CN218373884U - Stabilize novel elevator foundation ditch structure of antidetonation - Google Patents

Stabilize novel elevator foundation ditch structure of antidetonation Download PDF

Info

Publication number
CN218373884U
CN218373884U CN202222371105.0U CN202222371105U CN218373884U CN 218373884 U CN218373884 U CN 218373884U CN 202222371105 U CN202222371105 U CN 202222371105U CN 218373884 U CN218373884 U CN 218373884U
Authority
CN
China
Prior art keywords
steel
reinforcing bar
buried
bar frame
shock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222371105.0U
Other languages
Chinese (zh)
Inventor
谭艳
李广顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222371105.0U priority Critical patent/CN218373884U/en
Application granted granted Critical
Publication of CN218373884U publication Critical patent/CN218373884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to an elevator technical field, in particular to stabilize novel elevator foundation ditch structure of antidetonation, including ground and the body of building of watering, open subaerial upper end has the foundation ditch, it is provided with reinforcing bar frame and four I-steel, four to water to build internal I-steel is located reinforcing bar frame four corners, four the I-steel upper end all is provided with pre-buried steel sheet, four pre-buried steel sheet upper end is all opened a plurality of jack, and the fixed welding that all alternates in the plurality of jack has pre-buried reinforcing bar, a plurality of jack equidistance distributes and each other contactless, a plurality of pre-buried reinforcing bar and reinforcing bar frame and four I-steel all contactless, it alternates with the foundation ditch to water to build the body and be connected, a plurality of pre-buried reinforcing bar surface lower part all is located waters inside building, four pre-buried steel sheet all with water and build the body upper end laminating. A stabilize novel elevator foundation ditch structure of antidetonation, through pouring prefabricated shaping in advance, can directly use during the construction, can save more time for the construction.

Description

Stabilize novel elevator foundation ditch structure of antidetonation
Technical Field
The utility model relates to an elevator technical field, in particular to stabilize shock-resistant novel elevator foundation ditch structure.
Background
The elevator is a transportation equipment of transporting pedestrian or goods perpendicularly, and the elevator serves the floor building of regulation, and vertical lift elevator has a car, moves between two at least vertical or the angle of inclination is less than fifteen degrees rigid guide rails, and the passenger of being convenient for comes in and goes out or load and unload the goods, can divide low-speed elevator, fast elevator and high-speed elevator according to speed, and the elevator installation needs to use the elevator foundation ditch structure, has following drawback at least in current elevator foundation ditch structure: 1. the existing elevator foundation pit is unstable in structure, poor in anti-seismic effect and low in use safety; 2. the existing elevator foundation pit structure generally needs to be manufactured on site, and the manufacturing time is long due to the fact that the site environment is not controllable, so that a novel elevator foundation pit structure is developed.
SUMMERY OF THE UTILITY MODEL
A primary object of the utility model is to provide a stabilize shock-resistant novel elevator foundation ditch structure can effectively solve the problem in the background art.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides a stabilize shock-resistant novel elevator foundation ditch structure, includes ground and waters the body, subaerial upper end is opened there is the foundation ditch, it is provided with reinforcing bar frame and four I-steel, four to water the internal I-steel that is located reinforcing bar frame four corners, four I-steel upper end all is provided with pre-buried steel sheet, four pre-buried steel sheet upper end all has opened a plurality of jack, and the fixed welding that all alternates in the jack has pre-buried reinforcing bar, a plurality of jack equidistance distributes and each other contactless, a plurality of pre-buried reinforcing bar and reinforcing bar frame and four I-steel all do not contact, it alternates with the foundation ditch and is connected, a plurality of to water the body of building, a plurality of pre-buried reinforcing bar surface lower part all is located waters the internal portion of building, four the pre-buried steel sheet all with water the body upper end laminating of building.
Preferably, the reinforcing steel bar frame is formed by bending and weaving thread steel.
Preferably, the I-shaped steel is located between a plurality of embedded steel bars and does not contact.
Preferably, the reinforcing steel frame, the four I-shaped steels and the embedded steel bars are prefabricated and formed together through concrete pouring.
Preferably, the four embedded steel plates are fixedly connected with the casting body through a plurality of embedded steel bars.
Preferably, the embedded steel bars and the steel bar frames are all the same-size thread steel.
Compared with the prior art, the utility model discloses following beneficial effect has:
1. in the utility model, the reinforcing steel bar frame with higher density is arranged in the pouring body, the I-shaped steels are arranged at four corners of the reinforcing steel bar frame, the reinforcing steel bar frame and four I-shaped steels are poured into the pouring body together through concrete, the reinforcing steel bar frame and four I-shaped steels can provide enough stability when in use, the shock resistance of the device is increased, and the safety of the device can be effectively improved;
2. the utility model discloses in, pour into the body of casting jointly in advance through with reinforcing bar frame, four I-steel, four pre-buried steel sheets and a plurality of pre-buried reinforcing bar, during the construction, can directly pull the body of casting of fashioned to the construction site and use, can save a lot of engineering time.
Drawings
Fig. 1 is a schematic view of the overall structure of a novel elevator foundation pit structure with stable and shock-resistant performance of the utility model;
FIG. 2 is a schematic view of the overall structure of the casting body of the novel elevator foundation pit structure with stable and shock-resistant performance;
FIG. 3 is a schematic view of the overall structure of the casting body of the novel elevator pit structure with stable and shock-resistant performance;
fig. 4 is the utility model relates to a stabilize pre-buried steel sheet overall structure schematic diagram of shock-resistant novel elevator foundation ditch structure.
In the figure: 1. a ground surface; 2. a base groove; 3. pouring a building body; 4. a reinforcing steel bar frame; 5. i-shaped steel; 6. embedding reinforcing steel bars in advance; 7. pre-burying a steel plate; 8. and (4) inserting the jack.
Detailed Description
In order to make the technical means, creation features, achievement purposes and functions of the present invention easy to understand, the present invention is further described below with reference to the following embodiments.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Examples
Referring to fig. 1-4, the present invention provides a technical solution:
the utility model provides a stabilize shock-resistant novel elevator foundation ditch structure, including ground 1 and the body of casting 3, 1 upper end on ground is opened there is the foundation ditch 2, it is provided with reinforcing bar frame 4 and four I-steel 5 in the body of casting 3, four I-steel 5 are located reinforcing bar frame 4 four corners, four I-steel 5 upper ends all are provided with pre-buried steel sheet 7, a plurality of jack 8 has all been opened to four pre-buried steel sheet 7 upper ends, it has pre-buried reinforcing bar 6 all to alternate fixed welding in a plurality of jack 8, 8 equidistance distributions of a plurality of jack and each other contactless, a plurality of pre-buried reinforcing bar 6 and reinforcing bar frame 4 and four I-steel 5 all contactless, it is connected with foundation ditch 2 interlude to cast the body of casting, 6 surface lower parts of a plurality of pre-buried reinforcing bar all are located the body of casting 3 insides, four pre-buried steel sheet 7 all with the body of casting 3 upper ends laminating.
In this embodiment, the steel bar frame 4 is formed by bending and arranging thread steel, the i-beams 5 are located between the plurality of embedded steel bars 6 and are not in contact with each other, the embedded steel bars 6 and the steel bar frame 4 are both thread steel with the same size, the steel bar frame 4 with higher density is arranged in the casting body 3, the i-beams 5 are arranged at four corners of the steel bar frame 4, the steel bar frame 4 and the four i-beams 5 are jointly cast into the casting body 3 through concrete, the steel bar frame 4 and the four i-beams 5 can provide sufficient stability when in use, the shock resistance of the device is increased, and the safety of the device can be effectively improved.
In this embodiment, the steel frame 4, four i-beams 5 and a plurality of embedded bars 6 are prefabricated through concrete placement and are shaped jointly, and four embedded steel plates 7 are all through a plurality of embedded bars 6 and pouring body 3 fixed connection, through pouring the steel frame 4, four i-beams 5, four embedded steel plates 7 and a plurality of embedded bars 6 into pouring body 3 jointly in advance, during the construction, can directly pull fashioned pouring body 3 to the construction site and use, can save a lot of engineering time.
What need explain, the utility model relates to a stabilize shock-resistant novel elevator foundation ditch structure, in the use, at first place reinforcing bar frame 4 in the mould that has prepared in advance, place four I-steel 5 in the four corners of reinforcing bar frame 4, pour in the mould through concrete, the mould intussuseption is filled and is accomplished the concrete back, insert a plurality of embedded reinforcement 6 one by one and carry out welded fastening in a plurality of jack 8 on the embedded steel plate 7, the concrete surface on four I-steel 5 upper portions is placed to embedded steel plate 7 that will weld has a plurality of embedded reinforcement 6 again, make the lower part of a plurality of embedded reinforcement 6 be in inside the concrete, form after waiting for the concrete solidification and water body 3, water body 3 that will need use before the construction and pull to the construction site and press, water body 3 and place the base groove 2 inside that dig at the construction site and can normally be under construction, can save more time for the construction, can improve the construction progress greatly.
The basic principles and the main features of the invention and the advantages of the invention have been shown and described above. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only illustrative of the principles of the present invention, and that various changes and modifications may be made without departing from the spirit and scope of the present invention, and all such changes and modifications fall within the scope of the present invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (6)

1. The utility model provides a stabilize shock-resistant novel elevator foundation ditch structure, includes ground (1) and waters body (3), its characterized in that: open ground (1) upper end has base groove (2), be provided with reinforcing bar frame (4) and four I-steel (5), four in pouring body (3) I-steel (5) are located reinforcing bar frame (4) four corners, four I-steel (5) upper end all is provided with pre-buried steel sheet (7), four pre-buried steel sheet (7) upper end all opens a plurality of jack (8), all alternates fixed welding in a plurality of jack (8) has pre-buried reinforcing bar (6), a plurality of jack (8) equidistance distributes and each other contactless, a plurality of pre-buried reinforcing bar (6) and reinforcing bar frame (4) and four I-steel (5) all contactless, it alternates with base groove (2) to pour body (3) and is connected, a plurality of pre-buried reinforcing bar (6) surface lower part all is located inside pouring body (3), four pre-buried steel sheet (7) all with pour body (3) upper end laminating.
2. The novel stable and shock-resistant elevator foundation pit structure according to claim 1, characterized in that: the reinforcing steel bar frame (4) is formed by bending and arranging thread steel.
3. The novel stable and shock-resistant elevator foundation pit structure according to claim 1, characterized in that: the I-steel (5) is located among the embedded steel bars (6) and is not in contact with the embedded steel bars.
4. The novel stable and shock-resistant elevator foundation pit structure according to claim 1, characterized in that: the steel bar frame (4), the four I-shaped steels (5) and the embedded steel bars (6) are formed through concrete pouring and prefabricating.
5. The novel stable and shock-resistant elevator foundation pit structure according to claim 1, characterized in that: and the four embedded steel plates (7) are fixedly connected with the casting body (3) through a plurality of embedded steel bars (6).
6. The novel stable and shock-resistant elevator foundation pit structure according to claim 1, characterized in that: the embedded steel bars (6) and the steel bar frames (4) are all the same-size thread steel.
CN202222371105.0U 2022-09-07 2022-09-07 Stabilize novel elevator foundation ditch structure of antidetonation Active CN218373884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222371105.0U CN218373884U (en) 2022-09-07 2022-09-07 Stabilize novel elevator foundation ditch structure of antidetonation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222371105.0U CN218373884U (en) 2022-09-07 2022-09-07 Stabilize novel elevator foundation ditch structure of antidetonation

Publications (1)

Publication Number Publication Date
CN218373884U true CN218373884U (en) 2023-01-24

Family

ID=84971335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222371105.0U Active CN218373884U (en) 2022-09-07 2022-09-07 Stabilize novel elevator foundation ditch structure of antidetonation

Country Status (1)

Country Link
CN (1) CN218373884U (en)

Similar Documents

Publication Publication Date Title
CN218373884U (en) Stabilize novel elevator foundation ditch structure of antidetonation
CN210917364U (en) Steel pipe pile positioning platform for crane ship
CN207176677U (en) Steel pile casting deviation correcting device applied to deepwater regions
CN205296164U (en) Fill ability of swimming slip form construction device
CN214883001U (en) Bridge side span closure device
CN211572180U (en) Precast concrete superimposed sheet with mechanism sand
CN212427634U (en) Sectional self-resetting swinging wall
CN212053392U (en) Beam slab connection structure of prefabricated concrete structure
CN212052576U (en) Prefabricated panel for wharf
CN113882280A (en) Construction method of steel-concrete mixed combined continuous rigid frame bridge
CN213143109U (en) Novel structure that prefabricated pier stud is connected with cushion cap
CN220377537U (en) Outer frame plate bar pre-buried device of super high-rise core tube steel mould construction
CN216839533U (en) Prefabricated cushion cap
CN2459350Y (en) Pile core concrete grouting machine for artificial holing pile
CN113463510B (en) Prefabricated T-beam integral embedded guardrail structure and construction method thereof
CN217734079U (en) Plug-in type cup mouth foundation
CN220666289U (en) Soft soil water-rich stratum foundation pit construction structure
CN212837045U (en) Electric power tower pole supports mound
CN213061923U (en) External light-duty rail end structure that floats of blocking dirt
CN220550548U (en) Anti-floating anchor rod-to-bottom plate reinforcing steel bar installation structure
CN214658217U (en) Hollow wallboard of link up cavity type longitudinal rib and reinforcing bar rings connected node
CN215048006U (en) Prestressed hollow slab lifting appliance
CN219840087U (en) Supporting structure suitable for foundation pit excavation horse way position
CN210736042U (en) Novel tower crane foundation structure
CN217949431U (en) Assembled coincide shear force outer wall-inner frame mixed structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant