CN218294706U - Pressure pipeline laying device for town gas engineering - Google Patents
Pressure pipeline laying device for town gas engineering Download PDFInfo
- Publication number
- CN218294706U CN218294706U CN202222361953.3U CN202222361953U CN218294706U CN 218294706 U CN218294706 U CN 218294706U CN 202222361953 U CN202222361953 U CN 202222361953U CN 218294706 U CN218294706 U CN 218294706U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- round pin
- pin axle
- threaded rod
- laying device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Handcart (AREA)
Abstract
The utility model discloses a pipeline under pressure laying device of town gas engineering, including fixed plate and electric putter, electric putter's quantity is two, the middle-end fixed mounting at fixed plate top has step motor, step motor's output fixed mounting has the threaded rod, bearing swing joint is passed through in the middle-end of fixed plate bottom in the upper end of threaded rod, the surperficial threaded connection of threaded rod has the thread bush, the outer fixed surface of thread bush is connected with the diaphragm. The utility model discloses an under mutually supporting's effect between electric putter, second round pin axle, regulation pole, third round pin axle, splint, lifter, first round pin axle, step motor, threaded rod, diaphragm and thread bush and the fixed plate, realized that this device is convenient for highly adjusting the purpose of splicing pipeline under pressure, holistic convenient operation is swift, brings very big facility for pipeline under pressure's concatenation work.
Description
Technical Field
The utility model relates to a pressure pipeline lays technical field, specifically is a pressure pipeline laying device of town gas engineering.
Background
The pressure pipeline refers to all pipelines bearing internal pressure or external pressure, when gas engineering construction is carried out, firstly, the laying work of the pressure pipeline is exactly carried out, after the pressure pipeline is laid, all the pressure pipelines are required to be butted, however, the heights of the pressure pipelines required to be butted in two sections are different due to different terrain heights in the existing pressure pipeline butting process, the pressure pipeline is often required to be lifted up and spliced in a groove by manpower, the operation is inconvenient, the efficiency of the whole operation is low, and meanwhile, the labor intensity of workers is greatly increased.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pressure pipeline laying device of town gas engineering possesses the advantage of being convenient for highly adjusting that pressure pipeline spliced, has solved current pressure pipeline butt joint in-process because the topography height is different, causes the high difference that the pressure pipeline of two sections required docks was placed, often needs the manual work to lift up pressure pipeline in the slot inside and splices again, and the operation is inconvenient, and the inefficiency of whole operation, simultaneously very big increase staff intensity of labour's problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a pipeline under pressure laying device of town gas engineering, includes fixed plate and electric putter, electric putter's quantity is two, the middle-end fixed mounting at fixed plate top has step motor, step motor's output fixed mounting has the threaded rod, bearing swing joint is passed through in the middle-end of fixed plate bottom in the upper end of threaded rod, the surperficial threaded connection of threaded rod has the thread bush, the outer fixed surface of thread bush is connected with the diaphragm, the equal fixedly connected with lifter in both ends of fixed plate bottom, the first round pin axle of bottom fixedly connected with of lifter, the surface swing joint of first round pin axle has splint, two the middle-end fixedly connected with third round pin axle of one side is kept away from each other to splint, electric putter's output fixedly connected with second round pin axle, swing joint has the regulation pole between the surface of second round pin axle and the surface of third round pin axle.
Preferably, the lower end of one side of the two lifting rods which are far away from each other is fixedly connected with a fixing support, and one side of the two fixing supports which are far away from each other is fixedly arranged at the middle end of the electric push rod.
Preferably, both ends of the transverse plate are fixedly connected with sliding sleeves, and the surface of the lifting rod is movably connected to the inner surface of the sliding sleeves.
Preferably, the battery box is fixedly connected to the left end of the top of the transverse plate, and a storage battery is fixedly mounted in an inner cavity of the battery box.
Preferably, the both sides of diaphragm all fixedly connected with handrail, the surface cover of handrail is equipped with the lag.
Preferably, the equal fixedly connected with bracing piece in both sides of diaphragm bottom, the bottom fixedly connected with backup pad of bracing piece, the both ends of backup pad bottom all have the brake truckle through bearing swing joint.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a start electric putter extension and can drive second round pin axle and remove downwards, can drive the regulation pole when second round pin axle removes and remove downwards, and make the regulation pole can promote third round pin axle and splint, and make splint can rotate along the surface of first round pin axle on the lifter, the surface up to splint can be with the bottom contact of the inside pipeline under pressure of slot, simultaneously can drive the threaded rod through start-up step motor work and rotate along the internal surface of thread bush on the diaphragm, and make the threaded rod move up along the internal surface of thread bush, the threaded rod removes and drives the fixed plate and upwards remove, the fixed plate removes and drives the lifter, first round pin axle upwards removes with splint, can upwards hold up pipeline under the effect that splint removed from the inside of slot, and reached the effect of adjusting the concatenation height of pipeline under the effect of whole cooperation, realized that this device is convenient for highly adjusting the purpose of the height that splices the pipeline under the effect of whole cooperation, holistic convenient operation is swift, bring very big facility for the concatenation work of pipeline under pressure, because the highly different height of topography is different, cause the required concatenation of pipeline to splice to carry out the operation intensity again the operation of the whole inconvenience of the operation that the required concatenation of pipeline, and the operation efficiency is greatly increased again, the operation efficiency of the whole inconvenient operation of the required concatenation again.
2. The utility model discloses a setting of fixed bolster has reached and has supported fixed purpose to electric putter, through the setting of sliding sleeve, has reached and has carried out spacing purpose between lifter and the diaphragm, through the setting of battery, can provide electric power for whole, through the setting of handrail and lag, convenient to use person supports whole, through the setting of bracing piece, backup pad and brake truckle, has reached and has carried out the purpose that supports to the whole, is convenient for wholly remove simultaneously.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a partial structure of the lifting rod of the present invention;
fig. 3 is the schematic view of the cross plate of the present invention.
In the figure: 1. a transverse plate; 2. a threaded rod; 3. a stepping motor; 4. a fixing plate; 5. a battery; 6. a battery box; 7. a handrail; 8. a support bar; 9. a support plate; 10. braking a caster; 11. a splint; 12. a lifting rod; 13. a first pin shaft; 14. an electric push rod; 15. fixing a bracket; 16. a second pin shaft; 17. adjusting a rod; 18. a third pin shaft; 19. a sliding sleeve; 20. and (4) a threaded sleeve.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a pressure pipeline laying device for town gas engineering, comprising a fixed plate 4 and two electric push rods 14, wherein the number of the electric push rods 14 is two, a stepping motor 3 is fixedly installed at the middle end of the top of the fixed plate 4, a threaded rod 2 is fixedly installed at the output end of the stepping motor 3, the upper end of the threaded rod 2 is movably connected to the middle end of the bottom of the fixed plate 4 through a bearing, a threaded sleeve 20 is connected to the surface of the threaded rod 2 through a thread, a transverse plate 1 is fixedly connected to the outer surface of the threaded sleeve 20, a battery box 6 is fixedly connected to the left end of the top of the transverse plate 1, a storage battery 5 is fixedly installed in the inner cavity of the battery box 6, electric power can be supplied to the whole body through the arrangement of the storage battery 5, handrails 7 are fixedly connected to both sides of the transverse plate 1, a protective sleeve is sleeved on the surface of the handrail 7, the whole body is conveniently supported by a user through the arrangement of the handrails 7 and the protective sleeve, a support rod 8 is fixedly connected to both sides of the bottom of the transverse plate 1, a support plate 9 is fixedly connected to the bottom of the support plate 8, both ends of the support rod 9 and a brake caster 10 are movably connected through the arrangement of the support rod, a support rod 12 is connected to the support rod 14, a lifting support bracket 12 is connected to the inner surface of the support bracket 12 fixed support bracket 12, the purpose of limiting the space between the lifting rod 12 and the transverse plate 1 is achieved, a first pin 13 is fixedly connected to the bottom of the lifting rod 12, a clamping plate 11 is movably connected to the surface of the first pin 13, a third pin 18 is fixedly connected to the middle end of one side, away from each other, of the two clamping plates 11, a second pin 16 is fixedly connected to the output end of the electric push rod 14, an adjusting rod 17 is movably connected between the surface of the second pin 16 and the surface of the third pin 18, the second pin 16 can be driven to move downwards by starting the electric push rod 14 to extend, the adjusting rod 17 can be driven to move downwards while the second pin 16 moves, the adjusting rod 17 can push the third pin 18 and the clamping plates 11, the clamping plates 11 can rotate along the surface of the first pin 13 on the lifting rod 12 until the surface of the clamping plates 11 can be in contact with the bottom of the pressure pipeline in the groove, meanwhile, the step motor 3 is started to work to drive the threaded rod 2 to rotate along the inner surface of the threaded sleeve 20 on the transverse plate 1, the threaded rod 2 is enabled to move upwards along the inner surface of the threaded sleeve 20, the threaded rod 2 moves to drive the fixed plate 4 to move upwards, the fixed plate 4 moves to drive the lifting rod 12, the first pin shaft 13 and the clamping plate 11 to move upwards, the pressure pipeline can be lifted upwards from the inside of the groove under the action of movement of the clamping plate 11, the effect of adjusting the splicing height of the pressure pipeline is achieved, under the action of integral matching, the purpose that the device is convenient to adjust the splicing height of the pressure pipeline is achieved, the whole operation is convenient and fast, great convenience is brought to the splicing work of the pressure pipeline, and the problem that the heights of two sections of pressure pipelines required to be spliced are different due to different terrain heights in the existing butt joint process of the pressure pipelines is solved, often need the manual work to lift up pipeline under pressure in the inside slot and splice again, the operation is inconvenient, and the inefficiency of whole operation, simultaneously very big increase staff intensity of labour's problem.
During the use, can drive second round pin axle 16 and remove downwards through starting electric putter 14 extension, second round pin axle 16 can drive when removing and adjust pole 17 and remove downwards, and make and adjust pole 17 can promote third round pin axle 18 and splint 11, and make splint 11 can rotate along the surface of first round pin axle 13 on lifter 12, can contact with the bottom of the inside pressure pipeline of slot until the surface of splint 11, simultaneously can drive threaded rod 2 through starting step motor 3 work and rotate along the internal surface of thread bush 20 on diaphragm 1, and make threaded rod 2 upwards remove along the internal surface of thread bush 20, threaded rod 2 removes and drives fixed plate 4 and upwards remove, fixed plate 4 removes and drives lifter 12, first round pin axle 13 upwards removes with splint 11, can upwards hold up the pressure pipeline from the inside of slot under the effect that splint 11 removed, and reached the effect of adjusting the concatenation height of pressure pipeline, under the effect of whole complex, realized this device is convenient for the height that the pressure pipeline adjusted swiftly, the operation of whole concatenation is convenient for the very big concatenation work of pipeline brings.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides a town gas engineering's pressure pipeline laying device, includes fixed plate (4) and electric putter (14), its characterized in that: the quantity of electric putter (14) is two, the middle-end fixed mounting at fixed plate (4) top has step motor (3), the output fixed mounting of step motor (3) has threaded rod (2), the upper end of threaded rod (2) passes through bearing swing joint in the middle-end of fixed plate (4) bottom, the surperficial threaded connection of threaded rod (2) has thread bush (20), the outer fixed surface of thread bush (20) is connected with diaphragm (1), the equal fixedly connected with lifter (12) in both ends of fixed plate (4) bottom, the first round pin axle of bottom fixedly connected with (13) of lifter (12), the surperficial swing joint of first round pin axle (13) has splint (11), two the middle-end fixedly connected with third round pin axle (18) of one side is kept away from each other in splint (11), the output fixed connection of electric putter (14) has second round pin axle (16), swing joint has regulation pole (17) between the surface of second round pin axle (16) and the surface of third round pin axle (18).
2. The pressure pipe laying device for town gas engineering according to claim 1, wherein: two lower extreme fixedly connected with fixed bolster (15) of one side are kept away from each other in lifter (12), two one side fixed mounting that fixed bolster (15) kept away from each other is in electric putter (14)'s middle-end.
3. The pressure pipe laying device for town gas engineering according to claim 1, wherein: both ends of the transverse plate (1) are fixedly connected with sliding sleeves (19), and the surfaces of the lifting rods (12) are movably connected to the inner surfaces of the sliding sleeves (19).
4. The pressure pipe laying device for town gas engineering according to claim 1, wherein: the battery box is characterized in that a battery box (6) is fixedly connected to the left end of the top of the transverse plate (1), and a storage battery (5) is fixedly mounted in an inner cavity of the battery box (6).
5. The pressure pipe laying device for town gas engineering according to claim 1, wherein: the handrail is characterized in that handrails (7) are fixedly connected to two sides of the transverse plate (1), and a protective sleeve is sleeved on the surface of each handrail (7).
6. The pressure pipe laying device for town gas engineering according to claim 1, wherein: the all fixedly connected with bracing piece (8) in both sides of diaphragm (1) bottom, the bottom fixedly connected with backup pad (9) of bracing piece (8), the both ends of backup pad (9) bottom all have brake truckle (10) through bearing swing joint.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222361953.3U CN218294706U (en) | 2022-09-06 | 2022-09-06 | Pressure pipeline laying device for town gas engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202222361953.3U CN218294706U (en) | 2022-09-06 | 2022-09-06 | Pressure pipeline laying device for town gas engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN218294706U true CN218294706U (en) | 2023-01-13 |
Family
ID=84813259
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202222361953.3U Active CN218294706U (en) | 2022-09-06 | 2022-09-06 | Pressure pipeline laying device for town gas engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN218294706U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116928442A (en) * | 2023-07-27 | 2023-10-24 | 武汉市燃气集团有限公司 | District gas pipe network buried construction device and construction method |
CN117967871A (en) * | 2024-04-01 | 2024-05-03 | 中建八局第一建设有限公司 | Water supply and drainage pipeline construction device |
-
2022
- 2022-09-06 CN CN202222361953.3U patent/CN218294706U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116928442A (en) * | 2023-07-27 | 2023-10-24 | 武汉市燃气集团有限公司 | District gas pipe network buried construction device and construction method |
CN116928442B (en) * | 2023-07-27 | 2024-02-02 | 武汉市燃气集团有限公司 | District gas pipe network buried construction device and construction method |
CN117967871A (en) * | 2024-04-01 | 2024-05-03 | 中建八局第一建设有限公司 | Water supply and drainage pipeline construction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN218294706U (en) | Pressure pipeline laying device for town gas engineering | |
CN113356675B (en) | Bearing platform type electric tower installation construction system and installation method | |
CN220348245U (en) | Butt joint appurtenance is used in plumbing installation | |
CN214365322U (en) | Pole tower erecting device for electric power construction | |
CN212893794U (en) | Lifting device for overhauling electrical equipment | |
CN209736942U (en) | movable base | |
CN214399305U (en) | Distribution is overhauld with supplementary kinking device | |
CN216844837U (en) | Pipe network positioning device for heating system | |
CN211183222U (en) | Cable support for electric power | |
CN210257325U (en) | Plastic conduit construction welding set | |
CN221370029U (en) | Take-up and pay-off structure for electric power construction | |
CN218377984U (en) | Natural gas long distance pipeline pipe distribution device | |
CN206712352U (en) | A kind of LED productions punck-down block | |
CN214543341U (en) | Device for laying communication pole line suspension wire in long distance | |
CN210238313U (en) | Automatic maintenance device for bridge pier column | |
CN218905225U (en) | Intraductal insulating tube mechanism that wears of cover | |
CN217913763U (en) | Auxiliary supporting equipment for welding pipeline of air compressor station | |
CN218441002U (en) | Connecting and supporting device for petroleum conveying pipeline | |
CN210682863U (en) | Winding device of grounding wire | |
CN212193293U (en) | Optical cable construction is with unwrapping wire platform | |
CN218371376U (en) | A pipeline maintenance device for hydraulic engineering | |
CN221747823U (en) | Threading machine device | |
CN220005788U (en) | Reinforcing bar cuts equipment for construction | |
CN221625495U (en) | Cable processing is with pulling coiling device | |
CN221493554U (en) | Pipeline cleaning device for natural gas transportation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |