CN218404363U - Cooling device of continuous hot galvanizing machine for strip steel - Google Patents
Cooling device of continuous hot galvanizing machine for strip steel Download PDFInfo
- Publication number
- CN218404363U CN218404363U CN202222674888.XU CN202222674888U CN218404363U CN 218404363 U CN218404363 U CN 218404363U CN 202222674888 U CN202222674888 U CN 202222674888U CN 218404363 U CN218404363 U CN 218404363U
- Authority
- CN
- China
- Prior art keywords
- water pipe
- water
- continuous hot
- cooling device
- ice storage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model discloses a cooling device of a strip steel continuous hot galvanizing machine, which comprises a transportation structure and a pipeline structure, wherein a fixing device is arranged below the transportation structure, the pipeline structure is arranged outside the fixing device, the fixing device comprises a water tank, an ice storage tank and a fixture block, the water tank is arranged below the transportation structure, the inner side of the water tank is provided with the ice storage tank, the fixture block is arranged above the ice storage tank, the inner side of the ice storage tank is provided with a channel, one side of the water tank is connected with the pipeline structure, the transportation structure is fixedly connected with the fixing device, and the fixing device is fixedly connected with the pipeline structure; the utility model discloses the ice-cube of being convenient for ice storage tank inside cools down to the water of water tank inside, improves the cooling rate and the work efficiency of material.
Description
Technical Field
The utility model relates to the technical field of strip steel continuous hot galvanizing machines, in particular to a cooling device of a strip steel continuous hot galvanizing machine.
Background
Hot-dip galvanized steel strip is a common metallurgical product, which is a strip that combines a substrate and a coating by reacting molten metal with the iron substrate to produce an alloy layer. And a cooling device is needed to cool the alloy layer generated by the reaction of the molten metal and the iron matrix in the manufacturing process to form the hot galvanized steel strip product.
Through retrieval, chinese patent No. CN210394488U, publication No. 2020, 04, 24, discloses a cooling device for a continuous hot-dip galvanizing machine for strip steel, which proposes "a conveyor 1 for conveying strip steel, a fixed frame 11 fixed on the conveyor 1, a plurality of atomizer nozzles 12 sequentially arranged on the fixed frame 11 along a conveying direction of the strip steel, a water pipe 13 sleeved outside the atomizer nozzles 12 in a sliding manner, the water pipe 13 being a hose," the device cools a material made by a continuous hot-dip galvanizing machine for strip steel slowly, which affects a cooling speed and a working efficiency of the material.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cooling device of continuous hot-galvanize of belted steel machine to solve the problem that provides among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides the following technical scheme: a cooling device of a strip steel continuous hot galvanizing machine comprises a transportation structure and a pipeline structure, wherein a fixing device is arranged below the transportation structure, and the pipeline structure is arranged on the outer side of the fixing device;
fixing device includes water tank, ice storage tank and fixture block, the water tank is installed to the below of transport structure, the inboard of water tank is equipped with ice storage tank, the fixture block is installed to ice storage tank's top, ice storage tank's inboard is equipped with the passageway, one side of water tank is connected with pipeline structure.
Preferably, the transportation structure is fixedly connected with the fixing device, and the fixing device is fixedly connected with the pipeline structure.
Preferably, the water tank and the ice storage tank are integrally arranged, the ice storage tank is connected with the fixture block in a clamping manner, and the ice storage tank is communicated with the inside of the water tank through a channel.
Preferably, the transportation structure includes mount, conveyer and round hole, the mount is installed in the outside of water tank, the conveyer is installed to the intermediate position of mount top, the outside of conveyer is equipped with the round hole.
Preferably, the conveyor and the round hole are integrally arranged, and the fixing frame is fixedly connected with the conveyor.
Preferably, the pipeline structure includes support frame, first water pipe and water jet equipment, the support frame is installed to the top of transportation structure, first water pipe is installed to one side of water tank, first water pipe runs through the transportation structure and is connected with the water pump, the second water pipe is installed to the top of water pump, the third water pipe is installed to the top of second water pipe, the fourth water pipe is installed in the outside of third water pipe, a plurality of fifth water pipes are all installed in the outside of fourth water pipe, a plurality of water jet equipment are installed to the below of fifth water pipe.
Preferably, be parallel to each other between first water pipe and the third water pipe, be mutually perpendicular between third water pipe and the second water pipe and be connected, be mutually perpendicular between third water pipe and the fourth water pipe and be connected, be mutually perpendicular between fourth water pipe and the fifth water pipe and be connected, be fixed connection between fifth water pipe and the water jet equipment.
Preferably, the water spraying device comprises a fixed pipe and a rotary spray head, the fixed pipe is installed below the fifth water pipe, and the rotary spray head is installed below the fixed pipe.
Preferably, be fixed connection between fixed pipe and the fifth water pipe, be the block connection between fixed pipe and the rotation shower nozzle.
Preferably, the water tank and the conveyor are correspondingly arranged.
Compared with the prior art, this practical beneficial effect is:
through setting up water tank, ice storage tank and fixture block, the user pours the ice-cube into the inside of ice storage tank, reuses the top looks block of fixture block and ice storage tank, pours water into the inside of water tank into, and the ice-cube of the inside of ice storage tank of being convenient for cools down to the water of water tank inside, improves the cooling rate and the work efficiency of material.
Drawings
In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings needed to be used in the description of the embodiments or the prior art will be briefly introduced below, and it is obvious that the drawings in the following description are some embodiments of the present application, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without creative efforts. Throughout the drawings, like elements or portions are generally identified by like reference numerals. In the drawings, elements or portions are not necessarily drawn to scale.
FIG. 1 is a schematic view of the front cross-sectional structure of the present invention;
FIG. 2 is a side view of the cross-sectional structure of the present invention;
fig. 3 is a schematic view of the top view structure of the present invention.
In the figure: 1. a transport structure; 2. a pipe structure; 3. a water spraying device; 4. a fixing device; 101. a fixed mount; 102. a conveyor; 103. a circular hole; 201. a support frame; 202. a first water pipe; 203. a water pump; 204. a second water pipe; 205. a third water pipe; 206. a fourth water pipe; 207. a fifth water pipe; 301. a fixed tube; 302. rotating the spray head; 401. a water tank; 402. an ice storage tank; 403. and (7) clamping blocks.
Detailed Description
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments obtained by a person of ordinary skill in the art based on the embodiments in the present application without any creative work belong to the protection scope of the present application.
Referring to fig. 1-3, the present invention provides a cooling device for a strip steel continuous hot galvanizing machine, which comprises: a cooling device of a strip steel continuous hot galvanizing machine comprises a transportation structure 1 and a pipeline structure 2, wherein a fixing device 4 is arranged below the transportation structure 1, and the pipeline structure 2 is arranged on the outer side of the fixing device 4;
the fixing device 4 comprises a water tank 401, an ice storage tank 402 and a fixture block 403, the water tank 401 is mounted below the transportation structure 1, the ice storage tank 402 is arranged on the inner side of the water tank 401, the fixture block 403 is mounted above the ice storage tank 402, a channel is arranged on the inner side of the ice storage tank 402, and one side of the water tank 401 is connected with the pipeline structure 2.
During the use, the user pours the ice-cube into the inside of ice storage tank 402, and the top looks block of reuse fixture block 403 and ice storage tank 402 is pouring water into the inside of water tank 401, and the ice-cube of the inside of ice storage tank 402 of being convenient for is cooled down the water of the inside of water tank 401, improves the cooling rate and the work efficiency of material.
The transportation structure 1 is fixedly connected with the fixing device 4, and the fixing device 4 is fixedly connected with the pipeline structure 2.
The water tank 401 and the ice storage groove 402 are integrally arranged, the ice storage groove 402 is in clamping connection with the clamping block 403, and the ice storage groove 402 is communicated with the inside of the water tank 401 through a channel.
The transportation structure 1 comprises a fixed frame 101, a conveyor 102 and a round hole 103, wherein the fixed frame 101 is installed on the outer side of the water tank 401, the conveyor 102 is installed in the middle position above the fixed frame 101, and the round hole 103 is formed in the outer side of the conveyor 102.
The conveyer 102 and the round hole 103 are integrally arranged, and the fixing frame 101 and the conveyer 102 are fixedly connected.
The material produced by the strip steel continuous hot galvanizing machine is placed above the fixing frame 101, the fixing frame 101 is started to transport the material, and the water spraying device 3 cools the material while transporting the material.
The first water pipe 202 and the third water pipe 205 are arranged in parallel, the third water pipe 205 and the second water pipe 204 are connected in a perpendicular manner, the third water pipe 205 and the fourth water pipe 206 are connected in a perpendicular manner, the fourth water pipe 206 and the fifth water pipe 207 are connected in a perpendicular manner, and the fifth water pipe 207 and the water spraying device 3 are fixedly connected.
The water pump 203 is started to transport the water in the water tank 401 to the inside of the second water pipe 204 through the first water pipe 202, the water in the second water pipe 204 is transported to the inside of the fourth water pipe 206 through the third water pipe 205, and then the water in the fourth water pipe 206 is transported to the fifth water pipe 207 and spilled out from the inside of the water spraying device 3, so as to cool the material above the transport structure 1.
The water spraying device 3 comprises a fixed pipe 301 and a rotary spray head 302, the fixed pipe 301 is arranged below the fifth water pipe 207, and the rotary spray head 302 is arranged below the fixed pipe 301.
The fixed pipe 301 is fixedly connected with the fifth water pipe 207, and the fixed pipe 301 is connected with the rotary nozzle 302 in a clamping manner.
By utilizing the function of the rotary spray head 302, different positions above the transportation structure 1 can be sprayed, and the application range of the rotary spray head 302 is enlarged.
The water tank 401 and the conveyor 102 are correspondingly arranged.
The working principle is as follows:
firstly, a user respectively loads ice and water into the fixing device 4, and the pipeline structure 2 is started to cool the material produced by the continuous hot galvanizing machine of the strip steel above the transportation structure 1 through the water spraying device 3.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (10)
1. The utility model provides a cooling device of continuous hot dip galvanizing machine of belted steel, includes transportation structure (1) and pipeline structure (2), its characterized in that: a fixing device (4) is arranged below the transportation structure (1), and a pipeline structure (2) is arranged on the outer side of the fixing device (4);
the fixing device (4) comprises a water tank (401), an ice storage groove (402) and a clamping block (403), the water tank (401) is installed below the transportation structure (1), the ice storage groove (402) is formed in the inner side of the water tank (401), the clamping block (403) is installed above the ice storage groove (402), a channel is formed in the inner side of the ice storage groove (402), and one side of the water tank (401) is connected with the pipeline structure (2).
2. The cooling device of the strip steel continuous hot galvanizing machine according to claim 1, characterized in that: the transportation structure (1) is fixedly connected with the fixing device (4), and the fixing device (4) is fixedly connected with the pipeline structure (2).
3. The cooling device of the strip steel continuous hot galvanizing machine according to claim 2, characterized in that: the water tank (401) and the ice storage groove (402) are integrally arranged, the ice storage groove (402) is connected with the fixture block (403) in a clamping manner, and the ice storage groove (402) is communicated with the interior of the water tank (401) through a channel.
4. The cooling device of the strip steel continuous hot galvanizing machine according to claim 2, characterized in that: transportation structure (1) includes mount (101), conveyer (102) and round hole (103), mount (101) are installed in the outside of water tank (401), conveyer (102) are installed to the intermediate position of mount (101) top, the outside of conveyer (102) is equipped with round hole (103).
5. The cooling device of the strip steel continuous hot galvanizing machine according to claim 4, characterized in that: the conveyer (102) and the round hole (103) are integrally arranged, and the fixing frame (101) is fixedly connected with the conveyer (102).
6. The cooling device of the strip steel continuous hot galvanizing machine according to claim 2, characterized in that: pipeline structure (2) include support frame (201), first water pipe (202) and water jet equipment (3), support frame (201) are installed to the top of transportation structure (1), first water pipe (202) are installed to one side of water tank (401), first water pipe (202) run through transportation structure (1) and are connected with water pump (203), second water pipe (204) are installed to the top of water pump (203), third water pipe (205) are installed to the top of second water pipe (204), fourth water pipe (206) are installed in the outside of third water pipe (205), a plurality of fifth water pipe (207) are all installed in the outside of fourth water pipe (206), a plurality of water jet equipment (3) are installed to the below of fifth water pipe (207).
7. The cooling device of the strip steel continuous hot galvanizing machine according to claim 6, characterized in that: be mutual parallel arrangement between first water pipe (202) and third water pipe (205), be mutually perpendicular between third water pipe (205) and second water pipe (204) and be connected, be mutually perpendicular between third water pipe (205) and fourth water pipe (206) and be connected, be mutually perpendicular between fourth water pipe (206) and fifth water pipe (207) and be connected, be fixed connection between fifth water pipe (207) and water jet equipment (3).
8. The cooling device of the strip steel continuous hot galvanizing machine according to claim 7, characterized in that: water jet equipment (3) are including fixed pipe (301) and rotation shower nozzle (302), fixed pipe (301) are installed to the below of fifth water pipe (207), rotation shower nozzle (302) are installed to the below of fixed pipe (301).
9. The cooling device of the strip steel continuous hot galvanizing machine according to claim 8, characterized in that: fixed pipe (301) and fifth water pipe (207) are fixed connection, be the block connection between fixed pipe (301) and rotation shower nozzle (302).
10. The cooling device of the strip steel continuous hot galvanizing machine according to claim 3, characterized in that: the water tank (401) and the conveyor (102) are correspondingly arranged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222674888.XU CN218404363U (en) | 2022-10-11 | 2022-10-11 | Cooling device of continuous hot galvanizing machine for strip steel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222674888.XU CN218404363U (en) | 2022-10-11 | 2022-10-11 | Cooling device of continuous hot galvanizing machine for strip steel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218404363U true CN218404363U (en) | 2023-01-31 |
Family
ID=85000453
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222674888.XU Active CN218404363U (en) | 2022-10-11 | 2022-10-11 | Cooling device of continuous hot galvanizing machine for strip steel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218404363U (en) |
-
2022
- 2022-10-11 CN CN202222674888.XU patent/CN218404363U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207807380U (en) | A kind of outer wall of steel pipe polishing spray device | |
CN218404363U (en) | Cooling device of continuous hot galvanizing machine for strip steel | |
US3845540A (en) | Hot galvanizing process and apparatus | |
CN216422120U (en) | Copper line pickling tinning stack | |
KR20130074269A (en) | Apparatus for cooling strip having multi nozzle | |
CN213327877U (en) | Intelligent electroplating equipment is used in production of FPC flexible circuit board | |
KR101028405B1 (en) | Polyurea coating method for steel tube | |
US3908593A (en) | Continuous galvanizing manifold for tube and the like | |
CN214419343U (en) | Circulated plastic tubing production is with spraying cooling water tank | |
CN213944809U (en) | Automatic slag adding spray head device of continuous casting machine | |
CN114318200A (en) | Long material processing device, hot-dip production line based on long material processing device and hot-dip method | |
CN110643917B (en) | Production method of continuous hot-dip galvanizing aluminum magnesium, air knife device and air knife system | |
CN217202918U (en) | Zinc-aluminum-magnesium coating steel strip hot dip coating back fast cooling subassembly | |
CN216738493U (en) | Novel galvanizing equipment | |
CN211010793U (en) | Safe transportation protection device of natural gas storage tank | |
CN214813640U (en) | Corrosion-resistant, wear-resistant and heat-resistant steel rolling guide device | |
CN206153037U (en) | Target hot spraying is with cooling frock | |
CN209614641U (en) | A kind of spray and excessive pool cooling device of welded pipe units | |
CN213538071U (en) | Ceramic galvanizing pot for continuous galvanizing of strip steel | |
CN218026298U (en) | Novel cooling assembly for zinc-aluminum-magnesium coated steel strip after hot dip coating | |
CN218423598U (en) | Small-pipe-diameter 3PE anticorrosive steel pipe coating tool | |
CN218465918U (en) | Steel band galvanizing rig | |
CN217077759U (en) | Water cooling device of hot galvanizing product production line | |
CN215713306U (en) | Strip steel galvanizing device | |
CN211782152U (en) | Aluminum processing cooling arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |