CN218386546U - Power distribution network frame for power distribution network planning - Google Patents
Power distribution network frame for power distribution network planning Download PDFInfo
- Publication number
- CN218386546U CN218386546U CN202222087272.2U CN202222087272U CN218386546U CN 218386546 U CN218386546 U CN 218386546U CN 202222087272 U CN202222087272 U CN 202222087272U CN 218386546 U CN218386546 U CN 218386546U
- Authority
- CN
- China
- Prior art keywords
- distribution network
- block
- base plate
- installation base
- network frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Patch Boards (AREA)
Abstract
本实用新型提供一种用于配电网规划的配电网架,该用于配电网规划的配电网架,包括安装底板,所述安装底板的顶部设置有紧固机构,所述安装底板的底部设置有固定机构,所述安装底板的底部设置有固定板,所述安装底板的顶部设置有卡槽。本实用新型提供的用于配电网规划的配电网架解决了现有技术中的配电网架在使用时,一般是将支架安装在电线杆上端,然后给支架上通过螺栓固定几个绝缘子,然后使电网线在绝缘子上缠绕一圈,此方式连接复杂,安装起来相当麻烦,同时瓷质绝缘子也容易损坏,造成了使用不便,且无法对电线进行松紧调节,长时间使用后,高压电线容易发生脱落,容易导致发生故障。
The utility model provides a distribution network frame for distribution network planning. The distribution network frame for distribution network planning includes an installation base plate, and a fastening mechanism is arranged on the top of the installation base plate. The bottom of the base plate is provided with a fixing mechanism, the bottom of the installation base plate is provided with a fixing plate, and the top of the installation base plate is provided with a card slot. The distribution network frame for distribution network planning provided by the utility model solves the problem that when the distribution network frame in the prior art is in use, the bracket is generally installed on the upper end of the utility pole, and then several bolts are used to fix the bracket on the bracket. Insulators, and then wind the power grid wires around the insulators. This method is complicated to connect, and it is quite troublesome to install. At the same time, the porcelain insulators are also easily damaged, causing inconvenience in use, and it is impossible to adjust the tightness of the wires. After long-term use, high-voltage Wires are prone to fall off, which can easily lead to malfunction.
Description
技术领域technical field
本实用新型涉及电力设备领域,尤其涉及一种用于配电网规划的配电网架。The utility model relates to the field of electric equipment, in particular to a distribution network frame used for distribution network planning.
背景技术Background technique
配电网是指从输电网或地区发电厂接受电能,通过配电设施就地分配或按电压逐级分配给各类用户的电力网,在电力网中起重要分配电能作用的网络,它包含变电、输电、配电三个单元,电力网的任务是输送与分配电能,改变电压,目前电网都是通过若干电杆组成一个大的电路网路,以此来进行供电,配电网是由架空线路、电缆、杆塔、配电变压器、隔离开关、无功补偿器及一些附属设施等组成的,在电力网中起重要分配电能作用的网络,配电网一般采用闭环设计、开环运行,其结构呈辐射状,采用闭环结构是为了提高运行的灵活性和供电可靠性;开环运行一方面是为了限制短路故障电流,防止断路器超出遮断容量发生爆炸,另一方面是控制故障波及范围,避免故障停电范围扩大。The distribution network refers to the power network that receives electric energy from the transmission network or regional power plants, distributes it locally through power distribution facilities or distributes it to various users step by step according to voltage, and plays an important role in distributing electric energy in the power network. It includes substation , power transmission, and power distribution. The task of the power grid is to transmit and distribute electric energy and change the voltage. At present, the power grid forms a large circuit network through several poles to provide power. The distribution network is composed of overhead lines. , cables, towers, distribution transformers, isolating switches, reactive power compensators and some auxiliary facilities, etc., which play an important role in distributing electric energy in the power network. The distribution network generally adopts closed-loop design and open-loop operation, and its structure is Radial, the closed-loop structure is used to improve the flexibility of operation and power supply reliability; the open-loop operation is to limit the short-circuit fault current on the one hand, prevent the circuit breaker from exceeding the breaking capacity and explode, and on the other hand, control the scope of faults and avoid faults The power outage expanded.
现有技术中的配电网架在使用时,一般是将支架安装在电线杆上端,然后给支架上通过螺栓固定几个绝缘子,然后使电网线在绝缘子上缠绕一圈,此方式连接复杂,安装起来相当麻烦,同时瓷质绝缘子也容易损坏,造成了使用不便,且无法对电线进行松紧调节,长时间使用后,高压电线容易发生脱落,容易导致发生故障。When the distribution network frame in the prior art is used, the bracket is generally installed on the upper end of the utility pole, and then several insulators are fixed to the bracket by bolts, and then the grid wire is wound around the insulators. This method is complicated to connect. It is quite cumbersome to install, and the porcelain insulator is also easy to damage, which makes it inconvenient to use, and it is impossible to adjust the tightness of the wire. After long-term use, the high-voltage wire is prone to fall off, which is likely to cause failure.
因此,有必要提供一种新的用于配电网规划的配电网架解决上述技术问题。Therefore, it is necessary to provide a new distribution network frame for distribution network planning to solve the above technical problems.
实用新型内容Utility model content
为解决上述技术问题,本实用新型提供一种具有调节电线松紧且便于安装的用于配电网规划的配电网架。In order to solve the above technical problems, the utility model provides a distribution network frame for distribution network planning which can adjust the tightness of electric wires and is easy to install.
本实用新型提供的用于配电网规划的配电网架,包括安装底板,所述安装底板的顶部设置有紧固机构,所述安装底板的底部设置有固定机构,所述安装底板的底部设置有固定板,所述安装底板的顶部设置有卡槽,所述固定板的底部设置有卡块,所述固定板的底部设置有穿线槽。The distribution network frame for distribution network planning provided by the utility model includes an installation base plate, the top of the installation base plate is provided with a fastening mechanism, the bottom of the installation base plate is provided with a fixing mechanism, and the bottom of the installation base plate A fixing plate is provided, the top of the installation bottom plate is provided with a card slot, the bottom of the fixed plate is provided with a block, and the bottom of the fixed plate is provided with a threading groove.
为了达到调节电线松紧的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述紧固机构包括安装槽、限位块、夹持板、滑杆、固定杆和弹簧,所述安装底板的顶部设置有安装槽,所述安装槽的内腔设置有限位块。In order to achieve the effect of adjusting the tightness of the wires, as the utility model provides a distribution network frame for distribution network planning, preferably, the fastening mechanism includes a mounting groove, a limit block, a clamping plate, a slide bar, The rod and the spring are fixed, an installation groove is arranged on the top of the installation bottom plate, and a limit block is arranged in the inner cavity of the installation groove.
为了达到进一步调节电线松紧的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述夹持板的一侧固定连接有滑杆,所述滑杆的外侧与限位块的内腔滑动连接。In order to achieve the effect of further adjusting the tightness of the wires, as the utility model provides a distribution network frame for distribution network planning, preferably, one side of the clamping plate is fixedly connected with a slide bar, and the slide bar The outer side is slidingly connected with the inner cavity of the limit block.
为了达到提高调节时稳定性的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述夹持板的一侧固定连接有固定杆,所述固定杆的外侧设置有弹簧。In order to achieve the effect of improving stability during adjustment, as the utility model provides a distribution network frame for distribution network planning, preferably, one side of the clamping plate is fixedly connected with a fixed rod, and the fixed rod The outside is provided with a spring.
为了达到达到便于安装的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述固定机构包括第一固定块、第一连接块、第二固定块、第二连接块、防滑垫、第一螺栓和第一螺套,所述第一固定块的顶部与安装底板的底部合页转动连接,所述第一固定块的底部设置有第一连接块。In order to achieve the effect of easy installation, as the utility model provides a distribution network frame for distribution network planning, preferably, the fixing mechanism includes a first fixing block, a first connecting block, a second fixing block, The second connection block, the anti-skid pad, the first bolt and the first screw sleeve, the top of the first fixed block is rotatably connected with the bottom hinge of the installation base plate, and the bottom of the first fixed block is provided with the first connection block.
为了达到便于固定的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述第二固定块的顶部与安装底板的底部合页转动连接,所述第二固定块的底部设置有第二连接块。In order to achieve the effect of easy fixing, as the utility model provides a distribution network frame for distribution network planning, preferably, the top of the second fixing block is rotatably connected with the bottom hinge of the installation base plate, and the first The bottom of the two fixed blocks is provided with a second connecting block.
为了达到提高固定时的稳定性的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述第一固定块与第二固定块的内腔均设置有防滑垫。In order to achieve the effect of improving the stability during fixing, as the utility model provides a distribution network frame for distribution network planning, preferably, the inner cavities of the first fixing block and the second fixing block are provided with Non-slip mat.
为了达到进一步便于安装的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述第一连接块与第二连接块的内腔均螺纹连接有第一螺栓,所述第一螺栓的外侧螺纹连接有第一螺套。In order to further facilitate installation, the utility model provides a distribution network frame for distribution network planning. A bolt, the outer thread of the first bolt is connected with a first screw sleeve.
为了达到对固定板进行安装的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述安装底板的两侧均设置有第一安装块,所述固定板的两侧均设置有第二安装块。In order to achieve the effect of installing the fixed plate, as the utility model provides a distribution network frame for distribution network planning, preferably, both sides of the installation base plate are provided with first installation blocks, and the fixed Both sides of the board are provided with second mounting blocks.
为了达到进一步对固定板进行安装的效果,作为本实用新型提供一种用于配电网规划的配电网架,优选的,所述第一安装块与第二安装块的内腔均螺纹连接有第二螺栓,所述第二螺栓的外侧螺纹连接有第二螺套。In order to further achieve the effect of installing the fixing plate, as the utility model provides a distribution network frame for distribution network planning, preferably, the inner cavities of the first installation block and the second installation block are screwed together There is a second bolt, and the outer thread of the second bolt is connected with a second screw sleeve.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
该用于配电网规划的配电网架,通过设置紧固机构,达到了便于对电线松紧进行调节效果,通过设置固定机构,达到了便于安装的效果,通过设置防滑垫,提高了安装固定的稳定性,通过设置卡块和卡槽,达到了对固定板进行定位安装的效果,通过设置穿线槽,对高压电线进行固定,防止高压电线脱落,解决了现有的配电网架在使用时,一般是将支架安装在电线杆上端,然后给支架上通过螺栓固定几个绝缘子,然后使电网线在绝缘子上缠绕一圈,此方式连接复杂,安装起来相当麻烦,同时瓷质绝缘子也容易损坏,造成了使用不便,且无法对电线进行松紧调节,长时间使用后,高压电线容易发生脱落,容易导致发生故障。The distribution network frame used for distribution network planning achieves the effect of adjusting the tightness of the wires by setting the fastening mechanism, and achieves the effect of easy installation by setting the fixing mechanism. The stability of the fixed plate is achieved by setting the clamping block and the clamping slot. By setting the threading slot, the high-voltage wire is fixed to prevent the high-voltage wire from falling off, which solves the problem of the existing distribution network frame being used. Usually, the bracket is installed on the upper end of the utility pole, and then a few insulators are fixed on the bracket by bolts, and then the power grid wire is wound around the insulators. This method is complicated to connect and quite troublesome to install. Damaged, causing inconvenient use, and unable to adjust the tightness of the wires. After a long period of use, the high-voltage wires are prone to fall off, which is likely to cause failure.
附图说明Description of drawings
图1为本实用新型提供的一种用于配电网规划的配电网架的一种较佳实施例的结构示意图;Fig. 1 is a structural schematic diagram of a preferred embodiment of a distribution network frame for distribution network planning provided by the utility model;
图2为图1所示安装底板与固定板的结构示意图;Fig. 2 is a structural schematic diagram of the mounting base plate and the fixing plate shown in Fig. 1;
图3为图1所示紧固机构的结构示意图;Fig. 3 is a structural schematic diagram of the fastening mechanism shown in Fig. 1;
图4为图2所示滑杆与限位块的连接结构示意图;Fig. 4 is a schematic diagram of the connection structure between the slide bar and the limit block shown in Fig. 2;
图5为图1所示固定机构的结构示意图。FIG. 5 is a schematic structural diagram of the fixing mechanism shown in FIG. 1 .
图中标号:1、安装底板;2、紧固机构;21、安装槽;22、限位块;23、夹持板;24、滑杆;25、固定杆;26、弹簧;3、固定机构;31、第一固定块;32、第一连接块;33、第二固定块;34、第二连接块;35、防滑垫;36、第一螺栓;37、第一螺套;4、固定板;5、卡槽;6、卡块;7、穿线槽;8、第一安装块;9、第二安装块;10、第二螺栓;11、第二螺套。Symbols in the figure: 1, installation base plate; 2, fastening mechanism; 21, installation groove; 22, limit block; 23, clamping plate; 24, sliding rod; 25, fixing rod; 26, spring; 3, fixing mechanism ; 31, the first fixed block; 32, the first connecting block; 33, the second fixed block; 34, the second connecting block; 35, anti-skid pad; 36, the first bolt; 37, the first screw sleeve; plate; 5. card slot; 6. card block; 7. threading slot; 8. first installation block; 9. second installation block; 10. second bolt; 11. second screw sleeve.
具体实施方式Detailed ways
下面结合附图和实施方式对本实用新型作进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
请结合参阅图1、图2、图3、图4和图5,其中图1为本实用新型提供的一种用于配电网规划的配电网架的一种较佳实施例的结构示意图;图2为图1所示安装底板与固定板的结构示意图;图3为图1所示紧固机构的结构示意图;Please refer to Fig. 1, Fig. 2, Fig. 3, Fig. 4 and Fig. 5 in combination, wherein Fig. 1 is a structural schematic diagram of a preferred embodiment of a distribution network frame for distribution network planning provided by the utility model ; Fig. 2 is a structural schematic diagram of the installation base plate and a fixed plate shown in Fig. 1; Fig. 3 is a structural schematic diagram of the fastening mechanism shown in Fig. 1;
图4为图2所示滑杆与限位块的连接结构示意图;图5为图1所示固定机构的结构示意图。一种用于配电网规划的配电网架,包括安装底板1,安装底板1的顶部设置有紧固机构2,安装底板1的底部设置有固定机构3,安装底板1的底部设置有固定板4,安装底板1的顶部设置有卡槽5,固定板4的底部设置有卡块6,固定板4的底部设置有穿线槽7。FIG. 4 is a schematic diagram of the connection structure between the slide bar and the limit block shown in FIG. 2 ; FIG. 5 is a schematic diagram of the structure of the fixing mechanism shown in FIG. 1 . A distribution network frame for distribution network planning, comprising an
在具体实施过程中,如图1、图2、图3和图4所示,紧固机构2包括安装槽21、限位块22、夹持板23、滑杆24、固定杆25和弹簧26,安装底板1的顶部设置有安装槽21,安装槽21的内腔设置有限位块22。In the specific implementation process, as shown in Figure 1, Figure 2, Figure 3 and Figure 4, the
夹持板23的一侧固定连接有滑杆24,滑杆24的外侧与限位块22的内腔滑动连接。One side of the
夹持板23的一侧固定连接有固定杆25,固定杆25的外侧设置有弹簧26。One side of the
安装底板1的两侧均设置有第一安装块8,固定板4的两侧均设置有第二安装块9。Both sides of the
第一安装块8与第二安装块9的内腔均螺纹连接有第二螺栓10,第二螺栓10的外侧螺纹连接有第二螺套11。The inner cavities of the
需要说明的是:本装置在使用时,通过设置紧固机构2,先将高压电线放入夹持板23之间,通过弹簧26的作用将高压电线固定在配电网架中,通过设置滑杆24和限位块22,达到便于调节高压电线松紧的效果,调节完成后,通过卡块6和卡槽5的作用,对固定板4进行定位安装,通过第二螺栓10和第二螺套11的作用,进一步对固定板4进行安装固定,防止配电网架产生位移,提高了本装置的稳定性,通过设置穿线槽7,将高压电线固定在穿线槽7内,防止高压电线脱落。It should be noted that: when the device is in use, by setting the
参考图1和图5所示,固定机构3包括第一固定块31、第一连接块32、第二固定块33、第二连接块34、防滑垫35、第一螺栓36和第一螺套37,第一固定块31的顶部与安装底板1的底部合页转动连接,第一固定块31的底部设置有第一连接块32。Referring to Fig. 1 and Fig. 5, the
第二固定块33的顶部与安装底板1的底部合页转动连接,第二固定块33的底部设置有第二连接块34。The top of the
第一固定块31与第二固定块33的内腔均设置有防滑垫35。Both the
第一连接块32与第二连接块34的内腔均螺纹连接有第一螺栓36,第一螺栓36的外侧螺纹连接有第一螺套37。Both the inner cavities of the first connecting
需要说明的是:通过设置固定机构3,达到便于对本装置进行固定的效果,通过设置第一固定块31和第二固定块33,将本装置固定在电线杆横梁上,通过设置第一螺栓36和第一螺套37,使固定效果更加稳定,通过设置防滑垫35,防止配电网架脱落,增加了配电网架的稳定性,且不易损坏横梁,本装置解决了传统配电支架需要使用到绝缘子,绝缘子容易损坏的问题,同时便于安装,提高了实用性,安全性能较高,且降低了使用成本。It should be noted that: by arranging the
本实用新型提供的一种用于配电网规划的配电网架的工作原理如下:The working principle of a distribution network frame for distribution network planning provided by the utility model is as follows:
本装置在使用时,通过设置紧固机构2,先将高压电线放入夹持板23之间,通过弹簧26的作用将高压电线固定在配电网架中,通过设置滑杆24和限位块22,达到便于调节高压电线松紧的效果,调节完成后,通过卡块6和卡槽5的作用,对固定板4进行定位安装,通过第二螺栓10和第二螺套11的作用,进一步对固定板4进行安装固定,防止配电网架产生位移,提高了本装置的稳定性,通过设置穿线槽7,将高压电线固定在穿线槽7内,防止高压电线脱落,通过设置固定机构3,达到便于对本装置进行固定的效果,通过设置第一固定块31和第二固定块33,将本装置固定在电线杆横梁上,通过设置第一螺栓36和第一螺套37,使固定效果更加稳定,通过设置防滑垫35,防止配电网架脱落,增加了配电网架的稳定性,且不易损坏横梁。When the device is in use, by setting the
以上所述仅为本实用新型的实施例,并非因此限制本实用新型的专利范围,凡是利用本实用新型说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本实用新型的专利保护范围内。The above descriptions are only examples of the utility model, and are not intended to limit the patent scope of the utility model. Any equivalent structure or equivalent process transformation made by using the utility model specification and accompanying drawings may be directly or indirectly used in other applications. Related technical fields are all included in the patent protection scope of the present utility model in the same way.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222087272.2U CN218386546U (en) | 2022-08-09 | 2022-08-09 | Power distribution network frame for power distribution network planning |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222087272.2U CN218386546U (en) | 2022-08-09 | 2022-08-09 | Power distribution network frame for power distribution network planning |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218386546U true CN218386546U (en) | 2023-01-24 |
Family
ID=84965290
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222087272.2U Active CN218386546U (en) | 2022-08-09 | 2022-08-09 | Power distribution network frame for power distribution network planning |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218386546U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116914679A (en) * | 2023-09-08 | 2023-10-20 | 山东科泰电力科技有限公司 | Distribution network planning device based on distribution network frame |
-
2022
- 2022-08-09 CN CN202222087272.2U patent/CN218386546U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN116914679A (en) * | 2023-09-08 | 2023-10-20 | 山东科泰电力科技有限公司 | Distribution network planning device based on distribution network frame |
| CN116914679B (en) * | 2023-09-08 | 2023-11-17 | 山东科泰电力科技有限公司 | Distribution network planning device based on distribution network frame |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102684127B (en) | Mobile alternating-current ice melting device for power transmission line | |
| CN206135272U (en) | A installing support for 10kV regulator | |
| CN210156822U (en) | 10kV power cable emergency repair electric complete bypass device | |
| CN202930802U (en) | Movable type distribution transformer allowing uninterruptible power supply mounting and dismounting | |
| CN203690937U (en) | On-column high-voltage reactive power automatic compensation device | |
| CN201699327U (en) | Transformer-substation main wiring system based on single busbar section | |
| CN207339042U (en) | Intelligent amorphous alloy transformer platform on 10kV integration columns | |
| CN207320581U (en) | A kind of high-performance bus frame | |
| CN211017458U (en) | A New Type of Grounding Wire for 10kV Busbar | |
| CN212301633U (en) | Female support of arranging for temperature rise test of 4000A high tension switchgear | |
| CN209822060U (en) | Multifunctional combined training facility for simulation low-voltage distribution line | |
| CN203481755U (en) | 35kV overhead transmission line jumper wire bracket | |
| CN223502532U (en) | A high-efficiency power distribution network structure | |
| CN223809260U (en) | A grounding protection device for power distribution networks | |
| CN224053724U (en) | Combined pole-mounted transformer system | |
| CN224082339U (en) | Conductive piece of switch equipment for power system distribution network production operation | |
| CN221708602U (en) | Novel framework of knife switch | |
| CN107171343B (en) | Distribution network current compensation device | |
| CN221353606U (en) | A substation chassis | |
| CN201584702U (en) | Yoke plate capable of live replacement of 220 kV double-bundle conductor tension insulators | |
| CN223679985U (en) | Capacitor fast-assembling type capacitor electricity-taking type pole-mounted circuit breaker | |
| CN203553944U (en) | A pole-mounted magnetic control reactor type dynamic reactive voltage adjustment device | |
| CN220121622U (en) | Grounding transformer with secondary winding | |
| CN223093534U (en) | An ATS switching device used in outdoor cabinets | |
| CN204793975U (en) | Adjustable arrester installation device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |
