CN218323422U - Novel keel for building - Google Patents

Novel keel for building Download PDF

Info

Publication number
CN218323422U
CN218323422U CN202222321073.3U CN202222321073U CN218323422U CN 218323422 U CN218323422 U CN 218323422U CN 202222321073 U CN202222321073 U CN 202222321073U CN 218323422 U CN218323422 U CN 218323422U
Authority
CN
China
Prior art keywords
fossil fragments
keel
novel
threaded hole
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202222321073.3U
Other languages
Chinese (zh)
Inventor
仇早生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222321073.3U priority Critical patent/CN218323422U/en
Application granted granted Critical
Publication of CN218323422U publication Critical patent/CN218323422U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a building keel technical field just discloses a novel fossil fragments of building, including first fossil fragments, first screw hole has been seted up on the surface of first fossil fragments, the second screw hole has been seted up to the upper surface of first fossil fragments, the jack has been seted up on the surface of first fossil fragments, the surface of jack is pegged graft and is had second fossil fragments, the third screw hole has been seted up to the upper surface of second fossil fragments. This construct novel fossil fragments, through first fossil fragments, the jack, the second fossil fragments, first bolt, the spout, the cooperation setting of fixed plate and second bolt, during the use, the staff passes through the jack with the second fossil fragments and pegs graft in first fossil fragments, and then the staff pegs graft the fixed plate in the spout, rotate the second bolt, be in the same place fixed plate and first fossil fragments are fixed, and the staff rotates first bolt again, thereby can be in the same place first fossil fragments and second fossil fragments are fixed, and be convenient for the staff dismantles and installs, and easy operation, the staff of being convenient for uses.

Description

Novel keel for building
Technical Field
The utility model relates to a building keel technical field specifically is a novel fossil fragments of building.
Background
The building structure design is mainly divided into three stages, namely a structure scheme stage, a structure calculation stage and a construction drawing design stage. The structural scheme comprises the steps of determining the structural form of a building according to the importance of the building, an engineering geological survey report, the seismic fortification intensity of the place where the building is located, the height of the building, the number of floors and the type of the building place, and arranging stress members and a bearing system of the structure according to the requirements and characteristics of different structural forms after the structural form is determined.
The novel building steel-wood keel is disclosed in the Chinese patent CN214885080U, though, the novel building steel-wood keel, through setting up the gear, with the help of the rotation effect of the first rotating shaft in the first bearing, can drive the gear to rotate, thereby can be with the help of the friction force between the gear surface and the top of the fixing rod, can realize the purpose of taking out the fixing rod from the mounting sleeve, through setting up the second rotating shaft and the second bearing, when a user screws up the first threaded column, can drive the second rotating shaft and the second bearing to rotate and can move back and forth, and then with the help of the rotation effect of the second rotating shaft in the second bearing, can drive the extrusion plate to move back and forth, thereby can realize the purpose of installing the support frame outside the mounting sleeve.
However, current building keel structure is simpler, and the installation is wasted time and energy, also causes the damage to outer steel very easily, and stability nature is also relatively poor, brings very big inconvenience for the user, consequently, the utility model provides a novel fossil fragments of building.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a novel fossil fragments of building has solved and has proposed current building keel structure simpler among the above-mentioned background art, and the installation wastes time and energy, also causes the damage to outer steel very easily, and stability nature is also relatively poor, brings very big inconvenient problem for the user of service.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a novel keel for building, includes first fossil fragments, first screw hole has been seted up on the surface of first fossil fragments, the second screw hole has been seted up to the upper surface of first fossil fragments, the jack has been seted up on the surface of first fossil fragments, it has second fossil fragments to peg graft on the surface of jack, the third screw hole has been seted up on the upper surface of second fossil fragments, the surperficial threaded connection of second screw hole and third screw hole has first bolt, the spout has been seted up to the both sides of second fossil fragments, the surface of spout is pegged graft and is had the fixed plate, the fourth screw hole has been seted up on the surface of fixed plate, the surperficial threaded connection of first screw hole and fourth screw hole has the second bolt.
Optionally, the surface of the first keel is lapped with a first supporting plate and a second supporting plate, and the bottoms of the first supporting plate and the second supporting plate are fixedly connected with a first supporting rod and a second supporting rod.
Optionally, the bottom of the first support rod and the bottom of the second support rod are fixedly connected with a bottom plate.
Optionally, the surface of the first supporting rod is fixedly connected with an elastic belt, and the surface of the elastic belt is respectively connected with a hook surface magic tape and a cotton wool magic tape in a sewing manner.
Optionally, a round hole is formed in the surface of the second supporting rod, and a first fixing rod is inserted into the surface of the round hole.
Optionally, the two sides of the bottom plate are fixedly connected with second fixing rods, and the bottoms of the second fixing rods are fixedly connected with the upper surface of the bottom plate.
(III) advantageous effects
The utility model provides a novel fossil fragments of building possesses following beneficial effect:
this construct novel fossil fragments, through first fossil fragments, the jack, the second fossil fragments, first bolt, the spout, the cooperation setting of fixed plate and second bolt, during the use, the staff passes through the jack with the second fossil fragments and pegs graft in first fossil fragments, and then the staff pegs graft the fixed plate in the spout, rotate the second bolt, fix fixed plate and first fossil fragments together, and the staff rotates first bolt again, thereby can be in the same place first fossil fragments and second fossil fragments are fixed, and be convenient for the staff dismantles and installs, the operation is thus simple, the staff of being convenient for uses.
Drawings
FIG. 1 is a structural exploded view of the present invention;
FIG. 2 is a perspective view of the present invention;
fig. 3 is a perspective view of the first keel and the second keel of the structure of the utility model;
fig. 4 is a perspective view of the structure supporting mechanism of the present invention.
In the figure: 1. a first keel; 2. a first threaded hole; 3. a second threaded hole; 4. a jack; 5. a second keel; 6. a third threaded hole; 7. a first bolt; 8. a chute; 9. a fixing plate; 10. a second bolt; 11. a first support plate; 12. a first support bar; 13. a base plate; 14. an elastic band; 15. a circular hole.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a novel keel for a building comprises a first keel 1, wherein a first threaded hole 2 is formed in the surface of the first keel 1, a second threaded hole 3 is formed in the upper surface of the first keel 1, a jack 4 is formed in the surface of the first keel 1, a second keel 5 is inserted into the surface of the jack 4, a third threaded hole 6 is formed in the upper surface of the second keel 5, a first bolt 7 is connected to the surfaces of the second threaded hole 3 and the third threaded hole 6 in a threaded manner, sliding grooves 8 are formed in two sides of the second keel 5, a fixing plate 9 is inserted into the surface of each sliding groove 8, a fourth threaded hole is formed in the surface of the fixing plate 9, and a second bolt 10 is connected to the surfaces of the first threaded hole 2 and the fourth threaded hole in a threaded manner;
in order to fix the first keel 1 and the second keel 5 together and facilitate the detachment and installation of workers, the novel keel for the building is simple to operate and convenient for the workers to use, the second keel 5 is inserted into the first keel 1 through the insertion hole 4 by the workers through the matching arrangement of the first keel 1, the insertion hole 4, the second keel 5, the first bolt 7, the sliding groove 8, the fixing plate 9 and the second bolt 10, when in use, the second keel 5 is inserted into the first keel 1 through the insertion hole 4 by the workers, the fixing plate 9 is inserted into the sliding groove 8 by the workers, the second bolt 10 is rotated to fix the fixing plate 9 and the first keel 1 together, and the first bolt 7 is rotated by the workers;
first backup pad 11 and second backup pad have been lapped to the surface of first fossil fragments 1, the bottom fixedly connected with first backup pad 12 and the second backup pad of first backup pad 11 and second backup pad, the bottom fixedly connected with bottom plate 13 of first backup pad 12 and second backup pad, through setting up first backup pad 11 and second backup pad, thereby can fix the fossil fragments when the staff installs the fossil fragments, be convenient for the staff to operate, the fixed surface of first backup pad 12 is connected with elastic webbing 14, elastic webbing 14's surface is sewed up respectively and is connected with hook-and-loop magic subsides and cotton wool magic subsides, through setting up elastic webbing 14, hook-and-loop magic subsides and cotton wool magic subsides, thereby can accomodate the bracing piece, round hole 15 has been seted up on the surface of second bracing piece, round hole 15's surface is pegged graft and is had first dead lever, through setting up round hole 15 and first dead lever, thereby can fix first backup pad 12 and second backup pad, the both sides fixedly connected with the second dead lever of bottom plate 13, the bottom of second dead lever and the upper surface fixed connection of bottom plate 13.
The utility model discloses in, the device's working procedure as follows:
first fossil fragments 1, jack 4, second fossil fragments 5, first bolt 7, spout 8, the collocation use of fixed plate 9 and second bolt 10, in using, the staff pegs graft second fossil fragments 5 in first fossil fragments 1 through jack 4, and then the staff pegs graft fixed plate 9 in spout 8, rotate second bolt 10, be fixed together fixed plate 9 and first fossil fragments 1, and the staff rotates first bolt 7 again, thereby can be fixed first fossil fragments 1 and second fossil fragments 5 together, and be convenient for the staff dismantlement and the installation, and easy operation, the staff of being convenient for uses, can solve current building fossil fragments structure that mentioning in the background art effectively through the setting of above-mentioned structure simpler, the installation is wasted time and energy, also cause the damage to outer steel very easily, and stability is also relatively poor, bring very big inconvenient problem for the user.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a novel fossil fragments of building, includes first fossil fragments (1), its characterized in that: the novel steel plate fixing device is characterized in that a first threaded hole (2) is formed in the surface of the first keel (1), a second threaded hole (3) is formed in the upper surface of the first keel (1), a jack (4) is formed in the surface of the first keel (1), a second keel (5) is inserted into the surface of the jack (4), a third threaded hole (6) is formed in the upper surface of the second keel (5), first bolts (7) are connected to the surface threads of the second threaded hole (3) and the third threaded hole (6), sliding grooves (8) are formed in the two sides of the second keel (5), a fixing plate (9) is inserted into the surface of the sliding grooves (8), a fourth threaded hole is formed in the surface of the fixing plate (9), and second bolts (10) are connected to the surface threads of the first threaded hole (2) and the fourth threaded hole.
2. The novel keel for building of claim 1, wherein: the surface overlap joint of first fossil fragments (1) has first backup pad (11) and second backup pad, the bottom fixedly connected with first bracing piece (12) and the second bracing piece of first backup pad (11) and second backup pad.
3. The novel keel for buildings as claimed in claim 2, wherein: the bottoms of the first supporting rod (12) and the second supporting rod are fixedly connected with a bottom plate (13).
4. The novel keel for buildings as claimed in claim 2, wherein: the surface of the first supporting rod (12) is fixedly connected with an elastic belt (14), and the surface of the elastic belt (14) is respectively connected with a hook surface magic tape and a cotton wool magic tape in a sewing mode.
5. The novel keel for buildings as claimed in claim 2, wherein: a round hole (15) is formed in the surface of the second supporting rod, and a first fixing rod is inserted into the surface of the round hole (15).
6. The novel keel of claim 3, wherein: and the two sides of the bottom plate (13) are fixedly connected with second fixing rods, and the bottoms of the second fixing rods are fixedly connected with the upper surface of the bottom plate (13).
CN202222321073.3U 2022-09-01 2022-09-01 Novel keel for building Expired - Fee Related CN218323422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222321073.3U CN218323422U (en) 2022-09-01 2022-09-01 Novel keel for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222321073.3U CN218323422U (en) 2022-09-01 2022-09-01 Novel keel for building

Publications (1)

Publication Number Publication Date
CN218323422U true CN218323422U (en) 2023-01-17

Family

ID=84832876

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222321073.3U Expired - Fee Related CN218323422U (en) 2022-09-01 2022-09-01 Novel keel for building

Country Status (1)

Country Link
CN (1) CN218323422U (en)

Similar Documents

Publication Publication Date Title
CN115450441B (en) Energy-conserving wallboard installation auxiliary structure of green building
CN218323422U (en) Novel keel for building
CN213330113U (en) Interim strutting arrangement of wallboard is pulled out with carrying to indoor
CN211669930U (en) System exhibition device for software development
CN212718992U (en) Support base for engineering surveying and mapping
CN214444248U (en) Simple and easy device of steel reinforcement cage welding
CN214220001U (en) Connection structure of assembled building wallboard and floor
CN215669548U (en) Corner supporting mechanism for deep foundation pit
CN211143833U (en) Diagonal bracing structure for assembly type building
CN217420016U (en) Column base node of archaizing column
CN218668114U (en) Environment-friendly steel structure net body
CN213897747U (en) Suspended ceiling connecting structure based on BIM
CN212799341U (en) Tower crane arrangement display device based on BIM
CN216348933U (en) Engineering detects supports connection structure with water level detection
CN221799171U (en) Building engineering template fixing device
CN113653316B (en) Temporary supporting clamp for mounting of assembled laminated slab
CN221487288U (en) Cable strutting arrangement for power engineering
CN221590555U (en) Prefabricated post temporary fixing device of prefabricated post is built in room
CN214576071U (en) Detachable swimming pool
CN219548486U (en) Convenient-to-disassemble assembled building support frame
CN214090813U (en) Ceramic tile soak device for building engineering
CN218478508U (en) Electric power state overhauls monitoring devices
CN221557508U (en) Game paddle with line concentration function
CN217925023U (en) High-rise building construction safety protection net
CN215173469U (en) Anti-collision computer support for computer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230117

CF01 Termination of patent right due to non-payment of annual fee