CN218375820U - Construction enclosure - Google Patents

Construction enclosure Download PDF

Info

Publication number
CN218375820U
CN218375820U CN202222901004.XU CN202222901004U CN218375820U CN 218375820 U CN218375820 U CN 218375820U CN 202222901004 U CN202222901004 U CN 202222901004U CN 218375820 U CN218375820 U CN 218375820U
Authority
CN
China
Prior art keywords
construction
plate
bottom plate
top plate
upright
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222901004.XU
Other languages
Chinese (zh)
Inventor
康靖昆
王小瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222901004.XU priority Critical patent/CN218375820U/en
Application granted granted Critical
Publication of CN218375820U publication Critical patent/CN218375820U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Catching Or Destruction (AREA)

Abstract

The utility model belongs to the field of municipal engineering, in particular to a construction enclosure, which comprises upright columns arranged at the periphery of a construction area at intervals, wherein the bottoms of the upright columns are arranged on a base, and the bottom of the base is provided with a convex bolt plate piece which is of a cross structure; the enclosure mechanism comprises a bottom plate and a top plate which are arranged between the adjacent upright posts, and a baffle plate is clamped between the bottom plate and the top plate; the detection mechanism comprises a detector arranged on the outer side of the upright column facing the construction area, and the upper part and the middle part of the detector are respectively provided with an infrared detector; the spraying mechanism comprises a water pump arranged at the top of the upright post, and a water pipe is arranged at the water inlet end of the water pump; detection mechanism and spraying mechanism interval set up on the stand, enclose along the construction and keep off peripheral walking region, and detection mechanism and spraying mechanism work in proper order, and opening and close of control atomizing dust removal action prevents to cause pedestrian's health filth after spun fog and the dust mixture, promotes the construction and encloses the intelligent degree that keeps off.

Description

Construction enclosure
Technical Field
The utility model relates to a municipal works field, concretely relates to fender is enclosed in construction.
Background
The enclosure means measures taken to isolate a construction site from the external environment and make the construction site a relatively closed space, and includes enclosures built by various masonry materials, maintenance bodies formed by various formed plates, and the like.
The prior art has the following problems:
through enclosing the closure that keeps off and carry out construction area, enclose to keep off collocation and make fog device and make water smoke, mix with the floating raise dust of construction area, prevent that a large amount of raise dusts from floating to construction area periphery polluted environment, but the part is mixing dust and the water smoke of water smoke can fall to enclosing the switching that keeps off periphery pedestrian's health, can't follow pedestrian's state of marcing and in time make fog dust collecting equipment and open and close, exist not enough in the function.
SUMMERY OF THE UTILITY MODEL
Objects of the invention
For solving the technical problem who exists among the background art, the utility model provides a fender is enclosed in construction has water smoke dust removal function and advances the characteristics that state automatic start-stop with the pedestrian.
(II) technical scheme
In order to solve the technical problem, the utility model provides a construction enclosure, which comprises upright columns arranged at the periphery of a construction area at intervals, wherein the bottoms of the upright columns are arranged on a base, and the bottom of the base is provided with a convex bolt plate piece which is of a cross structure;
the enclosure mechanism comprises a bottom plate and a top plate which are arranged between the adjacent upright posts, and a baffle plate is clamped between the bottom plate and the top plate;
the detection mechanism comprises a detector arranged on the outer side of the upright column facing the construction area, and the upper part and the middle part of the detector are respectively provided with an infrared detector;
spraying mechanism is including installing the water pump at stand top, the water pipe is installed to the end of intaking of water pump, and goes out the water end and install atomizer.
Preferably, a communication cable is connected between the detecting instrument and the water pump.
Preferably, the other end of the water pipe is connected to an external water supply device, and the outer wall of the water pipe is sleeved with a pipe clamp installed on the upright column towards the construction area.
Preferably, the left side wall and the right side wall of the upright column are symmetrically provided with a bottom plate groove and a top plate groove which are matched with the bottom plate and the top plate, the bottom plate groove and the bottom plate are fixedly inserted, and the top plate groove and the top plate are fixedly inserted.
Preferably, the left side wall and the right side wall of the upright post are also provided with baffle grooves matched with the baffles, and the baffles and the baffle grooves are fixedly inserted.
Preferably, the edge of the base is provided with a bolt plate piece provided with a bolt groove.
The above technical scheme of the utility model following profitable technological effect has: detection mechanism and spraying mechanism interval set up on the stand, enclose along the construction and keep off peripheral walking region, and detection mechanism and spraying mechanism work in proper order, and opening and close of control atomizing dust removal action prevents to cause pedestrian's health filth after spun fog and the dust mixture, promotes the construction and encloses the intelligent degree that keeps off.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the back structure of the present invention;
fig. 3 is a schematic view of the column structure of the present invention.
Reference numerals are as follows:
1. a column; 21. a floor trough; 22. a base plate; 23. a roof plate groove; 24. a top plate; 25. a baffle slot; 26. a baffle plate; 31. a detector; 32. an infrared detector; 41. a water pump; 42. a water pipe; 43. a pipe clamp; 44. an atomizing spray head; 51. a base; 52. piling; 53. a plate member is bolted.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
As shown in fig. 1-3, the construction fence of the present invention comprises columns 1 disposed at the periphery of a construction area at intervals, wherein the bottom of each column 1 is mounted on a base 51, a protruding bolt plate 53 is mounted at the bottom of the base 51, and the bolt plate 53 is a cross structure;
the enclosure mechanism comprises a bottom plate 22 and a top plate 24 which are arranged between adjacent upright posts 1, and a baffle plate 26 is clamped between the bottom plate 22 and the top plate 24;
the detection mechanism comprises a detector 31 arranged on the outer side of the upright post 1 facing the construction area, and the upper part and the middle part of the detector 31 are respectively provided with an infrared detector 32;
the spraying mechanism comprises a water pump 41 arranged at the top of the upright post 1, a water pipe 42 is arranged at the water inlet end of the water pump 41, and an atomizing spray head 44 is arranged at the water outlet end.
It should be noted that: a communication cable is connected between the detector 31 and the water pump 41, and a signal monitored by the detector 31 is transmitted to the water pump 41 through the communication cable to control the on and off of the water supply state of the water pump 41.
In this embodiment, detection mechanism and spraying mechanism interval set up on stand 1, enclose along the construction and keep off peripheral walking region, detection mechanism on the first stand cooperates the spraying mechanism on the second stand, when the pedestrian walks along the peripheral walking in work area, infrared detector 32 on the detection instrument 31 passes through the back through infrared monitoring pedestrian, transmit the turn-off signal to the water pump 41 of second stand, water pump 41 pauses and intakes, atomizer 44 stop work, open after the pedestrian passes through, on following the walking region, detection mechanism and spraying mechanism work in proper order, the opening and close of control atomizing dust removal action, cause pedestrian's health filth after preventing spun fog and dust mixing, promote the intelligent degree that the construction enclosed.
What needs to be supplemented is: the upper part and the middle part of the detector 31 are respectively provided with an infrared detector 32 which is suitable for monitoring pedestrians with different heights and improves the monitoring range.
Wherein, infrared detector 32 adopts the purpose of horizontal setting, prevents that the infrared detector of vertical setting from appearing the tenesmus and smashing the pedestrian on every side.
In order to facilitate the installation of the water pipe 42, it is further preferable that a pipe clamp 43 installed on the outer wall of the water pipe 42 facing the construction area of the upright post 1 is sleeved on the outer wall of the upright post 1, the water pipe 42 is installed on the upright post 1, and the other end of the water pipe 42 is connected to an external water supply device to provide water required for atomization.
As shown in fig. 3, the left and right side walls of the upright post 1 are symmetrically provided with a bottom plate groove 21 and a top plate groove 23 which are matched with a bottom plate 22 and a top plate 24, the bottom plate groove 21 and the bottom plate 22 are fixedly inserted, and the top plate groove 23 and the top plate 24 are fixedly inserted.
Wherein, the left and right side walls of the upright post 1 are also provided with baffle slots 25 matched with the baffle 26, and the baffle 26 and the baffle slots 25 are inserted and fixed.
In order to facilitate the combination of the enclosure, after the bottom plate 22 is inserted into the bottom plate groove 21, the top plate 24 is inserted into the top plate groove 23, and after the baffle 26 in the middle is inserted into the baffle groove 25, the upper part and the lower part are limited and supported by the top plate 24 and the bottom plate 22, so that a stable enclosure is formed to surround the construction area.
In order to improve the installation stability of the upright column 1, further, a bolt plate piece 53 provided with a bolt groove is installed at the edge of the base 51, the bolt plate piece 53 can be matched with the bolt piece to fix the base 51 on the soil layer, and the bolt plate piece 53 with a cross structure is matched to perform secondary reinforcement on the upright column 1 on the soil layer.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.

Claims (6)

1. The construction fence is characterized by comprising upright columns (1) arranged on the periphery of a construction area at intervals, wherein the bottoms of the upright columns (1) are arranged on a base (51), a protruding bolt plate piece (53) is arranged at the bottom of the base (51), and the bolt plate piece (53) is of a cross structure;
the enclosure mechanism comprises a bottom plate (22) and a top plate (24) which are arranged between the adjacent upright posts (1), and a baffle plate (26) is clamped between the bottom plate (22) and the top plate (24);
the detection mechanism comprises a detector (31) which is arranged on the outer side of the upright post (1) facing the construction area, and infrared detectors (32) are respectively arranged on the upper part and the middle part of the detector (31);
the spraying mechanism comprises a water pump (41) arranged at the top of the upright post (1), a water pipe (42) is arranged at the water inlet end of the water pump (41), and an atomizing nozzle (44) is arranged at the water outlet end.
2. A construction fence according to claim 1 wherein a communication cable is connected between the probe (31) and the pump (41).
3. A construction fence according to claim 1 characterized in that the other end of the water pipe (42) is connected to an external water supply and the outer wall is sleeved with a pipe clamp (43) mounted on the post (1) towards the construction area.
4. The construction fence according to claim 1, wherein the left and right side walls of the upright post (1) are symmetrically provided with a bottom plate groove (21) and a top plate groove (23) which are matched with the bottom plate (22) and the top plate (24), the bottom plate groove (21) and the bottom plate (22) are fixedly inserted, and the top plate groove (23) and the top plate (24) are fixedly inserted.
5. The construction fence as claimed in claim 4, wherein the left and right side walls of the upright post (1) are further provided with baffle slots (25) matched with the baffles (26), and the baffles (26) and the baffle slots (25) are fixed in an inserted manner.
6. A construction fence according to claim 1 wherein at the edge of said base (51) is mounted a slotted peg plate (53).
CN202222901004.XU 2022-11-01 2022-11-01 Construction enclosure Active CN218375820U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222901004.XU CN218375820U (en) 2022-11-01 2022-11-01 Construction enclosure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222901004.XU CN218375820U (en) 2022-11-01 2022-11-01 Construction enclosure

Publications (1)

Publication Number Publication Date
CN218375820U true CN218375820U (en) 2023-01-24

Family

ID=84937021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222901004.XU Active CN218375820U (en) 2022-11-01 2022-11-01 Construction enclosure

Country Status (1)

Country Link
CN (1) CN218375820U (en)

Similar Documents

Publication Publication Date Title
CN218375820U (en) Construction enclosure
CN203546881U (en) Drainage device
CN211215973U (en) On-spot dust collecting equipment is used in highway construction
CN213710666U (en) Assembled fender
CN209585814U (en) A kind of municipal construction protective device
CN211006431U (en) A protection early warning device for job site crossing
CN211428593U (en) Preassembled box type transformer substation
CN204590221U (en) A kind of Intelligent anti-blocking plug integrated safe well
CN211922472U (en) Large-scale subway station foundation ditch construction sprays dust device
CN213014117U (en) Environment-friendly watering device for municipal works
CN208333952U (en) Deep-well underground water sampler
CN214461025U (en) Drainage ditch for safe driving
CN220678562U (en) Sand screening device for house construction
CN210589931U (en) Main building for mixing plant
CN214091344U (en) Construction enclosure device
CN215351706U (en) Fire extinguishing system is used to public floor safety
CN211358189U (en) Spray set for dust removal
CN205654115U (en) Simple and easy safety protective guard
CN214245505U (en) Safety protective guard frame of green construction of municipal works
CN220378027U (en) Peripheral safety fence is built in room
CN114809801B (en) Civil engineering safety management system and management monitoring method thereof
CN214090355U (en) Mobile detection laboratory
CN210774260U (en) Hydraulic engineering water level detection alarm device
CN217138002U (en) Underground mining automatic boot washing pool
CN215760051U (en) Assembled concrete house parapet

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant