CN218293071U - Construction protection fence convenient to mount and dismount - Google Patents

Construction protection fence convenient to mount and dismount Download PDF

Info

Publication number
CN218293071U
CN218293071U CN202222477281.2U CN202222477281U CN218293071U CN 218293071 U CN218293071 U CN 218293071U CN 202222477281 U CN202222477281 U CN 202222477281U CN 218293071 U CN218293071 U CN 218293071U
Authority
CN
China
Prior art keywords
installation
fixedly connected
connecting seat
plate
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202222477281.2U
Other languages
Chinese (zh)
Inventor
金衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202222477281.2U priority Critical patent/CN218293071U/en
Application granted granted Critical
Publication of CN218293071U publication Critical patent/CN218293071U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to a construction is with protection rail field discloses a convenient construction protection rail is dismantled in installation, including the installation slat, the equal fixedly connected with diagonal brace in installation slat rear end both sides, two the diagonal brace rear end all rotates and is connected with and rotates the seat, two rotate the equal fixedly connected with telescopic link of seat lower extreme, two the equal movable sleeve of telescopic link lower extreme is equipped with the support column, two the equal cover in support column upper end outside is equipped with fixed cover, fixed cover lateral wall threaded connection has first locking round pin, the first connecting seat of installation slat front end middle part fixedly connected with, first connecting seat both sides all are provided with the second connecting seat, two the second connecting seat all with installation slat fixed connection, two fence boards of first connecting seat and second connecting seat front end fixedly connected with. The utility model discloses in, this construction rail overall structure reasonable in design makes things convenient for the dismouting, saves the engineering time, effectively reduces the installation degree of difficulty, is worth wideling popularize the use.

Description

Construction protection fence convenient to mount and dismount
Technical Field
The utility model relates to a construction is with protecting rail field, especially relates to a convenient construction protection rail is dismantled in installation.
Background
Municipal works refer to municipal infrastructure construction works, and when the municipal buildings are constructed, fences need to be installed so as to protect the construction range.
At present, the rail that uses mostly at the job site only acts as with simple and easy iron sheet, need fix the stand on the concrete ground during installation, then adopt screw fixed mounting, this kind of mounting means is more loaded down with trivial details, and is difficult to dismantle after the installation, and the rate of reuse is lower, also is inconvenient for highly adjusting the construction rail, and when need not using, is not convenient for install and dismantle the rail.
Therefore, the construction protection fence with convenient installation and disassembly is provided by the technical personnel in the field so as to solve the problems in the background technology.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the convenient construction protection rail is dismantled in an installation that proposes, this construction rail overall structure reasonable in design makes things convenient for the dismouting, saves the engineering time, effectively reduces the installation degree of difficulty, is worth wideling popularize the use.
In order to achieve the above purpose, the utility model provides a following technical scheme:
a construction protection fence convenient to install and disassemble comprises an installation batten, wherein inclined support rods are fixedly connected to two sides of the rear end of the installation batten, rotating seats are rotatably connected to the rear ends of the two inclined support rods, telescopic rods are fixedly connected to the lower ends of the two rotating seats, support columns are movably sleeved at the lower ends of the two telescopic rods, fixing sleeves are sleeved on the outer sides of the upper ends of the two support columns, and the side walls of the fixing sleeves are in threaded connection with first locking pins;
the middle part of the front end of the installation batten is fixedly connected with a first connecting seat, two sides of the first connecting seat are respectively provided with a second connecting seat, the two second connecting seats are respectively and fixedly connected with the installation batten, the front ends of the first connecting seat and the second connecting seats are fixedly connected with two fence plates, and the front ends of the two fence plates are respectively provided with a placing frame;
the middle part of the front end of the fence plate is movably provided with a telescopic plate, the front end of the telescopic plate is provided with a limiting sliding groove, a locking part is arranged inside the limiting sliding groove, the front end of the locking part is in threaded connection with a locking pin, the end part of the telescopic plate on the left side is connected with a first connecting plate, the upper end and the lower end of the first connecting plate are both provided with connecting holes, the end part of the telescopic plate on the right side is connected with a second connecting plate, the upper end and the lower end of the second connecting plate are both connected with connecting columns, and connecting clamping grooves are formed inside the connecting columns;
through the technical scheme, the integrated configuration of concatenation formula is set to, first connecting plate and the second connecting plate through both sides, the extension is spliced to the rail to the convenience, thereby enclose the fender to the construction area, and this installation dismantlement structure conveniently uses, through the movable dop of connecting hole and lift-draw formula, conveniently install the rail, dismantle, make the reuse rate of this rail higher, lower extreme at the rail sets up telescopic support column and telescopic link extending structure, can conveniently carry out the regulation of rail height, thereby adapt to different user demands, and rotate in the upper end of bottom sprag frame and connect the installation slat, carry out joint support with the diagonal brace, can adjust the angle of rail, further expand the scope of using, set up the telescopic expansion plate at the rail front end, the effective usable floor who extends the rail through the flexible of expansion plate, further play the effect of extension area.
Furthermore, the bottom of the support column is fixedly connected with an anti-skidding foot seat;
through above-mentioned technical scheme, the stability that antiskid foot stool can make the rail is better, avoids appearing gliding phenomenon.
Furthermore, a second locking pin is connected to the upper end of the rotating seat in a threaded manner;
through above-mentioned technical scheme, the angle that the installation slat can be adjusted to the second fitting pin to lock.
Furthermore, the four corners of the front end of the installation batten are provided with first installation holes, the first connecting seat is provided with second installation holes, and the second connecting seat is provided with third installation holes;
through above-mentioned technical scheme, through the setting of first mounting hole, second mounting hole and third mounting hole, can be with fence board fixed mounting at the front end of installation slat, and then do benefit to and fix.
Furthermore, an auxiliary illuminating lamp is fixedly arranged at the lower end of the front side of the fence plate;
through above-mentioned technical scheme, supplementary lighting lamp can carry out supplementary illumination when using night, avoids appearing the condition that can't use night.
Furthermore, a reflective warning plate is arranged inside the placing frame;
through above-mentioned technical scheme, the effect of safety warning can be played to the board of warning of reflecting light to the safety of better assurance construction.
Furthermore, placing grooves are formed in the upper end and the lower end of the first connecting plate, limiting plates are slidably arranged in the placing grooves, the front ends of the limiting plates are connected with movable clamping heads, and the rear ends of the limiting plates are connected with lifting heads;
through above-mentioned technical scheme, through inside inserting the spliced pole into the connecting hole to insert the inside of establishing in connecting slot by the activity dop, thereby connect the joint between first connecting plate and the second connecting plate, realize the concatenation to the fencing board.
Furthermore, a tension spring is sleeved on the outer wall of the lifting head, and the end part of the tension spring is fixedly connected with the limiting plate;
through the technical scheme, the movable clamping head is inserted into the connecting clamping groove through the tension spring, and then the clamping and fixing of the movable clamping head are realized.
The utility model discloses following beneficial effect has:
1. the utility model provides a convenient construction protection rail is dismantled in installation, this protection rail is through setting up the integrated configuration of concatenation formula, through the first connecting plate and the second connecting plate of both sides, conveniently splices the extension to the rail to enclose the fender to construction area, and this installation dismantlement structure conveniently uses, through the movable dop of connecting hole and lift-draw formula, conveniently installs the rail, dismantles, makes the reuse rate of this rail higher, and it is more convenient to use.
2. The utility model provides a convenient construction protection rail is dismantled in installation sets up telescopic support column and telescopic link extending structure through the lower extreme at the rail, can conveniently carry out the regulation of rail height to adapt to different user demands, and rotate in the upper end of bottom sprag frame and connect installation slat, carry out joint support with the diagonal brace, can adjust the angle of rail, further expand the scope of using, the result of use is better.
3. The utility model provides a convenient construction protection rail is dismantled in installation through setting up the telescopic expansion plate at rail board front end, expands the effective usable floor area of rail through the flexible of expansion plate, further plays the effect of extension area to this construction rail overall structure reasonable in design makes things convenient for the dismouting, saves engineering time, effectively reduces the installation degree of difficulty, is worth wideling popularize the use.
4. The utility model provides a pair of convenient construction protection rail is dismantled in installation places the frame through the front end setting at the rail board to setting up reflection of light warning board in the inside of placing the frame, can playing safety warning's effect, thereby the safety of better assurance construction, the supplementary light of setting can assist the illumination when using night, avoids appearing the condition that can't use night.
Drawings
Fig. 1 is a schematic diagram of splicing a construction protective fence with convenient assembly and disassembly according to the present invention;
fig. 2 is a schematic structural view of a bottom supporting frame of a construction protection fence with convenient assembly and disassembly according to the present invention;
fig. 3 is an axial view of a construction protection fence with convenient assembly and disassembly according to the present invention;
fig. 4 is the utility model provides an installation dismantles spliced pole and first connecting plate joint schematic diagram of convenient construction protection rail.
Illustration of the drawings:
1. a support pillar; 2. an anti-slip foot seat; 3. a telescopic rod; 4. fixing a sleeve; 5. a first locking pin; 6. rotating the base; 7. a diagonal brace; 8. a second locking pin; 9. installing a batten; 10. a first mounting hole; 11. a first connecting seat; 12. a second connecting seat; 13. a second mounting hole; 14. a third mounting hole; 15. a fencing board; 16. placing a frame; 17. a retractable plate; 18. a limiting chute; 19. a first connecting plate; 20. connecting holes; 21. an auxiliary lighting lamp; 22. a locking member; 23. locking the pin; 24. a second connecting plate; 25. connecting columns; 26. a connecting clamping groove; 27. a light reflecting warning panel; 28. a placement groove; 29. a limiting plate; 30. a movable chuck; 31. lifting the pull head; 32. a tension spring.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative efforts all belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides an embodiment: a construction protection fence convenient to mount and dismount comprises a mounting batten 9, wherein inclined support rods 7 are fixedly connected to two sides of the rear end of the mounting batten 9, rotating seats 6 are rotatably connected to the rear ends of the two inclined support rods 7, telescopic rods 3 are fixedly connected to the lower ends of the two rotating seats 6, the lower ends of the two telescopic rods 3 are movably sleeved with support columns 1, fixed sleeves 4 are sleeved on the outer sides of the upper ends of the two support columns 1, and the side walls of the fixed sleeves 4 are in threaded connection with first locking pins 5;
the middle part of the front end of the installation slat 9 is fixedly connected with a first connecting seat 11, two sides of the first connecting seat 11 are respectively provided with a second connecting seat 12, the two second connecting seats 12 are respectively and fixedly connected with the installation slat 9, the front ends of the first connecting seat 11 and the second connecting seats 12 are fixedly connected with two fence plates 15, and the front ends of the two fence plates 15 are respectively provided with a placing frame 16;
the middle part of the front end of the fence plate 15 is movably provided with a telescopic plate 17, the front end of the telescopic plate 17 is provided with a limiting sliding groove 18, a locking part 22 is arranged inside the limiting sliding groove 18, the front end of the locking part 22 is in threaded connection with a locking pin 23, the end part of the left telescopic plate 17 is connected with a first connecting plate 19, the upper end and the lower end of the first connecting plate 19 are both provided with connecting holes 20, the end part of the right telescopic plate 17 is connected with a second connecting plate 24, the upper end and the lower end of the second connecting plate 24 are both connected with a connecting column 25, and a connecting clamping groove 26 is formed inside the connecting column 25;
set to the integrated configuration of concatenation formula, first connecting plate 19 and second connecting plate 24 through both sides, the extension is spliced to the rail to the convenience, thereby enclose the fender to the construction region, and this installation dismantlement structure conveniently uses, activity dop 30 through connecting hole 20 and lift-draw formula, conveniently install the rail, dismantle, make the reuse rate of this rail higher, lower extreme at the rail sets up telescopic support column 1 and 3 extending structure of telescopic link, can conveniently carry out the regulation of rail height, thereby adapt to different user demands, and rotate at the upper end of bottom sprag frame and connect installation slat 9, carry out joint support with diagonal brace 7, can adjust the angle of rail, further expand the scope of using, set up telescopic expansion plate 17 at fence 15 front end, expand the effective usable floor area of rail through expansion plate 17's flexible, further play the effect of extension area.
The bottom of the supporting column 1 is fixedly connected with an anti-skid foot seat 2, the anti-skid foot seat 2 can ensure that the stability of the fence is better and avoid the sliding phenomenon, the upper end of the rotating seat 6 is in threaded connection with a second locking pin 8, the second locking pin 8 can adjust the angle of the mounting strip plate 9 and lock the angle, the four corners of the front end of the mounting strip plate 9 are respectively provided with a first mounting hole 10, the first connecting seat 11 is provided with a second mounting hole 13, the second connecting seat 12 is provided with a third mounting hole 14, the fence plate 15 can be fixedly arranged at the front end of the mounting strip plate 9 through the arrangement of the first mounting hole 10, the second mounting hole 13 and the third mounting hole 14, so as to be beneficial to fixing, the lower end of the front side of the fence plate 15 is fixedly provided with an auxiliary illuminating lamp 21, the auxiliary illuminating lamp 21 can perform auxiliary illumination when being used at night, and avoid the condition that the fence plate cannot be used at night, place the inside reflection of light warning board 27 that is provided with of frame 16, reflection of light warning board 27 can play safety warning's effect, thereby the safety of better assurance construction, standing groove 28 has all been seted up to first connecting plate 19 upper and lower end inside, the inside slip of standing groove 28 is provided with limiting plate 29, limiting plate 29 is connected with movable dop 30 by the front end, limiting plate 29 is connected with lifting head 31 by the rear end, through inserting spliced pole 25 inside connecting hole 20, and insert the inside of establishing at connecting slot 26 by movable dop 30, thereby connect the joint between first connecting plate 19 and the second connecting plate 24, realize the concatenation to rail board 15, lifting head 31 outer wall cover is equipped with tension spring 32, tension spring 32 tip and limiting plate 29 fixed connection, make movable dop 30 insert the inside of connecting slot 26 through tension spring 32, and then realize that its joint is fixed.
The working principle is as follows: when this convenient construction protection rail is dismantled in installation uses, first connecting plate 19 and second connecting plate 24 through both sides, the extension is spliced to the rail to the convenience, thereby enclose the fender to the construction region, and this installation dismantlement structure conveniently uses, activity dop 30 through connecting hole 20 and lift-draw formula, conveniently install the rail, dismantle, make the reuse rate of this rail higher, lower extreme at the rail sets up telescopic support column 1 and telescopic link 3 extending structure, can conveniently carry out the regulation of rail height, thereby adapt to different user demands, and rotate the connection installation slat 9 in the upper end of bottom sprag frame, carry out the joint support with diagonal brace 7, can adjust the angle of rail, further expand the scope of using, set up telescopic expansion plate 17 at rail plate 15 front end, expand the effective usable floor area of rail through expansion plate 17's flexible, further play the effect of extension area, frame 16 is placed in rail plate 15's front end setting, and set up reflection of light warning board 27 in the inside of placing frame 16, can play the effect of safety warning, thereby better assurance safety that the construction can set up, the light 21 that can's supplementary illumination condition can's night of avoiding using.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (8)

1. The utility model provides a convenient construction protection rail is dismantled in installation, includes installation slat (9), its characterized in that: inclined support rods (7) are fixedly connected to two sides of the rear end of the installation batten (9), the rear ends of the two inclined support rods (7) are rotatably connected with rotating seats (6), telescopic rods (3) are fixedly connected to the lower ends of the two rotating seats (6), the lower ends of the two telescopic rods (3) are movably sleeved with support columns (1), fixed sleeves (4) are sleeved on the outer sides of the upper ends of the two support columns (1), and first locking pins (5) are in threaded connection with the side walls of the fixed sleeves (4);
the middle part of the front end of the installation batten (9) is fixedly connected with a first connecting seat (11), two sides of the first connecting seat (11) are respectively provided with a second connecting seat (12), two second connecting seats (12) are respectively and fixedly connected with the installation batten (9), the front ends of the first connecting seat (11) and the second connecting seats (12) are fixedly connected with two fence plates (15), and the front ends of the two fence plates (15) are respectively provided with a placing frame (16);
fence board (15) front end middle part activity is provided with expansion plate (17), spacing spout (18) have been seted up to expansion plate (17) front end, spacing spout (18) inside is provided with retaining member (22), retaining member (22) front end threaded connection has locking pin (23), and is left expansion plate (17) end connection has first connecting plate (19), connecting hole (20) have all been seted up to lower extreme on first connecting plate (19), and the right side expansion plate (17) end connection has second connecting plate (24), the lower extreme all is connected with spliced pole (25) on second connecting plate (24), connecting channel groove (26) have been seted up to spliced pole (25) inside.
2. The construction protective fence convenient to mount and dismount as claimed in claim 1, wherein: the bottom of the support column (1) is fixedly connected with an anti-skidding foot seat (2).
3. The construction protection fence convenient to mount and dismount as claimed in claim 1, wherein: the upper end of the rotating seat (6) is in threaded connection with a second locking pin (8).
4. The construction protective fence convenient to mount and dismount as claimed in claim 1, wherein: first mounting hole (10) have all been seted up to installation slat (9) front end four corners department, second mounting hole (13) have been seted up on first connecting seat (11), third mounting hole (14) have been seted up on second connecting seat (12).
5. The construction protective fence convenient to mount and dismount as claimed in claim 1, wherein: and an auxiliary illuminating lamp (21) is fixedly arranged at the lower end of the front side of the fence plate (15).
6. The construction protection fence convenient to mount and dismount as claimed in claim 1, wherein: a reflective warning board (27) is arranged inside the placing frame (16).
7. The construction protection fence convenient to mount and dismount as claimed in claim 1, wherein: the improved lifting device is characterized in that a placing groove (28) is formed in the upper end and the lower end of the first connecting plate (19), a limiting plate (29) is arranged in the placing groove (28) in a sliding mode, the front end of the limiting plate (29) is connected with a movable clamping head (30), and the rear end of the limiting plate (29) is connected with a lifting head (31).
8. The construction protection fence convenient to mount and dismount as claimed in claim 7, wherein: the outer wall of the lifting head (31) is sleeved with a tension spring (32), and the end part of the tension spring (32) is fixedly connected with the limiting plate (29).
CN202222477281.2U 2022-09-19 2022-09-19 Construction protection fence convenient to mount and dismount Active CN218293071U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202222477281.2U CN218293071U (en) 2022-09-19 2022-09-19 Construction protection fence convenient to mount and dismount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202222477281.2U CN218293071U (en) 2022-09-19 2022-09-19 Construction protection fence convenient to mount and dismount

Publications (1)

Publication Number Publication Date
CN218293071U true CN218293071U (en) 2023-01-13

Family

ID=84816709

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202222477281.2U Active CN218293071U (en) 2022-09-19 2022-09-19 Construction protection fence convenient to mount and dismount

Country Status (1)

Country Link
CN (1) CN218293071U (en)

Similar Documents

Publication Publication Date Title
US11591820B2 (en) Sunshade tent
CN218293071U (en) Construction protection fence convenient to mount and dismount
CN210482960U (en) Simple, safe and convenient movable working platform
CN213234518U (en) Security protection device for construction
CN210003009U (en) construction adjustable rail guard is built in room
CN214737663U (en) Folding guardrail
CN217326433U (en) Component combination for diversified assembly of building scaffold
CN215717754U (en) Railing with adjustable height
CN220869006U (en) Protective fence
CN210152410U (en) Stereotyping protective barrier suitable for soft foundation rapid construction
CN219952919U (en) Construction protective fence
CN214996588U (en) High safety device for building demolition construction
CN220059160U (en) Pavement construction safety device for municipal green building
CN216277301U (en) Building construction safety warning rail with function of reflecting light night
CN217630946U (en) Building railing capable of adjusting fixed angle at will
CN219711214U (en) Safety protection device
CN219281199U (en) Movable scaffold structure
CN218715739U (en) But reuse's assembled protector
CN217151540U (en) Guardrail for construction
CN215213306U (en) Crawling ladder for electric power construction
CN214658856U (en) Supporting device
CN220504718U (en) Building engineering protector
CN214363126U (en) Guardrail is supplementary to be demolishd device
CN220478013U (en) Supporting device for supporting horizontal bar on door and indoor body building device
CN218061474U (en) Concrete structure construction strutting arrangement

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant