CN218323422U - Novel keel for building - Google Patents
Novel keel for building Download PDFInfo
- Publication number
- CN218323422U CN218323422U CN202222321073.3U CN202222321073U CN218323422U CN 218323422 U CN218323422 U CN 218323422U CN 202222321073 U CN202222321073 U CN 202222321073U CN 218323422 U CN218323422 U CN 218323422U
- Authority
- CN
- China
- Prior art keywords
- fossil fragments
- keel
- novel
- threaded hole
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000012634 fragment Substances 0.000 claims abstract description 48
- 229920000742 Cotton Polymers 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 4
- 239000010959 steel Substances 0.000 claims description 4
- 238000009958 sewing Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 3
- 238000003780 insertion Methods 0.000 description 3
- 230000037431 insertion Effects 0.000 description 3
- 239000002023 wood Substances 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000001125 extrusion Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model relates to a building keel technical field just discloses a novel fossil fragments of building, including first fossil fragments, first screw hole has been seted up on the surface of first fossil fragments, the second screw hole has been seted up to the upper surface of first fossil fragments, the jack has been seted up on the surface of first fossil fragments, the surface of jack is pegged graft and is had second fossil fragments, the third screw hole has been seted up to the upper surface of second fossil fragments. This construct novel fossil fragments, through first fossil fragments, the jack, the second fossil fragments, first bolt, the spout, the cooperation setting of fixed plate and second bolt, during the use, the staff passes through the jack with the second fossil fragments and pegs graft in first fossil fragments, and then the staff pegs graft the fixed plate in the spout, rotate the second bolt, be in the same place fixed plate and first fossil fragments are fixed, and the staff rotates first bolt again, thereby can be in the same place first fossil fragments and second fossil fragments are fixed, and be convenient for the staff dismantles and installs, and easy operation, the staff of being convenient for uses.
Description
Technical Field
The utility model relates to a building keel technical field specifically is a novel fossil fragments of building.
Background
The building structure design is mainly divided into three stages, namely a structure scheme stage, a structure calculation stage and a construction drawing design stage. The structural scheme comprises the steps of determining the structural form of a building according to the importance of the building, an engineering geological survey report, the seismic fortification intensity of the place where the building is located, the height of the building, the number of floors and the type of the building place, and arranging stress members and a bearing system of the structure according to the requirements and characteristics of different structural forms after the structural form is determined.
The novel building steel-wood keel is disclosed in the Chinese patent CN214885080U, though, the novel building steel-wood keel, through setting up the gear, with the help of the rotation effect of the first rotating shaft in the first bearing, can drive the gear to rotate, thereby can be with the help of the friction force between the gear surface and the top of the fixing rod, can realize the purpose of taking out the fixing rod from the mounting sleeve, through setting up the second rotating shaft and the second bearing, when a user screws up the first threaded column, can drive the second rotating shaft and the second bearing to rotate and can move back and forth, and then with the help of the rotation effect of the second rotating shaft in the second bearing, can drive the extrusion plate to move back and forth, thereby can realize the purpose of installing the support frame outside the mounting sleeve.
However, current building keel structure is simpler, and the installation is wasted time and energy, also causes the damage to outer steel very easily, and stability nature is also relatively poor, brings very big inconvenience for the user, consequently, the utility model provides a novel fossil fragments of building.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a novel fossil fragments of building has solved and has proposed current building keel structure simpler among the above-mentioned background art, and the installation wastes time and energy, also causes the damage to outer steel very easily, and stability nature is also relatively poor, brings very big inconvenient problem for the user of service.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a novel keel for building, includes first fossil fragments, first screw hole has been seted up on the surface of first fossil fragments, the second screw hole has been seted up to the upper surface of first fossil fragments, the jack has been seted up on the surface of first fossil fragments, it has second fossil fragments to peg graft on the surface of jack, the third screw hole has been seted up on the upper surface of second fossil fragments, the surperficial threaded connection of second screw hole and third screw hole has first bolt, the spout has been seted up to the both sides of second fossil fragments, the surface of spout is pegged graft and is had the fixed plate, the fourth screw hole has been seted up on the surface of fixed plate, the surperficial threaded connection of first screw hole and fourth screw hole has the second bolt.
Optionally, the surface of the first keel is lapped with a first supporting plate and a second supporting plate, and the bottoms of the first supporting plate and the second supporting plate are fixedly connected with a first supporting rod and a second supporting rod.
Optionally, the bottom of the first support rod and the bottom of the second support rod are fixedly connected with a bottom plate.
Optionally, the surface of the first supporting rod is fixedly connected with an elastic belt, and the surface of the elastic belt is respectively connected with a hook surface magic tape and a cotton wool magic tape in a sewing manner.
Optionally, a round hole is formed in the surface of the second supporting rod, and a first fixing rod is inserted into the surface of the round hole.
Optionally, the two sides of the bottom plate are fixedly connected with second fixing rods, and the bottoms of the second fixing rods are fixedly connected with the upper surface of the bottom plate.
(III) advantageous effects
The utility model provides a novel fossil fragments of building possesses following beneficial effect:
this construct novel fossil fragments, through first fossil fragments, the jack, the second fossil fragments, first bolt, the spout, the cooperation setting of fixed plate and second bolt, during the use, the staff passes through the jack with the second fossil fragments and pegs graft in first fossil fragments, and then the staff pegs graft the fixed plate in the spout, rotate the second bolt, fix fixed plate and first fossil fragments together, and the staff rotates first bolt again, thereby can be in the same place first fossil fragments and second fossil fragments are fixed, and be convenient for the staff dismantles and installs, the operation is thus simple, the staff of being convenient for uses.
Drawings
FIG. 1 is a structural exploded view of the present invention;
FIG. 2 is a perspective view of the present invention;
fig. 3 is a perspective view of the first keel and the second keel of the structure of the utility model;
fig. 4 is a perspective view of the structure supporting mechanism of the present invention.
In the figure: 1. a first keel; 2. a first threaded hole; 3. a second threaded hole; 4. a jack; 5. a second keel; 6. a third threaded hole; 7. a first bolt; 8. a chute; 9. a fixing plate; 10. a second bolt; 11. a first support plate; 12. a first support bar; 13. a base plate; 14. an elastic band; 15. a circular hole.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a novel keel for a building comprises a first keel 1, wherein a first threaded hole 2 is formed in the surface of the first keel 1, a second threaded hole 3 is formed in the upper surface of the first keel 1, a jack 4 is formed in the surface of the first keel 1, a second keel 5 is inserted into the surface of the jack 4, a third threaded hole 6 is formed in the upper surface of the second keel 5, a first bolt 7 is connected to the surfaces of the second threaded hole 3 and the third threaded hole 6 in a threaded manner, sliding grooves 8 are formed in two sides of the second keel 5, a fixing plate 9 is inserted into the surface of each sliding groove 8, a fourth threaded hole is formed in the surface of the fixing plate 9, and a second bolt 10 is connected to the surfaces of the first threaded hole 2 and the fourth threaded hole in a threaded manner;
in order to fix the first keel 1 and the second keel 5 together and facilitate the detachment and installation of workers, the novel keel for the building is simple to operate and convenient for the workers to use, the second keel 5 is inserted into the first keel 1 through the insertion hole 4 by the workers through the matching arrangement of the first keel 1, the insertion hole 4, the second keel 5, the first bolt 7, the sliding groove 8, the fixing plate 9 and the second bolt 10, when in use, the second keel 5 is inserted into the first keel 1 through the insertion hole 4 by the workers, the fixing plate 9 is inserted into the sliding groove 8 by the workers, the second bolt 10 is rotated to fix the fixing plate 9 and the first keel 1 together, and the first bolt 7 is rotated by the workers;
The utility model discloses in, the device's working procedure as follows:
first fossil fragments 1, jack 4, second fossil fragments 5, first bolt 7, spout 8, the collocation use of fixed plate 9 and second bolt 10, in using, the staff pegs graft second fossil fragments 5 in first fossil fragments 1 through jack 4, and then the staff pegs graft fixed plate 9 in spout 8, rotate second bolt 10, be fixed together fixed plate 9 and first fossil fragments 1, and the staff rotates first bolt 7 again, thereby can be fixed first fossil fragments 1 and second fossil fragments 5 together, and be convenient for the staff dismantlement and the installation, and easy operation, the staff of being convenient for uses, can solve current building fossil fragments structure that mentioning in the background art effectively through the setting of above-mentioned structure simpler, the installation is wasted time and energy, also cause the damage to outer steel very easily, and stability is also relatively poor, bring very big inconvenient problem for the user.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a novel fossil fragments of building, includes first fossil fragments (1), its characterized in that: the novel steel plate fixing device is characterized in that a first threaded hole (2) is formed in the surface of the first keel (1), a second threaded hole (3) is formed in the upper surface of the first keel (1), a jack (4) is formed in the surface of the first keel (1), a second keel (5) is inserted into the surface of the jack (4), a third threaded hole (6) is formed in the upper surface of the second keel (5), first bolts (7) are connected to the surface threads of the second threaded hole (3) and the third threaded hole (6), sliding grooves (8) are formed in the two sides of the second keel (5), a fixing plate (9) is inserted into the surface of the sliding grooves (8), a fourth threaded hole is formed in the surface of the fixing plate (9), and second bolts (10) are connected to the surface threads of the first threaded hole (2) and the fourth threaded hole.
2. The novel keel for building of claim 1, wherein: the surface overlap joint of first fossil fragments (1) has first backup pad (11) and second backup pad, the bottom fixedly connected with first bracing piece (12) and the second bracing piece of first backup pad (11) and second backup pad.
3. The novel keel for buildings as claimed in claim 2, wherein: the bottoms of the first supporting rod (12) and the second supporting rod are fixedly connected with a bottom plate (13).
4. The novel keel for buildings as claimed in claim 2, wherein: the surface of the first supporting rod (12) is fixedly connected with an elastic belt (14), and the surface of the elastic belt (14) is respectively connected with a hook surface magic tape and a cotton wool magic tape in a sewing mode.
5. The novel keel for buildings as claimed in claim 2, wherein: a round hole (15) is formed in the surface of the second supporting rod, and a first fixing rod is inserted into the surface of the round hole (15).
6. The novel keel of claim 3, wherein: and the two sides of the bottom plate (13) are fixedly connected with second fixing rods, and the bottoms of the second fixing rods are fixedly connected with the upper surface of the bottom plate (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222321073.3U CN218323422U (en) | 2022-09-01 | 2022-09-01 | Novel keel for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222321073.3U CN218323422U (en) | 2022-09-01 | 2022-09-01 | Novel keel for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218323422U true CN218323422U (en) | 2023-01-17 |
Family
ID=84832876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222321073.3U Expired - Fee Related CN218323422U (en) | 2022-09-01 | 2022-09-01 | Novel keel for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218323422U (en) |
-
2022
- 2022-09-01 CN CN202222321073.3U patent/CN218323422U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN115450441B (en) | Energy-conserving wallboard installation auxiliary structure of green building | |
CN218323422U (en) | Novel keel for building | |
CN213330113U (en) | Interim strutting arrangement of wallboard is pulled out with carrying to indoor | |
CN211669930U (en) | System exhibition device for software development | |
CN212718992U (en) | Support base for engineering surveying and mapping | |
CN214444248U (en) | Simple and easy device of steel reinforcement cage welding | |
CN214220001U (en) | Connection structure of assembled building wallboard and floor | |
CN215669548U (en) | Corner supporting mechanism for deep foundation pit | |
CN211143833U (en) | Diagonal bracing structure for assembly type building | |
CN217420016U (en) | Column base node of archaizing column | |
CN218668114U (en) | Environment-friendly steel structure net body | |
CN213897747U (en) | Suspended ceiling connecting structure based on BIM | |
CN212799341U (en) | Tower crane arrangement display device based on BIM | |
CN216348933U (en) | Engineering detects supports connection structure with water level detection | |
CN221799171U (en) | Building engineering template fixing device | |
CN113653316B (en) | Temporary supporting clamp for mounting of assembled laminated slab | |
CN221487288U (en) | Cable strutting arrangement for power engineering | |
CN221590555U (en) | Prefabricated post temporary fixing device of prefabricated post is built in room | |
CN214576071U (en) | Detachable swimming pool | |
CN219548486U (en) | Convenient-to-disassemble assembled building support frame | |
CN214090813U (en) | Ceramic tile soak device for building engineering | |
CN218478508U (en) | Electric power state overhauls monitoring devices | |
CN221557508U (en) | Game paddle with line concentration function | |
CN217925023U (en) | High-rise building construction safety protection net | |
CN215173469U (en) | Anti-collision computer support for computer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20230117 |
|
CF01 | Termination of patent right due to non-payment of annual fee |