CN218294736U - Special interim pipe clamp of copper pipe - Google Patents
Special interim pipe clamp of copper pipe Download PDFInfo
- Publication number
- CN218294736U CN218294736U CN202222749574.1U CN202222749574U CN218294736U CN 218294736 U CN218294736 U CN 218294736U CN 202222749574 U CN202222749574 U CN 202222749574U CN 218294736 U CN218294736 U CN 218294736U
- Authority
- CN
- China
- Prior art keywords
- module
- pipe clamp
- pipe
- pipeline fixed
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910052802 copper Inorganic materials 0.000 title claims abstract description 38
- 239000010949 copper Substances 0.000 title claims abstract description 38
- RYGMFSIKBFXOCR-UHFFFAOYSA-N Copper Chemical compound [Cu] RYGMFSIKBFXOCR-UHFFFAOYSA-N 0.000 title claims abstract description 36
- 230000006978 adaptation Effects 0.000 claims abstract description 7
- 239000000463 material Substances 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 2
- 239000002390 adhesive tape Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- YCKRFDGAMUMZLT-UHFFFAOYSA-N Fluorine atom Chemical compound [F] YCKRFDGAMUMZLT-UHFFFAOYSA-N 0.000 description 2
- 150000001879 copper Chemical class 0.000 description 2
- 229910052731 fluorine Inorganic materials 0.000 description 2
- 239000011737 fluorine Substances 0.000 description 2
- 210000001503 joint Anatomy 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000004308 accommodation Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000003340 mental effect Effects 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Images
Landscapes
- Pipe Accessories (AREA)
Abstract
The utility model discloses a special interim pipe clamp of copper pipe, including pipeline fixed module and a plurality of pipe clamp, the pipe clamp sets up on pipeline fixed module uniformly, the setting can be dismantled to pipeline fixed module, the pipe clamp includes bolt and nut, pipeline fixed module is provided with the pipe clamp hole of a plurality of and bolt adaptation, the inboard that the pipe clamp hole extended to pipeline fixed module is passed to the one end of bolt is provided with the gasket, the other end setting of bolt is in the pipeline fixed module outside and nut threaded connection. The utility model provides a special interim pipe clamp of copper pipe improves the efficiency of construction and reduces the material consumption, and application scope is wider, and is fixed more firm, demolishs the convenience.
Description
Technical Field
The utility model relates to a pipe clamp technical field, especially a special interim pipe clamp of copper pipe.
Background
The copper pipe is very wide at commercial air conditioner engineering's range of application, in many online systems, often relate to the interim fixed and the butt joint of copper pipe, including copper pipe and copper pipe, interim fixed and seal between copper pipe and the branching pipe, because lack practicality and the wide interim fixing tool of accommodation, often rely on the adhesive tape among the prior art, modes such as rope carry out interim fixed and mouth of pipe seal, seal insecure and can leave glue behind the getting rid of the adhesive tape, influence follow-up operation such as welding, cutting, adopt the fixed pipeline of adhesive tape, the efficiency of implementation is low, manpower consumption is big, the security is low, the consumptive material is many, and the adhesive tape can only disposable, cause the waste.
The existing pipe clamp is single in specification, can only fix a pipeline with the same specification, has great limitation, only plays a role in fixing the pipeline simply, cannot adjust the pipeline, and most of the pipe clamps are disposable consumables, so that the temporary fixing pipe clamp which is large in application range and can be repeatedly used needs to be provided.
SUMMERY OF THE UTILITY MODEL
In order to overcome the above disadvantages of the prior art, the present invention provides a temporary pipe clamp for copper pipes, which solves the above problems of the prior art.
The utility model provides a technical scheme that its technical problem adopted is: the utility model provides a special interim pipe clamp of copper pipe, includes pipeline fixed module and a plurality of pipe clamp, the pipe clamp sets up on pipeline fixed module uniformly, the setting can be dismantled to pipeline fixed module, the pipe clamp includes bolt and nut, the pipe clamp hole that pipeline fixed module was provided with a plurality of and bolt adaptation, the inboard that the pipe clamp hole extended to pipeline fixed module is passed to the one end of bolt is provided with the gasket, the other end setting of bolt is in pipeline fixed module outside and nut threaded connection.
As a further improvement of the utility model: the pipeline fixing module is a circular pipe.
As a further improvement of the utility model: the pipeline fixing module is provided with a first module and a second module, and the first module is detachably connected with the second module.
As a further improvement of the utility model: when the first module is connected with the second module, two disassembly ports are arranged, and the disassembly ports are symmetrically arranged on the circumference of the circular pipe of the pipeline fixing module.
As a further improvement of the utility model: the first module and the second module are both set to be semi-arc-shaped.
As a further improvement of the utility model: the first module and the second module are arranged oppositely.
As a further improvement of the utility model: the both ends of first module all are provided with the recess, the both ends of second module all be provided with the buckle of recess adaptation, first module and second module buckle are connected.
As a further improvement of the utility model: the gasket is of an arc-shaped structure.
As a further improvement of the utility model: the gasket is a rubber ring gasket made of rubber.
As a further improvement of the utility model: the removal port is disposed between the two tube clamps.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses can be used to the special interim fixed pipe clamp of copper pipe, carry out interim fixing to the installation of the copper pipe of multi-online, extensive applicability can be applied to the fixed of the different pipe diameters of various occasions, the copper pipe of different mounting heights, improves the efficiency of construction and reduces the material consumption, and convenient the dismantlement simultaneously and removal can not influence follow-up welding operation, but wide application in the various copper pipe installations of air conditioner fluorine system need interim fixed and confined process.
Drawings
Fig. 1 is a first structural schematic diagram of an embodiment of the present invention.
Fig. 2 is a structural schematic diagram of an embodiment of the present invention.
Fig. 3 is a schematic view of the pipe fixing module according to the present invention.
Fig. 4 is a schematic structural diagram of an embodiment of the present invention.
The reference numbers in the figures: 1. pipeline fixing module, 11, first module, 12, second module, 13, recess, 14, buckle, 15, turn around portion, 16, dismantlement mouth, 2, pipe clamp, 21, bolt, 22, nut, 23, gasket.
Detailed Description
The invention will now be further described with reference to the accompanying drawings, in which:
it should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used is interchangeable under appropriate circumstances such that the embodiments of the invention described herein are capable of operation in sequences other than those illustrated or described herein.
In order to make the objects, technical solutions and advantages of the present invention more apparent, the technical solutions of the present invention will be clearly and completely described below with reference to the specific embodiments of the present invention and the accompanying drawings. It is to be understood that the described embodiments are merely exemplary of the invention, and not restrictive of the full scope of the invention. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be understood that the terms "upper", "lower", "left", "right", and the like indicate the position or positional relationship based on the position or positional relationship shown in the drawings, which is only for convenience of description of the present invention, and therefore, cannot be understood as a limitation on the actual use direction of the present invention.
The utility model discloses an implementation case one:
the utility model provides a special interim pipe clamp of copper pipe, includes pipeline fixed module 1 and four pipe clamp pieces 2, pipe clamp piece 2 sets up on pipeline fixed module 1 uniformly, the setting can be dismantled to pipeline fixed module 1, pipe clamp piece 2 includes bolt 21 and nut 22, pipeline fixed module 1 is provided with four pipe clamp holes with bolt 21 adaptation, the inboard that pipe clamp hole extended to pipeline fixed module 1 is passed to the one end of bolt 21 is provided with gasket 23, the other end setting of bolt 21 is in the pipeline fixed module 1 outside and nut 22 threaded connection.
The pipeline fixing module 1 is a circular pipe, and the pipeline fixing module 1 is set to be the circular pipe and can be matched with a circular structure of a copper pipe.
The pipeline fixing module 1 is provided with a first module 11 and a second module 12, the first module 11 is detachably connected with the second module 12, two detaching ports 16 are arranged when the first module 11 is connected with the second module 12, and the detaching ports 16 are symmetrically arranged on the circumference of a circular pipe of the pipeline fixing module 1.
The first module 11 and the second module 12 are both set to be semi-arc-shaped, and the first module 11 and the second module 12 are arranged oppositely.
Both ends of the first module 11 are provided with grooves 13, both ends of the second module 12 are provided with buckles 14 matched with the grooves 13, and the first module 11 is connected with the buckles 14 of the second module 12.
The gasket 23 is of an arc-shaped structure, and the gasket 23 is a rubber ring gasket 23 made of rubber.
The removal opening 16 is arranged between the two tube clamps 2.
The second embodiment:
the utility model provides a special interim pipe clamp of copper pipe, includes pipeline fixed module 1 and two pipe clamp pieces 2, pipe clamp piece 2 sets up on pipeline fixed module 1 symmetrically, the setting can be dismantled to pipeline fixed module 1, pipe clamp piece 2 includes bolt 21 and nut 22, pipeline fixed module 1 is provided with two pipe clamp holes with bolt 21 adaptation, the inboard that pipe clamp hole extended to pipeline fixed module 1 is passed to the one end of bolt 21 is provided with gasket 23, the other end setting of bolt 21 is in the pipeline fixed module 1 outside and nut 22 threaded connection.
The pipeline fixing module 1 is a circular pipe, and the pipeline fixing module 1 is set to be the circular pipe and can be matched with a circular structure of a copper pipe.
The fixed module 1 of pipeline is provided with first module 11 and second module 12, first module 11 and second module 12 detachably are connected, the one end of first module 11 is connected with the one end of second module 12, be equipped with when first module 11 and the combination of second module 12 and dismantle mouthful 16, first module 11 second module 12 junction still is equipped with around commentaries on classics portion 15, the one end of first module 11 can be around revolving portion 15 rotatory, promptly the one end of first module 11 can be around the one end rotation of second module 12, dismantle mouthful 16 and revolve portion 15 and be provided with on the circular pipe circumference of fixed module 1 of pipeline.
The first module 11 and the second module 12 are both set to be semi-arc-shaped, and the first module 11 and the second module 12 are arranged oppositely.
The one end that the first module 11 keeps away from around turning part 15 is provided with recess 13, the other end that the second module 12 keeps away from around turning part 15 is equipped with buckle 14 of recess 13 adaptation, first module 11 and second module 12 buckle 14 are connected.
The gasket 23 is of an arc-shaped structure, and the gasket 23 is a rubber ring gasket 23 made of rubber.
The disassembling port 16 is disposed between the two pipe clamping pieces 2, the revolving portion 15 is disposed at the other end opposite to the disassembling port 16, wherein the revolving portion 15 is a revolving shaft, and the disassembling port 16 and the revolving portion 15 are disposed on the pipe fixing module 1 with the two pipe clamping pieces 2 as a symmetrical center.
The third embodiment is as follows:
the utility model discloses constitute by a pipeline fixed module 1, four rubber ring gaskets 23 and four bolts 21 and four nuts 22.
In the specific embodiment, as shown in fig. 2, four bolts 21 and four nuts 22 respectively penetrate through the pipeline fixing module 1 from four directions, four rubber ring gaskets 23 are arranged inside the pipeline fixing module 1 and connected with the bolts 21, after a copper pipe which needs to be temporarily fixed and closed is installed, the pipeline fixing module 1 is disassembled in the direction of a disassembling port 16 and then sleeved between two pipe orifices which need to be temporarily fixed and closed, and then a buckle 14 is fastened to enter a groove 13, so as to disassemble and combine the device; and then adjusting the position, wherein the bolts 21 move in respective directions by adjusting the position of the nuts 22 to drive the rubber gasket gaskets 23 to clamp two copper pipes needing to be temporarily fixed and sealed, and then the nuts 22 are screwed down to temporarily fix and seal the copper pipes.
Follow-up needs weld the copper pipe, adjustment butt joint position, during operations such as cutting, only need to unpack the fixed module 1 of interim fixed pipeline according to the direction of dismantling mouth 16, just can carry out the dismantlement, very convenient and fast, can used repeatedly, through formulating the size of the fixed module 1 of suitable pipeline, the position of rethread adjusting bolt 21 and nut 22, press from both sides the tight copper pipe mouth of pipe through rubber ring gasket 23, carry out the fixed to different pipe diameter copper pipes, simultaneously because rubber ring gasket 23 has stronger toughness and plasticity, also can be used in on the reducing that two pipe diameter sizes differ little, carry out its interim fixed seal.
The device can fix copper pipes with different pipe diameters by adjusting, is convenient to detach and move, can be repeatedly used, reduces material waste, and can be widely applied to temporary fixing and sealing procedures required for installation of various copper pipes of an air conditioner fluorine system.
In conclusion, after the ordinary skilled in the art reads the document of the present invention, the technical solution and technical idea of the present invention need not creative mental labor and makes other various corresponding conversion schemes, which all belong to the protection scope of the present invention.
Claims (10)
1. The utility model provides a special interim pipe clamp of copper pipe, its characterized in that, includes pipeline fixed module and a plurality of pipe clamp, the pipe clamp sets up on pipeline fixed module uniformly, the setting can be dismantled to pipeline fixed module, the pipe clamp includes bolt and nut, the pipe clamp hole that pipeline fixed module was provided with a plurality of and bolt adaptation, the inboard that the pipe clamp hole extended to pipeline fixed module is passed to the one end of bolt is provided with the gasket, the other end setting of bolt is in pipeline fixed module outside and nut threaded connection.
2. The temporary pipe clamp for copper pipes as claimed in claim 1, wherein the pipe fixing module is a circular pipe.
3. A temporary pipe clamp dedicated to copper pipes as claimed in claim 2, wherein the pipe fixing module is provided with a first module and a second module, the first module and the second module being detachably connected.
4. A temporary pipe clamp special for copper pipes as claimed in claim 3, wherein the first module and the second module are provided with two disassembly ports when they are connected, and the disassembly ports are symmetrically arranged on the circumference of the circular pipe of the pipe fixing module.
5. A temporary pipe clamp special for copper pipes as claimed in claim 4, wherein the first and second modules are each configured in a semi-arc shape.
6. A temporary pipe clamp special for copper pipes as claimed in claim 5, wherein the first module is disposed opposite to the second module.
7. A temporary pipe clamp special for copper pipes as claimed in claim 6, wherein both ends of the first module are provided with grooves, both ends of the second module are provided with buckles adapted to the grooves, and the first module and the second module are connected by buckles.
8. A temporary pipe clamp for copper pipes as claimed in claim 1 wherein the gasket is of arcuate configuration.
9. The temporary pipe clamp special for the copper pipe as claimed in claim 8, wherein the gasket is a rubber ring gasket made of rubber.
10. A temporary pipe clamp for copper pipes as claimed in claim 4 wherein the removal opening is provided between two pipe clamp pieces.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222749574.1U CN218294736U (en) | 2022-10-19 | 2022-10-19 | Special interim pipe clamp of copper pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222749574.1U CN218294736U (en) | 2022-10-19 | 2022-10-19 | Special interim pipe clamp of copper pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218294736U true CN218294736U (en) | 2023-01-13 |
Family
ID=84808490
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222749574.1U Active CN218294736U (en) | 2022-10-19 | 2022-10-19 | Special interim pipe clamp of copper pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218294736U (en) |
-
2022
- 2022-10-19 CN CN202222749574.1U patent/CN218294736U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206234430U (en) | A kind of both-end has the valve of ready-packaged joint | |
CN218294736U (en) | Special interim pipe clamp of copper pipe | |
CN2886279Y (en) | Rotary flange disk device | |
CN203817851U (en) | Elbow machining device | |
CN212564764U (en) | Novel waterproof structure of wall-penetrating pipeline | |
CN111520540B (en) | Mounting device and method for T-shaped interface nodular cast iron pipe | |
CN213809388U (en) | Novel fire-fighting pipeline mounting structure | |
CN213954614U (en) | Pipeline connection combined flange plate | |
CN210893256U (en) | Quantitative control turbine flowmeter converter | |
CN213839976U (en) | Pipeline engineering pipeline connecting device | |
CN211649355U (en) | Natural gas line is welded junction group and is assembled device speedily carries out rescue work | |
CN212107327U (en) | Quick connecting mechanism of pressure-bearing pipeline | |
CN206717759U (en) | A kind of water pump provision for disengagement | |
CN213808544U (en) | Flange convenient to assemble and disassemble | |
CN206786138U (en) | A kind of multi-layer piping positioner | |
CN206425670U (en) | The cylindric folding anti-oxidation welding equipment of ripple filter screen of stainless steel | |
CN214466909U (en) | Rush-repair reducing opening tee joint | |
CN216576689U (en) | Clamp universal for processing flange parts of air-conditioning compressor | |
CN220118859U (en) | Flange convenient to detach for oil exploitation | |
CN205824422U (en) | A kind of acidproof flange of porous | |
CN217537062U (en) | Impervious corrosion resistant precast concrete square culvert | |
CN210736340U (en) | Quick-assembling aeration device convenient to quickly assemble for organic matter treatment | |
CN211779606U (en) | Adapter for PE and PVC | |
CN221880564U (en) | Dust removal pipeline convenient to installation | |
CN211649372U (en) | Pipeline fan |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |