CN218408030U - Clamp device for pipe pile butt joint construction - Google Patents

Clamp device for pipe pile butt joint construction Download PDF

Info

Publication number
CN218408030U
CN218408030U CN202222583141.3U CN202222583141U CN218408030U CN 218408030 U CN218408030 U CN 218408030U CN 202222583141 U CN202222583141 U CN 202222583141U CN 218408030 U CN218408030 U CN 218408030U
Authority
CN
China
Prior art keywords
hoop body
butt joint
semicircle
hoop
locking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222583141.3U
Other languages
Chinese (zh)
Inventor
秦世奇
姜命强
蒋和平
王海东
邓立雄
王海实
简安邦
骆云鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 8 Co Ltd
Original Assignee
Sinohydro Bureau 8 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 8 Co Ltd filed Critical Sinohydro Bureau 8 Co Ltd
Priority to CN202222583141.3U priority Critical patent/CN218408030U/en
Application granted granted Critical
Publication of CN218408030U publication Critical patent/CN218408030U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a clamp device is used in tubular pile butt joint construction, including the first semicircle hoop body, the second semicircle hoop body, hinge mechanisms and locking mechanism, the one end of the first semicircle hoop body and the second semicircle hoop body is passed through hinge mechanisms and is articulated, and the other end passes through locking mechanism to be connected, and the inboard middle part of the first semicircle hoop body and the second semicircle hoop body is equipped with the arc locating piece along semicircle hoop body extending direction setting, and the arc locating piece is used for the butt joint groove department of card in the tubular pile, all is equipped with the welding hole that runs through to inside and outside both sides on the first semicircle hoop body and the second semicircle hoop body. This clamp device for tubular pile butt joint construction simple structure, convenient operation and can improve efficiency of construction and quality.

Description

Clamp device for pipe pile butt joint construction
Technical Field
The utility model relates to a tubular pile butt joint construction technical field especially relates to a clamp device is used in tubular pile butt joint construction.
Background
In the tubular pile construction, often meet the tubular pile butt joint construction, the butt joint requires that the end board laminating of tubular pile is inseparable, can not leave the gap, otherwise uneven atress of joint department can lead to pile body or joint department to break under the impact force effect in the hammering pile sinking process, and this precision requirement to the horizontal position of stake top and butt joint department is higher during the butt joint. The mode that adopts tradition to weld short reinforcement at end board and push up through the manual work and carry out the tubular pile butt joint spends man-hour longer in the construction, and the difficult control of butt joint quality, the condition that often appears not to conform to the quality standard.
SUMMERY OF THE UTILITY MODEL
The to-be-solved technical problem of the utility model is to overcome the not enough of prior art, provide a simple structure, convenient operation and can improve the clamp device for tubular pile butt joint construction of efficiency of construction and quality.
In order to solve the technical problem, the utility model adopts the following technical scheme:
the utility model provides a clamp device is used in tubular pile butt joint construction, includes first semicircle hoop body, second semicircle hoop body, hinge mechanisms and locking mechanism, the one end of first semicircle hoop body and second semicircle hoop body is passed through hinge mechanisms and is articulated, and the other end passes through locking mechanism and connects, the inboard middle part of first semicircle hoop body and second semicircle hoop body is equipped with the arc locating piece that sets up along semicircle hoop body extending direction, the arc locating piece is used for the butt joint groove department of card in the tubular pile, all be equipped with the welding hole that runs through to inside and outside both sides on first semicircle hoop body and the second semicircle hoop body.
As a further improvement of the technical scheme:
the locking mechanism comprises a locking seat, a clamping seat, a locking rod and a locking piece, wherein the locking seat and the clamping seat are respectively arranged on the first semicircular hoop body and the second semicircular hoop body, the clamping seat is provided with a clamping groove, one end of the locking rod is rotatably connected with the locking seat, the other end of the locking rod is clamped in the clamping groove, and the locking piece is in threaded connection with the locking rod and abuts against the clamping seat.
The locking piece is a locking nut sleeved on the locking rod.
The locking seat and the clamping seat are respectively welded on the first semicircular hoop body and the second semicircular hoop body.
The hinge mechanism comprises a hinge seat, a hinge rod and a hinge shaft, wherein the hinge seat and the hinge rod are respectively arranged on the first semicircular hoop body and the second semicircular hoop body and are connected in a rotating mode through the hinge shaft.
The hinge seat and the hinge rod are respectively welded on the first semicircular hoop body and the second semicircular hoop body.
The cross section of the arc-shaped positioning block is triangular, and the vertex angle of the triangle faces inwards.
The cross section of the arc-shaped positioning block is in an isosceles triangle shape.
The outside of first semicircle hoop body and second semicircle hoop body all is equipped with the handle.
The welding holes on each semicircular hoop body are provided with at least two welding holes which are arranged at intervals along the extending direction of the semicircular hoop body.
Compared with the prior art, the utility model has the advantages of:
the utility model discloses a clamp device is used in tubular pile butt joint construction, the use: the method comprises the following steps of firstly, closing and butting two tubular piles, opening a first semicircular hoop body and a second semicircular hoop body by taking a hinged position as a rotation center, and then, embracing the opened first semicircular hoop body and the opened second semicircular hoop body at the butting position of the two tubular piles; then, the opening ends of the first semicircular hoop body and the second semicircular hoop body are locked and connected through a locking mechanism, so that the first semicircular hoop body and the second semicircular hoop body are tightly held at the butt joint position of the two tubular piles, and the arc-shaped positioning block is clamped in the butt joint groove of the tubular piles, so that the two tubular piles are kept in a butt joint state under the clamping and fixing action of the first semicircular hoop body and the second semicircular hoop body; then, welding the corresponding butt joint groove through the welding hole on the semicircular hoop body; and finally, disassembling the hoop device for the pipe pile butt joint construction, and then performing full welding on the butt joint groove. This clamp device for tubular pile butt joint construction simple structure, convenient operation and can improve efficiency of construction and quality.
Drawings
Fig. 1 is the main view structure schematic diagram (closed state) of the clamp device for pipe pile butt joint construction of the utility model.
Fig. 2 is the structure schematic diagram (open state) is looked to the owner of the clamp device for the pipe pile butt joint construction of the utility model.
Fig. 3 is the utility model discloses clamp device for tubular pile butt joint construction looks sideways at the schematic structure.
Fig. 4 is an enlarged view of a point a in fig. 3.
Fig. 5 is the utility model discloses clamp device's for tubular pile butt joint construction user state diagram.
Fig. 6 is an enlarged view at B in fig. 5.
The reference numerals in the figures denote:
1. a first semi-circular hoop body; 2. a second semi-circular hoop body; 3. a hinge mechanism; 31. a hinged seat; 32. a hinged lever; 33. hinging shafts; 4. a locking mechanism; 41. a locking seat; 42. a card holder; 421. a card slot; 43. a lock lever; 44. a locking member; 5. an arc-shaped positioning block; 6. welding the hole; 7. pipe pile; 71. butt jointing the grooves; 8. a handle.
Detailed Description
The invention will be described in further detail with reference to the drawings and specific examples.
As used in this disclosure and in the claims, the terms "a," "an," "the," and/or "the" are not intended to be inclusive in the singular, but rather are inclusive in the plural unless the context clearly dictates otherwise. The use of "first," "second," and similar terms in this disclosure is not intended to indicate any order, quantity, or importance, but rather is used to distinguish one element from another. Likewise, the word "comprising" or "comprises", and the like, means that the element or item listed before the word covers the element or item listed after the word and its equivalents, but does not exclude other elements or items. The terms "connected" or "coupled" and the like are not restricted to physical or mechanical connections, but may include electrical connections, whether direct or indirect.
Fig. 1 to fig. 6 show the utility model discloses clamp device for tubular pile butt joint construction's an embodiment, this clamp device for tubular pile butt joint construction includes first semicircle hoop body 1, second semicircle hoop body 2, hinge mechanisms 3 and locking mechanism 4, hinge mechanisms 3 are passed through to the one end of first semicircle hoop body 1 and second semicircle hoop body 2 articulated, the other end passes through locking mechanism 4 and connects, the inboard middle part of first semicircle hoop body 1 and second semicircle hoop body 2 is equipped with the arc locating piece 5 along semicircle hoop body extending direction setting, arc locating piece 5 is used for blocking in butt joint groove 71 department of tubular pile 7, all be equipped with the welding hole 6 that runs through to inside and outside both sides on first semicircle hoop body 1 and the second semicircle hoop body 2.
The using process comprises the following steps: firstly, two tubular piles 7 are closed and butted, then the first semicircular hoop body 1 and the second semicircular hoop body 2 are opened by taking the hinged position as a rotation center, and then the first semicircular hoop body 1 and the second semicircular hoop body 2 are opened and are clamped at the butted position of the two tubular piles 7; then, the open ends of the first semicircular hoop body 1 and the second semicircular hoop body 2 are locked and connected through the locking mechanism 4, so that the first semicircular hoop body 1 and the second semicircular hoop body 2 are tightly held at the butt joint position of the two tubular piles 7, and the arc-shaped positioning block 5 is clamped in the butt joint groove 71 of the tubular piles 7, so that the two tubular piles 7 are kept in a butt joint state under the clamping and fixing action of the first semicircular hoop body 1 and the second semicircular hoop body 2; then, welding the corresponding butt joint groove 71 through the welding hole 6 on the semicircular hoop body; finally, the hoop device for the pipe pile butt construction is disassembled, and then full welding is carried out on the butt-joint groove 71. This clamp device for tubular pile butt joint construction simple structure, convenient operation and can improve efficiency of construction and quality.
In this embodiment, as shown in fig. 4, the locking mechanism 4 includes a locking seat 41, a clamping seat 42, a locking rod 43 and a locking member 44, the locking seat 41 and the clamping seat 42 are respectively disposed on the first semicircular hoop body 1 and the second semicircular hoop body 2, the clamping seat 42 is provided with a clamping groove 421, one end of the locking rod 43 is rotatably connected with the locking seat 41, the other end is clamped in the clamping groove 421, and the locking member 44 is in threaded connection with the locking rod 43 and tightly abuts against the clamping seat 42. When unlocking, the locking member 44 is unscrewed, and then the locking rod 43 is rotated out of the clamping groove 421 around the rotation center, so that the structure is simple and the operation is convenient. Specifically, the locking slot 421 is a U-shaped slot with an outward opening, and the U-shaped slot is U-shaped. The locking member 44 is a locking nut fitted over the locking bar 43.
In this embodiment, the locking seat 41 and the locking seat 42 are respectively welded to the first half hoop body 1 and the second half hoop body 2. The structural connection is stable.
In this embodiment, the hinge mechanism 3 includes a hinge seat 31, a hinge rod 32 and a hinge shaft 33, and the hinge seat 31 and the hinge rod 32 are respectively disposed on the first semicircular hoop body 1 and the second semicircular hoop body 2 and are rotatably connected through the hinge shaft 33. The first and second semicircular bands 1 and 2 are circular when they are closed as shown in fig. 1.
In this embodiment, the hinge base 31 and the hinge rod 32 are welded to the first and second semicircular bodies 1 and 2, respectively. The structural connection is stable.
In this embodiment, the cross section of the arc-shaped positioning block 5 is triangular, and the vertex angle of the triangle is inward. The butt groove 71 where the two tubular piles 7 are butted is formed by combining chamfers on the peripheral edges of the end portions of the tubular piles 7, and the welding effect can be improved. The cross section of the arc-shaped positioning block 5 is in an isosceles triangle shape and is matched with the shape of the butt joint groove 71.
In this embodiment, the outer sides of the first and second semicircular bodies 1 and 2 are both provided with handles 8. The construction operation is convenient.
In this embodiment, the welding holes 6 on each semicircular hoop body are not two but arranged at intervals along the extending direction of the semicircular hoop body. Specifically, the number of the arc-shaped positioning blocks 5 on each semicircular hoop body is not two, the arc-shaped positioning blocks 5 and the welding holes 6 are arranged at intervals in the extending direction of the semicircular hoop body in a staggered mode.
Although the present invention has been described with reference to the preferred embodiments, it is not intended to limit the present invention. The technical solution of the present invention can be used by anyone skilled in the art to make many possible variations and modifications, or to modify equivalent embodiments, without departing from the scope of the present invention, using the technical content disclosed above. Therefore, any simple modification, equivalent change and modification made to the above embodiments by the technical entity of the present invention should fall within the protection scope of the technical solution of the present invention.

Claims (10)

1. The utility model provides a clamp device is used in tubular pile butt joint construction which characterized in that: including first semicircle hoop body (1), second semicircle hoop body (2), articulated mechanism (3) and locking mechanism (4), the one end of first semicircle hoop body (1) and second semicircle hoop body (2) is passed through articulated mechanism (3) and is articulated, and the other end passes through locking mechanism (4) and connects, the inboard middle part of first semicircle hoop body (1) and second semicircle hoop body (2) is equipped with arc locating piece (5) along semicircle hoop body extending direction setting, arc locating piece (5) are used for blocking in butt joint groove (71) department of tubular pile (7), all be equipped with on first semicircle hoop body (1) and second semicircle hoop body (2) and run through welding hole (6) to inside and outside both sides.
2. The hoop device for pipe pile butt joint construction according to claim 1, characterized in that: locking mechanism (4) are including locking seat (41), cassette (42), locking lever (43) and retaining member (44), locking seat (41) and cassette (42) set up respectively on first semicircle hoop (1) and second semicircle hoop (2), be equipped with draw-in groove (421) on cassette (42), the one end and the locking seat (41) of locking lever (43) rotate to be connected, and the other end card is located in draw-in groove (421), retaining member (44) and locking lever (43) threaded connection support tightly on cassette (42).
3. The hoop device for pipe pile butt joint construction according to claim 2, characterized in that: the locking piece (44) is a locking nut sleeved on the locking rod (43).
4. The hoop device for pipe pile butt joint construction according to claim 2, characterized in that: the locking seat (41) and the clamping seat (42) are respectively welded on the first semicircular hoop body (1) and the second semicircular hoop body (2).
5. The hoop device for pipe pile butt joint construction according to claim 1, characterized in that: articulated mechanism (3) are including articulated seat (31), articulated rod (32) and articulated shaft (33), articulated seat (31) and articulated rod (32) set up respectively on first semicircle hoop (1) and second semicircle hoop (2) to rotate through articulated shaft (33) and connect.
6. The hoop device for pipe pile butt joint construction according to claim 5, characterized in that: the hinge seat (31) and the hinge rod (32) are respectively welded on the first semicircular hoop body (1) and the second semicircular hoop body (2).
7. The hoop device for pipe pile butt joint construction according to any one of claims 1 to 6, characterized in that: the cross section of the arc-shaped positioning block (5) is triangular, and the vertex angle of the triangle is inward.
8. The hoop device for pipe pile butt joint construction according to claim 7, characterized in that: the cross section of the arc-shaped positioning block (5) is in an isosceles triangle shape.
9. The hoop device for pipe pile butt joint construction according to any one of claims 1 to 6, characterized in that: the outside of first semicircle hoop body (1) and second semicircle hoop body (2) all is equipped with handle (8).
10. The hoop device for pipe pile butt joint construction according to any one of claims 1 to 6, characterized in that: welding holes (6) on each semicircular hoop body are not two, and are arranged at intervals along the extending direction of the semicircular hoop bodies.
CN202222583141.3U 2022-09-28 2022-09-28 Clamp device for pipe pile butt joint construction Active CN218408030U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222583141.3U CN218408030U (en) 2022-09-28 2022-09-28 Clamp device for pipe pile butt joint construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222583141.3U CN218408030U (en) 2022-09-28 2022-09-28 Clamp device for pipe pile butt joint construction

Publications (1)

Publication Number Publication Date
CN218408030U true CN218408030U (en) 2023-01-31

Family

ID=84998678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222583141.3U Active CN218408030U (en) 2022-09-28 2022-09-28 Clamp device for pipe pile butt joint construction

Country Status (1)

Country Link
CN (1) CN218408030U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116292642A (en) * 2023-05-17 2023-06-23 四川托璞勒科技有限公司 Bearing mounting structure and dust sticking machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116292642A (en) * 2023-05-17 2023-06-23 四川托璞勒科技有限公司 Bearing mounting structure and dust sticking machine
CN116292642B (en) * 2023-05-17 2023-08-08 四川托璞勒科技有限公司 Bearing mounting structure and dust sticking machine

Similar Documents

Publication Publication Date Title
CN218408030U (en) Clamp device for pipe pile butt joint construction
US4095493A (en) Tong locking mechanism
CN220814904U (en) Auxiliary device for connecting steel reinforced concrete column with concrete beam
TWI689381B (en) Hand tools to increase working head strength
CN218810088U (en) Pipeline haulage equipment is used in construction
CN217122307U (en) Clamp for pipeline welding
CN212019921U (en) Clamping and fixing device for machining
CN216238506U (en) Major diameter drilling bored concrete pile protects a section of thick bamboo structure
CN212743383U (en) Template assembly auxiliary device
CN215443141U (en) Iron fixed bolster convenient to installation
CN212384909U (en) Tool type butt joint hoop lock for assembling pipe truss rod piece
CN210626420U (en) Crossing scanning device that detects a flaw
CN219523083U (en) Pipeline fusion device
CN113172379A (en) Rotary welding auxiliary equipment suitable for complex steel structure
CN219254653U (en) Pipeline welding fixing clamp
CN220704926U (en) Quick combined steel bar positioning device
JP2006181634A (en) Fixture for tack welding
CN216966613U (en) Welding device with butt joint structure for building steel structure
CN217998051U (en) Device for preventing PHC tubular pile connects dislocation
CN210908788U (en) Positioning device for welding and processing steel structure
CN211144308U (en) Lock-free type unilateral opening and closing anti-theft window
CN218194330U (en) Multi-pressing wheel group needle grinding device
CN211172713U (en) Arch-shaped pipe truss structure based on large-span steel structure
CN214942708U (en) Building structure reinforcing and connecting device
CN218815163U (en) Concrete construction template

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant