CN218323117U - Prefabricated small-size PE pump station - Google Patents

Prefabricated small-size PE pump station Download PDF

Info

Publication number
CN218323117U
CN218323117U CN202222382331.9U CN202222382331U CN218323117U CN 218323117 U CN218323117 U CN 218323117U CN 202222382331 U CN202222382331 U CN 202222382331U CN 218323117 U CN218323117 U CN 218323117U
Authority
CN
China
Prior art keywords
wall
main part
screw
post
pump station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222382331.9U
Other languages
Chinese (zh)
Inventor
朱爱梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong Degao Water Supply And Drainage Equipment Co ltd
Original Assignee
Nantong Degao Water Supply And Drainage Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nantong Degao Water Supply And Drainage Equipment Co ltd filed Critical Nantong Degao Water Supply And Drainage Equipment Co ltd
Priority to CN202222382331.9U priority Critical patent/CN218323117U/en
Application granted granted Critical
Publication of CN218323117U publication Critical patent/CN218323117U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a prefabricated small-size PE pump station, comprising a main body, the intubate has been seted up to the inner wall of main part, the screw has been seted up to the inner wall of intubate, the inner wall sliding connection of intubate has inserted the post, it includes the connecting plate to insert the post, the outer wall fixedly connected with connecting rod of connecting plate, the plane has been seted up to the outer wall of connecting rod, the inner wall of connecting plate is provided with the screw, the outer wall of screw and the inner wall threaded connection of screw. There is the protrusion in the outside of main part to insert the post, when the main part is installed, need bury the main part underground, after backfilling the earthwork, the convex post of inserting will be like the root of a tree with the earthwork joint, thereby improve the area of contact of main part and earthwork, just so can avoid the main part because groundwater level rises, and lead to the main part to float, insert the post and be connected through screw and screw, so can be through taking off the screw, will insert the post and part with the intubate, just so can play the effect of removing the post of inserting.

Description

Prefabricated small-size PE pump station
Technical Field
The utility model belongs to the technical field of small-size PE pump station, concretely relates to prefabricated small-size PE pump station.
Background
With the increase of population and the development of industry, the amount of domestic sewage and industrial sewage is larger and larger, so that various sewage treatment equipment appears, and a pump station is one of the sewage treatment equipment. The traditional pump station is built on site by concrete and the like, the building period is usually 2-3 months, a large amount of time, material resources and financial resources are consumed, the prefabricated pump station can be produced according to the situation, the working effect of the normal pump station can be provided, and meanwhile, the installation is convenient.
An integrated prefabricated small-sized PE pump station is stated in patent CN206706984U, the utility model mainly comprises a prefabricated PE cylinder, a water pump, a pressure pipeline system, a liquid level detection device and an electric appliance control cabinet; the water pump starts by PLC control, can realize unmanned on duty, remote control, remote monitoring function, but after the pump station buries underground, because outside wall is comparatively smooth, so let groundwater hold up the main part easily.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a prefabricated small-size PE pump station possesses the advantage of stabilizing the main part and being convenient for demolish.
In order to achieve the above purpose, the utility model provides a following technical scheme: the utility model provides a prefabricated small-size PE pump station, includes the main part, the intubate has been seted up to the inner wall of main part, the screw has been seted up to the inner wall of intubate, the inner wall sliding connection of intubate has inserted the post, it includes the connecting plate to insert the post, the outer wall fixedly connected with connecting rod of connecting plate, the plane has been seted up to the outer wall of connecting rod, the inner wall of connecting plate is provided with the screw, the outer wall of screw and the inner wall threaded connection of screw.
Through the technical scheme, can play the effect of stabilizing the main part, there is the protrusion in the outside of main part to insert the post, when the main part is installed, need bury the underground with the main part, after backfilling the earthwork, the convex post of inserting will be like the root with the earthwork joint, thereby improve the area of contact of main part and earthwork, just so can avoid the main part because groundwater level rises, and lead to the main part to float, insert the post and be connected through screw and screw, so can take off through taking the screw, will insert post and intubate separately, just so can play and demolish the effect of inserting the post, thereby can demolish when the main part is demolishd, make things convenient for digging of earthwork, avoid digging the quick-witted collision of digging and insert the post.
Preferably, the top fixedly connected with board house of main part, the inner wall of board house is provided with the door plant, the well head has been seted up to the bottom of main part, the inner wall of well head is provided with the hanging ladder.
Through the technical scheme, the effect of blocking the well mouth is achieved, the well mouth can be blocked through the board room with the door plate, and therefore people can be prevented from entering the well mouth at any time.
Preferably, the inner wall of the main body is communicated with a water inlet pipe opening, and the inner wall of the main body is communicated with a water outlet pipe opening.
Through the technical scheme, the effect of connecting the pump pipeline is achieved, the water pumping pipe of the pump can be connected through the water inlet pipe mouth, and therefore water at a low water level is extracted and discharged from the water outlet pipe mouth at a high position.
Preferably, the outer wall of the bottom of the main body is fixedly connected with a fixing foot, and the inner wall of the main body is fixedly connected with a workbench.
Through the technical scheme, the effect of standing for the personnel is achieved, and the workbench can enable the workers to stand on the workbench, so that the equipment can be checked.
Preferably, the workbench comprises a plate body, and the inner wall of the plate body is provided with a through opening.
Through above-mentioned technical scheme, played the effect that passes through for personnel, can provide the space for personnel's business turn over through the opening on the plate body.
Preferably, the inner wall of the plate body is provided with a first pipe orifice, and the inner wall of the plate body is provided with a second pipe orifice.
Through the technical scheme, the effect of providing space for pipeline routing is achieved, and the pipeline routing space can be provided for the pipeline of the pump through the first pipe orifice and the second pipe orifice on the plate body.
Compared with the prior art, the beneficial effects of the utility model are that:
1. there is the protrusion in the outside of main part to insert the post, when the main part was installed, need bury the main part underground, after backfilling the earthwork, the convex post of inserting will be like the root with the earthwork joint to improve the area of contact of main part and earthwork, just so can avoid the main part because groundwater level rises, and lead to the main part to float.
2. The inserting column is connected with the screw hole through the screw, so that the screw can be taken down, the inserting column is separated from the inserting tube, the effect of removing the inserting column can be achieved, the earthwork can be conveniently dug and taken when the main body is removed, and the digging machine is prevented from colliding with the inserting column.
Drawings
FIG. 1 is a schematic view of the main structure of the present invention;
FIG. 2 is a schematic sectional view of the main body of the present invention;
FIG. 3 is a schematic view of the internal structure of the main body of the present invention;
fig. 4 is a schematic view of the structure of the plug post of the present invention.
In the figure: 1. a main body; 2. inserting a tube; 3. inserting a column; 4. a screw hole; 5. a board house; 6. a door panel; 7. a wellhead; 8. a suspension ladder; 9. a water inlet pipe opening; 10. a water outlet pipe orifice; 11. a fixing leg; 12. a work table; 300. a connecting plate; 301. a connecting rod; 302. a plane; 303. a screw; 1200. a plate body; 1201. a port; 1202. a first nozzle; 1203. a second orifice.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a prefabricated small-size PE pump station, includes main part 1, and intubate 2 has been seted up to the inner wall of main part 1, and screw 4 has been seted up to the inner wall of intubate 2, and the inner wall sliding connection of intubate 2 has inserted post 3, inserts post 3 and includes connecting plate 300, the outer wall fixedly connected with connecting rod 301 of connecting plate 300, and plane 302 has been seted up to connecting rod 301's outer wall, and the inner wall of connecting plate 300 is provided with screw 303, the outer wall of screw 303 and the inner wall threaded connection of screw 4.
In this embodiment, there is the protrusion in main part 1's outside to insert post 3, when main part 1 installed, need bury main part 1 underground, after backfilling the earthwork, the convex post 3 of inserting will be like the root of a tree and earthwork joint, thereby improve the area of contact of main part 1 and earthwork, just so can avoid main part 1 because groundwater level rises, and lead to main part 1 to float, insert post 3 and be connected through screw 303 and screw 4, so can take off through taking off screw 303, will insert post 3 and intubate 2 separately, just so can play the effect of dismantling post 3 of inserting, thereby can be when main part 1 demolishs, make things convenient for digging of earthwork, avoid digging the machine collision and insert post 3.
Specifically, the top fixedly connected with board house 5 of main part 1, the inner wall of board house 5 is provided with door plant 6, and well head 7 has been seted up to the bottom of main part 1, and the inner wall of well head 7 is provided with hanging ladder 8.
In this embodiment, the well mouth 7 can be sealed by the plate house 5 with the door plate 6, so that people can be prevented from entering the well mouth at any time.
Specifically, the inner wall of the main body 1 is communicated with a water inlet pipe opening 9, and the inner wall of the main body 1 is communicated with a water outlet pipe opening 10.
In this embodiment, the water inlet pipe port 9 may be connected to a water pumping pipe of the pump, so as to pump water at a low water level and discharge the water from the water outlet pipe port 10 at a high level.
Specifically, the outer wall of the bottom of the main body 1 is fixedly connected with a fixing pin 11, and the inner wall of the main body 1 is fixedly connected with a workbench 12.
In this embodiment, the work table 12 allows a worker to stand thereon to perform inspection of the equipment.
Specifically, the table 12 includes a plate body 1200, and a through opening 1201 is formed in an inner wall of the plate body 1200.
In this embodiment, the through opening 1201 of the plate body 1200 can provide a space for people to enter and exit.
Specifically, the inner wall of the plate body 1200 is provided with a first pipe orifice 1202, and the inner wall of the plate body 1200 is provided with a second pipe orifice 1203.
In this embodiment, the first pipe port 1202 and the second pipe port 1203 in the plate 1200 can provide a pipe routing space for the pipe of the pump.
The utility model discloses a theory of operation and use flow: there is protruding post 3 in the outside of main part 1, when main part 1 installs, need bury main part 1 underground, after backfilling the earthwork, protruding post 3 will be just like the root joint with the earthwork, thereby improve the area of contact of main part 1 and earthwork, just so can avoid main part 1 because the groundwater level rises, and lead to main part 1 to float, post 3 is connected with screw 4 through screw 303, so can be through taking off screw 303, insert post 3 and intubate 2 separately, just so can play the effect of demolising post 3, thus can be when main part 1 demolishs, make things convenient for digging of earthwork, avoid the excavator to collide post 3, can seal well head 7 through the board house 5 of band door board 6, just so can avoid personnel's random entering, can connect the drinking-water pipe of pump machine through water inlet pipe mouth 9, thereby extract low water, discharge from high outlet pipe mouth 10, workstation 12 can let the workman stand on, thereby carry out the inspection station, can provide the water level through the board body 1200 for personnel's water inlet and outlet pipe mouth 1200 on can provide the pipeline for the second board body 1200.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a prefabricated small-size PE pump station, includes main part (1), its characterized in that: intubate (2) has been seted up to the inner wall of main part (1), screw (4) have been seted up to the inner wall of intubate (2), the inner wall sliding connection of intubate (2) has inserted post (3), it includes connecting plate (300) to insert post (3), the outer wall fixedly connected with connecting rod (301) of connecting plate (300), plane (302) have been seted up to the outer wall of connecting rod (301), the inner wall of connecting plate (300) is provided with screw (303), the outer wall of screw (303) and the inner wall threaded connection of screw (4).
2. The prefabricated small-sized PE pump station according to claim 1, wherein: the top fixedly connected with board house (5) of main part (1), the inner wall of board house (5) is provided with door plant (6), well head (7) have been seted up to the bottom of main part (1), the inner wall of well head (7) is provided with hanging ladder (8).
3. A prefabricated small PE pump station according to claim 1, characterised in that: the inner wall of the main body (1) is communicated with a water inlet pipe opening (9), and the inner wall of the main body (1) is communicated with a water outlet pipe opening (10).
4. The prefabricated small-sized PE pump station according to claim 1, wherein: the bottom outer wall fixedly connected with fixed foot (11) of main part (1), the inner wall fixedly connected with workstation (12) of main part (1).
5. A prefabricated small-size PE pump station according to claim 4, characterized in that: the workbench (12) comprises a plate body (1200), and a through opening (1201) is formed in the inner wall of the plate body (1200).
6. A prefabricated small-size PE pump station according to claim 5, characterized in that: the inner wall of the plate body (1200) is provided with a first pipe orifice (1202), and the inner wall of the plate body (1200) is provided with a second pipe orifice (1203).
CN202222382331.9U 2022-09-07 2022-09-07 Prefabricated small-size PE pump station Active CN218323117U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222382331.9U CN218323117U (en) 2022-09-07 2022-09-07 Prefabricated small-size PE pump station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222382331.9U CN218323117U (en) 2022-09-07 2022-09-07 Prefabricated small-size PE pump station

Publications (1)

Publication Number Publication Date
CN218323117U true CN218323117U (en) 2023-01-17

Family

ID=84834648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222382331.9U Active CN218323117U (en) 2022-09-07 2022-09-07 Prefabricated small-size PE pump station

Country Status (1)

Country Link
CN (1) CN218323117U (en)

Similar Documents

Publication Publication Date Title
CN208792969U (en) Coal mine hydraulic slag discharging drilling orifice blowout prevention buffered device
CN208009459U (en) A kind of well-points dewatering system
CN218323117U (en) Prefabricated small-size PE pump station
CN105525941A (en) Method for improving stability of permanent gas extraction system of outburst mine
CN210315444U (en) Water leakage collecting well suitable for underground powerhouse of pumped storage power station
CN218252137U (en) Intermittent extraction injection well system
CN216075237U (en) Municipal works piping lane construction is with hidden drainage structures
CN215256295U (en) Automatic dust removal and cooling system used in tunnel construction process
CN210289828U (en) High negative pressure jet flow drainage device
CN209278665U (en) A kind of water pump pipeline connection structure
CN107905262A (en) A kind of drainage system of pipe gallery
CN210976044U (en) Wall-mounted micro drainage pump station for sewage interception engineering
CN209585172U (en) A kind of arrangement system of fire cistern and fire pump room
CN209875205U (en) Drainage device for drainage drill hole of coal seam difficult to drain
CN207237136U (en) The pipe connecting structure of basement fire hydrant box
CN210484219U (en) Novel full-automatic precipitation pump
CN213573972U (en) Wind-water linkage totally-enclosed blowout-preventing and slag-discharging device for bedding drilling
CN219710520U (en) Flood prevention device for civil air defense underground structural engineering
CN215585354U (en) Novel building fire control detects device
CN206874936U (en) Case tubular type choke waterpower floats port valve device
CN215411347U (en) Steam pipeline drainage structure in box culvert
CN214401843U (en) Foundation drainage equipment
CN211714113U (en) Overflow siphon drainage assembly of high-level fire-fighting transfer water tank
CN205935054U (en) Integrated submersible pump pumping irrigation station in vacuum
CN217105426U (en) Drainage structure of underground powerhouse of hydropower station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant