CN218307180U - Waste gas treatment tower for electroplating production line - Google Patents
Waste gas treatment tower for electroplating production line Download PDFInfo
- Publication number
- CN218307180U CN218307180U CN202220045279.5U CN202220045279U CN218307180U CN 218307180 U CN218307180 U CN 218307180U CN 202220045279 U CN202220045279 U CN 202220045279U CN 218307180 U CN218307180 U CN 218307180U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- rigid coupling
- tower
- bottom plate
- treatment tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Treating Waste Gases (AREA)
Abstract
The utility model discloses a waste gas treatment tower for electroplating production line, including bottom plate and water tank, the left side top rigid coupling of bottom plate has the water tank, install processing apparatus in the middle of the top of bottom plate. This exhaust-gas treatment tower for electroplating production line, through the treatment tower, first diaphragm, a water pump, mutually support between first pipeline and the second pipeline isotructure, can make the water pump pass through the chemical agent suction of first pipeline in with the water tank, the rethread second pipe is when discharging chemical agent into the third pipeline, spout that chemical agent is even through the shower nozzle at last, thereby just improved the treatment effect to waste gas, through the intake pipe, the fourth pipeline, the check valve, mutually support between filter and the first exhaust pipe isotructure, can make the chemical agent in the treatment tower flow back to the water tank through fourth pipeline cooperation check valve and realize the circulation, carry out secondary treatment through the filter to waste gas, thereby the result of use of this device has been improved.
Description
Technical Field
The utility model relates to an electroplating waste gas treatment technical field specifically is an electroplating production is exhaust-gas treatment tower for line.
Background
Electroplating is a process of plating a thin layer of other metals or alloys on the surface of some metals by using the electrolysis principle, and is a process of attaching a layer of metal film on the surface of a metal or other material workpiece by using the electrolysis effect so as to prevent the oxidation of the metal, improve the wear resistance, the conductivity, the light reflection performance, the corrosion resistance, enhance the appearance and the like.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an exhaust-gas treatment for electroplating production line to solve and propose among the above-mentioned background art and the exhaust-gas treatment tower structure among the prior art is single, the problem that the treatment effeciency is lower.
In order to achieve the above object, the utility model provides a following technical scheme: a waste gas treatment tower for an electroplating production line comprises a bottom plate and a water tank, wherein the water tank is fixedly connected above the left side of the bottom plate, and a treatment device is arranged in the middle above the bottom plate;
the treatment device comprises a treatment tower, a first transverse plate, a water pump, a first pipeline and a second pipeline;
the lower part of the treatment tower is fixedly connected with the bottom plate, a first transverse plate is welded above the left side of the treatment tower, a water pump is fixedly connected inside the first transverse plate, a water suction port and a water outlet of the water pump are fixedly connected with a first pipeline and a second pipeline respectively, and the lower part of the first pipeline is communicated with the inside of the water tank.
Preferably, the right side rigid coupling of second pipeline has a plurality of third pipelines, and the both ends outer wall of third pipeline links to each other with the inside of treating the tower is fixed, the below rigid coupling of third pipeline has a plurality of shower nozzles, can be with the more even blowout of chemical agent through the shower nozzle like this.
Preferably, the inside of the treatment tower is provided with a connecting device;
the connecting device comprises an air inlet pipe, a fourth pipeline, a one-way valve, a filter plate and a first exhaust pipe;
the outer wall of intake pipe and the inside looks rigid coupling of treatment column, the below of intake pipe is equipped with the fourth pipeline, and the left and right sides of fourth pipeline is linked together with the inside of water tank and treatment column respectively, the left end rigid coupling of fourth pipeline has the check valve, the top of intake pipe is equipped with a plurality of filters, and the outer wall of filter and the inner wall looks rigid coupling of treatment column, the top of filter is equipped with first exhaust pipe, and the below of first exhaust pipe links to each other with treatment column is fixed.
Preferably, an exhaust device is installed on the right side above the bottom plate;
the exhaust device comprises a support, a first air storage chamber, a second exhaust pipe, a second transverse plate, a vertical plate and a bolt;
the below and the bottom plate looks rigid coupling of support, support top rigid coupling has first reservoir, the left side and the first blast pipe looks rigid coupling of first reservoir, and the top rigid coupling of first reservoir has the second blast pipe, the left side of second blast pipe is equipped with the second diaphragm, and the inside of second diaphragm and the outer wall looks rigid coupling of first blast pipe, the left side welding of second diaphragm has the riser, and the riser links to each other with the treatment tower screw thread through a plurality of bolts.
Preferably, the preceding terminal surface rigid coupling of first gas receiver has the second gas receiver, and the preceding terminal surface below rigid coupling of second gas receiver has the fan, the below and the bottom plate looks rigid coupling of fan, the fan cooperation first exhaust pipe can be with the waste gas suction in the treating column like this.
Compared with the prior art, the beneficial effects of the utility model are that: according to the waste gas treatment tower for the electroplating production line, through the mutual matching of the structures such as the treatment tower, the first transverse plate, the water pump, the first pipeline and the second pipeline, the water pump can suck out the chemical agent in the water tank through the first pipeline, then the second pipeline discharges the chemical agent into the third pipeline, and finally the chemical agent is uniformly sprayed out through the spray head, so that the treatment effect on waste gas is improved;
through mutual matching of the structures such as the air inlet pipe, the fourth pipeline, the one-way valve, the filter plate and the first exhaust pipe, the chemical agent in the treatment tower can flow back to the water tank through the fourth pipeline matched with the one-way valve to realize circulation, and the filter plate is used for carrying out secondary treatment on the waste gas, so that the using effect of the device is improved;
through mutually supporting between structures such as support, first gas receiver, second blast pipe, second diaphragm, riser and bolt, can cooperate the waste gas suction of handling in the tower through the first blast pipe of fan cooperation, make waste gas get into in first gas receiver and the second gas receiver, the second blast pipe of rethread is discharged at last to accomplish the exhaust-gas treatment work.
Drawings
FIG. 1 is a schematic view of the present invention;
FIG. 2 is a cross-sectional view of FIG. 1;
FIG. 3 is a schematic view of the structure of the air inlet pipe, the check valve and the water tank in FIG. 2;
fig. 4 is a schematic view of the filter plate, the second cross plate and the showerhead shown in fig. 2.
In the figure: 1. the bottom plate, 2, the water tank, 3, processing apparatus, 301, the treatment tower, 302, first diaphragm, 303, the water pump, 304, first pipeline, 305, the second pipeline, 4, connecting device, 401, the intake pipe, 402, the fourth pipeline, 403, the check valve, 404, the filter, 405, first blast pipe, 5, exhaust apparatus, 501, the support, 502, first gas receiver, 503, the second blast pipe, 504, the second diaphragm, 505, the riser, 506, the bolt, 6, the third pipeline, 7, the shower nozzle, 8, the second gas receiver, 9, the fan.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a various waste gas treatment tower for electroplating production line, including bottom plate 1 and water tank 2, the left side top rigid coupling of bottom plate 1 has water tank 2, the storage has chemical agent in water tank 2, install processing apparatus 3 in the middle of the top of bottom plate 1, processing apparatus 3 includes treatment tower 301, first diaphragm 302, water pump 303, first pipeline 304 and second pipeline 305, the below of treatment tower 301 is with bottom plate 1 rigid coupling, the welding of the left side top of treatment tower 301 has first diaphragm 302, and the inside rigid coupling of first diaphragm 302 has water pump 303, the model of water pump 303 is 0510S, the water sucking mouth and the delivery port of water pump 303 rigid coupling have first pipeline 304 and second pipeline 305 respectively, and the below of first pipeline 304 is linked together with the inside of water tank 2, the below of second pipeline 305 is closed design, the right side of second pipeline 305 has 2 third pipelines 6, the right-hand member of third pipeline 6 is closed design, and the both ends outer wall of third pipeline 6 is fixed with the inside of treatment tower 301 links together, the below of third pipeline 6 rigid coupling has 7 shower nozzles 7, can spray out more even chemical agent through 7 like this.
The internally mounted of treating tower 301 has connecting device 4, connecting device 4 includes intake pipe 401, fourth pipeline 402, check valve 403, filter 404 and first blast pipe 405, the outer wall of intake pipe 401 and the inside looks rigid coupling of treating tower 301, the below of intake pipe 401 is equipped with fourth pipeline 402, and the left and right sides of fourth pipeline 402 is linked together with the inside of water tank 2 and treating tower 301 respectively, the left end rigid coupling of fourth pipeline 402 has check valve 403, fourth pipeline 402 cooperates check valve 403 can make the chemical agent in treating tower 301 flow back to in the water tank 2, the top of intake pipe 401 is equipped with 2 filter 404, filter 404 is the activated carbon filter, can further filter the waste gas after handling, and the outer wall of filter 404 and the inner wall looks rigid coupling of treating tower 301, the top of filter 404 is equipped with first blast pipe 405, and the below of first blast pipe 405 is fixed continuous with treating tower 301.
In this embodiment, when an operator needs to use the waste gas treatment tower for the electroplating production line, firstly, the operator discharges waste gas generated by the electroplating production line into the treatment tower 301 through the air inlet pipe 401, the external power supply of the water pump 303 is switched on, the water pump 303 is started to suck out the chemical agent in the water tank 2 through the first pipeline 304, then the chemical agent is discharged into the two third pipelines 6 through the second pipeline 305, and finally the chemical agent is uniformly sprayed out through the spray head 7, then the chemical agent below the treatment tower can flow back into the water tank through the fourth pipeline to form a circulation, so that better reaction and treatment can be performed on the waste gas, then the external power supply of the fan 9 is switched on, the fan 9 is started, the waste gas after reaction in the treatment tower 301 can float upwards through the first exhaust pipe 405 and the like, the waste gas can be filtered through the filter plate 404, then can enter the first air storage chamber 502 and the second air storage chamber 8 through the first exhaust pipe 405, and finally is discharged through the second exhaust pipe 503, so that the purpose of waste gas treatment is achieved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (5)
1. The utility model provides an exhaust-gas treatment tower for electroplating production line, includes bottom plate (1) and water tank (2), the left side top rigid coupling of bottom plate (1) has water tank (2), its characterized in that: a processing device (3) is arranged in the middle of the upper part of the bottom plate (1);
the treatment device (3) comprises a treatment tower (301), a first horizontal plate (302), a water pump (303), a first pipeline (304) and a second pipeline (305);
the below and bottom plate (1) looks rigid coupling of treatment tower (301), the welding of the left side top of treatment tower (301) has first diaphragm (302), and the inside rigid coupling of first diaphragm (302) has water pump (303), the water sucking mouth and the delivery port of water pump (303) rigid coupling respectively have first pipeline (304) and second pipeline (305), and the below of first pipeline (304) is linked together with the inside of water tank (2).
2. The exhaust gas treatment tower for the electroplating production line according to claim 1, wherein: the right side rigid coupling of second pipeline (305) has a plurality of third pipelines (6), and the both ends outer wall of third pipeline (6) links to each other with the inside fixed of processing tower (301), the below rigid coupling of third pipeline (6) has a plurality of shower nozzles (7).
3. The exhaust gas treatment tower for the electroplating production line according to claim 1, wherein: a connecting device (4) is arranged in the processing tower (301);
the connecting device (4) comprises an air inlet pipe (401), a fourth pipeline (402), a one-way valve (403), a filter plate (404) and a first exhaust pipe (405);
the outer wall of intake pipe (401) and the inside looks rigid coupling of handling tower (301), the below of intake pipe (401) is equipped with fourth pipeline (402), and the left and right sides of fourth pipeline (402) is linked together with the inside of water tank (2) and handling tower (301) respectively, the left end rigid coupling of fourth pipeline (402) has check valve (403), the top of intake pipe (401) is equipped with a plurality of filter (404), and the outer wall of filter (404) and the inner wall looks rigid coupling of handling tower (301), the top of filter (404) is equipped with first blast pipe (405), and the below of first blast pipe (405) and handling tower (301) are fixed continuous.
4. The exhaust gas treatment tower for the electroplating production line according to claim 1, wherein: an exhaust device (5) is arranged on the right side above the bottom plate (1);
the exhaust device (5) comprises a support (501), a first air storage chamber (502), a second exhaust pipe (503), a second transverse plate (504), a vertical plate (505) and a bolt (506);
the below and bottom plate (1) looks rigid coupling of support (501), support (501) top rigid coupling has first gas reservoir (502), the left side and the first exhaust pipe (405) looks rigid coupling of first gas reservoir (502), and the top rigid coupling of first gas reservoir (502) has second blast pipe (503), the left side of second blast pipe (503) is equipped with second diaphragm (504), and the inside of second diaphragm (504) and the outer wall looks rigid coupling of first blast pipe (405), the welding of the left side of second diaphragm (504) has riser (505), and riser (505) link to each other through a plurality of bolts (506) and processing tower (301) screw thread.
5. The exhaust gas treatment tower for the electroplating production line according to claim 4, wherein: the front end face of the first air storage chamber (502) is fixedly connected with a second air storage chamber (8), a fan (9) is fixedly connected to the lower portion of the front end face of the second air storage chamber (8), and the lower portion of the fan (9) is fixedly connected with the bottom plate (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220045279.5U CN218307180U (en) | 2022-01-10 | 2022-01-10 | Waste gas treatment tower for electroplating production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220045279.5U CN218307180U (en) | 2022-01-10 | 2022-01-10 | Waste gas treatment tower for electroplating production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218307180U true CN218307180U (en) | 2023-01-17 |
Family
ID=84831927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220045279.5U Active CN218307180U (en) | 2022-01-10 | 2022-01-10 | Waste gas treatment tower for electroplating production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218307180U (en) |
-
2022
- 2022-01-10 CN CN202220045279.5U patent/CN218307180U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210544100U (en) | Zinc plating bath zinc cigarette processing system | |
CN209972766U (en) | Marine high-efficiency corrosion-resistant domestic sewage storage cabinet | |
CN218307180U (en) | Waste gas treatment tower for electroplating production line | |
CN209848569U (en) | Flue gas purification device for treating chemical iron mud and zinc tailings | |
CN210206376U (en) | Chlorine-containing tail gas treatment device | |
CN212576635U (en) | Anticorrosive spraying device of tap surface | |
CN218871759U (en) | Electroplating waste gas treatment device | |
CN209255653U (en) | A kind of aluminum profile processing water cooling cleaning device | |
CN209052787U (en) | A kind of type red copper embossment electroplating coating bath easy to maintain | |
CN211328713U (en) | Energy-saving emission-reducing device for industrial processing | |
CN216223605U (en) | Waste gas treatment structure of laser welding device | |
CN217613955U (en) | Electroplating waste gas purification tower | |
CN213507282U (en) | Plating solution production is with collecting plating bath device that has left | |
CN219502348U (en) | Tail gas dust washing tower | |
CN218794976U (en) | Electroplating noble metal steam washing tank | |
CN218012006U (en) | Coating waste gas processor capable of adjusting waste gas flow | |
CN214513592U (en) | Energy-concerving and environment-protective exhaust treatment device | |
CN214764348U (en) | Separation and purification device for waste gas treatment | |
CN213803936U (en) | Large-scale high carbon steel sheet preheating device for galvanization | |
CN215846259U (en) | Plasma cutting machine with dust removal function | |
CN212881170U (en) | Novel concentrated pond is from defoaming device | |
CN219723869U (en) | High-purity metal material cleaning equipment | |
CN212999046U (en) | Tail gas collecting device for electroplating metal plate | |
CN218107279U (en) | Printing and dyeing waste gas high-efficiency treatment equipment | |
CN215034674U (en) | Weld net machine dust extraction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |