CN218297156U - Monitoring and alarming device for inclination of hanging basket - Google Patents

Monitoring and alarming device for inclination of hanging basket Download PDF

Info

Publication number
CN218297156U
CN218297156U CN202222302019.4U CN202222302019U CN218297156U CN 218297156 U CN218297156 U CN 218297156U CN 202222302019 U CN202222302019 U CN 202222302019U CN 218297156 U CN218297156 U CN 218297156U
Authority
CN
China
Prior art keywords
conducting plate
alarm
monitoring box
monitoring
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222302019.4U
Other languages
Chinese (zh)
Inventor
刘旭锋
许明
石登峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zhongke Xufeng Intelligent Technology Co ltd
Original Assignee
Chongqing Zhongke Xufeng Intelligent Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Zhongke Xufeng Intelligent Technology Co ltd filed Critical Chongqing Zhongke Xufeng Intelligent Technology Co ltd
Priority to CN202222302019.4U priority Critical patent/CN218297156U/en
Application granted granted Critical
Publication of CN218297156U publication Critical patent/CN218297156U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model belongs to the technical field of hanging flower basket construction equipment, concretely relates to hanging flower basket slope monitoring alarm device, including installing the monitoring box on the hanging flower basket, be equipped with the triggering alarm subassembly on the monitoring box, the triggering alarm subassembly includes first alarm, first current conducting plate and second current conducting plate, first alarm is installed on the outer wall of monitoring box, contain conductive liquid in the monitoring box, first current conducting plate and second current conducting plate all are located conductive liquid's liquid level more than, and first current conducting plate and second current conducting plate are located the same one end of monitoring box, when first current conducting plate and second current conducting plate dip conductive liquid simultaneously, first alarm circular telegram work. The utility model discloses in, the monitoring box inclines together along with the hanging flower basket, after the hanging flower basket inclines to certain angle, first current conducting plate and second current conducting plate submergence are in conductive liquid, first alarm circular telegram work, and the staff can judge out the hanging flower basket slope fast to get into hanging flower basket calibration work fast, realize in time rectifying the hanging flower basket, eliminate the potential safety hazard.

Description

Monitoring and alarming device for inclination of hanging basket
Technical Field
The utility model belongs to the technical field of hanging flower basket construction equipment, concretely relates to hanging flower basket slope monitoring alarm device.
Background
The hanging basket is one of common high-altitude operation devices in building construction, and has the advantages of convenience in installation, high operation efficiency, small occupied area, easiness in displacement, convenience, practicability and the like. The lifting working principle of the hanging basket is as follows: the two lifting mechanisms are respectively fixedly arranged at two ends of the hanging basket and used for clamping the working steel wire rope, and the lifting mechanisms are controlled by an electric control system, so that the hanging basket can ascend, descend and stop. However, the two lifting mechanisms cannot be completely synchronized, and due to the sensitivity difference of the brakes, the abrasion of the centrifugal speed governor and the like, the hanging basket can be inclined after a period of operation.
At present, when a hanging basket inclines to a certain angle (the maximum inclination angle of the hanging basket in relevant regulations is 10 degrees), a safety lock automatically and quickly locks a safety steel wire rope firmly, and the hanging basket is guaranteed not to ascend or descend or continuously incline. However, because lack hanging flower basket slope monitoring mechanism on the hanging flower basket, consequently, after the hanging flower basket inclines to certain angle, the staff need wait until the safety lock with safe wire rope lock jail, operation hoist mechanism promote the both ends hanging flower basket of hanging flower basket simultaneously but when unable the motion, just can know the hanging flower basket and need rectify, do not accomplish timely correction, have the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model provides a hanging flower basket slope monitoring alarm device to solve among the prior art because of lacking the problem that the hanging flower basket can't in time rectify the hanging flower basket of hanging flower basket slope monitoring mechanism.
In order to achieve the above purpose, the utility model discloses a scheme does: hanging flower basket slope monitoring alarm device, including installing the monitoring box on the hanging flower basket, be equipped with the triggering alarm subassembly on the monitoring box, the triggering alarm subassembly includes first alarm, first current conducting plate and second current conducting plate, and first alarm is installed on the outer wall of monitoring box, contains electrically conductive liquid in the monitoring box, first current conducting plate and second current conducting plate all are located electrically conductive liquid's liquid level more than, and first current conducting plate and second current conducting plate are located the same end of monitoring box, and when first current conducting plate and second current conducting plate dip electrically conductive liquid simultaneously, first alarm circular telegram work.
The working principle and the beneficial effects of the scheme are as follows: in the scheme, when the hanging basket inclines, the monitoring box arranged on the hanging basket inclines along with the hanging basket, and at the moment, the conductive liquid in the monitoring box flows to the lower end of the monitoring box; when the hanging flower basket is poured to certain angle, the first current conducting plate of conducting liquid submergence and the second current conducting plate in the monitoring box, first alarm circular telegram work, whether staff can judge the hanging flower basket through first alarm fast and incline excessively to get into hanging flower basket calibration work fast, realize in time rectifying the hanging flower basket, eliminate the potential safety hazard.
Optionally, a power supply for supplying power to trigger the alarm assembly is mounted on the monitoring box, and the power supply, the first conductive plate, the second conductive plate and the first alarm form a first series circuit.
In this scheme, utilize the power on the monitoring box for triggering the power supply of warning subassembly, avoid inserting in the power supply system of hanging flower basket to hanging flower basket slope monitoring alarm device has independent power, can independent work.
Optionally, a first switch is mounted on the monitoring box, and the first switch, the power supply, the first conductive plate, the second conductive plate and the first alarm form a first series circuit.
In this scheme, when first switch disconnection, even first current conducting plate and second current conducting plate submergence in conducting liquid, first alarm also can not the circular telegram work to avoid first alarm circular telegram work in transportation or other non-operating time.
Optionally, the slope trigger assembly further comprises a second alarm, a third conductive plate and a fourth conductive plate, the second alarm is installed on the outer wall of the monitoring box, the third conductive plate and the fourth conductive plate are both located above the liquid level of the conductive liquid, the third conductive plate and the fourth conductive plate are located at the same end of the monitoring box, the third conductive plate and the first conductive plate are respectively located at two ends of the monitoring box, and when the third conductive plate and the fourth conductive plate are immersed in the conductive liquid, the second alarm is electrified to work.
In this scheme, first current conducting plate and second current conducting plate are located the one end of monitoring box, third current conducting plate and fourth current conducting plate are located the other end of monitoring box, so, when the hanging flower basket inclines, the staff can judge out the incline direction of hanging flower basket through first alarm and second alarm fast, judge out the left end of hanging flower basket promptly and be higher than the right-hand member fast, the left end that still hanging flower basket is less than the right-hand member, more be favorable to going on fast of the correction work of hanging flower basket, it is long when further reducing the hanging flower basket parking, improve the operating efficiency.
Optionally, a second switch is mounted on the monitoring box, and the second switch, the power supply, the third conductive plate, the fourth conductive plate and the second alarm form a second series circuit.
In this scheme, when the second switch disconnection, even third current conducting plate and fourth current conducting plate submergence in conducting liquid, the second alarm also can not the circular telegram work to avoid the second alarm circular telegram work in transportation or other non-operating time.
Optionally, the first alarm and the first conductive plate are located at the same end, and the second alarm and the third conductive plate are located at the same end.
In this scheme, first alarm circular telegram during operation, the staff can judge fast that the one side at first alarm place on the hanging flower basket is the low side, and second alarm circular telegram during operation, the staff can judge fast that the one side at second alarm place on the hanging flower basket is the low side.
Optionally, a first communication module and a second communication module are arranged on the monitoring box, the first communication module is connected in the first series circuit, and the second communication module is connected in the second series circuit.
In the scheme, when the first alarm (the second alarm) is electrified to work, the first communication module (the second communication module) is electrified to work, the terminal or the server receives a signal sent by the first communication module (the second communication module), and the terminal or the server immediately sends an instruction to control the corresponding lifting mechanism to work according to the received signal, so that the hanging basket is corrected, a worker is prevented from manually controlling the lifting mechanism to correct the hanging basket, and the correction efficiency is improved.
Optionally, the bottom intercommunication of monitoring box has the water changing pipe, installs the valve that is used for controlling the water changing pipe break-make on the water changing pipe.
In this scheme, through trading the water pipe, the staff can supply or change the conducting liquid in the monitoring box.
Optionally, the inner wall of the monitoring box is coated with an anticorrosive layer.
In this scheme, the anticorrosive coating can effectively slow down the corrosive action of conducting liquid to the monitoring box, improves the life of monitoring box.
Optionally, an observation port is arranged on the side wall of the monitoring box, the observation port is covered with a transparent plate for sealing the observation port, and the transparent plate is provided with scale marks.
In this scheme, can observe the condition in the monitoring box through the transparent plate to the staff in time supplyes or change conducting liquid. And, through the scale mark, the staff can hold the liquid level height of conducting liquid in the monitoring box well, avoids the liquid level height of conducting liquid too high or low excessively to ensure that hanging flower basket slope monitoring alarm device normally works.
Drawings
Fig. 1 is a schematic structural view of a basket inclination monitoring and alarming device according to an embodiment of the present invention when the basket is mounted on a basket;
fig. 2 is a schematic structural view of a basket inclination monitoring and alarming device in a first embodiment of the present invention;
FIG. 3 is a longitudinal cross-sectional view of FIG. 2;
FIG. 4 isbase:Sub>A cross-sectional view taken along line A-A of FIG. 3;
FIG. 5 is a cross-sectional view taken along line B-B of FIG. 3;
FIG. 6 is a schematic structural view of the inside of the monitoring box when the left end of the hanging basket is lower than the right end of the hanging basket;
FIG. 7 is a schematic structural view of the inside of the monitoring box when the left end of the hanging basket is higher than the right end of the hanging basket;
fig. 8 is a schematic structural view of a basket inclination monitoring and alarming device in the second embodiment of the present invention.
Detailed Description
The following is further detailed by way of specific embodiments:
the reference numbers in the drawings attached hereto include: the monitoring device comprises a hanging basket 1, a monitoring box 2, a first alarm 3, a second alarm 4, a first conducting plate 5, a second conducting plate 6, a third conducting plate 7, a fourth conducting plate 8, conducting liquid 9, a battery box 10, a first switch 11, a second switch 12, a water changing pipe 13, a valve 14, a transparent plate 15, a first communication module 16 and a second communication module 17.
Example one
This embodiment is substantially as shown in fig. 1, 2 and 3: the monitoring alarm device for the inclination of the hanging basket comprises a monitoring box 2 installed on the hanging basket 1, wherein in the embodiment, the monitoring box 2 is fixedly installed on the hanging basket 1 through bolts. Be equipped with on monitoring box 2 and trigger the warning subassembly, combine fig. 4 and fig. 5 to show, trigger the warning subassembly and include first alarm 3, second alarm 4, first current conducting plate 5, second current conducting plate 6, third current conducting plate 7 and fourth current conducting plate 8, first alarm 3 passes through screw fixed mounting on the left end outer wall of monitoring box 2, and second alarm 4 passes through screw fixed mounting on the right-hand member outer wall of monitoring box 2. The first alarm 3 and the second alarm 4 are audible and visual alarms or alarm lamps or buzzers, and in the embodiment, the first alarm 3 and the second alarm 4 are both alarm lamps.
The first conductive plate 5 and the second conductive plate 6 are both bonded on the inner side wall of the left side of the monitoring box 2, and the bottom ends of the first conductive plate 5 and the second conductive plate 6 have the same height; third current conducting plate 7 and fourth current conducting plate 8 all bond on monitoring box 2 right side inner wall, and the bottom of third current conducting plate 7 and fourth current conducting plate 8 is equal high. The monitoring box 2 contains a conductive liquid 9, and the conductive liquid 9 includes various kinds, such as an aqueous solution of sodium hydroxide, an aqueous solution of sodium chloride, an aqueous solution of hydrochloric acid, an aqueous solution of sulfuric acid, an aqueous solution of sodium carbonate, and the like. In this embodiment, the conductive liquid 9 is a saturated sodium chloride aqueous solution for safety. The first conductive plate 5, the second conductive plate 6, the third conductive plate 7 and the fourth conductive plate 8 are all located above the liquid level of the conductive liquid 9.
The outer wall mounting of monitoring box 2 is the power for triggering the power supply of warning subassembly, and in this embodiment, the power is the battery, and the power is installed in battery case 10, and battery case 10 passes through bolt fixed mounting on monitoring box 2. Still install first switch 11 and second switch 12 through the bolt on the outer wall of monitoring box 2, first switch 11 and second switch 12 are in normally open state, and first switch 11, power, first current conducting plate 5, second current conducting plate 6 and first alarm 3 form first series circuit, and second switch 12, power, third current conducting plate 7, fourth current conducting plate 8 and second alarm 4 form the second series circuit.
The bottom of the monitoring box 2 is communicated with a water changing pipe 13, and the water changing pipe 13 is provided with a valve 14 for controlling the on-off of the water changing pipe 13. Be equipped with the viewing aperture on the lateral wall of monitoring box 2, the viewing aperture covers has transparent plate 15 that is used for sealed viewing aperture, and in this embodiment, transparent plate 15 is first bright plastic slab, and transparent plate 15 bonds on monitoring box 2's outer wall, is equipped with the scale mark on transparent plate 15. The inner wall of the monitoring box 2 is coated with an anticorrosive coating, so that the corrosion of the conductive liquid 9 on the monitoring box 2 is effectively reduced, and the service life of the monitoring box 2 is prolonged. Alternatively, the monitoring box 2 is made of insulating corrosion-resistant plastic.
In particular use, the basket 1 starts to tilt, and since the monitoring box 2 is fixedly mounted on the basket 1 (when the monitoring box 2 is fixedly mounted on the basket 1, the first switch 11 and the second switch 12 are closed), the monitoring box 2 tilts together with the basket 1. If the left end of the hanging basket 1 is lower than the right end of the hanging basket 1, the left end of the monitoring box 2 is lower than the right end of the monitoring box 2, the conductive liquid 9 in the monitoring box 2 flows leftwards, and the liquid level of the left end of the monitoring box 2 is raised relative to the first conductive plate 5 and the second conductive plate 6. When the hanging basket 1 inclines to a certain angle, for example, when the inclination angle of the hanging basket 1 is 7 degrees, the bottom ends of the first conductive plate 5 and the second conductive plate 6 are immersed into the conductive liquid 9, as shown in fig. 6, the first series circuit is completely closed, the first alarm 3 is electrified and lighted, the worker on the hanging basket 1 is warned that the hanging basket 1 is over inclined, so that the hanging basket 1 is corrected in time, the hanging basket 1 is leveled again or the inclination angle of the hanging basket 1 is within an allowable range, and the worker does not need to wait until the safety lock locks the safety steel wire rope firmly, and then the worker corrects the hanging basket 1 when the hanging basket 1 cannot move, so that the potential safety hazard is eliminated. And, when rectifying hanging flower basket 1, the staff on the hanging flower basket 1 knows through the first alarm 3 that lights up that the left end of hanging flower basket 1 is less than the right-hand member, utilizes the left end of corresponding hoist mechanism promotion hanging flower basket 1 this moment, can realize the correction of hanging flower basket 1.
Similarly, if the left end of the hanging basket 1 is higher than the right end of the hanging basket 1, the left end of the monitoring box 2 is higher than the right end of the monitoring box 2, the conductive liquid 9 in the monitoring box 2 flows rightwards, and the liquid level of the right end of the monitoring box 2 is raised relative to the third conductive plate 7 and the fourth conductive plate 8. When hanging flower basket 1 inclines to certain angle, third current conducting plate 7 and fourth current conducting plate 8's bottom submergence to conductive liquid 9 in, as shown in fig. 7, the second series circuit is closed completely, second alarm 4 circular telegram is lighted, staff's accessible second alarm 4 on the hanging flower basket 1 judges out the slope of hanging flower basket 1 fast, and judge the left end that hanging flower basket 1 is less than the right-hand member of hanging flower basket 1 simultaneously, so that the staff in time utilizes the right-hand member that corresponding hoist mechanism promoted hanging flower basket 1, thereby in time rectify hanging flower basket 1, eliminate the potential safety hazard.
In the process of correcting the hanging basket 1, when the hanging basket 1 is gradually leveled, the monitoring box 2 is gradually leveled, therefore, the first conducting plate 5 and the second conducting plate 6 (the third conducting plate 7 and the fourth conducting plate 8) are gradually separated from the conducting liquid 9, when the first conducting plate 5 and the second conducting plate 6 (the third conducting plate 7 and the fourth conducting plate 8) are completely and gradually separated from the conducting liquid 9, the first alarm 3 (the second alarm 4) is powered off, and the lamp is not turned on, which indicates that the inclination angle of the hanging basket 1 is within an allowable range or the hanging basket 1 is leveled.
To sum up, staff on the hanging flower basket 1 judges whether the hanging flower basket 1 inclines excessively through observing whether first alarm 3 and second alarm 4 light: if the first alarm 3 or the second alarm 4 is lighted, the condition that the hanging basket 1 is excessively inclined is shown, so that a worker can correct the hanging basket 1 through the corresponding lifting mechanism in time, the inclination angle of the hanging basket 1 is in an allowable range or the hanging basket 1 is horizontal, and potential safety hazards are eliminated.
In addition, the staff regularly changes the conducting liquid 9 in the monitoring box 2 through the water changing pipe 13, and ensures that the liquid level of the conducting liquid 9 is appropriate according to the scale marks on the transparent plate 15, so as to avoid the liquid level of the conducting liquid 9 from being too high or too low.
Example two
The present embodiment is different from the first embodiment in that: as shown in fig. 8, in the present embodiment, the monitoring box 2 is provided with a first communication module 16 and a second communication module 17, the first communication module 16 is connected in the first series circuit, and the second communication module 17 is connected in the second series circuit. Specifically, the first communication module 16 may be connected in series in the first series circuit, or may be connected in parallel with the first alarm device 3, and similarly, the second communication module 17 may be connected in series in the second series circuit, or may be connected in parallel with the second alarm device 4. In this embodiment, the first communication module 16 is connected in parallel with the first alarm 3, and the second communication module 17 is connected in parallel with the second alarm 4, that is, the first switch 11, the power supply, the first conductive plate 5, the second conductive plate 6 and the first communication module 16 form a third series circuit, and the second switch 12, the power supply, the third conductive plate 7, the fourth conductive plate 8 and the second communication module 17 form a fourth series circuit. The first communication module 16 and the second communication module 17 are a WIFI module, a bluetooth module, a 4G module, a 5G module, etc., in this embodiment, the first communication module 16 and the second communication module 17 are both bluetooth modules.
In this embodiment, when hanging flower basket 1 inclines excessively, and the left end of hanging flower basket 1 is less than the right-hand member of hanging flower basket 1, when first series circuit is totally closed, the third series circuit is totally closed, therefore, first communication module 16 circular telegram this moment, and send the signal to terminal or server, terminal or server are according to the work of the corresponding hoist mechanism of signal control received, thereby promote the left end of hanging flower basket 1, make the inclination of hanging flower basket 1 in the allowed band or make hanging flower basket 1 level, realize the automatic correction of hanging flower basket 1, avoid the staff on the hanging flower basket 1 to correct hanging flower basket 1 manually.
Similarly, when hanging flower basket 1 inclines excessively, and when the left end of hanging flower basket 1 was higher than the right-hand member of hanging flower basket 1, when the second series circuit was complete closed, the fourth series circuit was complete closed, therefore, second communication module 17 circular telegram this moment, and send a signal to terminal or server, terminal or server controlled the hoist mechanism work that corresponds according to received signal, thereby promote the right-hand member of hanging flower basket 1, make the inclination of hanging flower basket 1 in the allowed band or make hanging flower basket 1 level, realize the automatic correction of hanging flower basket 1, avoid staff's manual correction hanging flower basket 1 on the hanging flower basket 1, shorten hanging flower basket 1 and rectify long, improve hanging flower basket 1 and rectify efficiency, it is long when reducing hanging flower basket 1 and stop, and improve the operating efficiency.
The above description is only an example of the present invention, and the common general knowledge of the known specific structures and characteristics of the embodiments is not described herein. It should be pointed out that to those skilled in the art, without departing from the structure of the present invention, a plurality of modifications and improvements can be made, which should also be regarded as the protection scope of the present invention, and these will not affect the effect of the implementation of the present invention and the utility of the present invention. The descriptions in the embodiments and the like in the specification can be used to explain the contents of the claims.

Claims (10)

1. Hanging flower basket slope monitoring alarm device, its characterized in that: including installing the monitoring box on the hanging flower basket, be equipped with the triggering alarm subassembly on the monitoring box, the triggering alarm subassembly includes first alarm, first current conducting plate and second current conducting plate, and first alarm is installed on the outer wall of monitoring box, contains conductive liquid in the monitoring box, first current conducting plate and second current conducting plate all are located conductive liquid's liquid level more than, and first current conducting plate and second current conducting plate are located the same end of monitoring box, and when first current conducting plate and second current conducting plate dip conductive liquid simultaneously, first alarm circular telegram work.
2. The basket inclination monitoring and warning device according to claim 1, characterized in that: the monitoring box is provided with a power supply for supplying power for triggering the alarm assembly, and the power supply, the first conductive plate, the second conductive plate and the first alarm form a first series circuit.
3. A basket inclination monitoring alarm device according to claim 2, characterized in that: the monitoring box is provided with a first switch, and the first switch, the power supply, the first current-conducting plate, the second current-conducting plate and the first alarm form a first series circuit.
4. A basket inclination monitoring and warning device according to claim 2 or 3, characterized in that: the triggering alarm assembly further comprises a second alarm, a third conducting plate and a fourth conducting plate, the second alarm is installed on the outer wall of the monitoring box, the third conducting plate and the fourth conducting plate are located above the liquid level of the conducting liquid, the third conducting plate and the fourth conducting plate are located at the same end of the monitoring box, the third conducting plate and the first conducting plate are located at two ends of the monitoring box respectively, and when the third conducting plate and the fourth conducting plate are immersed in the conducting liquid simultaneously, the second alarm is electrified to work.
5. A basket inclination monitoring and alarming device as claimed in claim 4, characterized in that: the monitoring box is provided with a second switch, and the second switch, the power supply, the third conducting plate, the fourth conducting plate and the second alarm form a second series circuit.
6. A basket inclination monitoring and alarming device as claimed in claim 5, characterized in that: the first alarm and the first conducting plate are located at the same end, and the second alarm and the third conducting plate are located at the same end.
7. A basket inclination monitoring and alarming device as claimed in claim 6, characterized in that: the monitoring box is provided with a first communication module and a second communication module, the first communication module is connected in the first series circuit, and the second communication module is connected in the second series circuit.
8. A basket inclination monitoring alarm device according to claim 1, characterized in that: the bottom intercommunication of monitoring box has traded the water pipe, trades and installs the valve that is used for controlling the switching-on and switching-off of water pipe on the water pipe.
9. A basket inclination monitoring alarm device according to claim 1, characterized in that: and an anticorrosive layer is coated on the inner wall of the monitoring box.
10. A basket inclination monitoring alarm device according to claim 1, characterized in that: be equipped with the viewing aperture on the lateral wall of monitoring box, the viewing aperture covers has the transparent plate that is used for sealed viewing aperture, is equipped with the scale mark on the transparent plate.
CN202222302019.4U 2022-08-30 2022-08-30 Monitoring and alarming device for inclination of hanging basket Active CN218297156U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222302019.4U CN218297156U (en) 2022-08-30 2022-08-30 Monitoring and alarming device for inclination of hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222302019.4U CN218297156U (en) 2022-08-30 2022-08-30 Monitoring and alarming device for inclination of hanging basket

Publications (1)

Publication Number Publication Date
CN218297156U true CN218297156U (en) 2023-01-13

Family

ID=84811310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222302019.4U Active CN218297156U (en) 2022-08-30 2022-08-30 Monitoring and alarming device for inclination of hanging basket

Country Status (1)

Country Link
CN (1) CN218297156U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117436712A (en) * 2023-12-21 2024-01-23 山东铁鹰建设工程有限公司 Real-time monitoring method and system for operation risk of construction hanging basket

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117436712A (en) * 2023-12-21 2024-01-23 山东铁鹰建设工程有限公司 Real-time monitoring method and system for operation risk of construction hanging basket
CN117436712B (en) * 2023-12-21 2024-04-12 山东铁鹰建设工程有限公司 Real-time monitoring method and system for operation risk of construction hanging basket

Similar Documents

Publication Publication Date Title
CN218297156U (en) Monitoring and alarming device for inclination of hanging basket
CN102061722B (en) Double-pump automatic alternation water charging system of coal mine hydrostatic tank
CN108382345A (en) A kind of escape system and its control method, vehicle of vehicle
KR20150115103A (en) Aircraft warning apparatus for transmission line
CN210639761U (en) Flow guide device for intelligent traffic
CN212128916U (en) Road and bridge engineering protector
CN201412761Y (en) Multifunctional solar warning device
CN207523694U (en) A kind of winch inclined gallery become slope and prevent the rope device that floats
CN107911914A (en) A kind of reservoir is taken precautions against natural calamities warning monitoring system
CN219449112U (en) Warning device for container tire crane
CN215908980U (en) Automatic multi-functional solar energy warning light of control
CN219575105U (en) Intelligent fire-fighting emergency indicator lamp
CN206408512U (en) The sensor conductor positioning protection device that bridge health monitoring system night installs
JP3027093U (en) Water supply device for vehicles with water storage tank
CN209982565U (en) Jib support of laser dome camera
CN217874518U (en) Pipeline supporting and hanging frame
CN212639725U (en) Energy-saving device for port hoisting equipment
CN213543735U (en) Automatic monitoring and alarming device for seawater level of nuclear power plant
CN215764876U (en) Fireproof lighting device for municipal engineering
CN210398698U (en) Intelligent security warning light for high-rise building
CN218623235U (en) Electric hanging basket lifting height limiting system
CN214412889U (en) Intelligent building monitoring camera device with light filling device
CN219950234U (en) Intelligent night laser positioning control system for tower crane lifting hook
CN210607167U (en) Drop fuse alarm device
CN216383906U (en) Intelligent street lamp convenient to maintenance, management