CN218408788U - Pipeline hoisting structure of gas design - Google Patents

Pipeline hoisting structure of gas design Download PDF

Info

Publication number
CN218408788U
CN218408788U CN202222405504.4U CN202222405504U CN218408788U CN 218408788 U CN218408788 U CN 218408788U CN 202222405504 U CN202222405504 U CN 202222405504U CN 218408788 U CN218408788 U CN 218408788U
Authority
CN
China
Prior art keywords
shaped frame
fixed
gas
hoisting structure
slides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222405504.4U
Other languages
Chinese (zh)
Inventor
朱宏
谢昊宇
姜耀
赵华鑫
吕鼎
曹经天
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Gas Design And Research Institute
Original Assignee
Wuhu Gas Design And Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Gas Design And Research Institute filed Critical Wuhu Gas Design And Research Institute
Priority to CN202222405504.4U priority Critical patent/CN218408788U/en
Application granted granted Critical
Publication of CN218408788U publication Critical patent/CN218408788U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/10Internal combustion engine [ICE] based vehicles
    • Y02T10/30Use of alternative fuels, e.g. biofuels

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to a gas pipeline lays the field, discloses a pipeline hoisting structure of gas design, including the U-shaped frame, the U-shaped frame has two vertical parts and a horizontal part, open U-shaped frame horizontal part upside has the spout, and slides in the spout and be equipped with a plurality of slides, slide upper portion slip is inserted and is equipped with the inserted block, and inserted block upper portion is fixed with the arc layer board, be equipped with between slide and the U-shaped frame and adjust chucking mechanism, the cover that all slides on two vertical parts is equipped with the sliding sleeve, and is fixed with the compression bar between two sliding sleeves, and two sliding sleeve one sides all are equipped with positioning bolt, and two vertical parts are kept away from one side lower part relatively and all are opened a plurality of screw thread locating holes, and screw thread locating hole and positioning bolt looks adaptation, two vertical part upper ends of U-shaped frame all are fixed with the mounting panel. The utility model discloses, with fixing device integration on the U-shaped frame for need not to use other auxiliary part during the installation pipeline, accelerated the installation process, arc layer board position is adjusted wantonly.

Description

Pipeline hoisting structure of gas design
Technical Field
The utility model belongs to the technical field of gas pipeline lays, specifically speaking relates to a pipeline hoisting structure of gas design.
Background
The gas pipe is a special pipeline for conveying combustible gas, and along with continuous propulsion of the urbanization process, every family needs to be connected with gas, so that the daily life is guaranteed, and after the gas pipe enters the interior of a building, the gas pipe needs to be fixed on the underground top wall of the building in a hoisting mode.
Current gas pipe hoisting structure is simple, lays the gas pipe behind gallows upper portion, still need utilize tools such as staple bolt to fix between pipeline and the gallows to staple bolt mounted position is fixed, makes the mounted position of pipeline on the gallows unique, is unfavorable for the installation.
In view of this special the utility model is put forward.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model adopts the following basic concept:
the utility model provides a pipeline hoisting structure of gas design, includes the U-shaped frame, the U-shaped frame has two vertical parts and a horizontal part, open U-shaped frame horizontal part upside has the spout, and slides in the spout and be equipped with a plurality of slides, slide upper portion slides and inserts and be equipped with the inserted block, and inserted block upper portion is fixed with the arc layer board, be equipped with between slide and the U-shaped frame and adjust chucking mechanism, the cover that all slides on two vertical parts is equipped with the sliding sleeve, and is fixed with the compression pole between two sliding sleeves, and two sliding sleeve one sides all are equipped with positioning bolt, and two vertical parts are kept away from one side lower part relatively and are all opened a plurality of screw thread locating holes, and screw thread locating hole and positioning bolt looks adaptation.
As a further improvement of the technical scheme, mounting plates are fixed at the upper ends of two vertical parts of the U-shaped frame, and a plurality of mounting holes are formed in the mounting plates.
As a further improvement of the technical scheme, a guide post is fixed between the inner walls of the two ends of the sliding groove and penetrates through the sliding seats and is in sliding connection with the sliding seats.
As a further improvement of the technical scheme, the adjusting and clamping mechanism comprises clamping teeth which are arranged on two sides of the sliding seat in a sliding mode, a plurality of tooth grooves are formed in two ends of the upper side of the horizontal part of the U-shaped frame, and the clamping teeth are matched with the tooth grooves.
As the further improvement of above-mentioned technical scheme, open on upper portion in the slide has the slot, the inserted block lower extreme extends to the slot in, and the relative both sides outer wall of slide has all opened the bar groove, the bar groove all is linked together with the slot, and the equal slip of bar inslot is equipped with two connecting blocks of connecting block and is close to one end relatively and be fixed in the inserted block both sides respectively, and two connecting blocks are kept away from one end relatively and are fixed in two latch one sides respectively.
As a further improvement of the technical scheme, a first protection pad is fixed on the upper portion of the arc-shaped supporting plate, and a second protection pad is fixed at the bottom of the pressing rod.
As a further improvement of the technical scheme, connecting plates are fixed on the lower portions of two ends of one side of the U-shaped frame, and a rotating roller is arranged between the two connecting plates in a rotating mode.
The utility model has the advantages as follows:
1. the utility model discloses, through a plurality of arc layer boards that the horizontal part set up on the U-shaped frame, cooperation U-shaped frame vertical part slides the compressing tightly pole that sets up and changes the roller, make us when the installation gas pipe, can set up pipeline one end earlier on changeing the roller, and then impel forward under the auxiliary stay effect of changeing the roller, until reacing next U-shaped frame, then put the pipeline to the level, make the pipeline set up on the arc layer board, many pipeline laying finish the back, only need compress tightly the pole gliding and compress tightly the pipeline upper wall, and then with positioning bolt tighten can, this device, with fixing device integration on U-shaped frame, need not to use other auxiliary component when making the installation pipeline, the installation process has been accelerated.
2. The utility model discloses, through sliding a plurality of arc layer boards through the slide and setting up on the U-shaped frame, chucking mechanism is adjusted in the cooperation for we can adjust the position of a plurality of arc layer boards according to actual need, only need to lift the arc layer board, make its latch and the tooth's socket separation that drives both sides through the inserted block, and then can transversely slide the regulation arc layer board position at will, adjust the back that finishes, loosen the arc layer board, in two latches block into the tooth's socket of both sides once more, automatic fixation.
The following describes embodiments of the present invention in further detail with reference to the accompanying drawings.
Drawings
In the drawings:
fig. 1 is a schematic perspective view of the present invention;
FIG. 2 is a schematic view of a partial three-dimensional structure of the present invention;
FIG. 3 is a schematic view of a partial three-dimensional structure of the present invention;
FIG. 4 is a schematic plan sectional view of the slide carriage of the present invention;
fig. 5 is a schematic view of the plane structure of the compressing rod of the present invention;
fig. 6 is a schematic view of the plane structure of the arc-shaped supporting plate of the present invention.
In the figure: 1. a U-shaped frame; 2. mounting a plate; 3. a sliding sleeve; 4. positioning a bolt; 5. threaded positioning holes; 6. a connecting plate; 7. rotating the roller; 8. a chute; 9. a slide base; 10. an arc-shaped supporting plate; 11. a tooth socket; 12. a compression bar; 13. a first protective pad; 14. inserting a block; 15. a strip-shaped groove; 16. connecting blocks; 17. clamping teeth; 18. a guide post; 19. a slot; 20. a second protective pad.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and the following embodiments are used to illustrate the present invention.
As shown in figures 1 to 6 of the drawings,
the utility model provides a pipeline hoisting structure of gas design, including U-shaped frame 1, U-shaped frame 1 has two vertical parts and a horizontal part, open the horizontal part upside of U-shaped frame 1 has spout 8, and slide in the spout 8 and be equipped with a plurality of slides 9, slide 9 upper portion slides and is inserted and be equipped with inserted block 14, and inserted block 14 upper portion is fixed with arc layer board 10, be equipped with the regulation chucking mechanism between slide 9 and the U-shaped frame 1, the cover that all slides on two vertical parts is equipped with sliding sleeve 3, and be fixed with compressing rod 12 between two sliding sleeve 3, 3 one side of two sliding sleeves all is equipped with positioning bolt 4, two vertical parts keep away from one side lower part relatively and all open and have a plurality of screw thread locating holes 5, and screw thread locating hole 5 and positioning bolt 4 looks adaptation, after the pipe erection, compressing rod 12 gliding compressing rod upper wall of pipeline, and then screwing up positioning bolt 4 and can fix the pipeline.
In the specific implementation mode, the upper ends of two vertical parts of the U-shaped frame 1 are both fixed with a mounting plate 2, and a plurality of mounting holes are opened on the mounting plate 2, a guide post 18 is fixed between the inner walls of two ends of the sliding chute 8, the guide post 18 penetrates through a plurality of sliding seats 9 and is connected with the sliding seats in a sliding manner, a first protection pad 13 is fixed on the upper part of the arc-shaped supporting plate 10, a second protection pad 20 is fixed at the bottom of the pressing rod 12, connecting plates 6 are fixed on the lower parts of two ends of one side of the U-shaped frame 1, and a rotating roller 7 is arranged between the two connecting plates 6 in a rotating manner, during installation, one end of a pipeline can be firstly erected on the rotating roller 7, and then forwards pushed under the auxiliary supporting effect of the rotating roller 7, and laying is assisted.
Further, adjust chucking mechanism and locate the latch 17 of slide 9 both sides including sliding, a plurality of tooth's grooves 11 have all been opened at 1 horizontal part upside both ends of U-shaped frame, latch 17 and tooth's groove 11 looks adaptation, upper portion opens has slot 19 in the slide 9, the 14 lower extreme of inserted block extends to in the slot 19, the relative both sides outer wall of slide 9 has all opened bar groove 15, bar groove 15 all is linked together with slot 19, and the equal slip of bar inslot 15 is equipped with two connecting blocks 16 of connecting block 16 and is close to one end relatively and be fixed in 14 both sides of inserted block respectively, two connecting blocks 16 keep away from one end relatively and are fixed in two latch 17 one sides respectively.
The implementation principle of the pipeline hoisting structure for gas design of the embodiment is as follows: when installing the gas pipe, can overlap pipeline one end earlier and establish on changeing roller 7, and then impel forward under the auxiliary stay effect of changeing roller 7, until reaching next U-shaped frame 1, then put the pipeline to the level, make the pipeline overlap on arc layer board 10, many pipe laying finish the back, only need compress tightly the pipeline upper wall with compressing tightly pole 12 gliding, and then tighten positioning bolt 4 can, the realization is integrated on the U-shaped frame, make when installing the pipeline need not to use other auxiliary component, before the installation, when needing to adjust the position of a plurality of arc layer boards 10 according to actual conditions, only need to lift arc layer board 10 on, it drives latch 17 and the tooth's socket 11 separation of both sides through inserted block 14, and then can transversely slide regulation arc layer board 10 position at will, after the regulation finishes, loosen arc layer board 10, two latch 17 block into the tooth's socket 11 of both sides once more, automatic chucking.

Claims (7)

1. The utility model provides a pipeline hoisting structure of gas design, its characterized in that, includes U-shaped frame (1), U-shaped frame (1) has two vertical parts and a horizontal part, open U-shaped frame (1) horizontal part upside has spout (8), and slides in spout (8) and be equipped with a plurality of slide (9), slide (9) upper portion slides and inserts and be equipped with inserted block (14), and inserted block (14) upper portion is fixed with arc layer board (10), be equipped with between slide (9) and U-shaped frame (1) and adjust chucking mechanism, the cover that all slides on two vertical parts is equipped with sliding sleeve (3), and is fixed with between two sliding sleeve (3) and presses compression bar (12), and two sliding sleeve (3) one side all are equipped with positioning bolt (4), and two vertical parts keep away from one side lower part relatively and all open and have a plurality of screw thread locating holes (5), and screw thread locating hole (5) and positioning bolt (4) looks adaptation.
2. The gas-designed pipeline hoisting structure according to claim 1, wherein the upper ends of the two vertical parts of the U-shaped frame (1) are fixed with mounting plates (2), and the mounting plates (2) are provided with a plurality of mounting holes.
3. The gas-designed pipeline hoisting structure according to claim 1, wherein a guide post (18) is fixed between the inner walls of the two ends of the chute (8), and the guide post (18) penetrates through the plurality of sliding seats (9) and is slidably connected therewith.
4. The gas designed pipeline hoisting structure of claim 1, wherein the adjusting and clamping mechanism comprises clamping teeth (17) slidably arranged on two sides of the sliding base (9), a plurality of tooth grooves (11) are formed in two ends of the upper side of the horizontal part of the U-shaped frame (1), and the clamping teeth (17) are matched with the tooth grooves (11).
5. The pipeline hoisting structure designed according to the gas as claimed in claim 4, wherein an insertion slot (19) is formed in the upper portion of the sliding seat (9), the lower end of the insertion block (14) extends into the insertion slot (19), the outer walls of two opposite sides of the sliding seat (9) are both provided with a strip-shaped groove (15), the strip-shaped grooves (15) are both communicated with the insertion slot (19), two connecting blocks (16) which are respectively provided with a connecting block (16) in the strip-shaped groove (15) in a sliding manner are respectively fixed on two sides of the insertion block (14) at the end close to each other, and the two connecting blocks (16) are respectively fixed on one side of two latches (17) at the end far away from each other.
6. The gas-designed pipeline hoisting structure according to claim 1, wherein a first protection pad (13) is fixed on the upper part of the arc-shaped supporting plate (10), and a second protection pad (20) is fixed on the bottom of the pressing rod (12).
7. The gas designed pipeline hoisting structure according to claim 1, characterized in that the lower parts of both ends of one side of the U-shaped frame (1) are fixed with connecting plates (6), and a rotating roller (7) is rotatably arranged between the two connecting plates (6).
CN202222405504.4U 2022-09-09 2022-09-09 Pipeline hoisting structure of gas design Active CN218408788U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222405504.4U CN218408788U (en) 2022-09-09 2022-09-09 Pipeline hoisting structure of gas design

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222405504.4U CN218408788U (en) 2022-09-09 2022-09-09 Pipeline hoisting structure of gas design

Publications (1)

Publication Number Publication Date
CN218408788U true CN218408788U (en) 2023-01-31

Family

ID=85032278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222405504.4U Active CN218408788U (en) 2022-09-09 2022-09-09 Pipeline hoisting structure of gas design

Country Status (1)

Country Link
CN (1) CN218408788U (en)

Similar Documents

Publication Publication Date Title
CN218408788U (en) Pipeline hoisting structure of gas design
CN218633226U (en) Circuit mounting structure at top of box room
CN213378915U (en) Advancing mechanism is used in steel sheet processing of bending
CN213039960U (en) Connecting device for petroleum pipeline
CN111769458B (en) Prefabricated block terminal of integral type
CN211714295U (en) Keel structure for mounting architectural decoration stone plate
CN210273148U (en) Cabinet combination mounting structure for fixing high-voltage cabinet
CN217904337U (en) Connecting frame for solar module
CN211655181U (en) Novel double-SIM card seat with strong stability for mobile phone
CN215294823U (en) Fixing mechanism for mounting building electrical equipment
CN214156774U (en) Adjustable seat support
CN216543368U (en) Clamping device is used in clamping jaw processing
CN220539482U (en) Spliced door frame
CN215523097U (en) Outdoor lamp with ground socket
CN221239421U (en) High-efficiency big data processing device
CN212968937U (en) Quick-buckling type steel conduit connecting structure
CN215421057U (en) Electrical cabinet convenient to disassemble
CN212311821U (en) A frock clamp for bicycle front fork processing
CN220848172U (en) Novel aluminum alloy wallboard
CN214083666U (en) Aluminum plate embossing device
CN216883665U (en) Vertical serging clamp
CN215054335U (en) Hang argil board curtain wall construction futilely
CN215337282U (en) Electric sliding rail device for refrigerator drawer
CN221151057U (en) Three-phase alternating current motor of double-screw feeding machine
CN215864964U (en) Hole aligning detection integration tool for position of assembled construction steel bar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant