CN218373026U - Pre-buried prefabricated track board that has settlement observation point and mileage sign - Google Patents

Pre-buried prefabricated track board that has settlement observation point and mileage sign Download PDF

Info

Publication number
CN218373026U
CN218373026U CN202222287971.1U CN202222287971U CN218373026U CN 218373026 U CN218373026 U CN 218373026U CN 202222287971 U CN202222287971 U CN 202222287971U CN 218373026 U CN218373026 U CN 218373026U
Authority
CN
China
Prior art keywords
settlement observation
prefabricated track
mileage
board
track board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222287971.1U
Other languages
Chinese (zh)
Inventor
吴俊�
王宇航
钱程
刘冬娅
王欣怡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanghai Design Institute Group Co Ltd filed Critical China Railway Shanghai Design Institute Group Co Ltd
Priority to CN202222287971.1U priority Critical patent/CN218373026U/en
Application granted granted Critical
Publication of CN218373026U publication Critical patent/CN218373026U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model belongs to the technical field of prefabricated track board technique and specifically relates to a pre-buried prefabricated track board that has settlement observation point and mileage sign, pre-buried two settlement observation marks on the plate body of prefabricated track board, two the settlement observation marks symmetrical arrangement in the central line of prefabricated track board line direction and two the settlement observation marks are arranged respectively in the both sides of a plurality of construction holes; and a mileage board is embedded on one side of the settlement observation mark. The utility model has the advantages that: the damage of punching and installation of a settlement observation point to an existing structure is avoided, and the integrity of the existing structure is ensured; the position accuracy of the settlement observation point is effectively ensured, so that the settlement observation accuracy of the prefabricated track slab is further improved; convenient construction, simple and reasonable structure, and is suitable for popularization.

Description

Pre-buried prefabricated track board that has settlement observation point and mileage sign
Technical Field
The utility model belongs to the technical field of prefabricated track board technique and specifically relates to a pre-buried prefabricated track board that has settlement observation point and mileage sign that has.
Background
With the development of the field of rail transit, the quality requirement on the rail plate is higher and higher. The track board is not exempted from the influence that shield constructs the section of jurisdiction and can take place to subside in the operation period, consequently need subside the track board in the operation period and observe to the monitoring condition of subsiding avoids exceeding the safety range and takes place the risk because of subsiding.
At present, when a track slab is subjected to settlement observation, the settlement observation point is required to be used, and the existing settlement observation point is damaged by punching and mounting on the track slab at the later stage; meanwhile, the installation accuracy of the settlement observation point also influences the observation accuracy of settlement observation, and if the settlement observation point is not accurately installed or the position of the settlement observation point deviates, the settlement observation loses the monitoring significance.
Disclosure of Invention
The utility model aims at providing a prefabricated track slab pre-buried with settlement observation points and mileage labels according to the defects of the prior art, which avoids the damage of the existing structure caused by the later-stage punching installation by pre-burying settlement observation marks on the prefabricated track slab, and simultaneously designs the pre-buried position and the structure of the settlement observation marks to ensure the accuracy of settlement observation operation; in addition, the mileage sign is also pre-buried on the prefabricated track slab, so that construction is facilitated.
The utility model discloses the purpose is realized accomplishing by following technical scheme:
the utility model provides a pre-buried prefabricated track board that has settlement observation point and mileage tablet, is provided with the rail bearing platform that the line direction was arranged along the line on this prefabricated track board's the plate body, the rail bearing platform is arranged prefabricated track board line direction's the central line bilateral symmetry position along the line prefabricated track board has seted up a plurality of construction holes, its characterized in that on the plate body of line direction central line position along the line prefabricated track board: two settlement observation marks are pre-buried on a plate body of the prefabricated track plate, the two settlement observation marks are symmetrically arranged on a center line of the prefabricated track plate along the line direction, and the two settlement observation marks are respectively arranged on two sides of the plurality of construction holes; and a mileage board is embedded on one side of the settlement observation mark.
Subside and observe sign including mark head and marker post, the mark head is half spherical structure, the diameter of mark head is greater than the pole footpath of marker post, the marker post is pre-buried in the inside of the plate body of prefabricated track board, mark head protruding in the surface of prefabricated track board.
The outer wall of the marker post is provided with a plurality of annular grooves along the length direction of the marker post body.
The construction hole comprises a pouring hole for pouring self-compacting concrete and two exhaust holes positioned on two sides of the pouring hole, and the two sedimentation observation marks are respectively arranged on two sides of the two exhaust holes.
The sign head and the sign post are of an integrated structure.
The length of the plate body of the prefabricated track plate is 4.7 meters.
The utility model has the advantages that: the damage of punching and installation of a settlement observation point to an existing structure is avoided, and the integrity of the existing structure is ensured; the position accuracy of the settlement observation point is effectively ensured, so that the settlement observation accuracy of the prefabricated track slab is further improved; convenient construction, simple and reasonable structure, and is suitable for popularization.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is the structure diagram of the settlement observation mark of the utility model.
Detailed Description
The features of the present invention and other related features are described in further detail below by way of example in conjunction with the accompanying drawings for the understanding of those skilled in the art:
as shown in fig. 1-2, reference numerals 1-9 in the figures denote: the device comprises a prefabricated track slab 1, a track bearing platform 2, a pouring hole 3, an exhaust hole 4, a settlement observation mark 5, a mileage sign 6, a mark head 7, a mark rod 8 and a ring groove 9.
The embodiment is as follows: as shown in fig. 1 and 2, the prefabricated track slab body embedded with the settlement observation point and the mileage sign in the embodiment is a prefabricated track slab 1, and the prefabricated track slab 1 is laid below the steel rail to support the steel rail so as to form track traffic. As shown in fig. 1, two rows of rail bearing platforms are arranged on two sides of a plate body of a prefabricated track plate 1, the two rows of rail bearing platforms 2 are respectively identical to the line direction of two steel rails, each row of rail bearing platform comprises a plurality of rail bearing platforms 2, and the steel rails can be installed and fixed through installing a fastener system and the like on the rail bearing platforms 2.
As shown in fig. 1, prefabricated track board 1 has been seted up one along the central line of line direction and has been pour hole 3 and two exhaust holes 4, these two exhaust holes 4 are arranged in the both sides of pouring hole 3, wherein pour hole 3 and be used for pouring self-compaction concrete to prefabricated track board 1's plate body below, form self-compaction concrete cushion between prefabricated track board 1's below and ballast bed basis, two exhaust holes 4 then exhaust when pouring self-compaction concrete respectively, guarantee the pouring compactness of self-compaction concrete.
As shown in fig. 1, two settlement observation marks 5 are pre-buried on a prefabricated track slab 1, both the two settlement observation marks 5 can be used as settlement observation points for settlement observation operation, and settlement observation equipment is used to observe the settlement observation marks 5 as the settlement observation points, so that the settlement condition of the prefabricated track slab 1 can be known; by embedding two settlement observation marks 5 in a single prefabricated track plate 1, the settlement degree and the settlement direction of the prefabricated track plate 1 can be effectively evaluated, for example, the settlement amount measured at one settlement observation mark A is larger than that measured at the other settlement observation mark B, namely, the settlement can be reflected to be uneven settlement from the A to the B.
The two settlement observation marks 5 are symmetrically arranged on the center line of the prefabricated track slab 1 along the line direction, and the two settlement observation marks 5 are respectively arranged on two sides of the two exhaust holes 4; on one hand, the settlement observation marks 5 are symmetrically arranged at the center line position of the prefabricated track plate 1 along the line direction, so that the settlement observation result can effectively reflect the current condition of the prefabricated track plate 1, and meanwhile, the settlement change condition and the mutual influence between the prefabricated track plate and the adjacent prefabricated track plate can be conveniently evaluated; on the other hand, the settlement observation mark 5 is arranged on the outer side of the exhaust hole 4, so that the adverse effect of the hydration heat of the self-compacting concrete on the structure of the settlement observation mark 5 can be reduced as much as possible, and the arrangement position of the settlement observation mark 5 is changed and even the structure is damaged.
As shown in fig. 2, the sedimentation observation marker 5 in this embodiment is composed of two parts, namely a marker head 7 and a marker rod 8, wherein the marker head 7 is arranged on the top of the marker rod 8, and the two parts are integrally formed to ensure the structural strength. The marking head 7 is of a hemispherical structure, and the diameter of the marking head 7 is larger than the rod diameter of the marking rod 8. The sign post 8 is pre-buried in the inside of the plate body of the prefabricated track slab 1, and then fixed connection between the settlement observation sign 5 and the prefabricated track slab 1 is realized. The mark head 7 protrudes from the surface of the prefabricated track slab 1, so that the settlement observation operation is carried out by taking the mark head 7 as a settlement observation point.
In this embodiment, two ring grooves 9 are uniformly distributed on the periphery of the marking rod 8, and the notches of the two ring grooves 9 are recessed towards one side of the marking rod 8; when the prefabricated track board 1 is prefabricated, the concrete of the prefabricated track board 1 can be embedded into the ring groove 9, so that the connection strength and integrity between the mark rod 8 and the prefabricated track board 1 are improved, and then the settlement of the prefabricated track board 1 can be applied to the mark rod 8, thereby ensuring that the settlement observation mark 5 can accurately reflect the settlement condition of the prefabricated track board 1, and meanwhile, the installation quality of the settlement observation mark 5 can be ensured through the design of the ring groove 9, and particularly ensuring that the settlement observation mark 5 is always firmly installed on a designed position.
In the embodiment, in specific implementation: the prefabricated track slabs 1 are unit slabs with the slab length of 4.7 meters, and a plurality of prefabricated track slabs 1 are uniformly arranged along the line direction to fix and support the steel rail.
Although the conception and the embodiments of the present invention have been described in detail with reference to the drawings, those skilled in the art will recognize that various changes and modifications can be made therein without departing from the scope of the appended claims, and therefore, the description is not repeated herein.

Claims (6)

1. The utility model provides a pre-buried prefabricated track board that has settlement observation point and mileage tablet, is provided with the rail bearing platform that the line direction was arranged along the line on this prefabricated track board's the plate body, the rail bearing platform is arranged prefabricated track board line direction's the central line bilateral symmetry position along the line prefabricated track board has seted up a plurality of construction holes, its characterized in that on the plate body of line direction central line position along the line prefabricated track board: two settlement observation marks are pre-buried on a plate body of the prefabricated track plate, the two settlement observation marks are symmetrically arranged on a center line of the prefabricated track plate along the line direction, and the two settlement observation marks are respectively arranged on two sides of the plurality of construction holes; and a mileage board is embedded in one side of the settlement observation mark.
2. The prefabricated track slab with the built-in settlement observation points and the embedded mileage signs as claimed in claim 1, wherein: subside and observe sign including mark head and marker post, the mark head is half spherical structure, the diameter of mark head is greater than the pole footpath of marker post, the marker post is pre-buried in the inside of the plate body of prefabricated track board, mark head protruding in the surface of prefabricated track board.
3. The prefabricated track slab with the built-in settlement observation points and the mileage signs as claimed in claim 2, wherein: the outer wall of the marker post along the length direction of the post body is provided with a plurality of ring grooves.
4. The prefabricated track slab embedded with the settlement observation points and the mileage signs as claimed in claim 1, wherein: the construction hole comprises a pouring hole for pouring self-compacting concrete and two exhaust holes positioned on two sides of the pouring hole, and the settlement observation marks are respectively arranged on two sides of the two exhaust holes.
5. The prefabricated track slab embedded with the settlement observation points and the mileage signs as claimed in claim 2, wherein: the sign head and the sign rod are of an integrally formed structure.
6. The prefabricated track slab embedded with the settlement observation points and the mileage signs as claimed in claim 1, wherein: the length of the plate body of the prefabricated track plate is 4.7 meters.
CN202222287971.1U 2022-08-30 2022-08-30 Pre-buried prefabricated track board that has settlement observation point and mileage sign Active CN218373026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222287971.1U CN218373026U (en) 2022-08-30 2022-08-30 Pre-buried prefabricated track board that has settlement observation point and mileage sign

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222287971.1U CN218373026U (en) 2022-08-30 2022-08-30 Pre-buried prefabricated track board that has settlement observation point and mileage sign

Publications (1)

Publication Number Publication Date
CN218373026U true CN218373026U (en) 2023-01-24

Family

ID=84969877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222287971.1U Active CN218373026U (en) 2022-08-30 2022-08-30 Pre-buried prefabricated track board that has settlement observation point and mileage sign

Country Status (1)

Country Link
CN (1) CN218373026U (en)

Similar Documents

Publication Publication Date Title
CN102590215B (en) Portable multifunctional tunnel defect information collector
CN103437374B (en) Group's foundation bolt installation positioner and installation method thereof
CN110656640B (en) Automatic monitoring system and method for post-construction settlement of expressway
CN110702068B (en) Existing railway settlement monitoring system and monitoring method
CN104260643A (en) Windproof-type overall steel bracket mounting method
CN103898816A (en) Precise control network measurement method of urban rails
CN109235292A (en) Railroad bridge changes beam process and changes girder system system
CN111155383A (en) Large-span self-anchored steel box girder suspension bridge track lofting and measuring method
CN106672016A (en) Subway wheel diameter real-time detection system and method by using laser emission detectors
CN115305749A (en) High-temperature superconducting magnetic suspension traffic track slab and braking method thereof
CN218373026U (en) Pre-buried prefabricated track board that has settlement observation point and mileage sign
CN205276079U (en) Magnetic levitation track condact rail double flute way positioning die
CN207842954U (en) Track traffic signal transponder mounting structure
CN219637592U (en) Device for simulating integral ballast bed steel rail and measuring system
CN218781802U (en) Pouring position calibrating device for contact net foundation
CN115075146B (en) Method for connecting prefabricated bent cap through prestressed tendons and steel bars
CN115112089B (en) Cross-sea high-speed railway bridge settlement observation device and observation method thereof
CN217560631U (en) Settlement observation device for cross-sea high-speed railway bridge
CN206531467U (en) The quick moving three dimension scanning survey target of the formulas of CP III
CN214694926U (en) Lifting deviation rectifying mechanism for ballastless track
CN110626383A (en) Track detection device based on inertia measurement
CN205603987U (en) Survey control point stand of laying on track roof beam
CN211006182U (en) Magnetic levitation track panel measuring device
CN213507844U (en) Novel vibration reduction track structure for elevated section sleeve track
CN210734164U (en) Auxiliary measuring device for railway steel rail displacement monitoring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant