CN218371345U - Suspension device for electric power installation construction - Google Patents
Suspension device for electric power installation construction Download PDFInfo
- Publication number
- CN218371345U CN218371345U CN202222955852.9U CN202222955852U CN218371345U CN 218371345 U CN218371345 U CN 218371345U CN 202222955852 U CN202222955852 U CN 202222955852U CN 218371345 U CN218371345 U CN 218371345U
- Authority
- CN
- China
- Prior art keywords
- sides
- seat
- suspension device
- construction
- power installation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
本实用新型公开了一种电力安装施工用悬吊装置,其技术方案包括:吊板和移动座,所述吊板底部靠近前后表面均安装有支撑架,两侧所述支撑架中间间隙位置处安装有转轴,所述转轴外表面套接有旋转座,所述旋转座底部安装有连接柱,所述连接柱底部安装有移动座,所述移动座底部两侧通过燕尾槽安装有滑板,两侧所述滑板底部中间通过缆绳安装有挂钩,所述吊板下表面两侧均安装有侧板。一种电力安装施工用悬吊装置解决了现有的部分悬吊装置在移动悬吊电力设备过程中,电力设备极易产生晃动,影响电力设备的悬吊安全性,即而影响电力安装施工正常运行的问题,提高了电力设备的悬吊安全性,从而保证了电力安装施工正常运行。
The utility model discloses a suspension device for electric power installation and construction. The technical scheme comprises: a hanging plate and a moving seat. Supporting frames are installed on the bottom of the hanging plate close to the front and rear surfaces, and the middle gap position of the supporting frames on both sides is A rotating shaft is installed, the outer surface of the rotating shaft is sleeved with a rotating seat, a connecting column is installed at the bottom of the rotating seat, a moving seat is installed at the bottom of the connecting column, and slide plates are installed on both sides of the bottom of the moving seat through dovetail grooves. A hook is installed in the middle of the bottom of the sliding plate on the side through a cable, and side plates are installed on both sides of the lower surface of the hanging plate. A suspension device for electric installation and construction solves the problem of some existing suspension devices. During the process of moving and suspending electric equipment, the electric equipment is very easy to shake, which affects the suspension safety of the electric equipment, which affects the normal operation of the electric installation and construction. It improves the suspension safety of power equipment, thus ensuring the normal operation of power installation and construction.
Description
技术领域technical field
本实用新型涉及电力设备安装技术领域,具体为一种电力安装施工用悬吊装置。The utility model relates to the technical field of electric equipment installation, in particular to a suspension device for electric installation and construction.
背景技术Background technique
电力设备主要包括发电设备和供电设备两大类,发电设备主要是电站锅炉、蒸汽轮机、燃气轮机、水轮机、发电机、变压器等,电力设备早安装移动时,需要使用悬吊机构悬吊电力设备。Power equipment mainly includes power generation equipment and power supply equipment. Power generation equipment mainly includes power station boilers, steam turbines, gas turbines, water turbines, generators, transformers, etc. When the power equipment is installed and moved, it is necessary to use a suspension mechanism to suspend the power equipment.
经过海量检索,发现现有技术中的悬吊机构如公开号为CN212982242U公开的一种电力工程用电力设备安装用悬吊装置,通过设置滑槽与滑块、固定杆,在工作过程中滑槽与滑块的设置使防脱板可以更快的移动,弹簧与固定块的设置,在工作过程中只需要移动防脱板,使固定杆进入防脱板的通孔内,固定杆进入通孔内从而挤压固定块与弹簧,并使弹簧收缩,待固定块与固定槽位于同一水平直线上时,弹簧伸展从而带动固定块进入固定槽内,即可将防脱板与吊钩固定,该装置操作简单,固定防脱板的速度更快,防脱效果更好,大大提高工作效率。After a large number of searches, it is found that the suspension mechanism in the prior art, such as the suspension device disclosed by the publication number CN212982242U, is a suspension device for the installation of electric power equipment for power engineering. The setting of the sliding block makes the anti-off plate move faster, and the setting of the spring and the fixed block only needs to move the anti-off plate during the working process, so that the fixed rod enters the through hole of the anti-off plate, and the fixed rod enters the through hole In this way, the fixed block and the spring are squeezed, and the spring is contracted. When the fixed block and the fixed groove are on the same horizontal line, the spring stretches to drive the fixed block into the fixed groove, and the anti-falling plate and the hook can be fixed. The device is easy to operate, the speed of fixing the anti-off plate is faster, the anti-off effect is better, and the work efficiency is greatly improved.
现有部分悬吊装置在移动悬吊电力设备过程中,电力设备极易产生晃动,影响电力设备的悬吊安全性,即而影响电力安装施工的正常运行,为此,我们提出一种电力安装施工用悬吊装置,提高了电力设备的悬吊安全性,从而保证了电力安装施工正常运行。In the process of moving and suspending power equipment in the existing part of the suspension device, the power equipment is very easy to shake, which affects the safety of the suspension of the power equipment, that is, affects the normal operation of the power installation and construction. Therefore, we propose a power installation The suspension device for construction improves the suspension safety of electric equipment, thereby ensuring the normal operation of electric installation and construction.
实用新型内容Utility model content
本实用新型的目的在于提供一种电力安装施工用悬吊装置,具备悬吊安全性高的优点,解决了现有的部分悬吊装置在移动悬吊电力设备过程中,电力设备极易产生晃动,影响电力设备的悬吊安全性,即而影响电力安装施工的正常运行的问题。The purpose of the utility model is to provide a suspension device for electric power installation and construction, which has the advantages of high suspension safety, and solves the problem that the existing suspension device is easily shaken during the process of moving and suspending the power equipment. , affecting the suspension safety of electric equipment, that is, affecting the normal operation of electric installation and construction.
为实现上述目的,本实用新型提供如下技术方案:一种电力安装施工用悬吊装置,包括吊板和移动座,其中所述吊板底部靠近前后表面均安装有支撑架,两侧所述支撑架中间间隙位置处安装有转轴,所述转轴外表面套接有旋转座,所述旋转座底部安装有连接柱,所述连接柱底部安装有移动座,所述移动座底部两侧通过燕尾槽安装有滑板,两侧所述滑板底部中间通过缆绳安装有挂钩,所述吊板下表面两侧均安装有侧板,两侧所述侧板靠近底部均安装有连接座A,两侧所述连接座A一侧通过活动轴安装有液压缓冲器,所述液压缓冲器输出端通过活动销安装有连接座B,所述连接座B连接于连接柱两侧。In order to achieve the above purpose, the utility model provides the following technical solutions: a suspension device for electric power installation construction, including a suspension plate and a moving seat, wherein the bottom of the suspension plate is equipped with support frames near the front and rear surfaces, and the supports on both sides A rotating shaft is installed at the gap in the middle of the frame, the outer surface of the rotating shaft is sleeved with a rotating seat, a connecting column is installed at the bottom of the rotating seat, a moving seat is installed at the bottom of the connecting column, and the two sides of the bottom of the moving seat pass through the dovetail groove Sliding boards are installed, hooks are installed in the middle of the bottom of the sliding boards on both sides through cables, side boards are installed on both sides of the lower surface of the hanging board, and connecting seats A are installed on the side boards on both sides near the bottom. A hydraulic buffer is installed on one side of the connecting seat A through a movable shaft, and a connecting seat B is installed on the output end of the hydraulic buffer through a movable pin, and the connecting seat B is connected to both sides of the connecting column.
优选的,所述吊板内部中间套接有吊柱,所述吊柱顶部安装有吊环,所述吊柱外表面靠近顶部四个角位置处均安装有吊绳,四个所述吊绳末端连接于吊板顶部。Preferably, a suspension column is sleeved in the middle of the suspension plate, a suspension ring is installed on the top of the suspension column, suspension ropes are installed at the four corners of the outer surface of the suspension column near the top, and the ends of the four suspension ropes are Attached to the top of the suspension plate.
优选的,所述移动座顶部位于连接柱间隙位置处安装有加强板。Preferably, a reinforcing plate is installed on the top of the moving seat at the gap between the connecting columns.
优选的,所述移动座一侧中间安装有通过电机板安装有电机,所述电机输出轴安装有调节杆,所述调节杆套接于两侧滑板内部。Preferably, a motor is installed through a motor plate in the middle of one side of the moving seat, and an adjustment rod is installed on the output shaft of the motor, and the adjustment rod is sleeved inside the slide plates on both sides.
优选的,所述调节杆与两侧滑板通过螺纹旋合连接,所述调节杆两端螺纹反向设置。Preferably, the adjusting rod is connected to the sliding plates on both sides through threads, and the threads at both ends of the adjusting rod are reversed.
优选的,所述吊板底部中间设有弹簧槽,所述吊柱底部位于弹簧槽内部安装有弹簧座,所述吊柱外表面位于弹簧座顶部安装有缓冲弹簧。Preferably, a spring groove is provided in the middle of the bottom of the suspension plate, a spring seat is installed at the bottom of the suspension column inside the spring groove, and a buffer spring is installed on the outer surface of the suspension column at the top of the spring seat.
优选的,所述液压缓冲器共设有两个,且两个所述液压缓冲器分设于连接柱两侧位置处。Preferably, there are two hydraulic buffers in total, and the two hydraulic buffers are respectively arranged at positions on both sides of the connecting column.
与现有技术相比,本实用新型的有益效果如下:Compared with the prior art, the beneficial effects of the utility model are as follows:
1、本实用新型通过设置液压缓冲器、连接柱和侧板,达到对电力设备所受晃动力进行缓冲的效果,以解决部分悬吊装置在移动悬吊电力设备过程中,电力设备极易产生晃动,影响电力设备的悬吊安全性,即而影响电力安装施工正常运行的问题,提高了电力设备的悬吊安全性,从而保证了电力安装施工正常运行。1. The utility model achieves the effect of buffering the swaying force of the electric equipment by setting the hydraulic buffer, the connecting column and the side plate, so as to solve the problem that the electric equipment is easily generated during the moving and suspending of the electric equipment by part of the suspension device. Shaking affects the suspension safety of power equipment, that is, affects the normal operation of power installation and construction, improves the suspension safety of power equipment, thereby ensuring the normal operation of power installation and construction.
2、本实用新型通过设置电机、调节杆和滑板,达到移动挂钩位置的效果,以解决挂钩使用位置固定,无法根据电力设备调整挂钩位置,悬吊机构使用适用性不佳的问题,提高了悬吊装置的使用适用性,从而方便对不同电力设备进行电力安装施工。2. The utility model achieves the effect of moving the position of the hook by setting a motor, an adjustment rod and a slide plate, so as to solve the problems that the position of the hook is fixed, the position of the hook cannot be adjusted according to the electric equipment, and the applicability of the suspension mechanism is not good. The applicability of the lifting device can be used to facilitate the electrical installation and construction of different electrical equipment.
附图说明Description of drawings
图1为本实用新型的立体结构示意图;Fig. 1 is the three-dimensional structure schematic diagram of the present utility model;
图2为本实用新型的剖视结构示意图;Fig. 2 is the sectional structure schematic diagram of the utility model;
图3为图2当中A的放大结构示意图;Fig. 3 is a schematic diagram of an enlarged structure of A in Fig. 2;
图4为图2当中B的放大结构示意图。FIG. 4 is a schematic diagram of an enlarged structure of B in FIG. 2 .
附图标记:1、吊环;2、吊板;3、连接座A;4、连接座B;5、移动座;6、加强板;7、连接柱;8、液压缓冲器;9、侧板;10、吊绳;11、吊柱;12、转轴;13、旋转座;14、支撑架;15、调节杆;16、燕尾槽;17、滑板;18、缆绳;19、挂钩;20、电机;21、弹簧槽;22、缓冲弹簧;23、弹簧座。Reference signs: 1, suspension ring; 2, hanging plate; 3, connecting seat A; 4, connecting seat B; 5, moving seat; 6, reinforcing plate; 7, connecting column; 8, hydraulic buffer; 9, side plate ;10, hanging rope; 11, hanging column; 12, rotating shaft; 13, swivel seat; 14, support frame; 15, adjusting rod; 16, dovetail groove; 17, slide plate; ; 21, spring groove; 22, buffer spring; 23, spring seat.
具体实施方式Detailed ways
下文结合附图和具体实施例对本实用新型的技术方案做进一步说明。The technical scheme of the utility model is further described below in conjunction with the accompanying drawings and specific embodiments.
实施例一Embodiment one
如图1-4所示,为实现上述目的,本实用新型提供如下技术方案:一种电力安装施工用悬吊装置,包括吊板2和移动座5,吊板2底部靠近前后表面均安装有支撑架14,两侧支撑架14中间间隙位置处安装有转轴12,转轴12外表面套接有旋转座13,旋转座13底部安装有连接柱7,连接柱7底部安装有移动座5,移动座5底部两侧通过燕尾槽16安装有滑板17,两侧滑板17底部中间通过缆绳18安装有挂钩19,吊板2下表面两侧均安装有侧板9,两侧侧板9靠近底部均安装有连接座A3,两侧连接座A3一侧通过活动轴安装有液压缓冲器8,液压缓冲器8输出端通过活动销安装有连接座B4,连接座B4连接于连接柱7两侧,吊板2内部中间套接有吊柱11,吊柱11顶部安装有吊环1,吊柱11外表面靠近顶部四个角位置处均安装有吊绳10,四个吊绳10末端连接于吊板2顶部,通过设置四个吊绳10,增加吊柱11的吊装安全性,移动座5顶部位于连接柱7间隙位置处安装有加强板6,通过设置的加强板6,对连接处进行稳定连接,吊板2底部中间设有弹簧槽21,吊柱11底部位于弹簧槽21内部安装有弹簧座23,吊柱11外表面位于弹簧座23顶部安装有缓冲弹簧22,通过设置的缓冲弹簧22,缓冲悬吊冲击力,液压缓冲器8共设有两个,且两个液压缓冲器8分设于连接柱7两侧位置。As shown in Figures 1-4, in order to achieve the above purpose, the utility model provides the following technical solutions: a suspension device for electric power installation construction, including a
基于实施例1的一种电力安装施工用悬吊装置的工作原理是:将本实用新型安装好后,通过设置的吊环1连接起吊设备,再将两侧挂钩19与电力设备连接,通过起吊设备和吊环1,对电力设备进行吊装,吊装过程中,通过设置的液压缓冲器8,缓冲移动过程中电力设备的晃动力,从而增加电力设备的安装稳定性,在吊柱11起吊时,通过设置的缓冲弹簧22缓冲电力设备的吊装冲击力,从而增加本实用新型的使用稳定性,至此,本设备工作流程完成。The working principle of a kind of suspension device for power installation and construction based on
实施例二Embodiment two
如图1-4所示,本实用新型提出的一种电力安装施工用悬吊装置,相较于实施例一,本实施例还包括:移动座5一侧中间安装有通过电机20板安装有电机20,电机20输出轴安装有调节杆15,调节杆15套接于两侧滑板17内部,调节杆15与两侧滑板17通过螺纹旋合连接,调节杆15两端螺纹反向设置。As shown in Figures 1-4, the utility model proposes a suspension device for electric power installation and construction. Compared with
本实施例中,在需要调整挂钩19位置时,启动电机20,通过电机20带动调节杆15转动,通过调节杆15带动两侧滑板17移动,从而调整挂钩19位置,方便对不同的电力设备进行吊运。In this embodiment, when the position of the
上述具体实施例仅仅是本实用新型的几种优选的实施例,基于本实用新型的技术方案和上述实施例的相关启示,本领域技术人员可以对上述具体实施例做出多种替代性的改进和组合。The above-mentioned specific embodiments are only several preferred embodiments of the present utility model. Based on the technical solutions of the present utility model and the related inspirations of the above-mentioned embodiments, those skilled in the art can make various alternative improvements to the above-mentioned specific embodiments. and combinations.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222955852.9U CN218371345U (en) | 2022-11-07 | 2022-11-07 | Suspension device for electric power installation construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202222955852.9U CN218371345U (en) | 2022-11-07 | 2022-11-07 | Suspension device for electric power installation construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN218371345U true CN218371345U (en) | 2023-01-24 |
Family
ID=84939130
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202222955852.9U Expired - Fee Related CN218371345U (en) | 2022-11-07 | 2022-11-07 | Suspension device for electric power installation construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN218371345U (en) |
-
2022
- 2022-11-07 CN CN202222955852.9U patent/CN218371345U/en not_active Expired - Fee Related
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113233344A (en) | Novel hoisting device for bridge installation | |
| CN118183521B (en) | Hoisting tool for pole-mounted transformer | |
| CN208516812U (en) | A kind of casting batch hoisting apparatus facilitating lifting | |
| CN211813035U (en) | Novel cantilever crane | |
| CN218371345U (en) | Suspension device for electric power installation construction | |
| CN208011206U (en) | Projecting rack | |
| CN201323408Y (en) | Tackle for pay-off tension | |
| CN207552941U (en) | Tooth block tensioning equipment mobile formwork on roof box in a kind of cast-in-situ continuous beam | |
| CN209481068U (en) | Hanging apparatus is used in a kind of spray painting of individual chair | |
| CN207175294U (en) | A kind of crane telescopic boom structure | |
| CN218231587U (en) | Chemical industry pipeline overhauls uses hoist and mount frame | |
| CN213774423U (en) | Hanging basket suspension device | |
| CN214935462U (en) | A segmented lift bridge crane | |
| CN211169602U (en) | A mobile hoist | |
| CN211644414U (en) | Lifting device for electromechanical engineering | |
| CN102030272A (en) | Building equipment hoisting device | |
| CN114180473A (en) | Construction equipment based on 5G communication | |
| CN210029810U (en) | A steel structure hoisting device | |
| CN217076766U (en) | Hydraulic engineering construction is with crane | |
| CN114964345A (en) | Movable offshore test platform | |
| CN221027198U (en) | A kind of lifting device structure for prefabricated components | |
| CN222433945U (en) | Crane lifting device | |
| CN223090142U (en) | A pipe burying device for water conservancy and hydropower engineering | |
| CN118684134B (en) | A hoisting device and method for steel rolling cooling bed waste heat recovery device | |
| CN222974684U (en) | Antidetonation gallows convenient to adjust |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230124 |