CN218371347U - Building construction building material lifting equipment - Google Patents

Building construction building material lifting equipment Download PDF

Info

Publication number
CN218371347U
CN218371347U CN202222409953.6U CN202222409953U CN218371347U CN 218371347 U CN218371347 U CN 218371347U CN 202222409953 U CN202222409953 U CN 202222409953U CN 218371347 U CN218371347 U CN 218371347U
Authority
CN
China
Prior art keywords
locking
groove
sliding
fixing
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222409953.6U
Other languages
Chinese (zh)
Inventor
严涛
邵璇璇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Shanze Construction Engineering Co ltd
Original Assignee
Anhui Shanze Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Shanze Construction Engineering Co ltd filed Critical Anhui Shanze Construction Engineering Co ltd
Priority to CN202222409953.6U priority Critical patent/CN218371347U/en
Application granted granted Critical
Publication of CN218371347U publication Critical patent/CN218371347U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application discloses building material hoisting equipment for building construction, which belongs to the field of building material hoisting and comprises a movable trolley and a support column, wherein a rope winding drum is fixedly connected to the movable trolley, a first fixing rod and a second fixing rod are arranged on the support column, a positioning rod is arranged below the first support rod, a sliding groove is formed in the support column, the positioning rod is connected to the side wall of the sliding groove in a sliding manner, a first positioning hole is formed in the support column, a second positioning hole is formed in one end of the positioning rod, and a rope on the rope winding drum penetrates through the first positioning hole and the second positioning hole; and a fixing assembly for fixing the position of the positioning rod is also arranged in the sliding groove. This application has through setting up mobilizable locating lever to make handling equipment can handling the great building materials of volume, and then enlarged handling equipment's application range's effect.

Description

Building construction building material handling equipment is built in room
Technical Field
The application relates to the field of building material lifting, in particular to building construction building material lifting equipment.
Background
With the continuous development of society, the demand of people on houses is continuously increased, so that the scale of the house building industry is continuously enlarged. In the process of building construction, some decorative materials, building materials and the like need to be hoisted by using building material hoisting equipment.
The chinese utility model patent that the grant bulletin number is CN212669039 can be consulted in the correlation technique, discloses a building materials handling supporting device for building engineering construction, including travelling car and support column, fixed mounting has the motor on the travelling car, the last rotation of motor is connected with the support column, fixed mounting has first fixed block on the lateral wall of support column, the lateral wall upper end fixed position of support column installs the second fixed block, the rope is installed in cup jointing to the outer end of a rope winding section of thick bamboo, the lateral wall fixed mounting that the support column is close to first fixed block has the reference column, the locating hole has been seted up on the reference column, stretch out and draw back and wear to locate the locating hole setting.
In view of the above related technologies, the inventor thinks that when a building material with a large volume is hoisted, because the position of the positioning column is fixed, the positioning column can block the hoisted building material, so that the building material with the large volume cannot be hoisted, and the application range of hoisting equipment is further reduced.
SUMMERY OF THE UTILITY MODEL
In order to enlarge the application range of handling equipment, this application provides building construction building materials handling equipment.
The application provides a construction building materials handling equipment is built in room adopts following technical scheme:
building construction building material lifting equipment comprises a moving trolley and a support column, wherein a motor is fixedly mounted on the moving trolley, the support column is rotatably connected with an output shaft of the motor, a rope winding drum is fixedly connected to the moving trolley, a first fixing rod and a second fixing rod are arranged on the support column, one end of the first fixing rod is fixedly connected to the support column, the other end of the first fixing rod is fixedly connected with a pulley, the second fixing rod is obliquely arranged, one end of the second fixing rod is fixedly connected to the support column, and the other end of the second fixing rod is fixedly connected to the first fixing rod;
a positioning rod is arranged below the first fixing rod, a sliding groove is formed in the supporting column, the positioning rod is connected to the side wall of the sliding groove in a sliding mode, a first positioning hole is formed in the supporting column, a second positioning hole is formed in one end of the positioning rod, and a rope on the rope winding drum penetrates through the first positioning hole, winds the pulley and penetrates through the second positioning hole; and a fixing assembly used for fixing the position of the positioning rod is also arranged in the sliding groove.
By adopting the technical scheme, before the building material is hung, the movable trolley is driven to be close to the building material to be hung, then the positioning rod is pushed to slide along the side wall of the sliding groove according to the size of the building material, so that the positioning rod is moved to a proper position, the fixing assembly is used for fixing the position of the positioning rod, then the building material is fixed at the end part of the rope, and the rope is wound and pulled by the rope winding drum through winding the rope winding drum so that the building material can be hung; after the building materials are lifted, the trolley is driven to move to a destination for placing the building materials, the motor is started, the output shaft of the motor rotates to drive the supporting columns to rotate, the supporting columns rotate to drive the building materials on the ropes to rotate, the motor is turned off when the supporting columns rotate to the position for placing the building materials, and then the building materials are put down; through setting up mobilizable locating lever to make handling equipment can the handling great building materials of volume, and then enlarged handling equipment's application range.
Preferably, fixed subassembly includes fixing bolt and sliding block, first bar hole and second bar hole have been seted up on the lateral wall of sliding tray both sides, the one end of locating lever with sliding block fixed connection, sliding block sliding connection in on the lateral wall of sliding tray, set up the sliding hole on the sliding block, fixing bolt wears to locate simultaneously first bar hole, sliding hole and the setting of second bar hole, fixing bolt's head and nut offset with the lateral wall of support column simultaneously.
Through adopting above-mentioned technical scheme, at the in-process that removes the locating lever, the staff is not hard up the nut earlier, promote the locating lever to remove after that, the locating lever removes and drives the sliding block and removes along the lateral wall of sliding tray, the sliding block removes and drives fixing bolt and nut and slide along the lateral wall of first bar hole and second bar hole, when removing suitable position, make nut and fixing bolt's head support tightly with the lateral wall of support column simultaneously through screwing up the nut, thereby just reach fixing positioning lever's purpose.
Preferably, the positioning rod comprises a telescopic part and an extension part, a telescopic groove is formed in the telescopic part, the extension part is connected to the side wall of the telescopic groove in a sliding mode, and a locking assembly used for locking the position of the extension part is further arranged on the extension part.
Through adopting above-mentioned technical scheme, when the length of locating lever is adjusted according to the size of building materials to needs, the staff removes the locking of locking subassembly to the extension earlier, and the pulling extension slides along the lateral wall of telescopic slot next, and when the extension board removed suitable position, rethread locking subassembly was with the rigidity of extension.
Preferably, the locking subassembly includes two first springs and two locking balls, all seted up locking groove on the lateral wall of extension both sides, two locking ball one-to-one sliding connection is in two on the lateral wall of locking groove, two first spring one-to-one sets up in two locking inslot, two the one end of first spring all with the lateral wall fixed connection of locking groove, two the other end of first spring all with locking ball fixed connection, it is equipped with multiunit locking hole, two to open relatively on the lateral wall of flexible groove both sides the locking ball homoenergetic with every group the locking hole cooperatees.
Through adopting above-mentioned technical scheme, at the in-process of adjusting the extension, press the locking ball of extension both sides earlier for locking ball and the separation of card fixed hole, the locking ball slides to the locking groove, the first spring of locking ball compression this moment, remove the extension after that, the extension removes and drives the locking ball and slide along the lateral wall in flexible groove, when locking groove on the extension aligns with card fixed hole, under the effect of first spring self elasticity, first spring promotes the cooperation of locking ball and card fixed hole, thereby be convenient for reach the purpose of adjusting the extension.
Preferably, a first guide groove is formed in the telescopic portion, a second guide groove is formed in the extending portion, and the bottom wall of the first guide groove is connected to the side wall of the second guide groove in a sliding mode.
By adopting the technical scheme, the stability in the process of moving the extension part is improved by utilizing the first guide groove and the second guide groove.
Preferably, a connecting groove is formed in the side wall of the moving trolley, a supporting plate is arranged in the connecting groove and comprises a supporting plate and a moving plate, one end of the moving plate is fixedly connected with one end of the supporting plate, the other end of the supporting plate is connected to the side wall of the connecting groove in a sliding mode, and a universal wheel is installed at the other end of the moving plate.
Through adopting above-mentioned technical scheme, at the in-process of handling building materials, shift out the spread groove through the pulling backup pad in, at the in-process of transportation, the backing plate can bear the building material that the accident dropped, also can promote the stability of whole allocation and transportation equipment simultaneously.
Preferably, the support plate is provided with a cushioning assembly, the cushioning assembly comprises a cushioning plate and a plurality of second springs, the cushioning plate is arranged above the support plate, one ends of the second springs are fixedly connected with the support plate, and the other ends of the second springs are fixedly connected with the support plate.
Through adopting above-mentioned technical scheme, drop when building material accident, through setting up second spring and bradyseism board, reduced building material and taken place the possibility of damaging.
Preferably, the cushioning plate is fixedly connected with cushioning rubber.
Through adopting above-mentioned technical scheme, reduced building material when unexpected dropping with the rigidity contact of bradyseism board.
In summary, the present application includes at least one of the following beneficial technical effects:
1. before workers start to hoist building materials, the movable trolley is moved to the position close to the building materials to be hoisted, then the positioning rod is pushed to slide along the side wall of the sliding groove according to the size of the building materials, so that the positioning rod is moved to be proper, the fixing assembly is used for fixing the position of the positioning rod, then the building materials are fixed to the end part of the rope, and the rope is wound and pulled by the rope winding drum through winding the rope winding drum so that the building materials can be hoisted; after the building materials are lifted, the trolley is driven to move to a destination, then the motor is started, the output shaft of the motor rotates to drive the supporting columns to rotate, the supporting columns rotate to drive the building materials on the ropes to rotate, when the building materials are rotated to the positions for placing the building materials, the motor is turned off, and then the winding drum is driven to put down the building materials; by arranging the movable positioning rod, the lifting equipment can lift building materials with larger volume, and the application range of the lifting equipment is further improved;
2. in the process of moving the positioning rod, a worker firstly loosens the nut and then pushes the positioning rod to move, the positioning rod moves to drive the sliding block to move along the side wall of the sliding groove, the sliding block moves to drive the fixing bolt and the nut to slide along the side walls of the first strip-shaped hole and the second strip-shaped hole, and when the positioning rod moves to a proper position, the nut and the head of the fixing bolt are simultaneously abutted against the side wall of the support column by screwing the nut, so that the aim of fixing the positioning rod is fulfilled;
3. at the in-process of adjusting the extension, press the locking ball of extension both sides earlier for locking ball and the separation of card fixed hole, the locking ball slides to the locking groove, and the first spring of locking ball compression this moment removes the extension after that, and the extension removes and drives the locking ball and slide along the lateral wall in flexible groove, and when locking groove on the extension aligns with card fixed hole, under the effect of first spring self elasticity, first spring promotes the cooperation of locking ball and card fixed hole, thereby is convenient for reach the purpose of adjusting the extension.
Drawings
Fig. 1 is a schematic structural diagram of the whole of the embodiment of the present application.
Fig. 2 is a schematic structural diagram of a highlighted support column and a positioning rod according to an embodiment of the present application.
Figure 3 is a schematic view showing the structure of the extension portion and the expansion portion according to the embodiment of the present application.
Description of reference numerals: 1. moving the trolley; 11. a motor; 12. mounting a plate; 13. a lead block box; 14. a rope drum; 15. a rope; 2. a support pillar; 21. a first fixing lever; 22. a second fixing bar; 23. a pulley; 3. positioning a rod; 31. a telescopic part; 311. a telescopic groove; 32. an extension portion; 33. a first positioning hole; 34. a second positioning hole; 35. a first guide groove; 36. a second guide groove; 4. a fixing assembly; 41. fixing the bolt; 42. a slider; 43. a sliding groove; 44. a slide hole; 45. a first strip-shaped hole; 46. a second bar-shaped hole; 5. a locking assembly; 51. a first spring; 52. a locking ball; 53. a locking groove; 54. a locking hole; 6. connecting grooves; 7. a support plate; 71. a bearing plate; 72. moving the plate; 8. a cushioning component; 81. a cushioning plate; 82. a second spring; 83. shock-absorbing rubber.
Detailed Description
The present application is described in further detail below with reference to figures 1-3.
The embodiment of the application discloses building construction building material handling equipment. Referring to fig. 1, the handling equipment includes travelling car 1 and support column 2, and the anterior segment fixed mounting of 1 up end of travelling car has motor 11, support column 2 and motor 11's output shaft fixed connection, the centre fixedly connected with mounting panel 12 of 1 up end of travelling car, fixedly connected with wire winding section of thick bamboo 14 on the mounting panel 12, around being equipped with rope 15 on the wire winding section of thick bamboo 14, the back end fixedly connected with lead box 13 of 1 up end of travelling car.
As shown in fig. 1 and 2, a first fixing rod 21 and a second fixing rod 22 are fixedly connected to the supporting column 2, the first fixing rod 21 is horizontally arranged, one end of the first fixing rod 21 is fixedly connected to the supporting column, and the other end of the first fixing rod 21 is fixedly connected to a pulley 23; the second fixing rod 22 is obliquely arranged above the first fixing rod 21, the higher end of the second fixing rod 22 is fixedly connected with the support column 2, and the lower end of the second fixing rod 22 is fixedly connected with the first fixing rod 21;
a sliding groove 43 is formed in the support column 2 below the first fixing rod 21, a positioning rod 3 is connected to the side wall of the sliding groove 43 in a sliding mode, a second positioning hole 34 is formed in the positioning rod 3, a first positioning hole 33 is formed in the support column 2 right above the higher end of the second fixing rod 22, the rope winding drum 14 stretches and retracts to penetrate through the first positioning hole 33, and the rope winding drum winds the pulley 23 and is arranged to penetrate through the second positioning hole 34; the slide groove 43 is provided with a fixing unit 4 for fixing the position of the positioning rod 3.
As shown in fig. 1 and 2, the fixing assembly 4 includes a fixing bolt 41 and a sliding block 42, the sliding block 42 is slidably connected to the side wall of the sliding groove 43, one end of the positioning rod 3 is fixedly connected to the sliding block 42, a sliding hole 44 is formed in the sliding block 42, a first bar-shaped hole 45 and a second bar-shaped hole 46 are formed in the side wall of the sliding groove 43, the fixing bolt 41 is simultaneously inserted into the first bar-shaped hole 45, the sliding hole 44 and the second bar-shaped hole 46 are arranged, the head of the fixing bolt 41 is abutted to the side wall of the adjusting column, the other end of the fixing bolt 41 is engaged with a nut, and the nut is abutted to the side wall of the adjusting column.
By arranging the supporting columns 2 and the positioning rods 3, the possibility that the building materials collide with equipment or peripheral wall surfaces due to the fact that the ropes 15 shake greatly in the process of hoisting the building materials can be reduced; by arranging the sliding groove 43 and the fixing component 4, the positioning rod 3 can be used for hanging building materials according to the requirement and is adjusted to a proper height; by providing the lead block box 13, the stability of the entire traveling carriage 1 can be improved by placing the lead block in the lead block box 13 before the building material is hung.
As shown in fig. 2 and 3, the positioning rod 3 includes a telescopic portion 31 and an extension portion 32, the telescopic portion 31 is provided with a telescopic slot 311, the extension portion 32 is slidably connected to a side wall of the telescopic slot 311, the telescopic portion 31 is provided with a first guide slot 35, the extension portion 32 is provided with a second guide slot 36, a bottom wall of the first guide slot 35 is slidably connected to a side wall of the second guide slot 36, and the extension portion 32 is provided with a locking assembly 5 for locking a position of the extension portion 32.
The locking assembly 5 comprises two first springs 51 and two locking balls 52, the side walls of the two sides of the extension portion 32 are respectively provided with a locking groove 53, the two locking balls 52 are correspondingly and slidably connected to the side walls of the locking grooves 53 one by one, the two first springs 51 are arranged in the two locking grooves 53 one by one, one end of each first spring 51 is fixedly connected with the locking ball 52, and the other end of each first spring 51 is fixedly connected with the side wall of the locking groove 53; the side walls of the two sides of the telescopic part 31 are provided with a plurality of groups of locking holes 54, and two locking balls 52 can be inserted and matched with each group of locking holes 54.
By providing the lock unit 5, the length of the positioning rod 3 can be adjusted to an appropriate length by sliding the extension portion 32 and the telescopic portion 31, and the length of the positioning rod 3 can be adjusted according to the length of the rope 15, and the purpose of fixing the position of the extension portion 32 can be achieved by providing the lock unit 5.
As shown in fig. 1, a connecting groove 6 is formed in a side wall of a moving trolley 1, a supporting plate 7 is arranged in the connecting groove 6, the supporting plate 7 comprises a supporting plate 71 and a moving plate 72, the supporting plate 71 and the moving plate 72 are arranged vertically, one end of the moving plate 72 is fixedly connected with one end of the supporting plate 71, the other end of the supporting plate 71 is connected to the side wall of the connecting groove 6 in a sliding manner, universal wheels are mounted on two sides of the other end of the moving plate 72, and universal wheels are mounted at four corners of the bottom of the moving trolley 1;
be provided with bradyseism subassembly 8 on the cushion board 71, bradyseism subassembly 8 includes bradyseism board 81 and a plurality of second spring 82, the one end of a plurality of second springs 82 all with cushion board 71 fixed connection, the other end of a plurality of second springs 82 all with bradyseism board 81 fixed connection, fixedly connected with bradyseism rubber 83 on the bradyseism board 81.
By utilizing the support plate 7 and the cushioning component 8, the possibility that the building materials directly fall to the ground due to the fact that the building materials are not firmly fixed in the building material transportation process is reduced; through setting up bradyseism subassembly 8 and bradyseism rubber 83, further reduced the building materials possibility of damaging after the accident falls.
The implementation principle of the building construction building material lifting equipment in the embodiment of the application is as follows: before a worker begins to hang building materials, the movable trolley 1 is moved to the position near the building materials to be hung, then the positioning rod 3 is pushed to slide along the side wall of the sliding groove 43 according to the size of the building materials, so that the positioning rod 3 is moved to be proper, the position of the positioning rod 3 is fixed by the fixing component 4, then the building materials are fixed at the end part of the rope 15, and the rope winding drum 14 winds and pulls the rope 15 to enable the building materials to be hung through winding the rope winding drum 14; after the building material is hoisted, the trolley is driven to move to a destination, then the motor 11 is started, the output shaft of the motor 11 rotates to drive the supporting column 2 to rotate, the supporting column 2 rotates to drive the building material on the rope 15 to rotate, when the building material is rotated to a position for placing the building material, the motor 11 is turned off, and then the winding drum is driven to put down the building material; through setting up mobilizable locating lever 3 to make handling equipment can handling the building materials of great volume, and then improved handling equipment's application range.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: equivalent changes in structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. Building construction building materials handling equipment is built in room, including travelling car (1) and support column (2), fixed mounting has motor (11) on travelling car (1), support column (2) with the output shaft of motor (11) rotates to be connected, fixedly connected with wire winding section of thick bamboo (14), its characterized in that on travelling car (1): a first fixing rod (21) and a second fixing rod (22) are arranged on the supporting column (2), one end of the first fixing rod (21) is fixedly connected to the supporting column (2), the other end of the first fixing rod (21) is fixedly connected with a pulley (23), the second fixing rod (22) is obliquely arranged, one end of the second fixing rod (22) is fixedly connected to the supporting column (2), and the other end of the second fixing rod (22) is fixedly connected to the first fixing rod (21);
a positioning rod (3) is arranged below the first fixing rod (21), a sliding groove (43) is formed in the supporting column (2), the positioning rod (3) is connected to the side wall of the sliding groove (43) in a sliding mode, a first positioning hole (33) is formed in the supporting column (2), a second positioning hole (34) is formed in one end of the positioning rod (3), and a rope (15) on the rope winding drum (14) penetrates through the first positioning hole (33), the pulley (23) and the second positioning hole (34); and a fixing assembly (4) for fixing the position of the positioning rod (3) is also arranged in the sliding groove (43).
2. The building construction building material lifting equipment as claimed in claim 1, wherein: fixed subassembly (4) include fixing bolt (41) and sliding block (42), first bar hole (45) and second bar hole (46) have been seted up on the lateral wall of sliding tray (43) both sides, the one end of locating lever (3) with sliding block (42) fixed connection, sliding block (42) sliding connection in on the lateral wall of sliding tray (43), set up sliding hole (44) on sliding block (42), wear to locate in the time of fixing bolt (41) first bar hole (45), sliding hole (44) and second bar hole (46) set up, and the head and the nut of fixing bolt (41) offset with the lateral wall of support column (2) simultaneously.
3. The building construction building material lifting equipment as claimed in claim 1, wherein: the positioning rod (3) comprises a telescopic part (31) and an extension part (32), a telescopic groove (311) is formed in the telescopic part (31), the extension part (32) is connected to the side wall of the telescopic groove (311) in a sliding mode, and a locking assembly (5) used for locking the position of the extension part (32) is further arranged on the extension part (32).
4. The building construction building material lifting equipment of claim 3, which is characterized in that: locking subassembly (5) include two first springs (51) and two locking balls (52), all seted up locking groove (53), two on the lateral wall of extension (32) both sides locking ball (52) one-to-one sliding connection in two on the lateral wall of locking groove (53), two first spring (51) one-to-one sets up in two in locking groove (53), two the one end of first spring (51) all with the lateral wall fixed connection of locking groove (53), two the other end of first spring (51) all with locking ball (52) fixed connection, it is equipped with multiunit locking hole (54) to open relatively on the lateral wall of flexible groove (311) both sides, two locking ball (52) all can with every group locking hole (54) cooperate.
5. The building construction building material lifting equipment as claimed in claim 3, wherein: the telescopic part (31) is provided with a first guide groove (35), the extension part (32) is provided with a second guide groove (36), and the bottom wall of the first guide groove (35) is connected to the side wall of the second guide groove (36) in a sliding mode.
6. The building construction building material lifting equipment of claim 1, which is characterized in that: the side wall of the movable trolley (1) is provided with a connecting groove (6), a supporting plate (7) is arranged in the connecting groove (6), the supporting plate (7) comprises a bearing plate (71) and a movable plate (72), one end of the movable plate (72) is fixedly connected with one end of the bearing plate (71), the other end of the bearing plate (71) is connected to the side wall of the connecting groove (6) in a sliding mode, and a universal wheel is installed at the other end of the movable plate (72).
7. The building construction building material lifting equipment as claimed in claim 6, wherein: be provided with bradyseism subassembly (8) on bearing board (71), bradyseism subassembly (8) include bradyseism board (81) and a plurality of second spring (82), bradyseism board (81) set up in bearing board (71) top, the one end of second spring (82) all with bearing board (71) fixed connection, the other end of second spring (82) all with bearing board (71) fixed connection.
8. The building construction building material lifting equipment as claimed in claim 7, wherein: and the shock absorption plate (81) is fixedly connected with shock absorption rubber (83).
CN202222409953.6U 2022-09-09 2022-09-09 Building construction building material lifting equipment Active CN218371347U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222409953.6U CN218371347U (en) 2022-09-09 2022-09-09 Building construction building material lifting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222409953.6U CN218371347U (en) 2022-09-09 2022-09-09 Building construction building material lifting equipment

Publications (1)

Publication Number Publication Date
CN218371347U true CN218371347U (en) 2023-01-24

Family

ID=84974032

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222409953.6U Active CN218371347U (en) 2022-09-09 2022-09-09 Building construction building material lifting equipment

Country Status (1)

Country Link
CN (1) CN218371347U (en)

Similar Documents

Publication Publication Date Title
CN209942205U (en) Construction hanging basket
CN115417328A (en) Hydraulic engineering uses multi-functional lifting machine
CN218371347U (en) Building construction building material lifting equipment
CN215711419U (en) Anti-falling building material transportation lifter
CN113320023A (en) A auxiliary device that is used for house building engineering capital drilling bar planting muscle
CN215364778U (en) Multifunctional platform for mounting electromechanical equipment
CN218406396U (en) Movable hanging basket for construction of building structure outer vertical face
CN216235816U (en) Glass curtain wall installation device
CN113735012B (en) A installation device that is arranged in factory building construction high altitude structure
CN215978333U (en) Supporting platform with protection function for construction engineering construction
CN206156676U (en) Portable hoisting device for engineering
CN212076191U (en) Special beam lifting machine for intercity light rail
CN112727037A (en) Beam frame device for building construction
CN209127915U (en) A kind of air entrained concrete plug pricker loop wheel machine and its movement turn pricker device
CN220790499U (en) Telescopic building platform
CN219992401U (en) Combined frame with protection function for maintaining offshore platform
CN220745146U (en) Mechanical engineering equipment mobile device
CN221051370U (en) Fan hoist device
CN220080002U (en) Piling device
CN212740459U (en) Building engineering material lifting machine
CN113530202B (en) Assembly type building external wall panel safety device
CN219669978U (en) Power distribution cabinet lifting device
CN213174732U (en) Suspension device for high-altitude construction in building
CN218620227U (en) Novel lifting device for coil collecting station