CN218421544U - Water cyclic utilization device for building engineering - Google Patents

Water cyclic utilization device for building engineering Download PDF

Info

Publication number
CN218421544U
CN218421544U CN202222804378.XU CN202222804378U CN218421544U CN 218421544 U CN218421544 U CN 218421544U CN 202222804378 U CN202222804378 U CN 202222804378U CN 218421544 U CN218421544 U CN 218421544U
Authority
CN
China
Prior art keywords
water
tank
sedimentation tank
water pump
filter element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222804378.XU
Other languages
Chinese (zh)
Inventor
范天恩
唐芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tirong Guangdong Engineering Technology Co ltd
Original Assignee
Meizhou Jinxiang Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meizhou Jinxiang Engineering Consulting Co ltd filed Critical Meizhou Jinxiang Engineering Consulting Co ltd
Priority to CN202222804378.XU priority Critical patent/CN218421544U/en
Application granted granted Critical
Publication of CN218421544U publication Critical patent/CN218421544U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses a water cyclic utilization device for building engineering, including sedimentation tank, transition pond and filtering mechanism, the sedimentation tank with be provided with the baffle between the transition pond, be provided with intercommunication or closure on the baffle the sedimentation tank with the accuse water structure of transition pond, filtering mechanism includes first water pump, second water pump and filter element group spare, first water pump removes water through the body extremely the filter element group spare, through with water drainage after the filter element group spare passes through in the filter pond, the second water pump passes through the body extraction water in the filter pond carries out preliminary sedimentation to waste water through the sedimentation tank, carries out prefiltration with graininess silt, then water after the prefiltration enters into the transition pond through accuse water structure, then first water pump extraction water in the transition pond passes through the filter element group spare filters it, enters into the water after filtering in the filter pond, the rethread the second water pump is taken out, recycles it.

Description

Water cyclic utilization device for building engineering
Technical Field
The utility model relates to a hydrologic cycle equipment field especially relates to a water cyclic utilization device for building engineering.
Background
In construction activities, a large amount of water is generally needed, and water is needed for assistance in many processes, so that a large amount of water is wasted. At present in the building activity, some waste water is mostly directly to be clapped on the ground, through nature infiltration underground or natural drying, not only causes the pollution to soil easily, causes water waste easily moreover, consequently needs a urgent need on the building site can carry out filterable equipment to building waste water, realizes water cyclic utilization.
SUMMERY OF THE UTILITY MODEL
In view of this, the utility model discloses a water cyclic utilization device for building engineering can realize the filtration of building engineering expense, makes its cyclic utilization.
The utility model discloses a water cyclic utilization device for building engineering, including sedimentation tank, transition pond and filtering mechanism, the transition pond sets up one side of sedimentation tank, the sedimentation tank with be provided with the baffle between the transition pond, be provided with intercommunication or closure on the baffle the sedimentation tank with the accuse water structure of transition pond, filtering mechanism includes first water pump, second water pump and filter element group spare, filter element group spare sets up and is being close to in the filter tank of transition pond, first water pump passes through the body with water removal extremely filter element group spare, through filter element group spare is gone into with the water after the cross in the filter tank, the second water pump passes through the body extraction water in the filter tank.
Further, the outside of sedimentation tank is provided with the suction pump, the suction pump passes through the water pipe with the muddy water suction in the sedimentation tank.
Furthermore, one side of sedimentation tank is provided with scrapes the mud mouth, it sets up to scrape the mud mouth the position that the sedimentation tank side is close to the bottom surface, it is provided with the closing plate to scrape mud mouth department, the closing plate pass through the screw with the side of sedimentation tank is connected, is used for sealing scrape the mud mouth, the closing plate with the cooperation has the sealing member between the side of sedimentation tank.
Further, the sealing element is a sealing rubber gasket.
Furthermore, a plurality of fixing feet are fixedly arranged on the outer side wall of the sedimentation tank, and the fixing feet can be fixed on the ground through expansion wires.
Furthermore, the water control structure comprises a plurality of through holes arranged on the partition board and a fixing plate for controlling the through holes to open and close, and the through holes are used for communicating the sedimentation tank with the transition tank.
Furthermore, a sliding groove is formed in the partition plate, the fixing plate slides along the sliding groove and is used for controlling the communication and the partition of the sedimentation tank and the transition tank, and the fixing plate is attached to the partition plate and slides.
Further, the through hole is located at the top end of the partition plate.
Further, still include first inlet tube and first outlet pipe, first inlet tube intercommunication the transition pond with first water pump water inlet, first outlet pipe intercommunication the delivery port of first water pump with the end of intaking of filter element group spare, the play water end intercommunication of filter element group spare the filtering ponds.
Furthermore, the first water pump and the second water pump are fixed on the outer side of the filter tank through mounting plates.
The technical scheme of the utility model, compared with the prior art, beneficial effect is:
carry out preliminary sedimentation to waste water through the sedimentation tank, carry out the prefilter with graininess silt, then water after the prefilter enters into the transition pond through accuse water structure, then first water pump extraction water in the transition pond passes through filter element group spare filters it, and the log raft after will filtering is gone into in the filter pond, the rethread the second water pump is taken out, recycles it.
Drawings
FIG. 1 is a schematic structural view of a water recycling device;
FIG. 2 is a top view of the water recycling device;
FIG. 3 is a schematic view of a baffle and water control structure;
description of the figures
100. A water recycling device; 10. a sedimentation tank; 11. a fixing leg; 12. a mud scraping port; 13. a sealing plate; 14. a partition plate; 15. a water control structure; 151. a through hole; 152. a fixing plate; 20. a transition pool; 30. a filtration tank; 40. a filter element assembly; 50. a first water pump; 51. a first water inlet pipe; 52. a first water outlet pipe; 60. and a second water pump.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it should be noted that when one component is considered to be "connected" to another component, it may be directly connected to the other component or intervening components may exist. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. It should also be noted that, unless expressly stated or limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly and can include, for example, fixed connections, removable connections, or integral connections; either mechanically or electrically, and may be internal to both elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention.
It should be further noted that in the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, but does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
As shown in fig. 1 and fig. 2, the utility model discloses a water recycling device 100 for building engineering for filter the building engineering water, make it can be by reuse.
The water recycling device 100 for the construction engineering comprises a sedimentation tank 10, a transition tank 20 and a filtering mechanism, wherein the water for the construction engineering is firstly discharged into the sedimentation tank 10, preliminary sedimentation is carried out through the sedimentation tank 10, particulate matters such as sand and stone are preliminarily precipitated, then the water after the preliminary sedimentation is discharged into the transition tank 20, and the filtering mechanism pumps water from the transition tank 20 and filters the water.
The transition tank 20 is arranged at one side of the sedimentation tank 10, and the filtering mechanism is connected with the transition tank 20.
In this application, the outside of sedimentation tank 10 is provided with suction pump 70, suction pump 70 passes through the water pipe with the muddy water suction in the sedimentation tank 10.
One side of sedimentation tank 10 is provided with scrapes mud mouth 12, it sets up to scrape mud mouth 12 the position that the sedimentation tank 10 side is close to the bottom surface, it is provided with closing plate 13 to scrape mud mouth 12 department, closing plate 13 pass through the screw with the side of sedimentation tank 10 is connected, is used for sealing scrape mud mouth 12, closing plate 13 with the cooperation has the sealing member between the side of sedimentation tank 10. Specifically, when the bottom deposit of sedimentation tank 10 has a large amount of silt, can be right sedimentation tank 10 clears up, during the clearance, piles up silt scrape mud mouth 12 play, shifts out silt through scraping mud mouth 12 the outside of sedimentation tank 10. The sealing plate 13 is arranged to seal the mud scraping port 12, so that water is prevented from flowing out of the mud scraping port 12 when sediment is not cleaned.
Further, the sealing element is a sealing rubber gasket. The sealing plate 13 may be fixedly connected to a side plate of the settling tank 10 by screws.
Further, a plurality of fixing legs 11 are fixedly arranged on the outer side wall of the sedimentation tank 10, and the fixing legs 11 can be fixed on the ground through expansion wires. In general, the sedimentation tank 10 is fixed on a hard ground, and then is locked and fixed by the expansion screws through the fixing legs 11.
Further, a partition plate 14 is arranged between the sedimentation tank 10 and the transition tank 20, a water control structure 15 for communicating or closing the sedimentation tank 10 and the transition tank 20 is arranged on the partition plate 14, water after sedimentation can pass through the partition plate 14 through the water control structure 15 and enter the transition tank 20, and when standing sedimentation is carried out in the sedimentation tank 10, the water control structure 15 prevents the water in the sedimentation tank 10 from entering the transition tank 20.
As shown in fig. 3, further, the water control structure 15 includes a plurality of through holes 151 disposed on the partition 14, and a fixing plate 152 for controlling the opening and closing of the through holes 151, wherein the through holes 151 are used for communicating the sedimentation tank 10 and the transition tank 20. The through hole 151 is located at the top end of the partition 14, and when the water in the sedimentation tank 10 reaches a certain water level, the water after standing and sedimentation in the sedimentation tank 10 enters the transition tank 20 through the through hole 151.
The partition plate 14 is provided with a sliding groove 141, the fixing plate 152 slides along the sliding groove 141 to control the communication and the partition of the sedimentation tank 10 and the transition tank 20, and the fixing plate 152 is attached to the partition plate 14 to slide. When the fixing plate 152 shields the through hole 151, the sedimentation tank 10 and the transition tank 20 are isolated, and when the fixing plate 152 slides upward for a certain distance, the fixing plate 152 opens the through hole 151.
Further, the filter mechanism includes a first water pump 50, a second water pump 60 and a filter element assembly 40, the filter element assembly 40 is disposed near the filter tank 30 of the transition tank 20, the first water pump 50 moves water to the filter element assembly 40 through a pipe body, the water is discharged into the filter tank 30 after passing through the filter element assembly 40, and the second water pump 60 extracts the water in the filter tank 30 through the pipe body. Specifically, still include first inlet tube 51 and first outlet pipe 52, first inlet tube 51 intercommunication the transition pond 20 with the water inlet of first water pump 50, first outlet pipe 52 intercommunication the delivery port of first water pump 50 with the intake end of filter element group 40, the delivery end intercommunication of filter element group 40 the filtering ponds 30. During operation, first water pump 50 extracts through first inlet tube 51 the water in the transition pond 20 to through first outlet pipe 52 with it transmit to in the filter element group spare 40, through filter element group spare 40 filters it, and with the drainage after the filtration to in the filtering ponds 30, second water pump 60 extracts the water in the filtering ponds 30 is with cyclic utilization.
Further, the first water pump 50 and the second water pump 60 are fixed to the outside of the filtering tank 30 by a mounting plate.
The present invention can be designed in various embodiments and modifications without departing from the spirit and scope of the present invention in its broadest sense, and the above-described embodiments are intended to illustrate the present invention, but not to limit the scope of the present invention.

Claims (10)

1. The utility model provides a water cyclic utilization device for building engineering, its characterized in that, includes sedimentation tank, transition pond and filtering mechanism, the transition pond sets up one side of sedimentation tank, the sedimentation tank with be provided with the baffle between the transition pond, be provided with intercommunication or closure on the baffle the sedimentation tank with the accuse water structure of transition pond, filtering mechanism includes first water pump, second water pump and filter element group spare, filter element group spare sets up and is being close to in the filter tank of transition pond, first water pump passes through the body with water removal extremely filter element group spare, through filter element group spare is gone into with the water in the back the filter tank, the second water pump passes through the body extraction water in the filter tank.
2. The water recycling device for construction engineering as claimed in claim 1, wherein a suction pump is provided outside the settling tank, and the suction pump pumps muddy water into the settling tank through a water pipe.
3. The water recycling device for constructional engineering as recited in claim 2, wherein a mud scraping port is provided at one side of the sedimentation tank, the mud scraping port is provided at a position close to the bottom surface of the side of the sedimentation tank, a sealing plate is provided at the mud scraping port, the sealing plate is connected with the side of the sedimentation tank through a screw for sealing the mud scraping port, and a sealing member is fitted between the sealing plate and the side of the sedimentation tank.
4. The water recycling device for construction engineering as claimed in claim 3, wherein the sealing member is a sealing rubber pad.
5. The water recycling device for construction engineering as claimed in claim 1, wherein a plurality of fixing legs are fixedly provided on the outer side wall of the settling tank, and the fixing legs can be fixed on the ground through expansion wires.
6. The water recycling device for construction engineering as claimed in claim 1, wherein the water control structure comprises a plurality of through holes disposed on the partition plate and a fixing plate for controlling the opening and closing of the through holes, and the through holes are used for communicating the sedimentation tank and the transition tank.
7. The water recycling device for building engineering according to claim 6, wherein the partition plate is provided with a sliding groove, the fixing plate slides along the sliding groove to control the communication and the partition of the sedimentation tank and the transition tank, and the fixing plate slides along the partition plate.
8. The construction work water recycling device according to claim 7, wherein the through hole is formed at a top end of the partition.
9. The water recycling device for building engineering as claimed in claim 8, further comprising a first water inlet pipe and a first water outlet pipe, wherein the first water inlet pipe is communicated with the transition tank and the first water pump inlet, the first water outlet pipe is communicated with the water outlet of the first water pump and the water inlet end of the filter element assembly, and the water outlet end of the filter element assembly is communicated with the filter tank.
10. The water recycling device for construction engineering according to claim 9, wherein the first water pump and the second water pump are fixed to the outside of the filtering tank by a mounting plate.
CN202222804378.XU 2022-10-22 2022-10-22 Water cyclic utilization device for building engineering Active CN218421544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222804378.XU CN218421544U (en) 2022-10-22 2022-10-22 Water cyclic utilization device for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222804378.XU CN218421544U (en) 2022-10-22 2022-10-22 Water cyclic utilization device for building engineering

Publications (1)

Publication Number Publication Date
CN218421544U true CN218421544U (en) 2023-02-03

Family

ID=85069685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222804378.XU Active CN218421544U (en) 2022-10-22 2022-10-22 Water cyclic utilization device for building engineering

Country Status (1)

Country Link
CN (1) CN218421544U (en)

Similar Documents

Publication Publication Date Title
CN106746030A (en) A kind of inorganic chemical industry purification tank for liquid waste for improving waste water cleannes
CN218421544U (en) Water cyclic utilization device for building engineering
CN105268219A (en) Easy backwashing gravity type valve-free filtration pool
CN217795003U (en) Filter device for cleaning sewage suction truck
CN204307421U (en) The gravity valveless filter of easy backwash
CN206778012U (en) Filter for pure water production
CN212388647U (en) Hydraulic engineering desilting device
CN213865741U (en) Dephosphorization formula sewage treatment integration equipment
CN212974445U (en) Horizontal flow type sedimentation tank for sewage treatment
CN210786510U (en) Sludge discharge device for sewage treatment
CN209865516U (en) Environment-friendly sewage treatment plant
CN2647850Y (en) Apparatus for dirty sand containing oil separating washing and dirty oil recovering
CN105126437A (en) Multi-stage composite filtration device
CN2630230Y (en) Extracorporeal circulating walnut-shell cleaning filter
CN216950282U (en) Mud circulation deposits structure
CN218860491U (en) Water quality circulating filter device
CN215026301U (en) Filter tank for sewage treatment
CN210583820U (en) Sewage treatment is with deposiing device
CN209957592U (en) Filtration type underground integrated sewage treatment equipment
CN209809723U (en) Precipitation filtration rainwater collection port
CN210814268U (en) Slag flushing tank filtering and back-blowing device
CN213773742U (en) Simple filter for rainwater collection
CN208493527U (en) A kind of industrial wastewater filtering-depositing device
CN219156941U (en) Leaching device for rare earth metal processing
CN219508782U (en) Drainage device convenient for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 514000, Store 2113, Building 2, Guangmei Green Innovation Center, Guangdong Meizhou High tech Industrial Park, Shejiang, Meixian District, Meizhou City, Guangdong Province

Patentee after: Tirong (Guangdong) Engineering Technology Co.,Ltd.

Country or region after: China

Address before: 514000 Single-storey shop, No. 25, Building A6 and A8, Hesheng Garden, No. 5, Huayin New Area, Meixian District, Meizhou City, Guangdong Province

Patentee before: Meizhou Jinxiang Engineering Consulting Co.,Ltd.

Country or region before: China