CN218317153U - Novel hydrology surveys buoy - Google Patents
Novel hydrology surveys buoy Download PDFInfo
- Publication number
- CN218317153U CN218317153U CN202222740297.8U CN202222740297U CN218317153U CN 218317153 U CN218317153 U CN 218317153U CN 202222740297 U CN202222740297 U CN 202222740297U CN 218317153 U CN218317153 U CN 218317153U
- Authority
- CN
- China
- Prior art keywords
- buoy
- fixedly connected
- novel
- instrument box
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Abstract
The utility model relates to a buoy apparatus technical field is surveyed to hydrology specifically is a novel buoy is surveyed to hydrology, including stabilizing plumbous weight, joint at the spacing section of thick bamboo of instrument box inner wall detachable and through bolted connection at buoy section of thick bamboo upper end detachable support, the upper end fixedly connected with of support can spacing ring, the middle part fixed mounting of ring upper end has the pillar that can support, the top joint of pillar has rotatable wind vane, the bottom fixed mounting of instrument box surface has the spreader that can stabilize, the upper end fixedly connected with of stabilizing plumbous weight can spacing connecting rope. This novel buoy is surveyed to hydrology through instrument box, buoy barrel and wind vane's setting, and constructor can place buoy barrel on the surface of water, can place the instrument and monitor the developments of the inside rivers of water at the instrument box, and constructor can survey the direction that wind came through the wind vane, and the constructor of being convenient for measures the wind direction.
Description
Technical Field
The utility model relates to a buoy apparatus technical field is surveyed to hydrology specifically is a novel buoy is surveyed to hydrology.
Background
Buoy, indicate a navigation mark that floats in the surface of water, be the anchoring in the assigned position, be used for marking the channel scope, instruct shoal, obstacle or show the surface of water aid to navigation sign of special use, when constructor surveyed the hydrology, need use to survey the data of buoy to the surface of water and monitor, but present buoy can not monitor wind direction and the developments of inside rivers at the in-process that uses, the impact and the water wave influence that the buoy received bottom in the in-process that uses are great, stability is not enough, consequently, need a novel hydrology survey buoy convenient to use.
Chinese patent publication No. CN216546584U discloses a hydrology and water resource surveying buoy, which comprises a surveying buoy body, wherein the surveying buoy body comprises a buoy base, and an installation frame is arranged at the upper end of the buoy base; be equipped with the maintenance hole on the installation frame, maintenance hole department installs and is used for sealing up and can dismantle the closing plate to the maintenance hole, and installation frame, closing plate and buoy base up end constitute the installation cavity that is used for installing water source monitoring equipment jointly, the utility model provides a hydrology water resource survey buoy, it can realize making things convenient for the maintainer to overhaul the function of monitoring equipment on surveying the buoy, solves the problem that the maintainer is not convenient for carry out the maintenance to monitoring equipment on surveying the buoy, reaches the effect that promotes surveying buoy maintainer work efficiency.
However, the hydrology and water resource surveying buoy has the following problems when in actual use:
1. however, the current buoy cannot monitor the wind direction and the dynamic state of the internal water flow in the using process;
2. the bottom of the buoy is greatly influenced by impact and water waves in the using process, and the stability is insufficient.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
In order to overcome prior art's above-mentioned defect, the utility model provides a novel buoy is surveyed to hydrology has solved present buoy and can not advance and the developments of inside rivers are monitored to the wind direction at the in-process that uses, and the impact that the buoy received bottom the in-process that uses influences great with the ripples of water, the not enough problem of stability.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a novel buoy is surveyed to hydrology, including stabilizing plumbous weight, joint at the spacing section of thick bamboo of instrument case inner wall detachable and through bolted connection at buoy section of thick bamboo upper end detachable support, the upper end fixedly connected with of support can spacing ring, the middle part fixed mounting of ring upper end has the pillar that can support, the top joint of pillar has rotatable wind vane, the bottom fixed mounting of instrument case surface has the spreader that can stabilize, the upper end fixedly connected with that stabilizes plumbous weight can spacing connection rope.
Optionally, one end of the cross column far away from the instrument box is fixedly connected with a supportable fixed plate, and one end of the connecting rope far away from the stable plummet is fixedly connected with the lower end of the fixed plate.
Optionally, the bottom end of the limiting cylinder is fixedly connected with a limiting clamping plate, the inner wall of the clamping plate is in threaded connection with a fastening knob which can be fastened, and one end of the fastening knob is fixedly connected with a spring which can absorb shock.
Optionally, one end of the spring abuts against the inner wall of the limiting cylinder, and the outer surface of the fastening knob is in threaded connection with the inner wall of the instrument box.
Optionally, there is a detachable safety cover at the top of the instrument box outer surface through bolted connection, but the upper end fixedly connected with screw thread post of safety cover is spacing.
Optionally, the outer surface of the threaded column is in threaded connection with the inner wall of the buoy barrel, and an observable window is formed in the outer surface of the protective cover.
(III) advantageous effects
The utility model provides a novel hydrology surveys buoy possesses following beneficial effect:
1. this novel buoy is surveyed to hydrology through instrument box, buoy barrel and wind vane's setting, and constructor can place buoy barrel on the surface of water, can place the instrument and monitor the developments of the inside rivers of water at the instrument box, and constructor can survey the direction that wind came through the wind vane, and the constructor of being convenient for measures the wind direction.
2. This novel buoy is surveyed to hydrology through a spacing section of thick bamboo and the setting of stabilizing the plumbous weight, and constructor can avoid a buoy section of thick bamboo bottom to receive great impact when in water through the spacing section of thick bamboo of installation to can protect placing at the inside measuring instrument of instrument case, stabilize the plumbous weight and possess good stability, make a buoy section of thick bamboo receive the less of wave influence in work, stability is better.
Drawings
Fig. 1 is a schematic diagram of the explosion structure of the present invention;
FIG. 2 is a schematic structural view of the present invention;
FIG. 3 is a schematic view of the instrument case of the present invention;
fig. 4 is a schematic structural view of the buoy barrel of the present invention.
In the figure: 1. an instrument cartridge; 2. a limiting cylinder; 3. a buoy barrel; 4. a support; 5. a circular ring; 6. a pillar; 7. a wind vane; 8. a cross post; 9. stabilizing the lead plummet; 10. connecting ropes; 11. a fixing plate; 12. clamping a plate; 13. fastening a knob; 14. a spring; 15. a protective cover; 16. a threaded post; 17. a viewing window.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1 to 4, the present invention provides a technical solution: a novel hydrological survey buoy comprises a stable lead weight 9, a detachable limiting cylinder 2 clamped on the inner wall of an instrument box 1, a clamping plate 12 capable of limiting is fixedly connected to the bottom end of the limiting cylinder 2, a fastening knob 13 capable of fastening is in threaded connection with the inner wall of the clamping plate 12, a spring 14 capable of damping is fixedly connected to one end of the fastening knob 13, one end of the spring 14 abuts against the inner wall of the limiting cylinder 2, the spring 14 can play a role of limiting and damping on the limiting cylinder 2, the bottom of the buoy can be prevented from being greatly impacted in water, so that a measuring instrument placed in the instrument box can be protected, a constructor can adjust the clamping force on the limiting cylinder 2 by rotating the fastening knob 13, and the constructor can conveniently adjust the clamping force according to the water wave impact;
the outer surface of the fastening knob 13 is in threaded connection with the inner wall of the instrument box 1, the top of the outer surface of the instrument box 1 is connected with a detachable protective cover 15 through a bolt, the upper end of the protective cover 15 is fixedly connected with a thread column 16 capable of limiting, the outer surface of the thread column 16 is in threaded connection with the inner wall of the buoy barrel 3, the outer surface of the protective cover 15 is provided with an observable window 17, the protective cover 15 is connected with a detachable support 4 at the upper end of the buoy barrel 3 through a bolt, the protective cover 15 can play a certain protection role, so that instruments placed in the instrument box 1 cannot be damaged due to water liquid invasion, and constructors can observe the state of the internal instruments through the window 17 and repair and adjust the instruments in time;
the upper end of the bracket 4 is fixedly connected with a ring 5 capable of limiting, the middle part of the upper end of the ring 5 is fixedly provided with a supporting column 6 capable of supporting, the top end of the supporting column 6 is clamped with a rotatable wind vane 7, and the wind vane 7 is clamped at the top end of the supporting column 6 and can rotate, so that a constructor can observe the wind direction through the wind vane 7, and the constructor can conveniently measure the wind direction;
bottom fixed mounting of 1 surface of instrument box has the spreader 8 that can be stabilized, the fixed plate 11 that the one end fixedly connected with that instrument box 1 can be supported is kept away from to spreader 8, connect rope 10 and keep away from the one end fixed connection that stabilizes lead weight 9 at the lower extreme of fixed plate 11, the upper end fixedly connected with that stabilizes lead weight 9 can be spacing connect rope 10, connect rope 10 to stabilize lead weight 9 and played and pull spacing effect, it possesses good stability to stabilize lead weight 9, it is less that messenger's buoy barrel 3 receives the ripples influence in the work, stability is better.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
The utility model discloses in, the device's working procedure as follows:
1. firstly, a constructor can place the buoy barrel 3 on the water surface and place an instrument in the instrument box 1 to monitor the dynamic state of water flow in a water body;
2. secondly, the constructor can observe the wind direction through the wind vane 7, so that the constructor can measure the wind direction conveniently;
3. then, the constructor can prevent the bottom of the buoy barrel 3 from being greatly impacted when the buoy barrel is in water by installing the limiting barrel 2, so that the measuring instrument placed in the instrument box 1 can be protected;
4. finally, constructors place the stable plummet 9 in water, and the stable plummet 9 has good stability, so that the buoy barrel 3 is less affected by water waves when working, and the stability is better.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a novel hydrology surveys buoy, includes stable plummet (9), joint at instrument holder (1) inner wall detachable spacing section of thick bamboo (2) and through bolted connection at buoy barrel (3) upper end detachable support (4), its characterized in that: the utility model discloses an instrument box, including support (4), middle part fixed mounting of ring (5) upper end has pillar (6) that can support, the top joint of pillar (6) has rotatable wind vane (7), the bottom fixed mounting of instrument box (1) surface has spreader (8) that can stabilize, but the upper end fixedly connected with spacing connection rope (10) of stabilizing plumb bob (9).
2. The novel hydrographic survey buoy of claim 1, wherein: the cross column (8) is far away from one end of the instrument box (1) and is fixedly connected with a supportable fixing plate (11), and the connecting rope (10) is far away from one end of the stable plummet (9) and is fixedly connected with the lower end of the fixing plate (11).
3. The novel hydrographic survey buoy of claim 1, characterized in that: the bottom end of the limiting cylinder (2) is fixedly connected with a limiting clamping plate (12), the inner wall of the clamping plate (12) is in threaded connection with a fastening knob (13) which can be fastened, and one end of the fastening knob (13) is fixedly connected with a damping spring (14).
4. The novel hydrographic survey buoy of claim 3, wherein: one end of the spring (14) abuts against the inner wall of the limiting barrel (2), and the outer surface of the fastening knob (13) is in threaded connection with the inner wall of the instrument box (1).
5. The novel hydrographic survey buoy of claim 1, wherein: the top of instrument box (1) surface has detachable safety cover (15) through bolted connection, but the upper end fixedly connected with of safety cover (15) is spacing screw thread post (16).
6. The novel hydrographic survey buoy of claim 5, wherein: the outer surface threaded connection of screw thread post (16) be in the inner wall of buoy barrel (3), observable window (17) has been seted up to the surface of safety cover (15).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222740297.8U CN218317153U (en) | 2022-10-18 | 2022-10-18 | Novel hydrology surveys buoy |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222740297.8U CN218317153U (en) | 2022-10-18 | 2022-10-18 | Novel hydrology surveys buoy |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218317153U true CN218317153U (en) | 2023-01-17 |
Family
ID=84825881
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222740297.8U Active CN218317153U (en) | 2022-10-18 | 2022-10-18 | Novel hydrology surveys buoy |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218317153U (en) |
-
2022
- 2022-10-18 CN CN202222740297.8U patent/CN218317153U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111982861A (en) | Device and method for monitoring erosion resuspension of shallow sediment in internal wave environment | |
CN213452664U (en) | Measuring instrument support | |
CN218317153U (en) | Novel hydrology surveys buoy | |
CN214690050U (en) | Hydrology water resource surveys buoy | |
CN210486871U (en) | Beach section form evolution real-time measuring device | |
CN212623155U (en) | Multifunctional hydrological monitoring instrument | |
CN209197798U (en) | A kind of middle and small river water quality-flow quantity intelligent monitoring station | |
CN216385635U (en) | Portable full-digital single-frequency depth finder for surveying and mapping | |
CN214066258U (en) | Ponding degree of depth measuring device is used in prevention and cure of urban area flood disaster | |
CN115535149A (en) | Multi-parameter monitoring intelligent navigation mark | |
CN210774025U (en) | House wall body slope detection device | |
CN114148455B (en) | Ocean communication base station multifunctional buoy based on satellite communication | |
CN109612533A (en) | A kind of middle and small river water quality-flow quantity intelligent monitoring station and monitoring method | |
CN212721666U (en) | Measuring rod with automatic display screen for water level of river water resource | |
CN114111729A (en) | Underwater automatic leveling platform and leveling method thereof | |
CN213903564U (en) | A rivers speed sensor for water conservancy detects | |
CN216559221U (en) | Be used for hydraulic engineering monitoring to use water level measuring device | |
CN216348942U (en) | Novel water level gauge | |
CN218443892U (en) | Measuring device for highway | |
CN214695186U (en) | Measuring instrument for bridge construction | |
CN217483607U (en) | Water level monitoring device for water environment monitoring | |
CN115419125B (en) | Device for monitoring stability and measuring angle of geological slope and application method thereof | |
CN215930871U (en) | Foundation ditch settlement monitoring device for building | |
CN214621197U (en) | Combined measuring device for bridge construction | |
CN218381103U (en) | Hydrological measuring and reporting liquid level detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |