through adopting above-mentioned technical scheme, when the installation, only need insert the fixed slot with the installation piece at bracing both ends, make the spring exert elasticity to the fixed block, make the fixed block insert in the fixed slot, can fix the both ends of bracing, realize the quick installation of bracing, the simple operation improves the installation effectiveness.
Optionally, the bottom plate is fixed on the bottom wall of the foundation pit through a first anchor rod.
Through adopting above-mentioned technical scheme, can fix the diapire of bottom plate and foundation ditch.
Optionally, the supporting plate is fixed on the side wall of the foundation pit through a second anchor rod.
Through adopting above-mentioned technical scheme, can fix the lateral wall of a backplate and foundation ditch.
Optionally, the fixed block is provided with a guide inclined surface facing the opening of the mounting groove.
Through adopting above-mentioned technical scheme, the guide inclined plane can be in the easy to assemble piece gets into the mounting groove.
Optionally, a limiting groove is formed in the inner side wall of the sliding groove, limiting blocks are fixedly connected to the two sides of the fixing block, and the limiting blocks are connected in the limiting groove in a sliding mode.
Through adopting above-mentioned technical scheme, through the cooperation of stopper and spacing groove, can play limiting displacement to the fixed block, reduce the condition that the fixed block breaks away from in the spout.
Optionally, a handle is fixedly mounted at one end of the pull rod.
Through adopting above-mentioned technical scheme, use the handle to conveniently stimulate the pull rod.
Optionally, the inclined strut comprises a sleeve and a connecting rod inserted at two ends of the sleeve.
Through adopting above-mentioned technical scheme, make the connecting rod can be in the sleeve internalization.
Optionally, positioning bolts are inserted into both ends of the sleeve, and a plurality of positioning grooves matched with the positioning bolts are formed in one end, close to the sleeve, of the connecting rod at equal intervals.
Through adopting above-mentioned technical scheme, insert the positioning bolt in the constant head tank of difference, can adjust the length of bracing.
To sum up, the utility model discloses following beneficial effect has:
1. the utility model discloses a bracing, installation piece, fixed slot, mount pad, mounting groove, spring, fixed block and pull rod set up, when the installation, only need insert the installation piece at bracing both ends in the fixed slot, make the spring exert elasticity to the fixed block, make the fixed block insert in the fixed slot, can fix both ends of bracing, realize the quick installation of bracing, the simple operation improves the installation effectiveness, when needing to dismantle, only need to stimulate the use handle and stimulate the pull rod, make the pull rod drive the fixed block and shift out from the fixed slot, can relieve the fixed that both ends of bracing received, realize the quick dismantlement of bracing, improve and dismantle efficiency;
2. the utility model discloses a cooperation of sleeve, connecting rod, positioning bolt and constant head tank, insert different constant head tanks with positioning bolt in, can adjust the length of bracing, facilitate the use.
Drawings
Fig. 1 is a schematic view of the overall structure of the present invention.
Fig. 2 is a schematic sectional view of the mounting base of the present invention.
Fig. 3 is a schematic sectional structure view of the inclined strut of the present invention.
Description of reference numerals:
1. a foundation pit; 2. a base plate; 3. supporting a guard plate; 4. bracing; 401. a sleeve; 402. a connecting rod; 403. positioning the bolt; 404. positioning a groove; 5. mounting blocks; 6. a fixing groove; 7. a mounting seat; 8. mounting grooves; 9. a chute; 10. a spring; 11. a fixed block; 12. a pull rod; 13. a first anchor rod; 14. a second anchor rod; 15. a limiting groove; 16. a limiting block; 17. a handle.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
Referring to fig. 1, a supporting structure for quickly installing a foundation pit comprises a foundation pit 1, a bottom plate 2 installed on the bottom wall of the foundation pit 1 and a supporting plate 3 installed on the side wall of the foundation pit 1, wherein the bottom plate 2 is fixed on the bottom wall of the foundation pit 1 through a first anchor rod 13, and the supporting plate 3 is fixed on the side wall of the foundation pit 1 through a second anchor rod 14. An inclined strut 4 is installed between the bottom plate 2 and the supporting plate 3, and the inclined strut 4 is used for supporting and reinforcing the supporting plate 3.
Referring to fig. 1 and 2, both ends of bracing 4 all are provided with installation piece 5, fixed slot 6 has all been seted up to the both sides of installation piece 5, bottom plate 2 and 3 surface of supporting plate all are provided with mount pad 7, the mounting groove 8 with installation 5 looks adaptation is seted up at the middle part of mount pad 7, spout 9 has all been seted up to the both sides of mounting groove 8, the inside of spout 9 is provided with spring 10, spring 10 is close to the one end of mounting groove 8 be connected with the fixed block 11 with 6 looks adaptations of fixed slot, fixed block 11 is provided with the guide inclined plane towards 8 open-ended directions of mounting groove, when the installation, only need insert in the fixed slot 6 with the installation piece 5 at bracing 4 both ends, make spring 10 exert elasticity to fixed block 11, make in fixed block 11 inserts fixed slot 6, can fix the both ends of bracing 4, realize the quick installation of bracing 4, and convenient for operation, and high installation efficiency.
Wherein, the inside wall of spout 9 has seted up spacing groove 15, and the equal fixedly connected with stopper 16 in both sides of fixed block 11, stopper 16 sliding connection can play limiting displacement to fixed block 11 in spacing groove 15 through stopper 16 and spacing groove 15's cooperation, reduce the condition that fixed block 11 breaks away from in the spout 9.
Referring to fig. 1 and 2, in order to detach the inclined strut 4 conveniently, the fixing block 11 is close to one side fixedly connected with pull rod 12 of the spring 10, one end fixed mounting of the pull rod 12 is provided with a handle 17, when the inclined strut is detached, the pull rod 12 is pulled by the handle 17, the pull rod 12 drives the fixing block 11 to move out of the fixing groove 6, the fixing of the two ends of the inclined strut 4 can be removed, the inclined strut 4 can be detached quickly, and the detachment efficiency is improved.
Referring to fig. 1 and 3, bracing 4 includes sleeve 401 and the connecting rod 402 of pegging graft at sleeve 401 both ends, all pegging graft at sleeve 401's both ends has positioning bolt 403, connecting rod 402 is close to sleeve 401's one end equidistance and has seted up a plurality ofly and positioning bolt 403 looks adaptation's constant head tank 404, through sleeve 401, connecting rod 402, positioning bolt 403 and positioning tank 404's cooperation, connecting rod 402 can be at sleeve 401 internalization, insert positioning bolt 403 in the different constant head tanks 404, can adjust bracing 4's length, facilitate the use.
The utility model discloses an implement the principle and do: when the installation, only need insert the installation piece 5 at 4 both ends of bracing in fixed slot 6, make spring 10 exert elasticity to fixed block 11, make fixed block 11 insert in fixed slot 6, can fix the both ends of bracing 4, realize the quick installation of bracing 4, the simple operation, the installation effectiveness is improved, when needs are dismantled, only need the pulling to use handle 17 pulling pull rod 12, make pull rod 12 drive fixed block 11 and shift out from fixed slot 6, can remove the fixed of bracing 4 both ends receipt, realize the quick dismantlement of bracing 4, the efficiency of dismantlement is improved.
The above is the preferred embodiment of the utility model, not limit according to this the utility model discloses a protection scope, the event: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.
Claims (8)
1. The utility model provides a foundation ditch quick installation supporting construction, includes foundation ditch (1), installs bottom plate (2) on foundation ditch (1) diapire and installs backplate (3) on foundation ditch (1) lateral wall, its characterized in that: an inclined strut (4) is arranged between the bottom plate (2) and the supporting plate (3);
the utility model discloses a mounting structure, including bracing (4), bracing piece (4), mounting block (5), fixed slot (6), bottom plate (2) and supporting plate (3), the surface of mounting block (7) all is provided with mounting seat (7), mounting groove (8) with mounting block (5) looks adaptation are seted up at the middle part of mounting seat (7), spout (9) have all been seted up to the both sides of mounting groove (8), the inside of spout (9) is provided with spring (10), the one end that spring (10) are close to mounting groove (8) is connected with fixed block (11) with fixed slot (6) looks adaptation, one side fixedly connected with pull rod (12) that fixed block (11) are close to spring (10).
2. The foundation pit rapid installation supporting structure of claim 1, wherein: the bottom plate (2) is fixed on the bottom wall of the foundation pit (1) through a first anchor rod (13).
3. The foundation pit rapid installation supporting structure of claim 1, wherein: the supporting and protecting plate (3) is fixed on the side wall of the foundation pit (1) through a second anchor rod (14).
4. The quick foundation pit installation and support structure of claim 1, wherein: the fixed block (11) is provided with a guide inclined plane towards the opening direction of the mounting groove (8).
5. The foundation pit rapid installation supporting structure of claim 1, wherein: spacing groove (15) have been seted up to the inside wall of spout (9), the equal fixedly connected with stopper (16) in both sides of fixed block (11), stopper (16) sliding connection is in spacing groove (15).
6. The quick foundation pit installation and support structure of claim 1, wherein: and one end of the pull rod (12) is fixedly provided with a handle (17).
7. The foundation pit rapid installation supporting structure of claim 1, wherein: the inclined strut (4) comprises a sleeve (401) and connecting rods (402) inserted at two ends of the sleeve (401).
8. The quick foundation pit installation and support structure of claim 7, wherein: positioning bolts (403) are inserted into two ends of the sleeve (401), and a plurality of positioning grooves (404) matched with the positioning bolts (403) are formed in one end, close to the sleeve (401), of the connecting rod (402) at equal intervals.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222675434.4U CN218437099U (en) | 2022-10-10 | 2022-10-10 | Foundation ditch quick installation supporting construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222675434.4U CN218437099U (en) | 2022-10-10 | 2022-10-10 | Foundation ditch quick installation supporting construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218437099U true CN218437099U (en) | 2023-02-03 |
Family
ID=85042896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222675434.4U Active CN218437099U (en) | 2022-10-10 | 2022-10-10 | Foundation ditch quick installation supporting construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218437099U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116427419A (en) * | 2023-02-23 | 2023-07-14 | 中建八局第三建设有限公司 | Supporting structure |
-
2022
- 2022-10-10 CN CN202222675434.4U patent/CN218437099U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116427419A (en) * | 2023-02-23 | 2023-07-14 | 中建八局第三建设有限公司 | Supporting structure |
CN116427419B (en) * | 2023-02-23 | 2023-09-22 | 中建八局第三建设有限公司 | Supporting structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218437099U (en) | Foundation ditch quick installation supporting construction | |
CN210562893U (en) | Steel bar truss floor board convenient to installation | |
CN114775634B (en) | Auxiliary construction equipment for deep foundation pit support of building construction | |
CN113718799B (en) | Quick emergency diagonal bracing for foundation pit rescue and construction method thereof | |
CN218880868U (en) | Foundation pit support structure | |
CN210507466U (en) | Deep-buried foundation pit supporting structure for engineering | |
CN114525792A (en) | Foundation pit supporting device for civil engineering and construction method thereof | |
CN112323852A (en) | Temporary light soil retaining structure for side slope and construction method | |
CN212026256U (en) | Guide platform for building | |
CN213625641U (en) | Light-duty retaining structure suitable for interim side slope is strutted | |
CN211395652U (en) | Steel-pipe pile foundation reinforced structure | |
CN113356231A (en) | Steel truss type foundation pit supporting structure | |
CN218291660U (en) | Assembled acoustic celotex board | |
CN221218678U (en) | Water retaining device for hydraulic engineering construction | |
CN113089685B (en) | Anchor cable drilled pile structure for deep foundation pit support and support method thereof | |
CN214614116U (en) | A bearing structure behind wall that leads for underground continuous wall construction | |
CN214783971U (en) | Steel sheet pile supporting construction | |
CN218148406U (en) | Foundation pit supporting structure for construction engineering construction | |
CN214194567U (en) | Retaining structure for foundation pit | |
CN219118907U (en) | Fixed base of communication tower | |
CN218206725U (en) | Pipe shed supporting device for water delivery tunnel construction | |
CN221297888U (en) | Deep foundation pit pile anchor supporting structure | |
CN219197372U (en) | Underground engineering roadway lets presses stock | |
CN219568905U (en) | Foundation pit support structure | |
CN220955622U (en) | Assembled guide table suitable for ultra-large diameter shield launching and receiving |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |