CN218323904U - Building templates fixed knot constructs - Google Patents

Building templates fixed knot constructs Download PDF

Info

Publication number
CN218323904U
CN218323904U CN202121770879.XU CN202121770879U CN218323904U CN 218323904 U CN218323904 U CN 218323904U CN 202121770879 U CN202121770879 U CN 202121770879U CN 218323904 U CN218323904 U CN 218323904U
Authority
CN
China
Prior art keywords
sets
groups
building
building templates
belt pulleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202121770879.XU
Other languages
Chinese (zh)
Inventor
倪祖亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Tianqu Construction Technology Co ltd
Original Assignee
Shandong Tianqu Construction Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Tianqu Construction Technology Co ltd filed Critical Shandong Tianqu Construction Technology Co ltd
Priority to CN202121770879.XU priority Critical patent/CN218323904U/en
Application granted granted Critical
Publication of CN218323904U publication Critical patent/CN218323904U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Toys (AREA)

Abstract

The utility model relates to the technical field of building construction, in particular to a building template fixing structure, which is convenient for splicing and fixing two groups of first building templates and two groups of second building templates by arranging the device, has simpler operation and improves the practicability; including two sets of first building templates, two sets of second building templates, eight groups of swivel nuts, the first belt of multiunit, four second belt pulleys, two sets of second belt, two sets of first gear, two sets of second gear and two sets of pivots, the front end and the rear end of two sets of first building templates all are provided with first screw rod, two sets of second belt pulleys of front side and two sets of second belt pulleys of rear side rotate through two sets of second belt synchronization respectively, two sets of first gear are installed respectively in the two sets of swivel nuts outside of upper right side, two sets of second gear are through the rotatable upper right side of installing at front side second building templates front end and rear side second building templates rear end of two sets of pivots, two sets of second gear and two sets of first gear mesh mutually.

Description

Building templates fixed knot constructs
Technical Field
The utility model relates to a technical field of construction especially relates to a building templates fixed knot constructs.
Background
The building formwork is a temporary supporting structure, which is manufactured according to the design requirements, so that the concrete structure and the members are formed according to the specified positions and geometric dimensions, the correct positions of the concrete structure and the members are kept, and the self weight of the building formwork and the external load acting on the building formwork are borne. The purpose of the template engineering is to ensure the quality and the construction safety of the concrete engineering, accelerate the construction progress and reduce the engineering cost.
Generally, a building model is formed by splicing four groups of building templates, the four groups of building templates are connected through bolts, and the method is complex in operation and inconvenient to install and disassemble the building templates.
SUMMERY OF THE UTILITY MODEL
In order to solve the technical problem, the utility model provides a be convenient for splice fixedly to two sets of first building templates and two sets of second building templates, operate simplely, improve the building templates fixed knot of practicality.
The utility model discloses a building templates fixed knot constructs, including two sets of first building templates, two sets of second building templates, eight sets of swivel nuts, the first belt of multiunit, four sets of second pulleys, two sets of second belts, two sets of first gears, two sets of second gears and two sets of pivots, the front end and the rear end of two sets of first building templates all are provided with first screw rod, eight sets of swivel nuts are rotatable respectively and install the front side second building templates front end and the left front side of rear side second building templates rear end in two sets of second building templates, the right front side, left rear side and right rear side, eight sets of swivel nuts can be connected with eight sets of first screw rod spiro fittings on two sets of first building templates, every two sets of first belt pulleys of vertical symmetry rotate through the first belt of multiunit respectively in step, four sets of second belt pulleys are installed respectively in the upside four sets of second belt sets of second pulleys and rear side front side and rear side second belt pass through two sets of second belt pulley synchronous rotation respectively, two sets of first gear install the upside respectively in the right set of second front side and two sets of second front side rear side and two sets of second gear mesh mutually, two sets of second front side and right set of second templates.
The utility model discloses a building templates fixed knot constructs, still include four group's push pedals and four group's second screw rods, the inboard upper portion of two sets of first building templates and lower part all are provided with accomodates the groove, and four group's push pedals are located the four groups of two sets of first building templates respectively and accomodate the inslot, and four group's second screw rods are connected with two sets of first building templates spiral shell dress respectively, four group's second screw rods inner and four group's push pedal outer end rotatable coupling.
The utility model discloses a building templates fixed knot constructs still includes four group's handles, and four group's handles are installed respectively in four group's second screw rod outer ends.
The utility model discloses a building templates fixed knot constructs still includes the return bend, and the return bend is installed at the front end of front side second gear.
The utility model discloses a building templates fixed knot constructs still includes the telescopic link, but telescopic link slidable mounting is in the elbow.
The utility model discloses a building templates fixed knot constructs still includes the handle, and the handle is rotatable to be installed on the telescopic link.
The utility model discloses a building templates fixed knot constructs, be provided with the barre on the handle.
The utility model discloses a building templates fixed knot constructs, the return bend can be dismantled with front side second gear and be connected, and the return bend can be connected with rear side second gear.
Compared with the prior art, the beneficial effects of the utility model are that: eight sets of swivel nuts on two sets of second building templates respectively with eight sets of first screw rod positions on two sets of first building templates correspond, then rotate two sets of second gears, two sets of second gears then with two sets of first gear engagement, two sets of first gears then drive two sets of swivel nuts of upper right side and rotate, two sets of swivel nuts of upper right side then drive two sets of second belt pulleys on right side and two sets of first belt pulleys of upper right side and rotate, two sets of second belt pulleys on right side then drive two sets of second belt pulleys on left side through two sets of second belts, two sets of second belt pulleys on left side then drive two sets of first belt pulleys on upper left side and rotate, two sets of first belt pulleys on upper right side then drive two sets of first belt pulleys on right side and rotate, two sets of first belt pulleys on lower right side then drive two sets of first belt pulleys on right side and rotate, two sets of first belt pulleys on upper left side then drive two sets of first belt pulleys on left side and rotate, two sets of first belt pulleys on lower left side then drive two sets of first belt pulleys and rotate, eight sets of swivel nuts and first set up with first screw rod and second set up, thereby two sets of building templates are connected to the fixed construction template, thereby it is convenient to carry out two sets of construction and two sets of construction.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
FIG. 2 is a schematic left side sectional view of the structure of FIG. 1;
FIG. 3 is a schematic top view of the structure of FIG. 1;
in the drawings, the reference numbers: 1. a first building template; 2. a second building template; 3. a first screw; 4. a threaded sleeve; 5. a first pulley; 6. a first belt; 7. a second pulley; 8. a second belt; 9. a first gear; 10. a second gear; 11. a rotating shaft; 12. pushing a plate; 13. a second screw; 14. a handle; 15. bending a pipe; 16. a telescopic rod; 17. a handle.
Detailed Description
The following detailed description of the embodiments of the present invention is provided with reference to the accompanying drawings and examples. The following examples are intended to illustrate the invention, but are not intended to limit the scope of the invention.
As shown in fig. 1 to 3, the utility model discloses a building templates fixed knot constructs, including two sets of first building templates 1, two sets of second building templates 2, eight sets of swivel nuts 4, multiunit first belt 6, four sets of second belt pulleys 7, two sets of second belt 8, two sets of first gear 9, two sets of second gear 10 and two sets of pivot 11, the front end and the rear end of two sets of first building templates 1 all are provided with first screw rod 3, eight sets of swivel nuts 4 can be rotationally installed in two sets of second building templates 2 front side and the left front side of rear side second building templates 2 rear end respectively, right front side, left rear side and right rear side, eight sets of swivel nuts 4 can be connected with eight sets of first screw rod 3 threaded connection on two sets of first building templates 1, each set of swivel nut 4 outside all is provided with first belt pulley 5, every vertical symmetry first belt pulley 5 passes through multiunit first belt 6 synchronous rotation respectively, four sets of second belt pulleys 7 install respectively in the upside, the second belt pulley 7 outside and the second belt pulley 10 rotate respectively through two sets of second belt pulleys, two sets of second belt pulleys front side and right side front side and two sets of second belt pulleys 10, two sets of second belt pulleys are installed in front side and right side synchronous upper side of second building templates 2, two sets of second belt pulleys respectively; eight groups of turnbuckles 4 on two groups of second building templates 2 respectively correspond to eight groups of first screws 3 on two groups of first building templates 1, then rotate two groups of second gears 10, two groups of second gears 10 then mesh with two groups of first gears 9, two groups of first gears 9 then drive two groups of turnbuckles 4 of upper right side and rotate, two groups of turnbuckles 4 of upper right side then drive two groups of second pulleys 7 of right side and two groups of first belt pulleys 5 of upper right side rotate, two groups of second pulleys 7 of right side then drive two groups of second belt pulleys 7 of left side through two groups of second belts 8 and rotate, two groups of second belt pulleys 7 of left side then drive two groups of turnbuckles 4 of upper left side and rotate, two groups of first belt pulleys 5 of upper left side then drive two groups of first belt pulleys 5 of right side through two groups of first belt pulleys 6 of right side and rotate, two groups of first belt pulleys 5 of right side lower side of right side then drive two groups of first belt pulleys 4 of right side and rotate, two groups of first belt pulleys 5 of first belt pulleys of lower side then drive two groups of first belt pulleys 5 of left side and rotate, two groups of first belt pulleys 5 of left side and two groups of first belt pulleys 5 of lower side and connect two groups of first building templates 2, thereby two groups of construction templates 2 are convenient for the construction, two groups of construction templates 2 are connected with two groups of construction templates 2, two groups of construction templates are connected through two groups of construction templates, two groups of construction templates 2, two groups of construction templates are convenient for construction.
The utility model discloses a building templates fixed knot constructs, still include four groups of push pedals 12 and four groups of second screw rods 13, two groups of first building templates 1 inboard upper portion and lower part all are provided with the groove of accomodating, four groups of push pedals 12 are located two groups of first building templates 1 respectively and accomodate the inslot, four groups of second screw rods 13 are connected with two groups of first building templates 1 spiro union respectively, four groups of second screw rods 13 inner and four groups of push pedals 12 outer end rotatable coupling; when two groups of first building templates 1 and two groups of second building templates 2 need to be disassembled, two groups of second gears 10 are reversely rotated, the two groups of second gears 10 are meshed with the two groups of first gears 9, the two groups of first gears 9 drive the two groups of screw sleeves 4 at the upper right side to rotate, the two groups of screw sleeves 4 at the upper right side drive the two groups of second belt wheels 7 at the right side and the two groups of first belt wheels 5 at the upper right side to rotate, the two groups of second belt wheels 7 at the right side drive the two groups of second belt wheels 7 at the left side to rotate through the two groups of second belts 8, the two groups of second belt wheels 7 at the left side drive the two groups of screw sleeves 4 at the upper left side to rotate, the two groups of first belt wheels 5 at the upper left side to rotate, and the two groups of first belt wheels 5 at the upper right side drive the two groups of first belt wheels 5 at the lower right side to rotate through the two groups of first belts 6 at the right side, the two sets of first belt pulleys 5 on the lower right side drive the two sets of screw sleeves 4 on the lower right side to rotate, the two sets of first belt pulleys 5 on the upper left side drive the two sets of first belt pulleys 5 on the lower left side to rotate through the two sets of first belts 6 on the left side, the two sets of first belt pulleys 5 on the lower left side drive the two sets of screw sleeves 4 on the lower left side to rotate, the eight sets of screw sleeves 4 on the upper left side rotate and are connected with the eight sets of first screws 3 in a screwed mode, so that the eight sets of screw sleeves 4 and the eight sets of first screws 3 are separated, the two sets of second building templates 2 are disassembled, then the four sets of second screws 13 are assembled with the two sets of first building templates 1 in a screwed mode by rotating the four sets of second screws 13, the two sets of second screws 13 drive the two sets of push plates 12 to move, the two sets of push plates 12 are contacted with the formed concrete, so that the two sets of first building templates 1 are pushed to be separated from the concrete, and the two sets of first building templates 1 are convenient to disassemble.
The utility model discloses a building template fixing structure, which also comprises four groups of handles 14, wherein the four groups of handles 14 are respectively arranged at the outer ends of the four groups of second screw rods 13; the handle 14 is provided to facilitate the rotation of the second screw 13.
The utility model discloses a building template fixing structure, which also comprises a bent pipe 15, wherein the bent pipe 15 is arranged at the front end of the front second gear 10; the second gear 10 is rotated conveniently by the elbow 15.
The utility model discloses a building template fixing structure, which also comprises a telescopic rod 16, wherein the telescopic rod 16 can be slidably arranged in a bent pipe 15; by arranging the telescopic rod 16, the length of the elbow 15 can be conveniently adjusted, and the elbow 15 can be conveniently rotated.
The utility model discloses a building template fixing structure, which also comprises a handle 17, wherein the handle 17 is rotatably arranged on a telescopic rod 16; by providing the handle 17, it is convenient to rotate the telescopic rod 16 and the elbow 15.
In the fixing structure of the building template of the utility model, the handle 17 is provided with a handle sleeve; the friction of the handle 17 can be increased to facilitate the operation of the handle 17.
In the fixing structure of the building template of the utility model, the elbow 15 is detachably connected with the front second gear 10, and the elbow 15 is connected with the rear second gear 10; two groups of second gears 10 can rotate to share one group of bent pipes 15, universality is improved, and cost is saved.
The utility model relates to a building template fixed knot constructs, when it works, first, eight sets of swivel nuts 4 on two sets of second building templates 2 respectively correspond to eight sets of first screw rods 3 on two sets of first building templates 1, then rotate two sets of second gear 10, two sets of second gear 10 mesh with two sets of first gear 9, two sets of first gear 9 drive the upper right two sets of swivel nuts 4 to rotate, the upper right two sets of swivel nuts 4 drive the right two sets of second belt pulley 7 and the upper right two sets of first belt pulley 5 to rotate, the right two sets of second belt pulley 7 drive the left two sets of second belt pulley 7 to rotate through two sets of second belt 8, the left two sets of second belt pulley 7 drive the upper left two sets of swivel nuts 4 to rotate, the upper left two sets of swivel nuts 4 drive the upper left two sets of first belt pulley 5 to rotate, the upper right two sets of first belt pulley 5 to rotate through the right two sets of first belt 6 to drive the right two sets of lower right first belt pulley 5 to rotate, the lower right two sets of first belt pulley 5 to rotate with the left two sets of second belt pulley 4, when the lower left two sets of first pulley 5 to rotate, the building templates 2, thereby the building templates 2 are connected with the second building templates 2, when the building templates 2 to rotate, the building templates via two sets of second belt pulley 5, thereby the construction templates 2, two groups of first gears 9 drive two groups of screw sleeves 4 at the upper right side to rotate, two groups of screw sleeves 4 at the upper right side drive two groups of second belt wheels 7 at the right side and two groups of first belt wheels 5 at the upper right side to rotate, two groups of second belt wheels 7 at the right side drive two groups of second belt wheels 7 at the left side to rotate through two groups of second belts 8, two groups of second belt wheels 7 at the left side drive two groups of screw sleeves 4 at the upper left side to rotate, two groups of screw sleeves 4 at the upper left side drive two groups of first belt wheels 5 at the upper left side to rotate, two groups of first belt wheels 5 at the upper right side drive two groups of first belt wheels 5 at the lower right side to rotate through two groups of first belts 6 at the right side, two groups of first belt wheels 5 at the lower right side drive two groups of screw sleeves 4 at the lower right side to rotate, and the two sets of first belt pulleys 5 on the upper left side rotate and then drive the two sets of first belt pulleys 5 on the lower left side through the two sets of first belts 6 on the left side to rotate, the two sets of first belt pulleys 5 on the lower left side drive the two sets of screw sleeves 4 on the lower left side to rotate, eight sets of screw sleeves 4 rotate and then are connected with the 3 spiral shell installations of eight sets of first screws, thereby make eight sets of screw sleeves 4 and eight sets of first screws 3 separate, two sets of second building templates 2 are then dismantled, later through rotating four sets of second screws 13, four sets of second screws 13 are then installed with the 1 spiral shell of two sets of first building templates, two sets of second screws 13 then drive two sets of push pedal 12 motions, two sets of push pedal 12 then contact with the concrete after the shaping, thereby promote two sets of first building templates 1 break away from on the concrete can.
The utility model discloses a building templates fixed knot constructs, its mounting means, connected mode or mode of setting are common mechanical type, as long as can reach all can implement of its beneficial effect.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and variations can be made without departing from the technical principle of the present invention, and these modifications and variations should also be regarded as the protection scope of the present invention.

Claims (8)

1. A building template fixing structure is characterized by comprising two groups of first building templates (1), two groups of second building templates (2), eight groups of screw sleeves (4), a plurality of groups of first belts (6), four groups of second belt pulleys (7), two groups of second belts (8), two groups of first gears (9), two groups of second gears (10) and two groups of rotating shafts (11), wherein the front ends and the rear ends of the two groups of first building templates (1) are respectively provided with a first screw (3), the eight groups of screw sleeves (4) are respectively rotatably arranged at the left front side, the right front side, the left rear side and the right rear side of the front side second building template (2) and the rear end of the rear side second building template (2) in the two groups of second building templates (2), the eight groups of screw sleeves (4) can be respectively and rotatably connected with the eight groups of first screw (3) on the two groups of first building templates (1) through the screw sleeves (7), the first belt pulleys (5) are respectively arranged at the outer sides of the two groups of the first building templates (4), the two groups of the screw sleeves (4) are respectively and are synchronously arranged at the upper sides of the two groups of the front sides and the two groups of second belt pulleys (7) through the two groups of second belt pulleys (7) at the outer sides of the two groups of second belt pulleys (7), two groups of second gears (10) are rotatably arranged at the front end of the front second building template (2) and the right upper side of the rear end of the rear second building template (2) through two groups of rotating shafts (11), and the two groups of second gears (10) are meshed with the two groups of first gears (9).
2. The building template fixing structure as claimed in claim 1, further comprising four sets of push plates (12) and four sets of second screws (13), wherein the upper and lower parts of the inner sides of the two sets of first building templates (1) are provided with receiving grooves, the four sets of push plates (12) are respectively positioned in the four sets of receiving grooves of the two sets of first building templates (1), the four sets of second screws (13) are respectively connected with the two sets of first building templates (1) in a screw-mounting manner, and the inner ends of the four sets of second screws (13) are rotatably connected with the outer ends of the four sets of push plates (12).
3. A construction form fixing structure as claimed in claim 2, further comprising four sets of handles (14), the four sets of handles (14) being respectively mounted to outer ends of the four sets of second screws (13).
4. A construction form fixing structure according to claim 3, further comprising a bent pipe (15), wherein the bent pipe (15) is installed at a front end of the front side second gear (10).
5. A building template fixing structure according to claim 4, further comprising an expansion link (16), wherein the expansion link (16) is slidably mounted in the bent pipe (15).
6. A building formwork attachment structure as claimed in claim 5, further comprising a handle (17), the handle (17) being rotatably mounted on the telescopic bar (16).
7. A construction stencil fixing structure according to claim 6, wherein the handle (17) is provided with a grip.
8. The building formwork securing structure as claimed in claim 7, wherein the bent pipe (15) is detachably connected to the front side second gear (10), and the bent pipe (15) is connectable to the rear side second gear (10).
CN202121770879.XU 2021-08-02 2021-08-02 Building templates fixed knot constructs Active CN218323904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202121770879.XU CN218323904U (en) 2021-08-02 2021-08-02 Building templates fixed knot constructs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202121770879.XU CN218323904U (en) 2021-08-02 2021-08-02 Building templates fixed knot constructs

Publications (1)

Publication Number Publication Date
CN218323904U true CN218323904U (en) 2023-01-17

Family

ID=84832075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202121770879.XU Active CN218323904U (en) 2021-08-02 2021-08-02 Building templates fixed knot constructs

Country Status (1)

Country Link
CN (1) CN218323904U (en)

Similar Documents

Publication Publication Date Title
CN108163700B (en) Clamping device is used in a kind of tubing lifting in construction place
CN218323904U (en) Building templates fixed knot constructs
CN209977448U (en) Fixing device for water conservancy and hydropower buried pipe
CN209552058U (en) Casting machine is used in building block production
CN108240112B (en) Circular arch door steel combined die carrier
CN211221186U (en) Production system of concrete member
CN116267071A (en) Swing arm type agricultural machine transmission shaft device
CN215279225U (en) Hot extrusion forming device for three-way pipe
CN216065229U (en) Pipe extruding machine
CN113617968B (en) Anti-floating anchor rod bending device and construction method thereof
CN108193875B (en) Circular arch door construction formwork supporting method
CN113828698A (en) Pipe extruding machine
CN202524030U (en) Clamping hoop for communication pipeline
CN220301841U (en) Building construction frame reinforcing apparatus
CN216632153U (en) Pipe bending machine applicable to different sizes
CN215980521U (en) Telescopic coupler
CN217170257U (en) PVC pipe production is with beating mark device
CN218294801U (en) Steel pipe connecting device
CN220133598U (en) Aluminum template construction support reinforced structure
CN220956498U (en) Length-adjustable coupler
CN219159711U (en) Pipeline butt joint mechanism
CN219649661U (en) Pipeline bracket for pipeline connection
CN216768567U (en) Pipeline connecting device for hydraulic engineering
CN215545340U (en) Anti-bending auxiliary supporting device for cutting long-size steel pipe
CN217474512U (en) Large-scale steel sheet is stop device for bending

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant