CN218342072U CN202221905504.4U CN202221905504U CN218342072U CN 218342072 U CN218342072 U CN 218342072U CN 202221905504 U CN202221905504 U CN 202221905504U CN 218342072 U CN218342072 U CN 218342072U
Authority
CN
China
Prior art keywords
storage layer
box
power construction
box body
partition plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202221905504.4U
Other languages
Chinese (zh)
Inventor
吴迪
田婧
薛锦
谢兆晖
徐国栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hongtao Electric Power Construction Yunnan Group Co ltd
Original Assignee
Hongtao Electric Power Construction Yunnan Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hongtao Electric Power Construction Yunnan Group Co ltd filed Critical Hongtao Electric Power Construction Yunnan Group Co ltd
Priority to CN202221905504.4U priority Critical patent/CN218342072U/en
Application granted granted Critical
Publication of CN218342072U publication Critical patent/CN218342072U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Workshop Equipment, Work Benches, Supports, Or Storage Means (AREA)

Abstract

The utility model relates to the technical field of electric power construction equipment, in particular to an electric power construction integrated tool box, which comprises a box body and a box cover rotationally arranged on one side of the top of the box body, wherein a first storage layer and a second storage layer are arranged in the box body in a sliding way and are fixedly connected through a support rod; the first storage layer and the second storage layer are internally provided with a first partition plate, the first partition plate is used for partitioning the first storage layer and the second storage layer to form two groups of first cavities, the first cavity at one side is internally provided with a second partition plate, and the second partition plate is used for partitioning the first cavities to form two groups of second cavities; still include elevating system, through laying first baffle and second baffle in order to form first cavity and second cavity between first storing layer and second storing layer, the volume of first cavity is greater than the volume of second cavity, and then can put the instrument of different volume sizes, is convenient for deposit and the classification of instrument.

Description

Electric power construction integration toolbox
Technical Field
The utility model relates to an electric power construction equipment technical field especially relates to an electric power construction integration toolbox.
Background
The invention and application of electric power take electric energy as the energy of power, the invention and application of electric power have raised the second industrialization climax, the electric power construction is the electric power production and consumption system composed of links such as electricity generation, transmission of electricity, transformation, distribution and power consumption, etc., it converts the primary energy of the nature into electric power through the mechanical energy device, and then supply the electric power to each user through transmission of electricity, transformation and distribution, the electric power constructor will often use the tool box for electric power construction maintenance in the course of carrying on the electric power construction.
Most inner spaces of the existing tool boxes cannot be partitioned, tools are placed disorderly, the tools are not convenient to take, the space at the bottom of the box cover cannot be utilized, the waste of the inner spaces of the tool boxes is caused, and the storage quantity of the tools is reduced.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides an electric power construction integration toolbox.
The utility model provides an electric power construction integration toolbox, including the box and rotate the case lid of laying in one side of box top, slide in the box and lay first storing layer and second storing layer, first storing layer and second storing layer pass through branch fixed connection;
the first storage layer and the second storage layer are internally provided with a first partition plate, the first partition plate is used for partitioning the first storage layer and the second storage layer to form two groups of first cavities, the first cavity at one side is internally provided with a second partition plate, and the second partition plate is used for partitioning the first cavities to form two groups of second cavities;
still include elevating system, elevating system is connected with first storing layer for drive first storing layer and second storing layer move in vertical direction.
Preferably, the lifting mechanism comprises an adjusting box body arranged on one side of the box body, a screw rod is arranged in the adjusting box body in a rotating mode, a handle is fixedly installed at the end portion of the screw rod, a nut is sleeved on the screw rod in a threaded mode, and the nut is fixedly connected with the first storage layer.
Preferably, a third storage layer is further arranged in the box cover;
wherein, a sealing plate used for sealing the third storage layer is arranged between the box covers in a sliding way.
Preferably, one end of the sealing plate is provided with a positioning hole, the end part of the box cover is slidably provided with a positioning rod, the end part of the positioning rod is fixedly provided with a handle, and the outer side of the positioning rod is provided with a return spring.
Preferably, a handle is arranged on one side of the box cover.
Preferably, in the third storage layer, a first partition plate and a second partition plate are synchronously arranged, and the first partition plate and the second partition plate partition the third storage layer to form a first chamber and a second chamber.
Compared with the prior art, the utility model provides a pair of electric power construction integration toolbox has following beneficial effect:
the utility model discloses a set up first storing layer and second storing layer in the box, not only can realize putting the layering of instrument at the in-process that uses at intervals, and can the inside space of make full use of box, the object that can deposit and instrument are more, meanwhile, through laying first baffle and second baffle in order to form first cavity and second cavity between first storing layer and second storing layer, the volume of first cavity is greater than the volume of second cavity, and then can put the instrument of not unidimensional size, be convenient for depositing and categorised of instrument.
Drawings
Fig. 1 is a schematic structural diagram of a preferred embodiment of an integrated power construction tool box provided by the present invention;
FIG. 2 is a schematic structural diagram of an integrated power construction tool box shown in FIG. 1;
FIG. 3 is a schematic structural diagram of a screw rod in the integrated power construction toolbox shown in FIG. 1;
fig. 4 is an enlarged schematic structural view of a portion a in fig. 2 of the power construction integration tool box shown in fig. 1.
The reference numbers in the figures: 1. a box body; 2. a first reservoir layer; 3. a second reservoir layer; 4. a second chamber; 5. a sealing plate; 6. a box cover; 101. adjusting the box body; 102. a handle; 103. a screw; 104. a nut; 201. a strut; 401. a first separator; 402. a first chamber; 403. a second separator; 501. a handle; 502. positioning holes; 503. a return spring; 504. positioning a rod; 601. a handle; 602. a third reservoir layer.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
The following detailed description is provided for the specific embodiments of the present invention.
Referring to fig. 1 to 4, an embodiment of the utility model provides an electric power construction integrated tool box, which includes a box body 1 and a box cover 6 rotatably disposed on one side of the top of the box body 1, a first storage layer 2 and a second storage layer 3 are slidably disposed in the box body 1, and the first storage layer 2 and the second storage layer 3 are fixedly connected through a support rod 201;
wherein, a first clapboard 401 is arranged in the first storage layer 2 and the second storage layer 3, the first clapboard 401 is used for separating the first storage layer 2 and the second storage layer 3 to form two groups of first chambers 402, a second clapboard 403 is arranged in the first chamber 402 at one side, and the second clapboard 403 is used for separating the first chamber 402 to form two groups of second chambers 4;
the lifting mechanism is connected with the first storage layer 2 and used for driving the first storage layer 2 and the second storage layer 3 to move in the vertical direction;
specifically, in this embodiment, the utility model discloses a set up first storage layer 2 and second storage layer 3 in box 1, not only can realize putting the layering of instrument at the in-process of using at the interval, and can make full use of the inside space of box 1, the object that can deposit and instrument are more, meanwhile, through laying first baffle 401 and second baffle 403 in order to form first cavity 402 and second cavity 4 between first storage layer 2 and second storage layer 3, the volume of first cavity 402 is greater than the volume of second cavity 4, and then can put the instrument of different volume sizes, be convenient for depositing and categorizing of instrument.
As a further scheme of the embodiment of the present invention, the lifting mechanism includes an adjusting box 101 disposed on one side of the box 1, a screw 103 is disposed in the adjusting box 101, a handle 102 is fixedly mounted on an end of the screw 103, a nut 104 is disposed on the screw 103 in a threaded manner, and the nut 104 is fixedly connected to the first storage layer 2;
specifically, in this embodiment, by rotating the handle 102, the handle 102 drives the screw 103 to rotate, the nut 104 drives the first storage layer 2 and the second storage layer 3 to move in the process of moving on the screw 103, when a tool needs to be stored, the box cover 6 is opened to push the first storage layer 2 and the second storage layer 3 out of the box body 1, and after the tool is stored and taken out, the handle 102 is rotated reversely to drive the first storage layer 2 and the second storage layer 3 to retract into the box body 1.
As a further solution of the embodiment of the present invention, a third storage layer 602 is further disposed in the box cover 6;
a sealing plate 5 for sealing the third storage layer 602 is arranged between the box covers 6 in a sliding manner;
specifically, in this embodiment, the utility model discloses a set up third storage layer 602 in case lid 6, can fully utilize the space in the case lid 6, meanwhile, in order to avoid case lid 6 and box 1 instrument to fall out when closing the lid, through setting up closing plate 5 between case lid 6, after the instrument is placed and finishes, realize the sealing to third storage layer 602 through pulling closing plate 5.
As a further scheme of the embodiment of the present invention, one end of the sealing plate 5 is provided with a positioning hole 502, the end of the box cover 6 is slidably provided with a positioning rod 504, the end of the positioning rod 504 is fixedly provided with a handle 501, and the outer side of the positioning rod 504 is provided with a return spring 503;
specifically, in this embodiment, when the sealing plate 5 is mounted, in order to fix the sealing plate 5, first, the handle 501 is pulled in a direction away from the case lid 6, the handle 501 drives the positioning rod 504 to stretch, the return spring 503 stretches to generate elastic force, after the sealing plate 5 is fixed, the handle 501 is loosened, and the return spring 503 drives the positioning rod 504 to be inserted into the positioning hole 502 under the elastic force.
As a further scheme of the embodiment of the utility model, case lid 6 one side sets up handle 601 to in case lid 6 rotates in third storage layer 602, set up first baffle 401 and second baffle 403 in step, first baffle 401 and second baffle 403 separate third storage layer 602 and form first cavity 402 and second cavity 4.
The utility model provides a pair of electric power construction integration toolbox theory of operation as follows: the utility model discloses a set up first storage layer 2 and second storage layer 3 in box 1, the layering that not only can realize the instrument at the in-process of using is separated and is put, and can the inside space of make full use of box 1, the object that can deposit and instrument are more, through rotating handle 102, handle 102 drives screw rod 103 and rotates, the in-process that nut 104 removed on screw rod 103 drives first storage layer 2 and second storage layer 3 and removes, when needs deposit the instrument, open case lid 6, release first storage layer 2 and second storage layer 3 from box 1, the back is accomplished in the access, reverse rotation handle 102, drive first storage layer 2 and second storage layer 3 shrink to box 1 in, meanwhile, through laying first baffle 401 and second baffle 403 in order to form first cavity 402 and second cavity 4 between first storage layer 2 and second storage layer 3.
In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", etc. indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, only for convenience of description and simplification of description, but not for indicating or implying that the referred device or element must have a specific orientation and a specific orientation configuration and operation, and thus, should not be construed as limiting the present invention. Furthermore, "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and the like are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate member, or they may be connected through two or more elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Although an embodiment of the present invention has been described in detail, the description is only for the purpose of illustrating the preferred embodiments of the present invention and should not be taken as limiting the scope of the present invention. All the equivalent changes and improvements made according to the application scope of the present invention should still fall within the patent coverage of the present invention.

Claims (6)

1. The power construction integrated tool box comprises a box body (1) and a box cover (6) which is rotatably arranged on one side of the top of the box body (1), and is characterized in that a first storage layer (2) and a second storage layer (3) are arranged in the box body (1) in a sliding mode, and the first storage layer (2) and the second storage layer (3) are fixedly connected through a support rod (201);
the first storage layer (2) and the second storage layer (3) are internally provided with a first partition plate (401), the first partition plate (401) is used for separating the first storage layer (2) and the second storage layer (3) to form two groups of first chambers (402), the first chamber (402) at one side is internally provided with a second partition plate (403), and the second partition plate (403) is used for separating the first chambers (402) to form two groups of second chambers (4);
the device is characterized by further comprising a lifting mechanism, wherein the lifting mechanism is connected with the first storage layer (2) and used for driving the first storage layer (2) and the second storage layer (3) to move in the vertical direction.
2. The integrated power construction tool box according to claim 1, wherein the lifting mechanism comprises an adjusting box body (101) arranged on one side of the box body (1), a screw (103) is rotationally arranged in the adjusting box body (101), a handle (102) is fixedly arranged at the end part of the screw (103), a nut (104) is sleeved on the screw (103) in a threaded manner, and the nut (104) is fixedly connected with the first storage layer (2).
3. An integrated power construction kit according to claim 1, wherein a third storage layer (602) is further arranged in the box cover (6);
wherein a sealing plate (5) used for sealing the third storage layer (602) is arranged between the box covers (6) in a sliding way.
4. The integrated power construction tool box according to claim 3, wherein a positioning hole (502) is formed in one end of the sealing plate (5), a positioning rod (504) is arranged at the end of the box cover (6) in a sliding mode, a handle (501) is fixedly arranged at the end of the positioning rod (504), and a return spring (503) is arranged on the outer side of the positioning rod (504).
5. An integrated tool box for electric power construction according to any one of claims 1-4, characterized in that a handle (601) is arranged on one side of the box cover (6).
6. An integrated power construction kit according to claim 3, characterized in that a first partition (401) and a second partition (403) are synchronously arranged in the third storage layer (602), and the first partition (401) and the second partition (403) separate the third storage layer (602) into a first chamber (402) and a second chamber (4).
CN202221905504.4U 2022-07-22 2022-07-22 Electric power construction integration toolbox Active CN218342072U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202221905504.4U CN218342072U (en) 2022-07-22 2022-07-22 Electric power construction integration toolbox

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202221905504.4U CN218342072U (en) 2022-07-22 2022-07-22 Electric power construction integration toolbox

Publications (1)

Publication Number Publication Date
CN218342072U true CN218342072U (en) 2023-01-20

Family

ID=84911713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202221905504.4U Active CN218342072U (en) 2022-07-22 2022-07-22 Electric power construction integration toolbox

Country Status (1)

Country Link
CN (1) CN218342072U (en)

Similar Documents

Publication Publication Date Title
CN218342072U (en) Electric power construction integration toolbox
CN211306248U (en) Tool storage device for construction of power transmission and distribution power consumption engineering
CN213439599U (en) Electric automatization equipment fixing and toolbox for maintenance
CN112223234B (en) Case is received with portable instrument storage to intelligent installation engineering
CN207518114U (en) A kind of new-energy automobile high-tension distribution box
CN211882906U (en) Project cost filing cabinet
CN212066155U (en) Engineering cost data collection strorage device
CN212919305U (en) Engineering cost budgets toolbox
CN210213198U (en) Portable metering instrument and tool integrated box
CN213442150U (en) New energy automobile is with filling electric pile
CN214174465U (en) Detection box for power equipment maintenance
CN216991851U (en) Auxiliary material tool cabinet for vehicle
CN211103911U (en) Toolbox for electronic engineering
CN217703374U (en) Convenient storage's electrician's auxiliary tool case
CN205968964U (en) A tool slide for electromechanical device installation
CN206300980U (en) A kind of ammeter being easily installed
CN220699581U (en) Tool box with cooling function for high-temperature workshop
CN212706719U (en) Tool storage bag in transformer substation operation vehicle
CN220423332U (en) Multifunctional picnic box
CN218777962U (en) New energy battery storage device
CN216098869U (en) Toolbox is used in electrical installation
CN217434306U (en) Tool box
CN220162431U (en) Case is deposited to instrument for electrical engineering
CN214394128U (en) Part box with bottom parts convenient to take
CN218875417U (en) Intelligent electric power tool box capable of adjusting position of partition plate

Legal Events