CN218362186U - Vertical tubular pile perforating device - Google Patents

Vertical tubular pile perforating device Download PDF

Info

Publication number
CN218362186U
CN218362186U CN202121092298.5U CN202121092298U CN218362186U CN 218362186 U CN218362186 U CN 218362186U CN 202121092298 U CN202121092298 U CN 202121092298U CN 218362186 U CN218362186 U CN 218362186U
Authority
CN
China
Prior art keywords
base
fixing
tubular pile
limiting
electric drill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121092298.5U
Other languages
Chinese (zh)
Inventor
段瑞龙
王吉超
郑权
史立志
由梓默
刘畅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaneng Chengde Wind Power Co ltd
Original Assignee
Hebei Branch Of Huaneng New Energy Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Branch Of Huaneng New Energy Co ltd filed Critical Hebei Branch Of Huaneng New Energy Co ltd
Priority to CN202121092298.5U priority Critical patent/CN218362186U/en
Priority to DE202021105000.4U priority patent/DE202021105000U1/en
Application granted granted Critical
Publication of CN218362186U publication Critical patent/CN218362186U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • B25H1/0078Guiding devices for hand tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Boring (AREA)

Abstract

The utility model discloses a vertical tubular pile perforating device, which relates to the technical field of solar cell panel installation, and comprises a base and a perforating mechanism, wherein the perforating mechanism is arranged on the base, a first fixing mechanism is arranged on the base, and the first fixing mechanism is used for fixing the perforating mechanism on the base; a limiting mechanism is arranged in front of the base and used for limiting the drilling depth of the punching mechanism; still be provided with hand mechanism on the base, still be provided with second fixed establishment on the base, second fixed establishment is used for fixing with tubular pile. The utility model discloses can realize the fixed of mechanism and tubular pile of punching, effectively improve the efficiency of punching of tubular pile.

Description

Vertical tubular pile perforating device
Technical Field
The utility model relates to a solar cell panel installs technical field, especially relates to a vertical tubular stake perforating device.
Background
A solar panel (also called a solar cell module) is an assembly assembled by a plurality of solar cells, and is a core part and the most important part in a solar power generation system.
When a solar panel is installed, the solar panel is usually installed on a solar panel installation support in an elevation angle mode, and the solar panel installation support is installed on the ground through a stand column; when the vertical column is installed, the tubular pile is usually installed on the ground, and then the bottom of the vertical column is sleeved on the tubular pile. At present, the tubular pile and the upright post are fixedly connected through bolts, so that bolt holes which are drilled through oppositely are required to be drilled in the tubular pile in advance, and the bolts penetrate through the bolt holes to realize the fixed connection of the tubular pile and the upright post.
In the prior art, the tubular pile needs to be drilled by manually holding an electric drill by hand, the drilling position is low, a worker needs to bend down to drill the tubular pile, and the labor capacity is large; and when drilling, the electric drill is difficult to fix well, and drilling efficiency is lower.
Therefore, it is desirable to provide a tubular pile drilling device to solve the above problems in the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a vertical tubular pile perforating device to solve the problem that above-mentioned prior art exists, can realize the fixed of mechanism and tubular pile of punching, effectively improve the efficiency of punching of tubular pile.
In order to achieve the above purpose, the utility model provides a following scheme:
the utility model provides a vertical tubular pile perforating device, which comprises a base and a perforating mechanism, wherein the perforating mechanism is arranged on the base, a first fixing mechanism is arranged on the base, and the first fixing mechanism is used for fixing the perforating mechanism on the base; a limiting mechanism is arranged in front of the base and used for limiting the drilling depth of the punching mechanism; still be provided with hand mechanism on the base, still be provided with second fixed establishment on the base, second fixed establishment is used for fixing with tubular pile.
Preferably, the punching mechanism adopts an electric drill, the electric drill comprises an electric drill body, the electric drill body is installed on the base, an electric drill handle is arranged above the electric drill body, and a drill rod is installed in front of the electric drill body.
Preferably, the base includes the bottom plate, a curb plate is respectively installed to the both sides top of bottom plate, the bottom plate with two be formed with the mounting groove between the curb plate, the electric drill body install in the mounting groove.
Preferably, the limiting rod is located below the drill rod and perpendicular to the drill rod, and the limiting rod is fixed in front of the base through a limiting rod support.
Preferably, the hand-held mechanism comprises a vertical rod, the bottom of the vertical rod is fixed on the base, a second handle is arranged at the top of the vertical rod, a first handle is arranged on the rear side of the vertical rod, and the first handle is located below the second handle.
Preferably, the rear side bottom of pole setting is connected with the bracing, a supporting bench is installed to the rear end top of base, the top of bracing with pole setting fixed connection, the bottom mounting of bracing is in on the supporting bench.
Preferably, the first fixing mechanism comprises a baffle, a fixing belt and a limiting support, and the baffle is mounted on the base and is positioned behind the electric drill body; the fixing band is fixed above the front end of the electric drill body, and the bottom of the fixing band is fixedly connected with the base; the rear end of the limiting support is fixed to the vertical rod, the front end of the limiting support is located in the front of the bottom of the electric drill handle, and a limiting groove is formed in the limiting support and used for limiting the electric drill handle.
Preferably, the second fixing mechanism comprises a fixing hook, a connecting seat is arranged at the front end of the limiting support, the fixing hook is connected with the connecting seat through a fixing hook support, and the fixing hook is located in front of the drill rod.
Preferably, a pterygoid lamina is all installed to the both sides bottom of fixed band, the both sides correspondence of base is provided with the pterygoid lamina, the bolt hole has been seted up on the pterygoid lamina, pterygoid lamina on the fixed band with pterygoid lamina on the base passes the bolt hole through fixing bolt and fixes.
The utility model discloses following beneficial technological effect has been gained for prior art:
the utility model provides a vertical tubular pile perforating device is provided with a second fixing mechanism, can realize the fixation of the perforating device and a tubular pile during drilling, is convenient to perforate, and effectively improves the perforating efficiency; and be provided with stop gear, can restrict the degree of depth of punching.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required to be used in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a schematic structural view of the middle vertical tubular pile perforating device of the present invention;
fig. 2 is a top view of the middle vertical tubular pile perforating device of the present invention;
FIG. 3 is a right side view of the middle vertical tubular pile perforating device of the present invention;
in the figure: 1-base, 2-supporting platform, 3-inclined support, 4-vertical rod, 5-first handle, 6-second handle, 7-electric drill body, 8-electric drill handle, 9-drill rod, 10-fixing band, 11-baffle, 12-limiting rod bracket, 13-limiting rod, 14-fixing hook bracket, 15-fixing hook, 16-limiting bracket, 17-connecting seat, 18-wing plate and 19-fixing bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model aims at providing a vertical tubular pile perforating device to solve the problem that prior art exists, can realize the fixed of mechanism and tubular pile of punching, effectively improve the efficiency of punching of tubular pile.
In order to make the above objects, features and advantages of the present invention more comprehensible, the present invention is described in detail with reference to the accompanying drawings and the detailed description.
As shown in fig. 1-3, the embodiment provides a vertical tubular pile perforating device, which includes a base 1 and a perforating mechanism, wherein the perforating mechanism is installed on the base 1, and a first fixing mechanism is arranged on the base 1 and is used for fixing the perforating mechanism on the base 1; a limiting mechanism is arranged in front of the base 1 and used for limiting the drilling depth of the punching mechanism; still be provided with hand mechanism on the base 1, still be provided with second fixed establishment on the base 1, second fixed establishment is used for fixing with tubular pile.
In the embodiment, the punching mechanism adopts an electric drill which is externally connected with a power supply through a power line; the electric drill can be selected from the prior art as required, and mainly comprises an electric drill body 7, wherein the electric drill body 7 is arranged on a base 1, an electric drill handle 8 is arranged above the electric drill body 7, and a drill rod 9 is arranged in front of the electric drill body 7; the electric drill handle 8 is provided with an electric drill switch button, and the electric drill switch button can be fixed through a binding band so as to be in a normally open state, so that the electric drill can work only by electrifying, and the electric drill switch button does not need to be manually controlled; and the electric drill can also adopt other switch mechanisms according to the working requirement.
In this embodiment, the base 1 includes a bottom plate, two side plates are respectively mounted above two sides of the bottom plate, an installation groove is formed between the bottom plate and the two side plates, and the electric drill body 7 is mounted in the installation groove; wherein, whole base 1 adopts the metal material, and the stainless steel material, bottom plate and two curb plate welded connection can be selected for use to the preferred.
In this embodiment, the gag lever post 13 is located the below of drilling rod 9, and gag lever post 13 sets up perpendicular drilling rod 9, and gag lever post 13 passes through gag lever post support 12 to be fixed in the place ahead of base 1, and wherein the telescopic link can be selected to gag lever post support 12, can control the distance of gag lever post 13 to drilling rod 9 front end through the telescopic link is flexible to adjust drilling depth.
In this embodiment, the handrail mechanism includes a vertical rod 4, the bottom of the vertical rod 4 is fixed on the base 1, the top of the vertical rod 4 is provided with a second handle 6, the rear side of the vertical rod 4 is provided with a first handle 5, and the first handle 5 is located below the second handle 6; the bottom of the rear side of the upright rod 4 is connected with an inclined strut 3, a supporting table 2 is arranged above the rear end of the base 1, the top end of the inclined strut 3 is fixedly connected with the upright rod 4, the bottom end of the inclined strut 3 is fixed on the supporting table 2, and the inclined strut 3 is arranged, so that the integral connection strength of the hand-held mechanism can be improved; when the drilling device works, the whole drilling device can be placed on the ground to drill the tubular pile, the height of the base is set according to the height of the drilled hole, the foot can be stepped on the inclined strut 3 to be fixed during drilling, and force can be applied to push the drilling device to move forwards to drill the hole. In the embodiment, through the matching of the first handle 5 and the second handle 6, the whole punching device can be conveniently and better held by a worker; wherein whole hand mechanism adopts stainless steel to make, can welded connection between each mechanism.
In the embodiment, the first fixing mechanism comprises a baffle 11, a fixing belt 10 and a limiting bracket 16, wherein the baffle 11 is mounted on the base 1 and is positioned behind the electric drill body 7 to limit the electric drill body 7 to move backwards; the rear end of the limiting support 16 is fixed on the upright rod 4, the front end of the limiting support 16 is positioned in front of the bottom of the electric drill handle 8, a limiting groove is formed in the limiting support 16 and used for limiting the electric drill handle 8, the electric drill handle 8 extends into the limiting groove, and the front end of the limiting support 16 limits the forward movement of the electric drill handle 8; in the embodiment, the front and back movement of the electric drill body 7 is limited by the matching of the baffle 11 and the limiting bracket 16. Wherein, spacing support 16 can comprise two spacing branches, and the space between two spacing branches is the spacing groove promptly, and the width of spacing groove is less than the width of electric drill body 7, and fixed band 10 is fixed in the front end top of electric drill body 7, the bottom and the base 1 fixed connection of fixed band 10. In this embodiment, the electric drill can be well fixed to the base 1 by the first fixing mechanism.
In this embodiment, the bottom portions of the two sides of the fixing band 10 are all welded with a wing plate 18, the two sides of the base 1 are correspondingly provided with the wing plates 18, bolt holes are formed in the wing plates 18, and the wing plates 18 on the fixing band 10 and the wing plates 18 on the base 1 are fixed by fixing bolts 19 passing through the bolt holes.
In this embodiment, the second fixing mechanism includes a fixing hook 15, a connecting seat 17 is disposed at the front end of the limiting bracket 16, the fixing hook 15 is connected to the connecting seat 17 through a fixing hook bracket 14, the fixing hook 15 is located in front of the drill rod 9, and the fixing hook bracket 14 may also adopt a telescopic rod to facilitate adjusting the position of the fixing hook 15; or, the fixed hook 15 and the fixed hook support 14 can be connected in a threaded manner, and the fixed hook support 14 and the connecting seat 17 are connected in a threaded manner, so that the fixed hook 15, the fixed hook support 14 and the connecting seat 17 can be detachably connected, and the fixed hook 15 and the fixed hook support 14 can be selected as required.
When the vertical tubular pile punching device works, the fixing hook 15 is fixed on a tubular pile to be punched, then the drill rod 9 of the electric drill is aligned to the tubular pile, and the electric drill is switched on to start working; the hand-held mechanism pushes the punching device to move forwards, and the pipe type pile is punched; after the completion punches, gag lever post 13 stops punching with tubular pile contact, pulls down vertical tubular pile perforating device, can carry out the next tubular pile's of waiting to punch work of punching.
The utility model discloses a specific embodiment is applied to explain the principle and the implementation mode of the utility model, and the explanation of the above embodiment is only used to help understand the method and the core idea of the utility model; meanwhile, for the general technical personnel in the field, according to the idea of the present invention, there are changes in the concrete implementation and the application scope. In summary, the content of the present description should not be construed as a limitation of the present invention.

Claims (9)

1. The utility model provides a vertical tubular pile perforating device which characterized in that: the punching mechanism is arranged on the base, a first fixing mechanism is arranged on the base, and the first fixing mechanism is used for fixing the punching mechanism on the base; a limiting mechanism is arranged in front of the base and used for limiting the drilling depth of the punching mechanism; still be provided with hand mechanism on the base, still be provided with second fixed establishment on the base, second fixed establishment is used for fixing with tubular pile.
2. The vertical tubular pile perforating device of claim 1, wherein: the electric drill comprises an electric drill body, the electric drill body is installed on the base, an electric drill handle is arranged above the electric drill body, and a drill rod is installed in front of the electric drill body.
3. The vertical tubular pile perforating device of claim 2, wherein: the base includes the bottom plate, a curb plate is respectively installed to the both sides top of bottom plate, the bottom plate with two be formed with the mounting groove between the curb plate, the electric drill body install in the mounting groove.
4. The vertical tubular pile perforating device of claim 2, wherein: the limiting mechanism is a limiting rod, the limiting rod is located below the drill rod and perpendicular to the drill rod, and the limiting rod is fixed in front of the base through a limiting rod support.
5. The vertical tubular pile perforating device of claim 2, wherein: the hand-held mechanism comprises a vertical rod, the bottom of the vertical rod is fixed on the base, a second handle is arranged at the top of the vertical rod, a first handle is arranged on the rear side of the vertical rod, and the first handle is located below the second handle.
6. The vertical tubular pile perforating device of claim 5, wherein: the utility model discloses a support device for a bicycle, including a base, a pole setting, a bracing, a supporting bench, the rear side bottom of pole setting is connected with the bracing, install a supporting bench above the rear end of base, the top of bracing with pole setting fixed connection, the bottom mounting of bracing is in on the supporting bench.
7. The vertical tubular pile perforating device of claim 5, wherein: the first fixing mechanism comprises a baffle, a fixing belt and a limiting bracket, and the baffle is arranged on the base and is positioned behind the electric drill body; the fixing band is fixed above the front end of the electric drill body, and the bottom of the fixing band is fixedly connected with the base; the rear end of the limiting support is fixed to the vertical rod, the front end of the limiting support is located in the front of the bottom of the electric drill handle, and a limiting groove is formed in the limiting support and used for limiting the electric drill handle.
8. The vertical tubular pile perforating device of claim 7, wherein: the second fixing mechanism comprises a fixing hook, a connecting seat is arranged at the front end of the limiting support, the fixing hook is connected with the connecting seat through a fixing hook support, and the fixing hook is located in front of the drill rod.
9. The vertical tubular pile perforating device of claim 7, wherein: a pterygoid lamina is all installed to the both sides bottom of fixed band, the both sides correspondence of base is provided with the pterygoid lamina, the bolt hole has been seted up on the pterygoid lamina, pterygoid lamina on the fixed band with pterygoid lamina on the base passes the bolt hole through fixing bolt and fixes.
CN202121092298.5U 2021-05-21 2021-05-21 Vertical tubular pile perforating device Active CN218362186U (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202121092298.5U CN218362186U (en) 2021-05-21 2021-05-21 Vertical tubular pile perforating device
DE202021105000.4U DE202021105000U1 (en) 2021-05-21 2021-09-16 Vertical tubular pile drilling jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121092298.5U CN218362186U (en) 2021-05-21 2021-05-21 Vertical tubular pile perforating device

Publications (1)

Publication Number Publication Date
CN218362186U true CN218362186U (en) 2023-01-24

Family

ID=78267878

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121092298.5U Active CN218362186U (en) 2021-05-21 2021-05-21 Vertical tubular pile perforating device

Country Status (2)

Country Link
CN (1) CN218362186U (en)
DE (1) DE202021105000U1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114029527A (en) * 2021-11-19 2022-02-11 上海森信建设集团有限公司 Device for drilling hole in bottom of top plate and using method
CN115026957A (en) * 2022-06-24 2022-09-09 山西四建集团有限公司 Novel lengthened drilling tool

Also Published As

Publication number Publication date
DE202021105000U1 (en) 2021-09-28

Similar Documents

Publication Publication Date Title
CN218362186U (en) Vertical tubular pile perforating device
CN101304164B (en) Installation apparatus for 35Kv isolating switch controlling mechanism
CN215442380U (en) Purlin connection structure
CN212000654U (en) Connecting device for steel pipe upright post and existing pier
CN215545082U (en) Horizontal tubular pile perforating device
CN215511006U (en) Combined support frame for constructional engineering
CN217680339U (en) Simple and easy reinforced concrete roof beam board end auxiliary device that punches a hole
CN208005747U (en) A kind of new-type semi-automatic sheet clipping machine
CN214977390U (en) Connecting rod formula reinforcing bar cutting device
CN210232172U (en) Double-end multifunctional screw locking machine
CN217789592U (en) Interval-adjustable supporting frame structure for mounting solar cell panel
CN220074773U (en) Automatic punching and receiving device for processing reinforcing plate
CN211437674U (en) Horizontal type arc punching machine for machining electric bicycle pipe
CN217537891U (en) Aluminum formwork connecting device for house building construction
CN215756187U (en) Hydraulic lifting device turnover platform
CN217356254U (en) Portable structure roof construction support that punches
CN214818321U (en) Simple and convenient auxiliary device that punches of security
CN216326108U (en) Three-dimensional positioning tool for lower frame
CN216699890U (en) Counter weight device of photovoltaic board headwind load
CN213571353U (en) A installation device that is used for pin on track sliding bed
CN219138534U (en) Connection structure for steel structure frame type parking spaces
CN218285832U (en) Book-binding machine with intelligence function of punching
CN216625656U (en) Novel solar photovoltaic panel vertical pile top support arm
CN220863272U (en) Fixing clamp for cutting and processing thermal pipeline
CN215564694U (en) Reinforcing device for engineering structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20231222

Address after: Yudaokou Ranch, Weichang County, Chengde City, Hebei Province, 067000

Patentee after: Huaneng Chengde Wind Power Co.,Ltd.

Address before: 050000 2 / F and 3 / F, Huashi Hotel, No.52, Hongqi Street, Qiaoxi District, Shijiazhuang City, Hebei Province

Patentee before: Hebei Branch of Huaneng new energy Co.,Ltd.

TR01 Transfer of patent right