CN218395752U CN202222577722.6U CN202222577722U CN218395752U CN 218395752 U CN218395752 U CN 218395752U CN 202222577722 U CN202222577722 U CN 202222577722U CN 218395752 U CN218395752 U CN 218395752U
Authority
CN
China
Prior art keywords
pair
fixed
frame
shaped
wind tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222577722.6U
Other languages
Chinese (zh)
Inventor
张学海
姚大伟
薛建新
王冬
刘振远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hailong Construction Industry Co Ltd
Suzhou Hailong Construction Technology Co Ltd
Original Assignee
Anhui Hailong Construction Industry Co Ltd
Suzhou Hailong Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hailong Construction Industry Co Ltd, Suzhou Hailong Construction Technology Co Ltd filed Critical Anhui Hailong Construction Industry Co Ltd
Priority to CN202222577722.6U priority Critical patent/CN218395752U/en
Application granted granted Critical
Publication of CN218395752U publication Critical patent/CN218395752U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a concrete wind tower segment steel bar moulding bed processing frame, which comprises two side arc tubes, wherein a middle T-shaped frame is fixed between the two side arc tubes and at the middle position, a pair of side T-shaped frames I, a pair of side T-shaped frames II and a pair of bottom T-shaped frames are symmetrically fixed between the two side arc tubes, a plurality of concave-convex frames are fixed on the upper end surfaces of the middle T-shaped frame and the pair of side T-shaped frames II, and a pair of positioning assemblies I and a pair of positioning assemblies II are symmetrically arranged between the two side arc tubes; the utility model discloses a plurality of concavo-convex frames that set up carry out location processing to the reinforcing bar that constitutes the fetal membrane, make this part reinforcing bar can put in proper order by length order to this size that realizes the drawing requirement, the reinforcing bar of avoiding constituting the fetal membrane is at the in-process of putting, appears removing, influences the normal clear of installation operation, does not need the position of operating personnel adjustment reinforcing bar, convenient to use repeatedly.

Description

Concrete wind tower tube sheet reinforcing steel bar fetal membrane processing frame
Technical Field
The utility model relates to a construction technical field especially relates to a concrete wind tower tube sheet reinforcing bar fetal membrane processing frame.
Background
In recent years, building industrialization, which is characterized by standardized design, factory production, assembly construction, integrated decoration and the like, has become a necessary trend in the development of the building industry in China, when a concrete wind tower pipe piece reinforcing steel bar tire membrane is processed and produced, processing operation is generally required to be assisted by a reinforcing steel bar tire membrane processing frame, the existing non-integral reinforcing steel bar tire membrane processing frame is inconvenient to position reinforcing steel bars forming the tire membrane, and the position of the reinforcing steel bars needs to be adjusted in the processing process, so that the use is inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the problem existing in the prior art and providing a concrete wind tower tube sheet reinforcing bar fetal membrane processing frame.
In order to achieve the above purpose, the utility model adopts the following technical proposal:
the utility model provides a concrete wind tower tube sheet reinforcing bar fetal membrane processing frame, includes two side arc tubes, two between the side arc tube and the position intermediate position be fixed with middle T shape frame, still the symmetry be fixed with a pair of side T shape frame one, a pair of side T shape frame two and a pair of bottom T shape frame between two side arc tubes, the up end of middle T shape frame and a pair of side T shape frame two all is fixed with a plurality of concave-convex framves, the symmetry is provided with a pair of locating component one and a pair of locating component two between two side arc tubes.
As a further technical scheme of the utility model, every locating component one all is fixed with the location horizontal pole including fixing two location montants at bottom T shape frame up end between two location montants, and the location horizontal pole is located bottom T shape frame directly over.
As a further technical scheme of the utility model, every all be fixed with a plurality of bracing pieces one between the up end of location horizontal pole and the corresponding bottom T shape frame.
As the technical scheme of the utility model provides a further, every locating component two is all including fixing the upper portion arc pipe between two location montants, and the upper portion arc pipe is located the side arc pipe directly over.
As a further technical scheme of the utility model, every all be fixed with a plurality of bracing pieces two between the lateral wall of upper portion arc pipe and corresponding side arc pipe.
As a further technical scheme of the utility model, every all be fixed with three pairs of blend stop between the lateral wall of side T shape frame two and the corresponding bottom T shape frame.
As a further technical scheme of the utility model, the symmetry is fixed with the bracing piece three of two slopes on the lateral wall of middle T shape frame.
The utility model has the advantages that:
1. the reinforcing steel bars forming the reinforced bar tire membrane of the concrete wind tower tube piece are sequentially laid on the upper surface of the processing frame, and the reinforcing steel bars forming the tire membrane are positioned through the arranged concave-convex frames, so that the reinforcing steel bars can be sequentially placed in length order, the size required by a drawing is realized, the phenomenon that the reinforcing steel bars forming the tire membrane move in the process of being placed to influence the normal operation of installation operation is avoided, an operator does not need to repeatedly adjust the positions of the reinforcing steel bars, and the concrete wind tower tube piece reinforcing steel bar tire membrane is convenient to use.
2. Through the cooperation of the locating horizontal pole, the bracing piece one that set up, upper portion arc pipe and bracing piece two, make the fetal membrane steel reinforcement cage of the wind tower section of jurisdiction of constitution laminate with one side of this processing frame mutually, conveniently control protective layer thickness to this realizes the higher protective layer thickness requirement of required precision, and the operation of lifting by crane of fetal membrane after convenient processing finishes with one side of this processing frame laminating mutually.
Drawings
Fig. 1 is a side view of the present invention;
FIG. 2 is a schematic structural view of the present invention;
fig. 3 is a top view of the present invention;
fig. 4 is a partially enlarged schematic view of a portion a in fig. 2.
In the figure: 1. a side arc tube; 2. a middle T-shaped frame; 3. a first side T-shaped frame; 4. a second side T-shaped frame; 5. a bottom T-shaped frame; 6. a concave-convex frame; 7. positioning the vertical rod; 8. positioning the cross bar; 9. a first supporting rod; 10. an upper arcuate tube; 11. a second supporting rod; 12. blocking strips; 13. and a third supporting rod.
Detailed Description
To further illustrate the technical means and effects of the present invention adopted to achieve the objects of the present invention, the following detailed description of the embodiments, structures, features and effects according to the present invention will be made with reference to the accompanying drawings and preferred embodiments.
Referring to fig. 1-4, a concrete wind tower segment steel bar tire mold processing frame comprises two side arc tubes 1, a middle T-shaped frame 2 is fixed between the two side arc tubes 1 at the middle position, a pair of side T-shaped frames 3, a pair of side T-shaped frames two 4 and a pair of bottom T-shaped frames 5 are symmetrically fixed between the two side arc tubes 1, the middle T-shaped frame 2, the pair of side T-shaped frames one 3, the pair of side T-shaped frames two 4 and the pair of bottom T-shaped frames 5 form a base of the processing frame, so that steel bars forming a tire mold can be laid on the upper end face of the processing frame, the part of steel bars are erected and supported, and subsequent welding and other processing is facilitated.
The upper end faces of the middle T-shaped frame 2 and the pair of side T-shaped frames 4 are all fixed with a plurality of concave-convex frames 6, the reinforcing steel bars forming the tire membrane are positioned through the plurality of concave-convex frames 6, and the reinforcing steel bars can be sequentially placed in length order, so that the size required by a drawing is realized, the reinforcing steel bars forming the tire membrane are prevented from moving in the placing process, the normal operation of installation operation is influenced, the positions of the reinforcing steel bars are not required to be repeatedly adjusted by an operator, and the device is convenient to use.
A pair of first positioning assemblies and a pair of second positioning assemblies are symmetrically arranged between the two side arc-shaped pipes 1, each first positioning assembly comprises two vertical positioning rods 7 fixed on the upper end face of the bottom T-shaped frame 5, a positioning cross rod 8 is fixed between the two vertical positioning rods 7, the positioning cross rod 8 is located right above the bottom T-shaped frame 5, and a plurality of first supporting rods 9 are fixed between each positioning cross rod 8 and the upper end face corresponding to the bottom T-shaped frame 5.
Through a plurality of bracing pieces 9 that set up, make it can accept the weight of location horizontal pole 8, avoid location horizontal pole 8 at the in-process that uses, the bending deformation appears, influence the result of use to through a plurality of bracing pieces 9 that set up and the cooperation of location horizontal pole 8, carry out the location of Y direction to the reinforcing bar that constitutes the fetal membrane.
Each second positioning assembly comprises an upper arc-shaped pipe 10 fixed between two vertical positioning rods 7, the upper arc-shaped pipe 10 is located right above the side arc-shaped pipe 1, and a plurality of second supporting rods 11 are fixed between each upper arc-shaped pipe 10 and the side wall of the corresponding side arc-shaped pipe 1.
Through a plurality of two 11 of bracing pieces that set up, make it can accept the weight of upper portion arc pipe 10, avoid upper portion arc pipe 10 at the in-process that uses, the bending deformation appears, influence the result of use to two 11 of individual bracing pieces and the cooperation of upper portion arc pipe 10 carry out the location of X direction to the reinforcing bar that constitutes the fetal membrane.
Through the cooperation of the locating horizontal pole 8, the bracing piece 9, the upper portion arc pipe 10 and the bracing piece two 11 that set up, make the fetal membrane steel reinforcement cage of the wind tower section of jurisdiction of constitution laminate mutually with one side of this processing frame, conveniently control protective layer thickness to this realizes the higher protective layer thickness requirement of required precision, and the fetal membrane steel reinforcement cage laminates mutually with one side of this processing frame, the operation of lifting by crane of fetal membrane after convenient processing finishes.
All be fixed with three pairs of blend stop 12 between every side T shape frame two 4 and the lateral wall that corresponds bottom T shape frame 5, the purpose is dodged bellied hand hole, the symmetry is fixed with the bracing piece three 13 of two slopes on the lateral wall of middle T shape frame 2, the both ends of bracing piece three 13 are connected with the interior top and the hypomere lateral wall of middle T shape frame 2 respectively, make three 13 of bracing pieces can support the interior top of middle T shape frame 2, the deformation appears at the in-process that uses in the upper segment part of avoiding middle T shape frame 2, influence the result of use.
When the utility model is used, the steel bars forming the steel bar tire membranes of the concrete wind tower pipe pieces are sequentially laid on the upper surface of the processing frame, and the steel bars forming the tire membranes are positioned by the arranged concave-convex frames 6, so that the part of the steel bars can be sequentially placed in length order, thereby realizing the size required by the drawing, and avoiding the influence on the normal operation of installation operation caused by the movement of the steel bars forming the tire membranes in the placing process;
through the cooperation of the locating horizontal pole 8, the bracing piece 9, the upper portion arc pipe 10 and the bracing piece two 11 that set up, make the fetal membrane steel reinforcement cage of the wind tower section of jurisdiction of constitution laminate mutually with one side of this processing frame, conveniently control protective layer thickness to this realizes the higher protective layer thickness requirement of required precision, and the fetal membrane steel reinforcement cage laminates mutually with one side of this processing frame, the operation of lifting by crane of fetal membrane after convenient processing finishes.
The above description is only a preferred embodiment of the present invention, and the present invention is not limited to the above description, and although the present invention has been disclosed by the preferred embodiment, it is not limited to the present invention, and any person skilled in the art can make modifications or changes equivalent to the equivalent embodiments by utilizing the above disclosed technical contents without departing from the technical scope of the present invention, but all the modifications, changes and changes of the technical spirit of the present invention made to the above embodiments are also within the scope of the technical solution of the present invention.

Claims (7)

1. The utility model provides a concrete wind tower tube sheet steel reinforcement fetal membrane adds clamping frame, includes two side arc tubes (1), its characterized in that, two between side arc tube (1) and the position intermediate position be fixed with middle T shape frame (2), still the symmetry is fixed with a pair of side T shape frame (3), a pair of side T shape frame two (4) and a pair of bottom T shape frame (5) between two side arc tubes (1), and the up end of middle T shape frame (2) and a pair of side T shape frame two (4) all is fixed with a plurality of concave-convex frames (6), and the symmetry is provided with a pair of locating component one and a pair of locating component two between two side arc tubes (1).
2. The concrete wind tower tube sheet reinforcing steel bar membrane processing frame according to claim 1, wherein each positioning assembly comprises two positioning vertical rods (7) fixed on the upper end surface of the bottom T-shaped frame (5), a positioning cross rod (8) is fixed between the two positioning vertical rods (7), and the positioning cross rod (8) is positioned right above the bottom T-shaped frame (5).
3. The concrete wind tower tube sheet reinforcement tire membrane processing frame according to claim 2, wherein a plurality of first supporting rods (9) are fixed between each positioning cross rod (8) and the upper end face of the corresponding bottom T-shaped frame (5).
4. The concrete wind tower tube sheet reinforcement tire membrane processing frame according to claim 1, wherein each positioning assembly II comprises an upper arc-shaped tube (10) fixed between two positioning vertical rods (7), and the upper arc-shaped tube (10) is positioned right above the side arc-shaped tube (1).
5. The concrete wind tower tube sheet reinforcement tire membrane processing frame according to claim 4, wherein a plurality of second support rods (11) are fixed between each upper arc-shaped tube (10) and the side wall of the corresponding side arc-shaped tube (1).
6. The concrete wind tower tube sheet reinforcement tire membrane processing frame according to claim 1, wherein three pairs of barrier strips (12) are fixed between each side T-shaped frame two (4) and the side wall of the corresponding bottom T-shaped frame (5).
7. The concrete wind tower tube sheet reinforcement tire membrane processing frame according to claim 1, characterized in that two inclined support rods III (13) are symmetrically fixed on the side wall of the middle T-shaped frame (2).
CN202222577722.6U 2022-09-28 2022-09-28 Concrete wind tower tube sheet reinforcing steel bar fetal membrane processing frame Active CN218395752U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222577722.6U CN218395752U (en) 2022-09-28 2022-09-28 Concrete wind tower tube sheet reinforcing steel bar fetal membrane processing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222577722.6U CN218395752U (en) 2022-09-28 2022-09-28 Concrete wind tower tube sheet reinforcing steel bar fetal membrane processing frame

Publications (1)

Publication Number Publication Date
CN218395752U true CN218395752U (en) 2023-01-31

Family

ID=85034373

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222577722.6U Active CN218395752U (en) 2022-09-28 2022-09-28 Concrete wind tower tube sheet reinforcing steel bar fetal membrane processing frame

Country Status (1)

Country Link
CN (1) CN218395752U (en)

Similar Documents

Publication Publication Date Title
CN112554549B (en) Template supporting structure of circular arc-shaped shell plate and construction method
CN106592775A (en) High-precision embedded part reinforcing and mounting device and method and purpose
CN218395752U (en) Concrete wind tower tube sheet reinforcing steel bar fetal membrane processing frame
CN215368122U (en) Coincide floor truss reinforcing bar positioner
CN212428115U (en) A ligature lift frock for prefabricated superimposed sheet reinforcing bar net
CN110670873B (en) Support system of steel formwork of ultrahigh large-section concrete column and construction method
CN115502306A (en) Concrete wind tower tube sheet reinforcing steel bar fetal membrane processing frame
CN108214874A (en) Pretensioning prestressed concrete track board assembly line puts a system and its application
CN206868865U (en) Have an area of transition fitting press
CN115162504A (en) Prefabricated reinforced concrete structural member for prefabricated building construction
CN216428709U (en) Building curtain built-in fitting frock structure and building curtain
CN211313311U (en) Assembled concrete structure regularization stair protection platform
CN110409800B (en) High-precision formwork construction method for cast-in-situ bare concrete wind tunnel
CN210002708U (en) assembled column steel bar positioning device
CN211622195U (en) Adjustable dog bed-jig
CN218948039U (en) Prefabricated superimposed sheet truss reinforcing bar location frock
CN216787591U (en) Prefabricated ribbed prestressed hollow bidirectional laminated slab
CN205918142U (en) Aligning device is assembled to shear force wall
CN217999014U (en) PC superimposed sheet hoist and mount positioner
CN206733300U (en) Prefabricated case beam steel bar overall binding mold
CN219825607U (en) Combined lifting support for integrally lifting grid structure
CN217268366U (en) Prefabricated component framework of steel reinforcement profiling of assembled station
CN212897647U (en) Intelligent steel bar positioning and deviation rectifying device for reinforced concrete structure
CN216304361U (en) Cast-in-place cement concrete pavement template locator
CN214695158U (en) Novel anti-collision guardrail protective layer control jig frame