CN218346518U - Building curtain wall mounting structure - Google Patents

Building curtain wall mounting structure Download PDF

Info

Publication number
CN218346518U
CN218346518U CN202222286767.8U CN202222286767U CN218346518U CN 218346518 U CN218346518 U CN 218346518U CN 202222286767 U CN202222286767 U CN 202222286767U CN 218346518 U CN218346518 U CN 218346518U
Authority
CN
China
Prior art keywords
erection column
curtain wall
dovetail
mounting
mounting structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222286767.8U
Other languages
Chinese (zh)
Inventor
吴士远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhitang Industrial Development Co Ltd
Original Assignee
Shanghai Zhitang Industrial Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhitang Industrial Development Co Ltd filed Critical Shanghai Zhitang Industrial Development Co Ltd
Priority to CN202222286767.8U priority Critical patent/CN218346518U/en
Application granted granted Critical
Publication of CN218346518U publication Critical patent/CN218346518U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a building curtain wall mounting structure, including erection column and curtain board, the side fixed mounting of erection column has the mounting panel, and the mounting panel is "L" shape, and the long limit of mounting panel passes through welded fastening and installs in the side of erection column, and the minor face of mounting panel passes through expansion bolts and the floor fixed connection of building, and the dovetail has been seted up on the surface of erection column, and the fixed surface of curtain board installs the joint piece, and the cross sectional shape of joint piece is the same with the cross sectional shape of dovetail, and the top of erection column is provided with the direction subassembly. This mounting structure, in whole installation, owing to receive the restriction of guide way, consequently, the curtain board is hardly taken place great deflection under the effect of wind power, and the curtain board is owing to receive the restriction of dovetail again, consequently, the curtain board can not take place the skew under the effect of wind power, so, in whole installation, the influence that receives wind power will greatly reduced to can effectively guarantee the smooth installation of curtain board.

Description

Building curtain wall mounting structure
Technical Field
The utility model relates to a curtain installation technical field specifically is a building curtain mounting structure.
Background
The curtain wall, also known as "curtain wall", is a kind of enclosure installed on the outer wall of the building, mainly playing a decorative role, the most installation of existing curtain wall is installed through the way of hoisting, this kind of installation mode is very easily influenced by strong wind weather, even unable installation when serious. Therefore, the utility model provides a do not receive gale weather influence's building curtain mounting structure.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building curtain mounting structure to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a building curtain wall mounting structure, including erection column and curtain board, the side fixed mounting of erection column has the mounting panel, the mounting panel is "L" shape, the long limit of mounting panel is passed through welded fastening and is installed in the side of erection column, the minor face of mounting panel passes through expansion bolts and the floor fixed connection of building, the dovetail has been seted up on the surface of erection column, the fixed surface of curtain board installs the joint piece, and the cross sectional shape of joint piece is the same with the cross sectional shape of dovetail, the top of erection column is provided with the direction subassembly, realize the alignment of joint piece and dovetail through the direction subassembly.
Preferably, the guide assembly includes a guide groove detachably installed on the top surface of the building by a coupling bolt.
Preferably, the left inner groove surface and the right inner groove surface of the guide groove are in a wedge shape, and when the curtain wall plate is tightly attached to the inner rear groove surface of the guide groove, the clamping blocks are aligned to the dovetail grooves.
Preferably, the surface of the curtain wall plate is fixedly provided with a first hoisting ring, and two side surfaces of the guide groove are fixedly provided with a second hoisting ring.
Preferably, the side of erection column is seted up the logical groove that runs through, and the centre that leads to the groove slides and inserts and be equipped with the layer board, and the upper surface of layer board and the lower surface parallel and level of joint piece.
Preferably, the end part of the supporting plate is fixedly provided with a connecting plate, and the connecting plate is fixedly arranged on the side surface of the mounting column through a screw.
Advantageous effects
The utility model provides a building curtain wall mounting structure possesses following beneficial effect:
1. this building curtain wall mounting structure, in whole installation, owing to receive the restriction of guide way, therefore, the curtain board hardly takes place great deflection under the effect of wind power, so the workman only needs constantly to promote the curtain board, make the surface of curtain board hug closely with the interior back groove face of guide way can, later the curtain board is owing to receive the restriction of dovetail again, consequently, the curtain board can not take place the skew under the effect of wind power, so, in whole installation, the influence that receives wind power will greatly reduced, thereby can effectively guarantee the smooth installation of curtain board.
2. This building curtain wall mounting structure, because curtain wall board and erection column realize being connected through the cooperation of dovetail and joint piece, and under dovetail and joint piece restriction, curtain wall board can remain fixed, so, just need not fix extra curtain wall board, this installation of simplifying curtain wall board greatly for whole installation is simpler.
Drawings
FIG. 1 is a schematic view of the three-dimensional structure of the present invention;
FIG. 2 is a schematic view of the split structure of the present invention;
fig. 3 is an enlarged schematic view of a portion a in fig. 2.
In the figure: the curtain wall comprises 1 mounting column, 2 curtain wall boards, 3 mounting plates, 4 expansion bolts, 5 buildings, 6 dovetail grooves, 7 clamping blocks, 8 guide grooves, 9 connecting bolts, 10 first hoisting rings, 11 through grooves, 12 supporting plates, 13 connecting plates, 14 screws and 15 second hoisting rings.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides a building curtain wall mounting structure, including erection column 1 and curtain board 2, the side fixed mounting of erection column 1 has mounting panel 3, mounting panel 3 is "L" shape, the long limit of mounting panel 3 is passed through welded fastening and is installed in the side of erection column 1, the floor fixed connection of expansion bolts 4 with building 5 is passed through to the minor face of mounting panel 3, dovetail 6 has been seted up on the surface of erection column 1, the fixed surface of curtain board 2 installs joint piece 7, and the cross sectional shape of joint piece 7 is the same with the cross sectional shape of dovetail 6, the top of erection column 1 is provided with the direction subassembly, realize the alignment of joint piece 7 and dovetail 6 through the direction subassembly, at this moment, alright let slowly put down curtain board 2, joint piece 7 on the curtain board 2 just can insert in the dovetail 6, then slowly slide to the bottom of erection column 1, it circulates in proper order, alright accomplish the installation of curtain board 2.
The direction subassembly includes guide way 8, guide way 8 passes through connecting bolt 9 detachable and installs the top surface at building 5, the wedge is personally submitted to the inside groove about guide way 8, and when curtain board 2 hugs closely with the interior back groove face of guide way 8, joint piece 7 aligns with dovetail 6, hang up whole curtain board 2 to the guide way 8, at this moment, only need a workman to stand at the top surface of building 5, support curtain board 2 with the hand, make the surface of curtain board 2 hug closely with the interior back groove face of guide way 8, at this moment, joint piece 7 will aim at with dovetail 6.
Fixed surface of curtain board 2 installs first hoisting ring 10, the both sides face fixed mounting of guide way 8 has second hoisting ring 15, the first hoisting ring 10 of accessible lifts up whole curtain board 2, lift up whole guide way 8 through second hoisting ring 15, logical groove 11 that runs through is seted up to the side of erection column 1, the centre that leads to groove 11 slides and inserts and be equipped with layer board 12, and the upper surface of layer board 12 and the lower surface parallel and level of joint piece 7, thus, under the effect of layer board 12, the weight of every curtain board 2 all can be exerted for erection column 1, thereby can avoid the curtain board 2 of bottommost to damage because the atress is too big, the end fixing of layer board 12 installs connecting plate 13, connecting plate 13 passes through 14 fixed mounting of screw in the side of erection column 1, so, alright realize the fixed of layer board 12, thereby effectively guarantee whole mounting structure's stability.
The working principle is as follows: when the device is used, firstly, the whole mounting column 1 is fixedly connected with a building 5 through the mounting plate 3, then, the whole guide groove 8 is hoisted by a crane through the second hoisting ring 15, and the mounting is fixedly arranged on the top surface of the building 5 through the connecting bolt 9, at the moment, the crane can hoist the whole curtain wall plate 2 to the guide groove 8 through the first hoisting ring 10, at the moment, only one worker needs to stand on the top surface of the building 5 to support the curtain wall plate 2 by hand, so that the surface of the curtain wall plate 2 is tightly attached to the inner rear groove surface of the guide groove 8, at the moment, the clamping blocks 7 are aligned with the dovetail groove 6, so that the crane can slowly put down the curtain wall plate 2, the clamping blocks 7 on the curtain wall plate 2 can be inserted into the dovetail groove 6, then slowly slide to the bottom end of the mounting column 1, cycle is performed in sequence, the mounting of the curtain wall plate 2 can be completed, and after the mounting is completed, the guide groove 8 can be detached.
In whole installation, owing to receive the restriction of guide way 8, therefore, curtain board 2 hardly takes place great deflection under the effect of wind power, so the workman only needs constantly to promote curtain board 2, make the surface of curtain board 2 and the interior back groove face of guide way 8 hug closely can, later curtain board 2 is owing to receive dovetail 6's restriction again, consequently, curtain board 2 can not take place the skew under the effect of wind power, so, in whole installation, the influence that receives wind power will greatly reduced, thereby can effectively guarantee the smooth installation of curtain board 2.
Simultaneously because curtain board 2 realizes being connected through the cooperation of dovetail 6 with joint piece 7 with erection column 1, and under the restriction of dovetail 6 with joint piece 7, curtain board 2 can remain fixed, so, just need not fix curtain board 2 in extra, this installation of simplifying curtain board 2 greatly for whole installation is simpler.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building curtain wall mounting structure, includes erection column (1) and curtain board (2), its characterized in that: the side fixed mounting of erection column (1) has mounting panel (3), mounting panel (3) are "L" shape, the long limit of mounting panel (3) is passed through welded fastening and is installed in the side of erection column (1), the floor fixed connection of expansion bolts (4) and building (5) is passed through to the minor face of mounting panel (3), dovetail (6) have been seted up on the surface of erection column (1), the fixed surface of curtain board (2) installs joint piece (7), and the cross sectional shape of joint piece (7) is the same with the cross sectional shape of dovetail (6), the top of erection column (1) is provided with the direction subassembly, realize the alignment of joint piece (7) and dovetail (6) through the direction subassembly.
2. The construction curtain wall mounting structure as claimed in claim 1, wherein: the guide assembly comprises a guide groove (8), and the guide groove (8) is detachably mounted on the top surface of the building (5) through a connecting bolt (9).
3. The construction curtain wall mounting structure as claimed in claim 2, wherein: the left inner groove surface and the right inner groove surface of the guide groove (8) are wedge-shaped, and when the curtain wall plate (2) is tightly attached to the inner rear groove surface of the guide groove (8), the clamping block (7) is aligned to the dovetail groove (6).
4. The construction curtain wall mounting structure as claimed in claim 3, wherein: the surface fixed mounting of curtain board (2) has first hoist and mount ring (10), and the both sides face fixed mounting of guide way (8) has second hoist and mount ring (15).
5. The building curtain wall mounting structure as claimed in claim 1, wherein: the side of the mounting column (1) is provided with a through groove (11), the middle of the through groove (11) is slidably inserted with a supporting plate (12), and the upper surface of the supporting plate (12) is flush with the lower surface of the clamping block (7).
6. The construction curtain wall mounting structure as claimed in claim 5, wherein: the end part of the supporting plate (12) is fixedly provided with a connecting plate (13), and the connecting plate (13) is fixedly arranged on the side surface of the mounting column (1) through a screw (14).
CN202222286767.8U 2022-08-30 2022-08-30 Building curtain wall mounting structure Active CN218346518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222286767.8U CN218346518U (en) 2022-08-30 2022-08-30 Building curtain wall mounting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222286767.8U CN218346518U (en) 2022-08-30 2022-08-30 Building curtain wall mounting structure

Publications (1)

Publication Number Publication Date
CN218346518U true CN218346518U (en) 2023-01-20

Family

ID=84917159

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222286767.8U Active CN218346518U (en) 2022-08-30 2022-08-30 Building curtain wall mounting structure

Country Status (1)

Country Link
CN (1) CN218346518U (en)

Similar Documents

Publication Publication Date Title
CN217480405U (en) Assembled steel construction building
CN218346518U (en) Building curtain wall mounting structure
CN218438659U (en) Iron art railing assembled enclosure and lifting device thereof
CN214246247U (en) Stone curtain wall system without cross beam
CN212405556U (en) Prefabricated wall for prefabricated building
CN210561697U (en) Bridge is with shock attenuation formula support of convenient dismouting
CN212376098U (en) Spliced curtain wall for building
CN216641060U (en) Building curtain wall construction pendant
CN216617080U (en) Concrete pole of easily installing cable
CN220266942U (en) Curtain wall aluminum veneer splicing structure
CN221627359U (en) Install convenient curtain board
CN216109006U (en) Mounting structure of curtain
CN218814299U (en) Green energy-saving high-strength prefabricated balcony
CN213653858U (en) Assembled wallboard
CN213391146U (en) Anti-falling support mounting structure for elevator shaft steel structure frame
CN217298961U (en) Detachable supporting hanging plate for subway open cut station
CN218264480U (en) Aluminum veneer curtain wall
CN219509153U (en) Aluminum template for green construction
CN217924147U (en) Steel rib column mounting structure
CN215443196U (en) Building wall curtain wall installation location construction equipment
CN217782511U (en) Large-span steel construction cell cube connection structure
CN217325813U (en) Energy-saving building convenient to build dismouting temporarily
CN218714224U (en) Pseudo-classic architecture rafter truss structure
CN220645177U (en) Building post-pouring strip formwork support
CN216893087U (en) Clean panel frame that heat-proof quality is good

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant