CN218346813U CN202221081376.6U CN202221081376U CN218346813U CN 218346813 U CN218346813 U CN 218346813U CN 202221081376 U CN202221081376 U CN 202221081376U CN 218346813 U CN218346813 U CN 218346813U
Authority
CN
China
Prior art keywords
building
fixing device
rods
fixing
screw rods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202221081376.6U
Other languages
Chinese (zh)
Inventor
张文文
孟贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202221081376.6U priority Critical patent/CN218346813U/en
Application granted granted Critical
Publication of CN218346813U publication Critical patent/CN218346813U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model provides a fixing device is pour to concrete for building. Fixing device is pour to concrete for building includes: a fixed mount; the first motor is fixedly arranged at the top of the fixing frame; the two bidirectional screw rods are respectively and rotatably arranged on the inner walls of the two sides of the fixing frame, and the top ends of the corresponding bidirectional screw rods are fixedly connected with the output shaft of the first motor; the two corresponding moving blocks are arranged on the corresponding bidirectional screw rods in a threaded manner; the two corresponding shearing fork rods are hinged with the two corresponding moving blocks respectively; and the two connecting plates are respectively hinged on the two scissor rods. The utility model provides a fixing device is pour to concrete for building has can be suitable for and not co-altitude concrete column, convenient to use, the advantage of being convenient for demolish.

Description

Concrete pouring fixing device for building
Technical Field
The utility model relates to a building technical field especially relates to a fixing device is pour to concrete for building.
Background
The concrete pouring is a construction process of pouring mixed concrete materials into a bin, leveling the bin and tamping the mixed concrete materials to be dense, the pouring is required to be continuous and uniform and the concrete is prevented from being separated, and after some concrete columns are poured, because the concrete is not formed, a supporting device is usually required to support the concrete poured concrete columns.
However, most of the existing supporting devices support the concrete column by manually building plates outside the concrete column in the using process, and the fixed plates are removed after the concrete column is fixed, so that the building and installation of the built plates are not good when the higher concrete is fixed, and the supporting devices are inconvenient to use.
Therefore, it is necessary to provide a concrete pouring fixing device for building to solve the above technical problems.
SUMMERY OF THE UTILITY MODEL
The utility model provides a technical problem provide one kind can be suitable for with not co-altitude concrete column, convenient to use, the fixing device is pour to the concrete for building of being convenient for demolish.
In order to solve the technical problem, the utility model provides a fixing device is pour to concrete for building, include: a fixed mount; the first motor is fixedly arranged at the top of the fixing frame; the two bidirectional screw rods are respectively and rotatably arranged on the inner walls of the two sides of the fixed frame, and the top ends of the corresponding bidirectional screw rods are fixedly connected with the output shaft of the first motor; the two corresponding moving blocks are arranged on the corresponding bidirectional screw rods in a threaded manner; the corresponding scissor rods are hinged with the corresponding two moving blocks respectively; the two connecting plates are respectively hinged on the two scissor rods; the two second motors are respectively fixed at the bottoms of the two connecting plates; the two mounting grooves are respectively formed in the outer walls of one sides of the two connecting plates; the two first screw rods are respectively and rotatably arranged on the inner walls of the two mounting grooves, and the bottom ends of the two first screw rods are respectively and fixedly connected with output shafts of the two second motors; the two first fixing sleeves are respectively and fixedly arranged on the outer wall of one side, close to each other, of the two connecting plates; the two second fixing sleeves are respectively arranged on the two first screw rods in a threaded manner; two pouring semicircular steel sleeves, wherein the two pouring semicircular steel sleeves are arranged on the fixed frame; two rag bolts, two rag bolt all sets up on the mount.
Preferably, two all the cover is equipped with the belt pulley on the two-way lead screw, two the activity cover is equipped with same root belt on the belt pulley.
Preferably, the two first screws are all provided with connecting blocks in a threaded manner, and one ends of the two connecting blocks, which are close to each other, are respectively fixedly connected with the two second fixing sleeves.
Preferably, two limiting grooves are formed in the inner walls of the two sides of the fixing frame, limiting blocks are slidably mounted in the four limiting grooves, and the corresponding limiting blocks are fixedly connected with the corresponding moving blocks.
Preferably, two equal fixed mounting has a slide bar on the one side outer wall that the connecting plate kept away from each other, two equal slidable mounting has two sliders on the slide bar, corresponding two the slider all with corresponding the scissor pole is articulated mutually.
Preferably, two equal fixed mounting has a mounting bracket, two on the first fixed cover equal fixed mounting has a third motor, two on the mounting bracket all rotate on the mounting bracket and install the second screw rod, two the one end of second screw rod respectively with two the output shaft fixed connection of third motor, two equal threaded mounting has the joint board, two on the second screw rod the equal fixed mounting in top of joint board has the fourth motor, two equal fixed mounting has two stay bolts on the output shaft of fourth motor.
Preferably, the two mounting frames are fixedly provided with limiting rods, the two connecting plates are provided with limiting holes, and the two limiting rods penetrate through the two limiting holes and are connected with the corresponding inner walls of the limiting holes in a sliding mode.
Preferably, two threaded through holes are formed in each of the two second fixing sleeves, and the two long bolts penetrate through the corresponding two threaded through holes and are connected with the inner walls of the corresponding two threaded through holes in a screwing mode.
Compared with the prior art, the utility model provides a fixing device is pour to concrete for building has following beneficial effect:
the utility model provides a fixing device is pour to concrete for building, during the use, first motor through setting up, two-way lead screw, movable block and connecting plate can drive connecting plate horizontal migration through the articulated effect of scissors pole, thereby can drive two first fixed covers and two fixed covers of second and lean on two to pour half round steel bushing clamp to fix each other recently, thereby can fix the concrete column that the concrete was pour, and the second motor and the first screw rod that set up can drive the fixed cover of second and reciprocate, thereby can fix the concrete column of the co-altitude not of pouring, thereby can strengthen the suitability of this device.
Drawings
Fig. 1 is a schematic front view of a first embodiment of a concrete pouring and fixing device for building provided by the present invention;
fig. 2 is a schematic structural view of a first fixing sleeve in a first embodiment of the concrete pouring and fixing device for building provided by the present invention;
FIG. 3 is an enlarged schematic view of portion A shown in FIG. 1;
fig. 4 is a schematic front view of a second embodiment of the concrete pouring and fixing device for building provided by the present invention;
fig. 5 is an enlarged schematic view of a portion B shown in fig. 4.
Reference numbers in the figures: 1. a fixed mount; 2. a first motor; 3. a bidirectional screw rod; 4. a moving block; 5. a connecting plate; 6. a second motor; 7. mounting grooves; 8. a first screw; 9. a first fixing sleeve; 10. a second fixing sleeve; 11. shearing a fork rod; 12. a belt pulley; 13. a belt; 14. pouring a semicircular steel sleeve; 15. a foundation bolt; 16. a mounting frame; 17. a third motor; 18. a second screw; 19. a connector tile; 20. a fourth motor; 21. a long bolt.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and embodiments.
First embodiment
Referring to fig. 1-3, in a first embodiment of the present invention, a concrete pouring fixing device for building includes: the device comprises a fixed frame 1, wherein a through groove is formed in the bottom of the fixed frame 1, and one side of the through groove is provided with an opening, so that the device can be conveniently arranged on the outer side of a concrete column; the first motor 2 is fixedly arranged at the top of the fixed frame 1; the two bidirectional screw rods 3 are respectively and rotatably arranged on the inner walls of the two sides of the fixed frame 1, the top ends of the corresponding bidirectional screw rods 3 are fixedly connected with the output shaft of the first motor 2, and the bidirectional screw rods 3 are rotatably arranged on the fixed frame 1 through two bearings; the two corresponding moving blocks 4 are arranged on the corresponding bidirectional screw rods 3 in a threaded manner; the two scissor rods 11, the corresponding scissor rods 11 are respectively hinged with the two corresponding moving blocks 4; the two connecting plates 5 are respectively hinged to the two scissor rods 11, and one side of each of the two connecting plates 5 is provided with a limiting sleeve and a limiting long rod, so that the connecting plates 5 can always horizontally move; the two second motors 6 are respectively fixed at the bottoms of the two connecting plates 5; the two mounting grooves 7 are respectively formed in the outer wall of one side of each of the two connecting plates 5; the two first screw rods 8 are respectively rotatably installed on the inner walls of the two installation grooves 7, the bottom ends of the two first screw rods 8 are respectively fixedly connected with the output shafts of the two second motors 6, and the first screw rods 8 are rotatably connected with the inner walls of the installation grooves 7 through bearings; the two first fixing sleeves 9 are respectively and fixedly installed on the outer wall of one side, close to each other, of the two connecting plates 5, the two first fixing sleeves 9 are fixed through bolts, the number of the bolts is four, and the four bolts are installed on two sides of each first fixing sleeve 9; the two second fixing sleeves 10 are respectively arranged on the two first screw rods 8 in a threaded manner, the two second fixing sleeves 10 are fixed through bolts, the number of the bolts is four, and every two second fixing sleeves 10 are arranged on two sides of each second fixing sleeve 10; the two casting semicircular steel sleeves 14 are arranged on the fixed frame 1, and the inner diameters of the casting semicircular steel sleeves 14 can be changed according to concrete columns with different diameters; two anchor bolts 15, two anchor bolts 15 all set up on the mount 1.
Two all the cover is equipped with belt pulley 12 on the two-way lead screw 3, two the activity cover is equipped with same root belt 13 on the belt pulley 12, carries out the transmission through setting up belt pulley 12 and belt 13 for two-way lead screws 3 can rotate simultaneously.
Two equal threaded mounting has a connecting block, two on the first screw rod 8 one end that the connecting block is close to each other respectively with two the fixed cover 10 fixed connection of second couples together between with the fixed cover 10 of second and first screw rod 8 through setting up the connecting block for the rotation of first screw rod 8 can drive the fixed cover 10 of second and reciprocate.
Two limiting grooves are formed in the inner walls of the two sides of the fixing frame 1, limiting blocks are arranged in the four limiting grooves in a sliding mode, the corresponding limiting blocks are fixedly connected with the corresponding moving blocks 4, the moving distance of the moving blocks 4 is limited by the limiting grooves and the limiting blocks, the moving blocks can be prevented from moving excessively and colliding with the belt pulley 12, the limiting blocks can be limited, and the two-way lead screw 3 can be prevented from rotating to cause the moving blocks to be incapable of moving.
Two equal fixed mounting has a slide bar on the one side outer wall that connecting plate 5 kept away from each other, two equal slidable mounting has two sliders on the slide bar, corresponding two the slider all with corresponding scissors pole 11 is articulated mutually, can take place to slide when making two scissors poles 11 can articulate with connecting plate 5 through setting up slider and slide bar to can promote connecting plate 5 horizontal migration.
The utility model provides a fixing device is pour to concrete for building's theory of operation as follows:
when concrete pouring is carried out, after the concrete pouring is finished, two pouring semicircular steel sleeves 14 are sleeved outside a poured concrete column, the device is fixed on two sides of the concrete column through foundation bolts 15, the position of a second fixing sleeve 10 is adjusted according to the height of the poured concrete column, first, a second motor 6 is started, the second motor 6 rotates to drive a first screw 8 to rotate, then the second fixing sleeve 10 can be driven to move through the thread action between the first screw 8 and a connecting block, the second fixing sleeve 10 can be adjusted to a position suitable for the height of the concrete column, then, a first motor 2 is started, the first motor 2 rotates to drive one of two-way screw rods 3 to rotate, then the other two-way screw rod 3 can be driven to rotate together through the transmission action between a belt pulley 12 and a belt 13, so that two moving blocks 4 can be driven to approach each other, so that two connecting plates 5 can be driven to approach each other through the hinging action between scissor rods 11, then the first fixing sleeve 9 and the second fixing sleeve 10 on the two connecting plates 5 can be driven to approach each other so that the two fixing sleeves 14 are attached to the surfaces of the semicircular steel sleeves 14, the two semicircular steel sleeves 14 are clamped and the fixing bolts 9 and the second fixing sleeve 10 can be detached after the pouring of the concrete column is finished, and the fixing device is fixed, and the two fixing sleeves 15 can be used for fixing the concrete column.
Compared with the prior art, the utility model provides a fixing device is pour to concrete for building has following beneficial effect:
during the use, through the first motor 2 that sets up, two-way lead screw 3, movable block 4 and connecting plate 5 can drive connecting plate 5 horizontal migration through the articulated effect of scissor rod 11, thereby can drive two fixed covers 9 and two fixed covers 10 of second and lean on each other and press from both sides tightly to fix two semicircle steel casings 14 of pouring, thereby can fix the concrete column that the concrete was poured, and the fixed cover 10 of second motor 6 and the first screw rod 8 that set up can drive the second and reciprocate, thereby can fix the concrete column of the co-altitude of pouring, thereby can strengthen the suitability of this device.
Second embodiment:
based on the concrete pouring fixing device for the building provided by the first embodiment of the application, the second embodiment of the application provides another concrete pouring fixing device for the building. The second embodiment is merely a preferred way of the first embodiment, and the implementation of the second embodiment does not affect the implementation of the first embodiment alone.
A second embodiment of the present invention will be further described with reference to the drawings and the following description.
Referring to fig. 4-5, the concrete pouring fixing device for building further includes two first fixing sleeves 9, which are both fixedly mounted with mounting brackets 16, two mounting brackets 16 are both fixedly mounted with third motors 17, two mounting brackets 16 are both rotatably mounted with second screws 18, one ends of the two second screws 18 are respectively fixedly connected with output shafts of the two third motors 17, the second screws 18 are rotatably connected with the mounting brackets 16 through two bearings, two second screws 18 are both threadedly mounted with connecting plates 19, the connecting plates 19 are provided with internal threaded holes screwed with the second screws 18, and can horizontally move through rotation of the second screws 18, the tops of the two connecting plates 19 are both fixedly mounted with fourth motors 20, and output shafts of the two fourth motors 20 are both fixedly mounted with two long bolts 21.
Two equal fixed mounting has a gag lever post on the mounting bracket 16, two spacing hole has all been seted up on the linkage plate 19, two the gag lever post runs through two respectively spacing hole and all with corresponding the inner wall sliding connection in spacing hole carries on spacingly to linkage plate 19 through setting up gag lever post and spacing hole, prevents that linkage plate 19 from following second screw rod 18 and rotating together and leading to its unable horizontal migration, and the gag lever post also can carry out the effect of an auxiliary stay to linkage plate 19.
Two threaded through holes are formed in the two second fixing sleeves 10, the two long bolts 21 respectively penetrate through the corresponding two threaded through holes and are connected with the inner walls of the corresponding two threaded through holes in a screwing manner, and the two long bolts 21 are screwed into the threaded through holes to fix the two second fixing sleeves 10 by forming the threaded through holes in the two second fixing sleeves 10.
When the second fixing sleeve 10 is higher in the device, people often do not fix the two second fixing sleeves 10 through bolts, at the moment, the third motor 17 and the fourth motor 20 can be started, the third motor 17 rotates to drive the second screw rod 18 to rotate, so that the connecting plate 19 can be driven to horizontally move through the thread action between the second screw rod 18 and the connecting plate 19, at the moment, the fourth motor 20 rotates to drive the long bolt 21 to rotate, and the horizontal movement of the connecting plate 19 also drives the horizontal movement of the fourth motor 20, so that the fourth motor 20 can drive the rotating long bolt 21 to be screwed into the thread through holes in the two second fixing sleeves 10 while moving horizontally, so that the two second fixing sleeves 10 can be fixed, and people can conveniently fix the second fixing sleeves 10 at high positions.
The above only is the embodiment of the present invention, not limiting the scope of the present invention, all the equivalent structures or equivalent processes of the present invention are used in the specification and the attached drawings, or directly or indirectly applied to other related technical fields, and the same principle is included in the protection scope of the present invention.

Claims (8)

1. The utility model provides a fixing device is pour to concrete for building which characterized in that includes:
a fixed mount;
the first motor is fixedly arranged at the top of the fixing frame;
the two bidirectional screw rods are respectively and rotatably arranged on the inner walls of the two sides of the fixed frame, and the top ends of the corresponding bidirectional screw rods are fixedly connected with the output shaft of the first motor;
the two corresponding moving blocks are mounted on the corresponding bidirectional screw rods in a threaded manner;
the two corresponding shearing fork rods are hinged with the two corresponding moving blocks respectively;
the two connecting plates are respectively hinged on the two scissor rods;
the two second motors are respectively fixed at the bottoms of the two connecting plates;
the two mounting grooves are respectively formed in the outer wall of one side of each of the two connecting plates;
the two first screw rods are respectively and rotatably arranged on the inner walls of the two mounting grooves, and the bottom ends of the two first screw rods are respectively and fixedly connected with output shafts of the two second motors;
the two first fixing sleeves are respectively and fixedly arranged on the outer wall of one side, close to each other, of the two connecting plates;
the two second fixing sleeves are respectively arranged on the two first screw rods in a threaded manner;
two semi-circular steel sleeves are poured, and the two semi-circular steel sleeves are arranged on the fixing frame;
two rag bolts, two rag bolt all sets up on the mount.
2. The concrete pouring fixing device for the building as claimed in claim 1, wherein two belt pulleys are sleeved on both the two-way screw rods, and the same belt is movably sleeved on both the two belt pulleys.
3. The concrete pouring and fixing device for the building as claimed in claim 1, wherein connecting blocks are threadedly mounted on both of the first screw rods, and one ends of the two connecting blocks, which are close to each other, are fixedly connected with the two second fixing sleeves respectively.
4. The concrete pouring and fixing device for the building as claimed in claim 1, wherein two limiting grooves are respectively formed on the inner walls of the two sides of the fixing frame, limiting blocks are respectively slidably mounted in the four limiting grooves, and the corresponding limiting blocks are respectively fixedly connected with the corresponding moving blocks.
5. The concrete pouring fixing device for the building as claimed in claim 1, wherein a sliding rod is fixedly mounted on the outer wall of one side, away from each other, of each of the two connecting plates, two sliding blocks are slidably mounted on each of the two sliding rods, and the two corresponding sliding blocks are hinged to the corresponding scissor rods.
6. The concrete pouring fixing device for the building according to claim 1, wherein two first fixing sleeves are fixedly provided with mounting frames, two mounting frames are fixedly provided with third motors, two mounting frames are rotatably provided with second screws, one ends of the two second screws are fixedly connected with output shafts of the two third motors, two second screws are provided with connecting plates in a threaded manner, the tops of the two connecting plates are fixedly provided with fourth motors, and two output shafts of the two fourth motors are fixedly provided with two long bolts.
7. The concrete pouring fixing device for the building of claim 6, wherein two limiting rods are fixedly installed on each of the two installation frames, limiting holes are formed in each of the two connecting plates, and each of the two limiting rods penetrates through each of the two limiting holes and is in sliding connection with the inner wall of the corresponding limiting hole.
8. The concrete pouring and fixing device for the building of claim 6, wherein two threaded through holes are formed in each of the two second fixing sleeves, and the two long bolts respectively penetrate through the two corresponding threaded through holes and are screwed and connected with the inner walls of the two corresponding threaded through holes.
CN202221081376.6U 2022-05-08 2022-05-08 Concrete pouring fixing device for building Expired - Fee Related CN218346813U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221081376.6U CN218346813U (en) 2022-05-08 2022-05-08 Concrete pouring fixing device for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221081376.6U CN218346813U (en) 2022-05-08 2022-05-08 Concrete pouring fixing device for building

Publications (1)

Publication Number Publication Date
CN218346813U true CN218346813U (en) 2023-01-20

Family

ID=84921261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221081376.6U Expired - Fee Related CN218346813U (en) 2022-05-08 2022-05-08 Concrete pouring fixing device for building

Country Status (1)

Country Link
CN (1) CN218346813U (en)

Similar Documents

Publication Publication Date Title
CN209040547U (en) A kind of building engineering construction floor structure
CN112284665A (en) Be used for building steel structure model anti-seismic test detection device
CN218346813U (en) Concrete pouring fixing device for building
CN211221186U (en) Production system of concrete member
CN218036066U (en) Building prefabricated plate detects anti pressure detection device of usefulness
CN211920744U (en) Steel reinforcement cage lifting device
CN215443483U (en) Fender is enclosed in construction
CN215359042U (en) Concrete distributing device for prefabricated wallboard
CN110565778B (en) A mounting structure for road rainwater pipeline
CN220978801U (en) Reinforced concrete post reinforcing apparatus
CN221031669U (en) Template support bracket
CN220705211U (en) Concrete vibration ramming device
CN220747712U (en) Prefabricated filled wall body group builds fixing device
CN220338093U (en) Electromechanical installing support
CN219344034U (en) Template supporting installation frame
CN111677528B (en) Tunnel ditch construction rack
CN215433629U (en) Adjustable PC component placing rack
CN211164695U (en) Concrete slab drilling equipment for building construction
CN217352172U (en) Bridge bent cap template supports adjusting device
CN218893361U (en) Assembled prefabricated plate hoist device
CN219754014U (en) Building template supporting device
CN220348675U (en) Demolding auxiliary device for civil engineering
CN213774503U (en) Aluminum mould board bracing device for building
CN220768844U (en) Construction device for hanging mould of reserved hole of structural plate
CN218843845U (en) Anti-deformation device for construction of concrete filled steel tubular column

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230120