CN218392843U - Water flow vortex dust removal structure for tail gas treatment - Google Patents

Water flow vortex dust removal structure for tail gas treatment Download PDF

Info

Publication number
CN218392843U
CN218392843U CN202222403668.3U CN202222403668U CN218392843U CN 218392843 U CN218392843 U CN 218392843U CN 202222403668 U CN202222403668 U CN 202222403668U CN 218392843 U CN218392843 U CN 218392843U
Authority
CN
China
Prior art keywords
cavity
handle
lower extreme
dust removal
depressed groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222403668.3U
Other languages
Chinese (zh)
Inventor
田志伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Yikos Automation Equipment Co ltd
Original Assignee
Anhui Yikos Automation Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Yikos Automation Equipment Co ltd filed Critical Anhui Yikos Automation Equipment Co ltd
Priority to CN202222403668.3U priority Critical patent/CN218392843U/en
Application granted granted Critical
Publication of CN218392843U publication Critical patent/CN218392843U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a tail gas treatment is with rivers swirl dust removal structure, including handling the cavity down, go up processing cavity and sealing washer, it is equipped with first depressed groove to handle the cavity lower extreme down, the second depressed groove is located to the upper end, imbed the sealing washer in the first depressed groove, make down handle cavity lower extreme and circulating water pump's drainage end sealing connection, imbed the sealing washer in the second depressed groove, make down handle the cavity and utilize clamp sealing connection with last processing cavity, be equipped with the inlet channel in the lower processing cavity, and the inlet channel surpasss and handle in the recess that the cavity lower extreme was gone up in inserting down to handle the cavity, it is equipped with the baffle to go up in the middle of the processing cavity, it evenly is equipped with curve sewage pipes to go up to handle the cavity lower extreme and be the circumference, it evenly is equipped with drainage pipes to go up to handle the cavity upper end to be the circumference, realize the circulating water swirl dust removal of water tank through curve sewage pipes, avoid causing the pipeline jam in circulating water route to pump out, avoid frequently changing or wasing the pipeline, increase the maintenance cycle that equipment used, and labor intensity is reduced.

Description

Water flow vortex dust removal structure for tail gas treatment
Technical Field
The utility model belongs to the technical field of photovoltaic semiconductor trade exhaust-gas treatment, specifically speaking, the utility model relates to a rivers vortex dust removal structure for tail gas treatment.
Background
The waste gas of poisonous and harmful or other pollution nature that photovoltaic semiconductor trade processing procedure produced mainly adopts processing procedure technology waste gas treatment board to handle, and present processing procedure technology waste gas treatment board all possesses the washing function, and processing procedure technology waste gas is through pyrolysis treatment, need pass through the water tank again and wash, then discharge through a flange section of thick bamboo.
Utilize the circulating pump to take out the inside water of water tank and wash gas again, carry out cyclic utilization, the inside water of water tank is when taking out the input circulation water route, and some remaining granule dusts of water tank can be taken out simultaneously, enter into the pipeline in circulation water route, and long-time work causes the pipeline in circulation water route to block up easily, need change or wash the pipeline, shortens the maintenance cycle of equipment use, increases intensity of labour.
SUMMERY OF THE UTILITY MODEL
The utility model provides a rivers swirl dust removal structure for tail gas treatment to solve the problem that exists among the above-mentioned background art.
In order to realize the purpose, the utility model discloses the technical scheme who takes does: the utility model provides a tail gas treatment is with rivers swirl dust removal structure, includes down handles the cavity, goes up and handles cavity and sealing washer, it is equipped with first depressed groove to handle the cavity lower extreme down, and the second depressed groove is located to the upper end, imbed the sealing washer in the first depressed groove for handle cavity lower extreme and circulating water pump's drainage end sealing connection down, imbed the sealing washer in the second depressed groove, make and handle the cavity and utilize clamp sealing connection with last processing cavity down, be equipped with the inlet channel down in handling the cavity, and the inlet channel surpasss and handle in the cavity inserts the recess of handling the cavity lower extreme down, be equipped with the baffle in the middle of the processing cavity of going up, it evenly is equipped with curve sewage pipes to go up processing cavity lower extreme to be the circumference, and it evenly is equipped with drainage pipe to be the circumference to go up processing cavity upper end.
Preferably, an annular sewage particle storage tank is formed between the lower treatment cavity and the water inlet pipeline, and a drain pipe communicated with the sewage particle storage tank in a tangential direction is arranged on the outer side of the lower treatment cavity.
The beneficial effect of adopting above technical scheme is:
1. the utility model discloses a rivers swirl dust removal structure for tail gas treatment, embedding sealing washer in the first depressed groove for handle cavity lower extreme and circulating water pump's drainage end sealing connection down, make water tank internal circulating water from supreme down, handle cavity and last processing cavity under the process in proper order, it blocks to pour into water into the recess inside of last processing cavity through the inlet channel, rivers pass through curve sewage pipes and drainage pipe, curve sewage pipes among the arc structural design, under the effect of gravity and centrifugal force, the inside of sewage particles hold up tank is discharged with the water of hybrid particles, the rivers that have filtered granule and impurity flow through drainage pipe to handle cavity upper end inside to last, in the pipeline of last flow direction circulation water route. The sewage stored in the sewage particle storage tank can be discharged out of the equipment through the sewage discharge pipe.
The utility model discloses a tail gas treatment is with rivers vortex dust removal structure realizes the circulating water vortex that the water tank pumped through curve sewage pipes and removes dust, avoids causing the pipeline in circulation water route to block up, avoids frequently changing or wasing the pipeline, increases the maintenance cycle that equipment used, reduces intensity of labour.
Drawings
FIG. 1 is an assembly view of a water vortex dust removal structure for tail gas treatment according to the present invention;
FIG. 2 is an exploded view of a water vortex dust removal structure for tail gas treatment according to the present invention;
FIG. 3 is a sectional view of the water vortex dust removal structure for tail gas treatment of the present invention;
wherein:
1. a lower processing cavity; 2. an upper processing chamber; 3. a seal ring;
10. a first recess groove; 11. a second recess groove; 12. a water inlet pipe; 13. a sewage particle storage tank; 14. a blow-off pipe;
20. a groove; 21. a partition plate; 22. a curved sewage pipe; 23. and (4) a water drainage pipeline.
Detailed Description
The following detailed description of the embodiments of the present invention is provided to help those skilled in the art to more fully, accurately and deeply understand the conception and the technical solution of the present invention, and to help them implement the same, by referring to the accompanying drawings and the description of the embodiments.
As shown in fig. 1 to 3, the utility model relates to a tail gas treatment is with rivers vortex dust removal structure realizes through curve sewage pipes that the circulating water vortex that the water tank pumped removes dust, avoids causing the pipeline jam in circulating water route, avoids frequently changing or wasing the pipeline, increases the maintenance cycle of plant use, reduces intensity of labour.
Specifically, as shown in fig. 1 to 3, the device comprises a lower treatment cavity 1, an upper treatment cavity 2 and a sealing ring 3, wherein a first concave groove 10 is formed in the lower end of the lower treatment cavity 1, a second concave groove 11 is formed in the upper end of the lower treatment cavity 1, the sealing ring 3 is embedded in the first concave groove 10, so that the lower end of the lower treatment cavity 1 is hermetically connected with the drainage end of a circulating water pump, the sealing ring 3 is embedded in the second concave groove 11, so that the lower treatment cavity 1 and the upper treatment cavity 2 are hermetically connected by a clamp, a water inlet pipe 12 is arranged in the lower treatment cavity 1, the water inlet pipe 12 exceeds the lower treatment cavity 1 and is inserted into a groove 20 in the lower end of the upper treatment cavity 2, a partition plate 21 is arranged in the middle of the upper treatment cavity 2, a curved drainage pipe 14 is uniformly arranged at the lower end of the upper treatment cavity 2, and a drainage pipe 23 is uniformly arranged at the upper end of the upper treatment cavity 2.
An annular sewage particle storage tank 13 is formed between the lower treatment cavity 1 and the water inlet pipeline 12, and a sewage discharge pipe 14 which is tangentially communicated with the sewage particle storage tank 13 is arranged on the outer side of the lower treatment cavity 1.
The following specific working modes are illustrated by specific examples:
example 1:
the utility model discloses a tail gas treatment is with rivers swirl dust removal structure, embedding sealing washer 3 in the first dead slot 10, make 1 lower extreme of lower processing cavity and circulating water pump's drainage end sealing connection, make water tank internal recycle water follow supreme down, process cavity 1 and last processing cavity 2 under in proper order, the recess 20 that pours into water into last processing cavity 2 through inlet channel 12 is inside to receive baffle 21 and blocks, rivers are through curve sewage pipes 22 and drainage pipe 23, curve sewage pipes 22 among the arc structural design, under the effect of gravity and centrifugal force, discharge the inside of sewage particles hold up tank 13 with the water drainage of hybrid particles, the rivers that have filtered granule and impurity pass through inside 23 flow direction upper end of drainage pipe and upward processing cavity 2, flow to in the pipeline in circulation water route at last. The sewage stored in the sewage particle storage tank 13 is finally discharged out of the apparatus through the sewage discharge pipe 14.
The utility model discloses a water flow vortex dust removal structure for tail gas treatment realizes the circulating water vortex dust removal that the water tank pumped through curve sewage pipes 22, avoids causing the pipeline in circulation water route to block up, avoids frequently changing or wasing the pipeline, increases the maintenance cycle that equipment used, reduces intensity of labour.
The present invention has been described in detail with reference to the accompanying drawings, and it is to be understood that the invention is not limited to the specific embodiments, but is intended to cover various insubstantial modifications, including those made by the method and technical solutions of the present invention; or without improvement, the above conception and technical scheme of the utility model can be directly applied to other occasions, all within the protection scope of the utility model.

Claims (2)

1. The utility model provides a tail gas treatment is with rivers swirl dust removal structure which characterized in that: including handling cavity (1) down, going up and handling cavity (2) and sealing washer (3), handle cavity (1) lower extreme down and be equipped with first depressed groove (10), second depressed groove (11) are located to the upper end, embedding sealing washer (3) in first depressed groove (10) for handle cavity (1) lower extreme and circulating water pump's drainage end sealing connection down, embedding sealing washer (3) in second depressed groove (11) make down handle cavity (1) and last processing cavity (2) utilize clamp sealing connection, be equipped with inlet channel (12) down in handling cavity (1), and inlet channel (12) surpass down handle cavity (1) insert in recess (20) of processing cavity (2) lower extreme, it is equipped with baffle (21) to go up in the middle of handling cavity (2), it evenly is equipped with curve (14) way (22) to go up to handle cavity (2) lower extreme to be the circumference, upward handles cavity (2) upper end and is the circumference and evenly is equipped with drainage pipe (23).
2. The water flow vortex dust removal structure for tail gas treatment according to claim 1, characterized in that: an annular sewage particle storage tank (13) is formed between the lower treatment cavity (1) and the water inlet pipeline (12), and a drainage pipe (14) which is communicated with the sewage particle storage tank (13) in a tangential direction is arranged on the outer side of the lower treatment cavity (1).
CN202222403668.3U 2022-09-10 2022-09-10 Water flow vortex dust removal structure for tail gas treatment Active CN218392843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222403668.3U CN218392843U (en) 2022-09-10 2022-09-10 Water flow vortex dust removal structure for tail gas treatment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222403668.3U CN218392843U (en) 2022-09-10 2022-09-10 Water flow vortex dust removal structure for tail gas treatment

Publications (1)

Publication Number Publication Date
CN218392843U true CN218392843U (en) 2023-01-31

Family

ID=85031402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222403668.3U Active CN218392843U (en) 2022-09-10 2022-09-10 Water flow vortex dust removal structure for tail gas treatment

Country Status (1)

Country Link
CN (1) CN218392843U (en)

Similar Documents

Publication Publication Date Title
CN201390795Y (en) Waste gas pump drainage device for surface finishing equipment
CN218392843U (en) Water flow vortex dust removal structure for tail gas treatment
CN201565160U (en) Anaerobic methane gas-liquid separation deaeration device
CN212663138U (en) Spraying waste gas purification spray tower capable of recycling water resources
CN210855295U (en) Reactor for efficiently removing arsenic from fluosilicic acid
CN211394203U (en) Car washing water filtering and circulating system
CN209874022U (en) Sediment oil-separating well
CN217613915U (en) Waste gas collecting device of epoxidized soybean oil reaction kettle
CN213885171U (en) Multistage wastewater treatment device
CN216693075U (en) Anti-blocking gas drainer
CN215855530U (en) Unpowered treatment device for chemical softening and pre-separation of sewage
CN212819101U (en) Waste gas recovery device for dry-method glass processing
CN219433819U (en) Baffle type condensation filter
CN213984648U (en) Condenser water charging system convenient to clearance
CN216767792U (en) LDTN condensate pump seals water saving fixtures
CN219689454U (en) Vertical flow sedimentation tank
CN218529903U (en) Tail gas treatment is with water tank that possesses function of decontaminating fast
CN215085780U (en) Desulfurization dust removal circulating water pool
CN212881177U (en) High-efficient environmental protection sedimentation tank for sewage treatment
CN218764737U (en) Condenser for pyrolysis system
CN212799974U (en) High-efficient processing system of yellow phosphorus industrial wastewater
CN218077200U (en) Biomass boiler flue gas denitration treatment equipment
CN211896425U (en) Wastewater treatment device for thermal power plant
CN218717376U (en) Automatic water-vapor separation mechanism for air compressor
CN218454019U (en) Ozone purifier